25R1303 P614 Note16.pdf

PDF 364 KB Posted

Attached to
FY24 MCON P-614 JOINT CONSOLIDATED COMMUNICATIONS CENTER, US JOINT REGION MARIANAS, ANDERSEN, GUAM
Solicitation number
N6274225R1303
Issued by

About this file

This document is a Pre-Proposal Questions & Answers (Notice No. 16) for RFP N62742-25-R-1303, related to the FY24 MCON Project P-614 Joint Consolidated Communications Center at Joint Region Marianas Andersen, Guam. The notice addresses three specific technical questions deferred from a previous notice: 1) clarification on the type of raised access flooring to be used (Cementitious-Filled Formed Steel Composite Panels), 2) request for seismic separation joint details for ceilings over 2,500 SF, and 3) inquiries about finish schedules for exterior structures.

The document indicates that the specification for access flooring (Spec 09 69 13) and Drawing Sheet A-511A will be revised in a forthcoming amendment to provide the requested details. For the exterior structures like the Electrical Yard, Fuel Tank Building, Mechanical Enclosure, Switchgear enclosure, and Trash Enclosure, the Navy clarified these are not intended to be in the Room Finish Schedule but will be included in an Exterior Finish Schedule on Sheet A-602A. These revisions will be made in a future amendment to the solicitation.

View the file

Other files

File Type Posted
25R1303 P614 Note25.pdf PDF
01_25R1303_AMD0017.pdf PDF
02_25R1303_ AMD 0017 Drawings.pdf PDF
25R1303 P614 Note22.pdf PDF
03_25R1303_01 91 19_AMD0015.pdf PDF
01_25R1303_AMD0015.pdf PDF
04_25R1303_08 91 00_AMD0015.pdf PDF
02_25R1303_01 91 00.15_AMD0015.pdf PDF
25R1303 P614 Note 21.pdf PDF
02_25R1303_09 69 13_AMD0013.pdf PDF
03_25R1303_26 33 53_AMD0013.pdf PDF
01_25R1303_AMD0013.pdf PDF
04_25R1303_AMD0013 DRAWINGS.pdf PDF
25R1303 P614 Note 18.pdf PDF
02_25R1303_05 50 13_AMD0011.pdf PDF
03_25R1303_05 51 33_AMD0011.pdf PDF
06_25R1303_DRAWINGS_AMD0011.pdf PDF
04_25R1303_09 29 00_AMD0011.pdf PDF
05_25R1303_09 84 20_AMD0011.pdf PDF
01_25R1303_AMD0011.pdf PDF
25R1303 P614 Note14.pdf PDF
25R1303 P614 Note12.pdf PDF
05_25R1303_09 30 10_Amd0008.pdf PDF
03_25R1303_AMD 0010 DRAWINGS.pdf PDF
04_25R1303_AMD 0009_1737021_DRAWINGS.pdf PDF
06_25R1303_10 11 00_Amd0008.pdf PDF
12_25R1303_26 24 13_Amd0008.pdf PDF
03_25R1303_07 60 00_Amd0008.pdf PDF
02_25R1303_01 57 19.03 20_Amd0008.pdf PDF
11_25R1303_26 20 00_Amd0008.pdf PDF
09_25R1303_10 71 13.13_Amd0008.pdf PDF
08_25R1303_10 51 13_Amd0008.pdf PDF
01_25R1303_AMD0010.pdf PDF
02_25R1303_02 61 13_AMD0009.pdf PDF
07_25R1303_10 28 13_Amd0008.pdf PDF
10_25R1303_26 11 16_Amd0008.pdf PDF
01_25R1303_Amd0008.pdf PDF
01_25R1303_AMD0009.pdf PDF
03_25R1303_32 12 13_AMD0009.pdf PDF
04_25R1303_08 41 19_Amd0008.pdf PDF
13_25R1303_AMD 0008_1737021_DRAWINGS.pdf PDF
02_25R1303_01 57 19_AMD0010.pdf PDF
25R1303 P614 Note 10.pdf PDF
25R1303 P614 Note 8.pdf PDF
01_25R1303_Amd0006.pdf PDF
02_Signed AMD 0006_1737021_ARCH.pdf PDF
25R1303 P614 Note 6.pdf PDF
04_SIGNED Amd0005_1737021_ARCH.pdf PDF
01_25R1303 _Amd0005.pdf PDF
03_10 44 16_Amd0005.pdf PDF
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

RFP N62742-25-R-1303

Notice No. 16

Notice No. 16 08 May 2025

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-25-R-1303

FY24 MCON PROJECT P-614 JOINT CONSOLIDATED COMMUNICATIONS

CENTER JOINT REGION MARIANAS ANDERSEN, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

RESPONSES DEFERRED FROM NOTICE NO. 14 DATED 06 MAY 2025

250. In Specification 09 69 13 Rigid Grid Access Flooring, there are two varieties of access flooring, the Hollow Formed Steel (section 2.2.3.1) and Cementitious-Filled Formed Steel (Composite Panels) (section 2.3.3.2). Please clarify what kind of raised access flooring will be used.

ANSWER: Use Cementitious-Filled Form Steel (Composite Panels). Spec 09 69 13 will be revised in forthcoming amendment

251. As per Drawing Sheet No A-511A, Ceiling Details, Seismic Separation Joint is required for a ceiling with area greater than 2500 SF, however there are no details provided.

Please provide details for seismic separation joints.

ANSWER: Sheet A-511A will be revised in forthcoming amendment to include seismic separation joint detail.

253. The following buildings/enclosures are not included in the Room Finish Schedule.

Please provide Wall, Floor, and other required finishes for this building.

1. Electrical Yard

2. Fuel Tank Building

3. Mechanical Enclosure

4. Switchgear enclosure

5. Trash Enclosure

ANSWER: These are exterior structures and not intended to be in the Room Finish Schedule.

Will clarify and include in Exterior Finish Schedule. Sheet A-602A will be revised in forthcoming amendment.

File details come from the government source that posted it. Updated .