04_25R1303_AMD0013 DRAWINGS.pdf

PDF 2 MB Posted

Attached to
FY24 MCON P-614 JOINT CONSOLIDATED COMMUNICATIONS CENTER, US JOINT REGION MARIANAS, ANDERSEN, GUAM
Solicitation number
N6274225R1303
Issued by

About this file

The provided documents are architectural reflected ceiling plan and room finish schedule drawings for the FY24 MCON Project P-614 Joint Consolidated Communications Center at Andersen Air Force Base, Guam. The drawings detail the first and second floor ceiling configurations, including specific room finishes, ceiling materials, lighting fixtures, and mechanical elements across multiple rooms such as offices, corridors, conference rooms, technical spaces, and support areas.

The comprehensive drawing set includes detailed specifications for materials like acoustic ceiling tiles, exposed ceilings, gypsum board, and various paint finishes. Room-specific details are meticulously documented, with ceiling heights ranging from 8'-0" to 11'-0", and multiple rooms designated for raised access flooring. The project is associated with a large-scale communications facility consolidation for the 36th Communications Squadron, with an estimated project value between $100-250 million and a projected contract completion period of 1,286 calendar days.

View the file

Other files

File Type Posted
25R1303 P614 Note25.pdf PDF
01_25R1303_AMD0017.pdf PDF
02_25R1303_ AMD 0017 Drawings.pdf PDF
25R1303 P614 Note22.pdf PDF
03_25R1303_01 91 19_AMD0015.pdf PDF
01_25R1303_AMD0015.pdf PDF
04_25R1303_08 91 00_AMD0015.pdf PDF
02_25R1303_01 91 00.15_AMD0015.pdf PDF
25R1303 P614 Note 21.pdf PDF
02_25R1303_09 69 13_AMD0013.pdf PDF
03_25R1303_26 33 53_AMD0013.pdf PDF
01_25R1303_AMD0013.pdf PDF
25R1303 P614 Note 18.pdf PDF
25R1303 P614 Note16.pdf PDF
02_25R1303_05 50 13_AMD0011.pdf PDF
03_25R1303_05 51 33_AMD0011.pdf PDF
06_25R1303_DRAWINGS_AMD0011.pdf PDF
04_25R1303_09 29 00_AMD0011.pdf PDF
05_25R1303_09 84 20_AMD0011.pdf PDF
01_25R1303_AMD0011.pdf PDF
25R1303 P614 Note14.pdf PDF
25R1303 P614 Note12.pdf PDF
05_25R1303_09 30 10_Amd0008.pdf PDF
03_25R1303_AMD 0010 DRAWINGS.pdf PDF
04_25R1303_AMD 0009_1737021_DRAWINGS.pdf PDF
06_25R1303_10 11 00_Amd0008.pdf PDF
12_25R1303_26 24 13_Amd0008.pdf PDF
03_25R1303_07 60 00_Amd0008.pdf PDF
02_25R1303_01 57 19.03 20_Amd0008.pdf PDF
11_25R1303_26 20 00_Amd0008.pdf PDF
09_25R1303_10 71 13.13_Amd0008.pdf PDF
08_25R1303_10 51 13_Amd0008.pdf PDF
01_25R1303_AMD0010.pdf PDF
02_25R1303_02 61 13_AMD0009.pdf PDF
07_25R1303_10 28 13_Amd0008.pdf PDF
10_25R1303_26 11 16_Amd0008.pdf PDF
01_25R1303_Amd0008.pdf PDF
01_25R1303_AMD0009.pdf PDF
03_25R1303_32 12 13_AMD0009.pdf PDF
04_25R1303_08 41 19_Amd0008.pdf PDF
13_25R1303_AMD 0008_1737021_DRAWINGS.pdf PDF
02_25R1303_01 57 19_AMD0010.pdf PDF
25R1303 P614 Note 10.pdf PDF
25R1303 P614 Note 8.pdf PDF
01_25R1303_Amd0006.pdf PDF
02_Signed AMD 0006_1737021_ARCH.pdf PDF
25R1303 P614 Note 6.pdf PDF
04_SIGNED Amd0005_1737021_ARCH.pdf PDF
01_25R1303 _Amd0005.pdf PDF
03_10 44 16_Amd0005.pdf PDF
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

5 6 7 8

G

F

E

30'-0" 10'-0" 30'-0"

'-0

'-0

'-5

'-5

70'-0"

FLIGHT

OPERATIONS

OFFICE

CORRIDOR 3

111 RESOURCES FLIGHT

VTR

CONFERENCE RM

OFFICE

WEATHER

VEST

CORRIDOR 1

BLIND VENDOR

WING CYBERSECURITY

MULTIPURPOSE/TRAINING RM

BREAK RM

LAC RM

CORRIDOR 5

ELEV

WOMENS

CORRIDOR 4

CORRIDOR 2

COMSEC VAULT

MENS

JAN

STAIR 1

PLUMBING ROOM

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

MATCHLINE SEE SHEET A-126A

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

EXP

9'-0" 9'-0"

9'-0"

9'-0" 9'-0"

9'-0"

9'-0"

9'-0"

9'-0"

9'-0" 9'-0"

9'-0"

9'-0"

8'-0" 9'-0"

EXP

8'-0"

9'-0"

9'-0" 9'-0" 6'-0" 6'-0" 4'-6 1/2" 2'-1 1/4"

7'-7 3/4" 5'-6 1/2"

4'-3 1/2"

2'-2 1/2" 6'-0" 6'-0" 4'-6 1/2" 2'-1 1/4"

4' -3

/4

4'

-1

/2

1'-10" 4'-0 3/4" 3'-6 1/2"

5' -7

/2

5'

-1

1/ 2"

1'-10 1/2"

E Q

E Q

7'-7 3/4" 5'-6 1/2"

1'-5 1/4" 6'-3" 2'-1 1/2"

3' -3

/2

2'

-1

/2

6' -1

/4

4'

-7

CONT 3 5/8" TOP

TRACK FROM

WALL TO WALL

CONT 3 5/8" TOP

TRACK FROM

WALL TO WALL

2X2 ACOUSTIC CEILING TILE

EXPOSED CEILING

GYPSUM BOARD

SYMBOL

EMERGENCY LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EXIT SIGN. REFER TO ELECTRICAL DRAWINGS.

CEILING SUPPLY DIFFUSER. REFER TO MECHANICAL DRAWINGS.

CEILING RETURN. REFER TO MECHANICAL DRAWINGS.

REFLECTED CEILING PLAN LEGEND

DESCRIPTION

CONCRETE WALL

LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EMERGENCY LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

PLAN

NORTH

A1

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

-6

N A

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

KEY PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

NTS

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/8

/2

:5

:0

A

M

A-122A

P A

R T

IA

L

F

IR

S T

F

LO

O R

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

FL DA DK

17332723

KYM

3/16" = 1'-0"A1

FIRST FLOOR REFLECTED CEILING PLAN -1

3/16" = 1' - 0" 0 5' 10' 20'

1. DAMAGED CONCRETE FROM ANCHORING SUPPORT WIRES FOR CEILING GRIDS MUST

BE REPAIRED.

INTEGRAL CONC GUTTER

PAINT UNDERSIDE OF CONC

OVERHANG AND BEAM

/2

1/

R

E V

IS

E

D A

C O

U S

T

IC

C E

IL

IN

G T

IL

E

S

IZ

E

05/12/2025

D K

/12 /2

R E

V

IS

E D

C E

IL

IN

G H

E

IG

H T

D K

EXPIRES: 4/30/26

4 5 6 7 8

E

D

C

B

A

30'-0" 30'-0" 10'-0" 30'-0"

'-0

'-8

'-0

'-0

100'-0"

'-8

STORAGE/LOADING/RECEIVING/ LAYDOWN/IT STAGING

TELEPHONY WORKSHOP

TR RM

CORRIDOR 5

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

MATCHLINE SEE SHEET A-123A

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

9'-0"

11'-0"

EXP

5'-5 1/4" 14'-9 3/4" 14'-9 3/4" 14'-9 3/4" 14'-9 3/4" 5'-5 1/4"

9'-9 3/4" 14'-9 3/4" 5'-4 3/4"

L104 L103

L115 L116

4'-0 1/4" 1'-6" 1'-6" 6'-5 1/4"

4'-3" 2'-6" 2'-0" 6'-7 1/4"

8' -7

/4

9'

-0

9' -0

9'

-0

9' -0

4' -8

/2

9'

-0

8' -8

/2

9'

-3

/2

3' -1

/4

5'

-0

2' -5

2'

-6 " 7'-4" 7'-4" 3'-2"

3'-3 1/4"

2X2 ACOUSTIC CEILING TILE

EXPOSED CEILING

GYPSUM BOARD

SYMBOL

EMERGENCY LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EXIT SIGN. REFER TO ELECTRICAL DRAWINGS.

CEILING SUPPLY DIFFUSER. REFER TO MECHANICAL DRAWINGS.

CEILING RETURN. REFER TO MECHANICAL DRAWINGS.

REFLECTED CEILING PLAN LEGEND

DESCRIPTION

CONCRETE WALL

LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EMERGENCY LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

PLAN

NORTH

A4

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

KEY PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

NTS

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/8

/2

:5

:2

A

M

A-125A

P A

R T

IA

L

F

IR

S T

F

LO

O R

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

FL DA DK

17332726

KYM

3/16" = 1'-0"A1

FIRST FLOOR REFLECTED CEILING PLAN - 4

3/16" = 1' - 0" 0 5' 10' 20'

/2

1/

R

E V

IS

E

D A

C O

U S

T

IC

C E

IL

IN

G T

IL

E

S

IZ

E

D K

05/12/2025

/12

/2

R

E V

IS

E

D C

E

IL

IN

G

H E

IG

H

T D

K

9 10 11 12

E

D

C

B

A

30'-0" 30'-0" 30'-11"

'-0

'-8

'-0

'-0

90'-11"

'-8

ELEC

MECHANICAL

WOMENS LOCKER

MENS LOCKER

OFFICE

CORRIDOR 7

OFFICE

INFORMATION TECHNOLOGY MAINTENANCE AND REPAIR CENTER

STORAGE/LOADING/RECEIVING/ LAYDOWN/IT STAGING

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

MATCHLINE SEE SHEET A-128A

11'-0"

9'-0"

9'-0"

9'-0"

9'-0"

8'-0"

8'-0"

EXP

EXP

1'-8 3/8" 3'-11 3/8" 5'-0 1/4" 4'-11 1/4" 4'-1 1/8" 1'-7 5/8"

13'-1 1/4" 13'-1 1/4" 7'-5 1/2"

'-1

1/

2"

1' -6

/8

4' -1

/2

4' -1

/4

5'-7 1/4"

3' -1

1/

4"

3' -1

1/

4"

6'-9 1/4" 6'-1" 7'-0" 7'-0" 7'-8 1/4" 3'-7"

3' -3

/4

9' -3

'-1

9' -1

1/

4" 9'

-4

/4

4' -9

/4

4'

-1

1/ 2"

7'-4 1/4" 7'-3 1/2"

7' -8

/4

5'-2 1/2" 4'-10 1/4" 4'-7 3/4" 3'-7"

'-2

/4

'-9

/4

9' -0

8'

-8

/2

9' -3

/2

8'

-7

/4

9' -0

9'

-0

9' -0

5'-0" 4'-1 1/4"

7'-0" 2'-10"

13'-4 1/2"

MENS

WOMENS

CONT 6" TOP

TRACK FROM

WALL TO WALL

2X2 ACOUSTIC CEILING TILE

EXPOSED CEILING

GYPSUM BOARD

SYMBOL

EMERGENCY LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EXIT SIGN. REFER TO ELECTRICAL DRAWINGS.

CEILING SUPPLY DIFFUSER. REFER TO MECHANICAL DRAWINGS.

CEILING RETURN. REFER TO MECHANICAL DRAWINGS.

REFLECTED CEILING PLAN LEGEND

DESCRIPTION

CONCRETE WALL

LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EMERGENCY LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

PLAN

NORTH

A3

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

KEY PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

NTS

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/8

/2

:5

:0

A

M

A-126A

P A

R T

IA

L

F

IR

S T

F

LO

O R

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

FL DA DK

17332727

KYM

3/16" = 1'-0"A1

FIRST FLOOR REFLECTED CEILING PLAN - 5

3/16" = 1' - 0" 0 5' 10' 20'

/2

1/

R

E V

IS

E

D A

C O

U S

T

IC

C E

IL

IN

G T

IL

E

S

IZ

E

05/12/2025

D K

/12 /2

R E

V

IS

E D

C E

IL

IN

G H

E

IG

H T

D K

H

5 6 7 8

G

F

E

30'-0" 10'-0" 30'-0"

70'-0"

CONFERENCE

VTR

CUST/BLDG SUPPLY

CORRIDOR 8

STAIR 1

JAN

ELEV

CORRDIOR 11

CORRIDOR 10

MENS

WOMENS

PLUMBING ROOM

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

M A

T C

H

LI

N E

S E

E S

H E

E T

A -1

A

MATCHLINE SEE SHEET A-132A

9'-0"

9'-0"

9'-0"

8'-0"

EXP

8'-0"

9'-0"

9'-0"

EXP

EXP

6'-0" 6'-0" 6'-8 5/8" 2'-0 3/8"

6'-0" 6'-0" 6'-8 5/8" 2'-0 3/8"

2'-1 1/4" 3'-6" 4'-0" 1'-6 3/4"

4' -1

3/

4"

3'-5" 6'-7 3/4" 6'-7 3/4" 3'-5"

5'-8 1/2" 4'-3 1/2"

5' -7

/2

4'-5" 4'-3"

4' -9

/2

5' -7

3' -0

2'

-6

/2

2'-0 1/4"

3' -0

L213 L214

6 1/4" 2'-6" 10'-0" 2'-0"

CONT 3 5/8" TOP

TRACK FROM

WALL TO WALL

CONT 3 5/8" TOP

TRACK FROM

WALL TO WALL

2X2 ACOUSTIC CEILING TILE

EXPOSED CEILING

GYPSUM BOARD

SYMBOL

EMERGENCY LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EXIT SIGN. REFER TO ELECTRICAL DRAWINGS.

CEILING SUPPLY DIFFUSER. REFER TO MECHANICAL DRAWINGS.

CEILING RETURN. REFER TO MECHANICAL DRAWINGS.

REFLECTED CEILING PLAN LEGEND

DESCRIPTION

CONCRETE WALL

LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

EMERGENCY LINEAR LIGHT FIXTURE. REFER TO ELECTRICAL DRAWINGS.

PLAN

NORTH

A1

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

KEY PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

NTS

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/8

/2

:5

:1

A

M

A-128A

P A

R T

IA

L

S E

C O

N D

F

LO

O R

R E

F

LE

C T

E D

C E

IL

IN

G P

LA

N

FL DA DK

17332729

KYM

3/16" = 1'-0"A1

SECOND FLOOR REFLECTED CEILING PLAN - 1

3/16" = 1' - 0" 0 5' 10' 20'

/2

1/

R

E V

IS

E

D A

C O

U S

T

IC

C E

IL

IN

G T

IL

E

S

IZ

E

05/12/2025

D K

/12

/2

R

E V

IS

E

D C

E

IL

IN

G

H E

IG

H

T D

K

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/7

/2

:2 :4

P

M

A-601A

R O

O M

F

IN

IS

H

S C

H E

D U

LE

FL DA DK

17332814

KYM

ROOM FINISH SCHEDULE

R O

O M

N U

M B

E R

ROOM NAME

F

LO

O R

B A

S E

W A

IN

S

WALLS CEILING

REMARKS

A B C D

M A

T 'L

F

IN H

T

156 MECH ENCL 2

201 STAIR 1 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

202 CORRIDOR 8 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

203 CORRDIOR 11 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

204 ELEV LVT-1 & 2 - - SST-2 SST-2 SST-2 SST-2 SST-3 SST-3 9'-0"

205 JAN CT-7, GT-1 - - PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 9'-0" CT-7, GT-1 WAINS AT MOP SINK

206 CUST/BLDG SUPPLY HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

207 WOMENS CT-1, GT-1 CT-1,GT-1 CT-4,GT-4 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

208 PLUMBING ROOM CS-1 CT-1,GT-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

209 MENS CT-1,GT-1 CT-1,GT-1 CT-2,GT-1 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

210 CORRIDOR 10 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

211 CONFERENCE CPT-1 RB-1 - PT-3 PT-4 PT-3 PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

212 VTR HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

213 CORRIDOR 9 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

214 COMMAND & SUPPORT CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

214A KITCHENETTE HPL-1 RB-1 SS-1 PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

215 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

216 VEST CT-1, GT-1 CT-1,GT-1 CT-2,GT-1 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

217 TOILET CT-1, GT-1 CT-1,GT-1 CT-2,GT-1 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 10'-0"

218 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

219 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

220 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

221 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

223 STAIR 2 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

224 ELEC RM FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

225 RADIO RM HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

226 RF TRANS RM CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

227 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

228 PLANS & PROGRAMS CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

229 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'0" RAISED ACCESS FLOORING

230 TECH CONTROL

FACILITY

CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

231 COPY RM CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

232 COMMUNICATIONS

FOCAL POINT

CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

233 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

234 DATA RM HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

235 ELEC FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

236 NETWORK CONTROL

CENTER

CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

237 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

238 MECHANICAL FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

239 ELEC FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

240 INFRASTRUCTURE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

241 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

242 STAIR 3 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

ROOM FINISH SCHEDULE

R O

O M

N U

M B

E R

ROOM NAME

F

LO

O R

B A

S E

W A

IN

S

WALLS CEILING

REMARKS

A B C D

M A

T 'L

F

IN H

T

001 CABLE VAULT FC-2 RB-1 - FC-2 FC-2 FC-2 FC-2 CONC PT-2 10'-0"

002 ELEV PIT

101 WEATHER

VEST

FM-1 CT-6,GT-3 - PT-5 PT-1 PT-4 PT-1 GYP BD PT-2 9'-0"

102 CORRIDOR 1 CT-6,GT-3 CT-6,GT-3 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0"

103 BLIND VENDOR CT-6,GT-3 CT-6,GT-3 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0"

104 MULTIPURPOSE/TRAINING RM CPT-1 RB-1 PT-3/AP-1 PT-3/AP-1 PT-3 PT-4 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

105 BREAK RM CT-6,GT-3 CT-6,GT-3 - PT-3 PT-5 PT-4 PT-3 ACT-1 ACT-1 9'0"

106 LAC RM CT-6,GT-3 CT-6,GT-3 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'0"

107 CONFERENCE RM CPT-1 RB-1 - PT-3/AP-1 PT-3/AP-1 PT-3 PT-3 ACT-1 ACT-1 9'0" RAISED ACCESS FLOORING

108 VTR HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

109 CORRIDOR 2 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

110 JAN CT-7,GT-1 - - PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 9'-0" CT-7, GT-1 WAINS AT MOP SINK

111 CORRIDOR 3 LVT-3 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

112 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

113 RESOURCES FLIGHT CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

114 FLIGHT

OPERATIONS

CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

115 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0"

116 CORRIDOR 4 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

117 COMM POP HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

118 MENS CT-1,GT-1 CT-1,GT-1 CT-2,GT-1 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

119 PLUMBING ROOM CS-1 CT-1,GT-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

120 WOMENS CT-1,GT-1 CT-1,GT-1 CT-4,GT-4 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

121 CORRIDOR 5 LVT-3 RB-1 WP-1 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

122 ELEV LVT-1 & 2 - - SST-2 SST-2 SST-2 SST-2 SST-3 SST-3 9'-0"

123 STAIR 1 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

124 COMSEC VAULT HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

125 NETWK DIST/GOV ENTRY HPL-1/FC-2 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING/FC-2 AT VAULT

126 STAIR 2 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

127 ELEC RM FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

128 UPS RM FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

129 TELEPHONY ADMIN CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

130 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

131 TELEPHONY ADMIN CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

132 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

133 TELEPHONY WORKSHOP FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0"

134 STORAGE/LOADING/RECEIVING/ LAYDOWN/IT

STAGING

FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 11'-0"

135 TR RM HPL-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 - RAISED ACCESS FLOORING

136 INFORMATION TECHNOLOGY MAINTENANCE AND

REPAIR CENTER

HPL-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

137 CORRIDOR 7 LVT-3 RB-1 WP-1 PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

138 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

139 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

140 MENS LOCKER CT-1,GT-1 CT-1,GT-1 CT-2,GT-1 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

141 MENS CT-1,GT-1 CT-1,GT-1 CT-2,GT-1 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

142 WOMENS LOCKER CT-1,GT-1 CT-1,GT-1 CT-4,GT-4 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0"

143 WOMENS CT-1,GT-1 CT-1,GT-1 CT-4,GT-4 PT-1 PT-1 PT-1 PT-1 GYP BD PT-2 8'-0" CT-3 AT SHWR FLR

144 MECHANICAL FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

145 ELEC FC-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

147 STAIR 3 CS-1 RB-1 - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

148 CLIENT SUPPORT CENTER CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

149 KNOWLEDGE OPERATIONS CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

150 CABLE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

151 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

152 WING CYBERSECURITY CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

153 OFFICE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

154 QUALITY ASSURANCE CPT-1 RB-1 - PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

155 CORRIDOR 6 LVT-3 RB-1 - PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 PT-1,PT-3 ACT-1 ACT-1 9'-0" RAISED ACCESS FLOORING

LO

C

A T

IO

N

LO

C

A T

IO

N

C O

M M

B U

IL

D

IN

G

F

IR

S T

F

LO

O R

C O

M M

B U

IL

D

IN

G

S E

C O

N D

F

LO

O R

C O

M M

B U

IL

D

IN

G

R O

O F

301 STAIR 1 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

302 VEST CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

303 ELEV MACH

RM

FC-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

304 VEST CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

305 STAIR 2 CS-1 - - PT-1 PT-1 PT-1 PT-1 CONC PT-2 -

1 1

/2

1/

05/12/2025

R E

V

IS

E D

S C

H E

D U

LE

/2

6/

R

E V

IS

E

D S

C H

E D

U

LE

D K

D K

/0

2/

R

E V

IS

E

D S

C H

E D

U

LE

D K

/12

/2

R

E V

IS

E

D S

C H

E D

U

LE

D K

EXPIRES: 4/30/26EXPIRES: 4/30/26

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

GENERAL SHEET NOTES

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/8

/2

:2 :0

P

M

A-601B

R O

O M

F

IN

IS

H

A N

D M

A T

E R

IA

L

S C

H E

D U

LE

FL DA DK

17333350

KYM

ROOM FINISH SCHEDULE

R O

O M

N U

M B

E R

ROOM NAME

F

LO

O R

B A

S E

W A

IN

S

WALLS CEILING

REMARKSA B C D

M A

T 'L

F

IN H

T

G01 GENERATOR RM FC-1 - - PT-1 PT-1 PT-1 PT-1 - - - CEILING EXPOSED TO SPRAY-APPLIED INSUL

G02 EQUIPMENT RM FC-1 - - PT-1 PT-1 PT-1 PT-1 - - - CEILING EXPOSED TO SPRAY-APPLIED INSUL

G03 TYPHOON ENCLOSURE CS-1 - - EFS-1 EFS-1 EFS-1 EFS-1 CONC EFS-1 -

G04 TYPHOON ENCLOSURE CS-1 - - EFS-1 EFS-1 EFS-1 EFS-1 CONC EFS-1 -

MATERIAL SCHEDULE

KEY (MATERIAL

SCHEDULE) MATERIAL DESCRIPTION SPEC SECTION

SOURCE / MANUFACTURER (FOR

REFERENCE ONLY) SIZE / PATTERN / FINISH COLOR NAME / PRODUCT NO. REFERENCE REMARKS

CS-1 CONCRETE SEALER 03 30 00

EFS-1 EXTERIOR FINISH SYSTEM 07 24 00 STO CORP SMOOTH ANTIQUE LINEN - FED SPECS 23578 EXTERIOR WALL - FIELD

FAR-1 FLUID-APPLIED ROOF MEMBRANE 07 56 00 WHITE ROOF

FAR-3 FLUID-APPLIED ROOF MEMBRANE 07 56 00 ANTIQUE LINEN - FED SPECS 23578 OTHER SURFACES

FC-1 FLOOR COATING, POLYURETHANE 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS HAZE GRAY / HS POLYURETHANE INTERIOR SHOP, STORAGE

PT-1 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS DRIFT OF MIST SW9166 INTERIOR PAINT - FIELD COLOR

PT-2 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS FUTON SW7101 EXTERIOR PAINT

PT-6 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS ANTIQUE LINEN - FED SPECS 23578 OTHER SURFACES

EXTERIOR FINISH SCHEDULE

EXTERIOR KEY EXTERIOR MATERIAL DESCRIPTION REMARKS

EFS-1 DIRECT-APPLIED EXTERIOR FINISH SYSTEM, FIELD

EFS-2 DIRECT-APPLIED EXTERIOR FINISH SYSTEM, ACCENT

FAR-1 FLUID-APPLIED ROOF MEMBRANE, ROOF

FAR-3 FLUID-APPLIED ROOF MEMBRANE, SURFACES OTHER THAN ROOF

EXPOSED EXTERIOR SIDE OF INTEGRAL CONCRETE GUTTER, VERTICAL SURFACES AND UNDERSIDE OF CONC

SLABS TO MATCH EXTERIOR WALL

PT-6 EXTERIOR PAINT DOORS, DOOR FRAMES, LOUVERS, STORM SHUTTERS, DOWNSPOUTS, AND OTHER MISCELLANEOUS METALS

TYPICAL FOR EXTERIOR WALL FIELD, ALL ENCLOSURES, AND RETAINING WALLS

NOT USED

/12

/2

R

E V

IS

E

D E

X T

E R

IO

R

F

IN

IS

H

S C

H E

D U

LE

D

K

05/12/2025

A-122A - PARTIAL FIRST FLOOR REFLECTED CEILING PLAN - 1
A-125A - PARTIAL FIRST FLOOR REFLECTED CEILING PLAN - 4
A-126A - PARTIAL FIRST FLOOR REFLECTED CEILING PLAN - 5
A-128A - PARTIAL SECOND FLOOR REFLECTED CEILING PLAN - 1
A-601A - ROOM FINISH SCHEDULE
A-601B - ROOM FINISH AND MATERIAL SCHEDULE
2025-05-13T13:41:35-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-05-13T13:41:45-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-05-13T13:41:45-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-05-13T13:41:45-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-05-13T13:41:45-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-05-13T13:41:45-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.

File details come from the government source that posted it. Updated .