These architectural and engineering drawings detail the design for the FY24 MCON P-614 Joint Consolidated Communications Center project at Andersen Air Force Base in Guam. The documents include multiple technical sheets covering structural elements such as pavement jointing plans, foundation details, wall types, material schedules, and floor plans for a two-story reinforced concrete communications facility. The drawings specify construction requirements for specialized spaces including a Sensitive Compartmented Information Facility, with detailed specifications for concrete work, wall assemblies, flooring, and exterior finishes. Key technical elements include precise structural reinforcement, specific material selections like ceramic tiles and paint finishes, and specialized construction details for areas like an entry vault and retaining walls.

The project is a complex federal construction effort estimated between $100-250 million, with a contract completion period of 1,286 calendar days. The facility will consolidate communications, command and control, and IT functions for the 36th Communications Squadron, featuring advanced technical infrastructure including precision cooling systems, uninterruptable power supply, and clean agent fire suppression systems. The solicitation requires U.S. firms and citizens for execution, with strict security protocols for document access, including a one-time pre-proposal site visit scheduled for 18 March 2025 and detailed citizenship verification processes for all personnel involved in the project.

View the file

Other files

File Type Posted
25R1303 P614 Note25.pdf PDF
01_25R1303_AMD0017.pdf PDF
02_25R1303_ AMD 0017 Drawings.pdf PDF
25R1303 P614 Note22.pdf PDF
03_25R1303_01 91 19_AMD0015.pdf PDF
01_25R1303_AMD0015.pdf PDF
04_25R1303_08 91 00_AMD0015.pdf PDF
02_25R1303_01 91 00.15_AMD0015.pdf PDF
25R1303 P614 Note 21.pdf PDF
02_25R1303_09 69 13_AMD0013.pdf PDF
03_25R1303_26 33 53_AMD0013.pdf PDF
01_25R1303_AMD0013.pdf PDF
04_25R1303_AMD0013 DRAWINGS.pdf PDF
25R1303 P614 Note 18.pdf PDF
25R1303 P614 Note16.pdf PDF
02_25R1303_05 50 13_AMD0011.pdf PDF
03_25R1303_05 51 33_AMD0011.pdf PDF
06_25R1303_DRAWINGS_AMD0011.pdf PDF
04_25R1303_09 29 00_AMD0011.pdf PDF
05_25R1303_09 84 20_AMD0011.pdf PDF
01_25R1303_AMD0011.pdf PDF
25R1303 P614 Note14.pdf PDF
25R1303 P614 Note12.pdf PDF
05_25R1303_09 30 10_Amd0008.pdf PDF
04_25R1303_AMD 0009_1737021_DRAWINGS.pdf PDF
06_25R1303_10 11 00_Amd0008.pdf PDF
12_25R1303_26 24 13_Amd0008.pdf PDF
03_25R1303_07 60 00_Amd0008.pdf PDF
02_25R1303_01 57 19.03 20_Amd0008.pdf PDF
11_25R1303_26 20 00_Amd0008.pdf PDF
09_25R1303_10 71 13.13_Amd0008.pdf PDF
08_25R1303_10 51 13_Amd0008.pdf PDF
01_25R1303_AMD0010.pdf PDF
02_25R1303_02 61 13_AMD0009.pdf PDF
07_25R1303_10 28 13_Amd0008.pdf PDF
10_25R1303_26 11 16_Amd0008.pdf PDF
01_25R1303_Amd0008.pdf PDF
01_25R1303_AMD0009.pdf PDF
03_25R1303_32 12 13_AMD0009.pdf PDF
04_25R1303_08 41 19_Amd0008.pdf PDF
13_25R1303_AMD 0008_1737021_DRAWINGS.pdf PDF
02_25R1303_01 57 19_AMD0010.pdf PDF
25R1303 P614 Note 10.pdf PDF
25R1303 P614 Note 8.pdf PDF
01_25R1303_Amd0006.pdf PDF
02_Signed AMD 0006_1737021_ARCH.pdf PDF
25R1303 P614 Note 6.pdf PDF
04_SIGNED Amd0005_1737021_ARCH.pdf PDF
01_25R1303 _Amd0005.pdf PDF
03_10 44 16_Amd0005.pdf PDF
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

L

T T T T

T T T T

T T T T

T T T T L L

L L L

L L L

L L L

L L L

E E E E

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N

AM

E:

W

:\1

-0

2\ Ci vil \C

AD

D\

_S ite

\D W

GS

\B

LD

G

CO

M

M -1

-M

AS

TE

R-

JO

IN

TI

NG

.d wg L

AY

OU

T

NA

M E:

B

LD

G

CO

M M

-1

-C S1

A

P

LO

TT

ED

: W ed ne sd ay , A pr il 1

6,

- 4 :4

6p m

U

SE

R:

th om m a

NA

VA

L

FA

CI

LIT

IE

S

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

PA

CI

FI

C

AN

DE

RS

EN

, G

UA

M

US

N

AV

SU

PA

CT

DE

PA

RT

ME

NT

O

F

TH

E

NA

VY

FY

M

CO

N

PR

OJ

EC

T P-

NA

VF

AC

P

AC

IF

IC

JO

IN

T

RE

GI

ON

M

AR

IA

NA

S

JO

IN

T

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

NAVFAC DRAWING NO.

EPROJECT NO.:

SCALE:

1737021

SHEET OF

CONSTR. CONTR. NO.

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

SEAL

DATE

FIRE PROTECTION

A/E INFO

AS NOTED

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

SMK

BL TH BT

17332421

PC

C

JO

IN

TI

NG

P

LA

N

- 4

CS124A

SCALE:1" = 5'

PCC JOINTING PLAN - 4A1

PLAN

NORTH

LONGITUDINAL JOINT

TRANSVERSE JOINT

AC PAVEMENT

CONCRETE PAVEMENT

A1

CS508A

B1

CS507A

D1

CS507A

EXPANSION JOINT

A1

CS508A

D3

CS508A

L

T

E

PCC PAVEMENT

LANDSCAPE

A1

CS507A

REINFORCER

3 AT 12' = 36'

AT

2'

10'

CS122A

CS123A

CS124A

CS121A

GENERAL SHEET NOTES

SHEET KEYNOTES#

GRAPHIC SCALE(S)

KEYPLAN

LEGEND

05 5 10FT

CS124A

RE

VI

SE

D

JO

IN

TI

NG

P

LA

N

BL

SEALSEALSEALSEAL

C K

OLA N A.

IR

B

No. 9867-C

ENGINEER

PROFESSIONAL

LICENSED

.A.S

HAWA I I, U.

04/28/2025

/28

/20

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

FI

LE

N

AM

E:

W

:\1

-0

2\ Ci vil \C

AD

D\

_S ite

\D W

GS

\B

LD

G

CO

M

M -1

-C

-M

AS

TE

R-

DE

TA

IL

-S

IT

E.

dw g

L

AY

OU

T

NA

M

E:

B

LD

G

CO

M

M -1

-C

S5

P

LO

TT

ED

: W ed ne sd ay , A pr il 1

6,

- 4 :5

2p m

U

SE

R:

th om m a

NA

VA

L

FA

CI

LIT

IE

S

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

PA

CI

FI

C

AN

DE

RS

EN

, G

UA

M

US

N

AV

SU

PA

CT

DE

PA

RT

ME

NT

O

F

TH

E

NA

VY

FY

M

CO

N

PR

OJ

EC

T P-

NA

VF

AC

P

AC

IF

IC

JO

IN

T

RE

GI

ON

M

AR

IA

NA

S

JO

IN

T

CO

NS

OL

ID

AT

ED

C

OM

MU

NI

CA

TI

ON

C

EN

TE

R

NAVFAC DRAWING NO.

EPROJECT NO.:

SCALE:

1737021

SHEET OF

CONSTR. CONTR. NO.

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

SEAL

DATE

FIRE PROTECTION

A/E INFO

AS NOTED

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

SMK

BL TH BT

17332429

PA

VE

M

EN

T

DE

TA

IL

S (2

O F

2)

CS508A

SCALE:NTS

CONSTRUCTION JOINT SEALD1

SEAL DETAIL D2 THIS SHT

SEE CONTRACTION JOINT

SEAL DETAIL D1 THIS SHT

SEE CONSTRUCTION JOINT

1-1/4"Ø SMOOTH DOWEL BARS, 20" LONG, AT

12" OC

FORMED BUTT JOINT

NOTE:

TRANSVERSE CONSTRUCTION JOINT MUST ONLY BE

AT A PLANNED LOCATION

NOTE FOR JOINT SEAL DETAILS:

1. W=WIDTH OF SEALANT RESERVOIR=3/4" MINIMUM

2. D=DEPTH OF SEALANT= 1.0 TO 1.5 X W

3. T=DEPTH OF INITIAL SAWCUT OR INSERT TYPE JOINT FORMER (CONTRACTION JOINT)= 1/4 SLAB THICKNESS

4. DEPTH AND WIDTH OF SEAL MUST BE AS RECOMMENDED BY MANUFACTURER

5. TOP OF SEALANT 1/8" TO 1/4" BELOW TOP OF PAVEMENT

1/8" TO 1/4"W

D

FIELD MOLDED SEAL

BACKER ROD

T

JOINT BOTTOM

CRACK INITIAL SAWCUT 1/8" WIDE

PAVEMENT SURFACE

1/8" TO 1/4"W

D

FIELD MOLDED SEAL

BACKER ROD

PREFORMED JOINT MATERIAL

PAVEMENT SURFACE

W

D

FIELD MOLDED SEAL

1/8" TO 1/4"

BACKER ROD

PAVEMENT SURFACE

PAVEMENT SURFACE OR

STRUCTURAL SLAB

10" 10" 10" 10"

PAINT AND LIGHTLY OIL ONE END OF

DOWELPAINT AND LIGHTLY OIL ONE END OF

DOWEL

1-1/4"Ø SMOOTH DOWEL BARS, 20" LONG, AT

12" OC

9"

4- 1/

2" ±1

/2

9"

4- 1/

2" ±1

/2

SCALE:NTS

CONTRACTION JOINT SEALD2 SCALE:NTS

EXPANSION JOINT SEALD3

SCALE:NTS

TRANSVERSE CONTRACTION JOINTB2SCALE:NTS

LONGITUDINAL/TRANSVERSE CONSTRUCTION JOINTB1

SEAL DETAIL D2 THIS SHT

SEE CONTRACTION JOINT

PAVEMENT SURFACE

SEAL DETAIL D1 THIS SHT

SEE CONSTRUCTION JOINT

1-1/4"Ø SMOOTH DOWEL BARS, 20" LONG, AT

12" OC

FORMED BUTT JOINT

NOTE:

TRANSVERSE CONSTRUCTION JOINT MUST ONLY BE

AT A PLANNED LOCATION

10" 10" 16" 16"

PAINT AND LIGHTLY OIL ONE END OF

DOWELPAINT AND LIGHTLY OIL ONE END

OF DOWEL

NO. 5 DEFORMED STEEL TIEBAR, 2'-8" LONG, AT

2'-8" OC

3" CLR

3" CLR

3"

9" THK PCC PAVEMENT

8" THK RIGID PAVEMENT BASE COURSE

COMPACTED SUBGRADE

12" MIN.

EDGE OF

PAV'T

FINISH GRADE

NOTE:

OVER EXCAVATE SOFT, YIELDING, OR

OTHERWISE UNSATISFACTORY MATERIAL TO

AT LEAST 24" BELOW BOTTOM OF BASE

COURSE LEVEL AND REPLACE WITH

PROPERLY COMPACTED STRUCTURAL FILL.

FINISH

GRADE

(GRASS)

#4 REBAR AT 18" OC, EW

3" CLR

CL

R

-1

/4

FINISH

GRADE

(GRASS)

3" CLR

8"

4- 1/

2" ±1

/2

9"

4- 1/

2" ±1

/2

SCALE:NTS

REINFORCED PCC PAVEMENTD4

SCALE:NTS

THICKENED EDGE PCC PAVEMENTB4

SCALE:NTS

THICKENED EDGE PCC PAVEMENT AT BLDGSA4

SCALE:NTS

TIED LONGITUDINAL CONTRACTION JOINTA2SCALE:NTS

LONGITUDINAL/TRANSVERSE CONSTRUCTION

JOINT FOR REINFORCED PCCA1

8" THK PCC PAVEMENT

8" THK RIGID PAVEMENT BASE

COURSE

12" MIN.

COMPACTED SUBGRADE

5'

PCC THICKENED

EDGE

-1

/4

8" THK PCC PAVEMENT

8" THK RIGID PAVEMENT BASE

COURSE

COMPACTED SUBGRADE

5'

PCC THICKENED

EDGE

PAVEMENT SURFACE

PAVEMENT SURFACE

PAVEMENT SURFACE

BUTTED

JOINT

4"-6"

RETROREFLECTIVE DOUBLE

YELLOW PAINT. (TYP)

SCALE:NTS

YELLOW CENTERLINE MARKINGS DETAILC4

9'3'

RE

VI

SE

D

PA

VE

M

EN

T

DE

TA

IL

S

BL

SEE EXPANSION JOINT

DETAIL

D3

CS508A

SEALSEALSEALSEAL

C K

OLA N A.

IR

B

No. 9867-C

ENGINEER

PROFESSIONAL

LICENSED

.A.S

HAWA I I, U.

04/28/2025

/28

/20

H

G

A3

S-400A

B3

S-400A

F-5A

CC-1

3'

7'

SUMP PIT

2' - 0"SQ.

T.O.F. = -10' - 6"

4' - 2 7/8" 14' - 6"

A1

S-400A

CMF-3

CWF-1

CWF-3

F T

B -1

F T

B -1

CWF-1

#7 AT 12" O.C.

BOT. BARS

#7 AT 12" O.C.

TOP BARS

#7 AT 12" O.C.

BOT. BARS

#7 AT 12" O.C.

TOP BARS

#7 AT 12" O.C. ADDED

BOT. BARS

#7 AT 12" O.C. ADDED

TOP BARS

T.O.S. = -10' - 6"

CWF-1

C W

F -1

CSW-2

H

G

A3

S-400A

B3

S-400A

6" THICK

CONC. SLAB

3'

11' - 4"

VB - 1

VB - 1

VB - 1

24"

24"

A1

S-400A

C 6X

8.

C 6X

8.

C 6X

8.

C 6X

8.

T.O.S. = 0' - 0"

#4 AT 16" O.C. TOP

AND BOT. TEMP.

BARS, TYP.

#4 AT 10" O.C. TOP

AND BOT. BARS, TYP.

T.O.S. = -2' - 0"

CSW-2

SUB 1ST FLOOR

1ST FLOOR

BASEMENT VAULT

6" THICK

CONC. SLAB

VB - 1

S-400A

C4

SLAB ON GRADE,

SEE PLAN

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.14' - 6"

SLAB ON GRADE,

SEE PLAN

#5 AT 6" O.C.

HOR. BARS, E.F., TYP.

#5 AT 6" O.C.

VERT. BARS, E.F., TYP.

WATERSTOP

1'

SUB 1ST FLOOR

1ST FLOOR

HG

BASEMENT VAULT

6" THICK CONC. SLAB

SUMP PIT

2' - 0"

CSW-2

VB - 1 VB - 1 VB - 1

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP. 36' - 6"

SLAB ON GRADE,

SEE PLAN

WATERSTOP,

TYP.

#5 AT 6" O.C.

HOR. BARS, E.F., TYP.

#5 AT 6" O.C.

VERT. BARS, E.F., TYP.

1'

1'

1'

2' - 0" 2' - 0" 2' - 0"

LEGENDS

1. CONTRACTOR MUST COORDINATE ALL FLOOR DEPRESSION LIMITS, LOCATIONS AND

DEPTHS WITH ARCHITECTURAL DRAWINGS, INCLUDING BUT NOT LIMITED TO WALL

LOCATIONS, ROOFING MATERIALS/THICKNESSES, FLOORING INSTALLATION METHODS AND

REQUIRED SLOPES. THE FINAL FINISHED FLOOR MUST COMPLY WITH ADA/ABA.

2. CONTRACTOR MUST CONFIRM LOCATION, DIMENSIONS, AND ELEVATION OF EQUIPMENT

PADS WITH THE VARIOUS DISCIPLINES AND WITH THE ACTUAL EQUIPMENT TO BE

INSTALLED.

3. SEE ARCHITECTURAL, MECHANICAL, ELECTRICAL DRAWINGS FOR SIZES AND LOCATIONS

OF OPENINGS.

REFERENCE DRAWINGS

CC-1 DENOTES CONCRETE COLUMN

F-1 DENOTES CONCRETE FOOTING

CF-1 DENOTES CONCRETE COMBINED FOOTING

CMF-1 DENOTES CONCRETE MAT FOOTING

CWF-1 DENOTES CONCRETE WALL FOOTING

CSW-2 DENOTES SHEARWALL

VB-1 DENOTES CONCRETE BEAM

T.O.F. TOP OF FOOTING

T.O.S. TOP OF SLAB

SHEET S-001 GENERAL STRUCTURAL NOTES

SHEET S-002 GENERAL STRUCTURAL NOTES

SHEET S-101A COMM BLDG OVERALL FOUNDATION PLAN

SHEET S-102A COMM BLDG OVERALL FIRST FLOOR PLAN

SHEET S-501A TYPICAL SLAB-ON-GRADE DETAILS

SHEET S-502A TYPICAL CONCRETE PAD DETAILS AND REBAR SPLICE DETAILS

SHEET S-503A TYPICAL CONCRETE WALL DETAILS

SHEET S-505A FOUNDATION SCHEDULE AND DETAILS

SHEET S-506A FOUNDATION SCHEDULE AND DETAILS

SHEET S-507A FOUNDATION DETAILS

SHEET S-508A FOUNDATION DETAILS

SHEET S-509A COLUMN SCHEDULE AND DETAILS

SHEET S-510A TYPICAL CONCRETE COLUMN DETAIL

SHEET S-514A CONCRETE BEAM SCHEDULE AND DETAILS

6" THK. CONCRETE SLAB

SUB 1ST FLOOR

1ST FLOOR

BASEMENT VAULT

8" THICK

CONC. WALL

6" THICK CONC. SLAB

SUMP PIT

2' - 0"

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

BOT. BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

#7 AT 12" O.C.

TOP BARS, TYP.

1' - 6"14' - 6"

SLAB ON GRADE,

SEE PLAN SLAB ON GRADE,

SEE PLAN

WATERSTOP,

TYP.

1'

1'

2' - 0"

1ST FLOOR

VB - 1

C6X8.2

C6X8.2

5/8" DIA. WELDED STUD BOLT

SPACE AT 24" O.C., TYP.

CONC. SLAB

REINFORCING

CONC. SLAB

REINFORCING

2"

PLAN

NORTH

A6

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M U

S N

A V

S U

P A

C T

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

-6

N

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

KEY PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

NTS

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

04/28/2025

W

S tr u c tu ra l P ro je c ts

\2 .0

P

E I

P -6

G

U M

J O

IN

T

C O

M M

C T

R F

U L L D

E S

IG

N

\C o n tr a c t

D o c s \0

W o rk in g d ra w in g \L

M B

L D

G C

O M

M -1

-S

R

L o c a l.

rv t /1

/2

:3

:4

A

M

S-400A

E N

LA

R

G E

D E

N T

R Y

V A

U

LT

F O

U N

D A

T

IO

N P

LA

N

LM LC BF

17332603

BC

1/4" = 1'-0" B1

ENTRY VAULT FOUNDATION PLAN

1/4" = 1'-0"

B2

ENTRY VAULT FLOOR PLAN

1/4" = 1'-0" B3

ENTRY VAULT BUILDING SECTION

1/4" = 1'-0" A3

ENTRY VAULT BUILDING SECTION

1/4" = 1'-0"

A1

ENTRY VAULT BUILDING SECTION

1/4" = 1' - 0" 0 5' 10' 15'1'

1 1/2" = 1'-0" C4

DETAIL

1 1

A D

D E

D D

IM

E

N S

IO

S

/28

/20

LM

LIC. EXP. DATE 4/30/26

BENNET T Y . FUNG

HA W A II, U.S .A

LICENSED

PROFESSIONAL

ENGINEER

No. 6293-S

4/14/25

1737021

C3

S-442A

C3

S-442A

B3

S-442A

S.J.

S.J.

6" THICK CONC. SLAB ON

GRADE WITH #4 BARS SPACED

AT 12" O.C., E.W., TYP.

8" THICK CMU

WALL, TYP.

EYE BOLT TIE

DOWN, SEE ARCH.

8" THK. x 8" HIGH

CONC. CURB

A4

S-442A

A4

S-442A

A3

S-442A

SLOPE

TWF-1

T W

F -1

TWF-1

4" THICK PROPERLY COMPACTED

STRUCTURAL FILL, ASTM D448 NO. 67 GRAVEL

SLOPE

4" THICK PROPERLY COMPACTED

STRUCTURAL FILL, ASTM D448

NO. 67 GRAVEL

1'

2'

0"

5' - 0"

CONC. CAP,

TYP

8" THICK CMU

WALL

#4 CONT. HORIZ. BAR

AT 24" O.C., TYP.

#6 VERT. BARS SPACED

AT 16" O.C., TYP.

4"

#4 CONT.

HORIZ. BAR

2- #4 CONT.

BAR

EYE BOLT TIE DOWN,

SEE ARCH.

3- #4 EACH WAY

3"

5- #4 CONT. BAR

#6 AT 10"

BOTTOM BAR

4" THICK PROPERLY COMPACTED

STRUCTURAL FILL, ASTM D448

NO. 67 GRAVEL

1ST FLOOR

EYE BOLT TIE DOWN,

SEE ARCH.

3- #4 EACH WAY

6" THK. SLAB ON

GRADE

1'

1' - 6"

4" THICK PROPERLY COMPACTED

STRUCTURAL FILL, ASTM D448

NO. 67 GRAVEL

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M U

S N

A V

S U

P A

C T

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

GRAPHIC SCALE(S)

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

04/28/2025

W

S tr u c tu ra l P ro je c ts

\2 .0

P

E I

P -6

G

U M

J O

IN

T

C O

M M

C T

R F

U L L D

E S

IG

N

\C o n tr a c t

D o c s \0

W o rk in g d ra w in g \L

M B

L D

G C

O M

M -1

-S

R

L o c a l.

rv t /1

/2

:3

:4

A

M

S-442A

T R

A S

H E

N C

LO

S

U R

E F

O U

N D

A T

IO

N

P

LA

N A

N D

D E

T A

IL

E

D S

E C

T

IO

N

LM MM BF

17332645

BC

1/4" = 1'-0" A1

TRASH ENCLOSURE FOUNDATION PLAN

1/4" = 1'-0" C3

TRASH ENCLOSURE DETAILED SECTION

1/4" = 1' - 0" 0 5' 10' 15'1'

1/4" = 1'-0" B3

TRASH ENCLOSURE DETAILED SECTION

3/4" = 1'-0" A4

SECTION

3/4" = 1'-0"

A3

DETAIL

3/4" = 1' - 0" 0 1' 5'6" 2' 3' 4'

A D

D E

D C

A

LL

O U

T

/28 /20

LM

SEALLIC. EXP. DATE 4/30/26

BENNET T Y . FUNG

HA W A II, U.S .A

LICENSED

PROFESSIONAL

ENGINEER

No. 6293-S

4/14/25

UP

A1

S-704A

C4

S-704A

5' - 0"

5'

STAIR RAILINGS

4" THK. SLAB ON GRADE

WITH #4 AT 12" O.C.

RETAINING

WALL

2' - 6"

#5 TOP BAR AT 6" AND

BOTTOM BAR AT 12"

O.C., TYP.

#5 TOP AND BOTTOM

BAR AT 10" O.C., TYP.

#4 BARS AT

8" O.C., TYP.

6" THICK SLAB ON GRADE

WITH #4 TEMP. BARS AT 16"

O.C., E.W., TYP.

6" THICK SLAB ON GRADE

WITH #4 TEMP. BARS AT 16"

O.C., E.W., TYP.

#4 BARS AT

8" O.C., TYP.

SCHEDULE

SEE TYP. LAP SPLICE

SCHEDULE

SEE TYP. LAP SPLICE

#5 AT 5" O.C.,

AS SHOWN

STAIR RAILING

6"

6"

RETAINING

WALL

T.O.S

ELEV. 542.67

T.O.S

ELEV. 529.12

RETAINING WALL

FOUNDATION

PROPERLY COMPACTED

STRUCTURAL FILL

PROPERLY COMPACTED

STRUCTURAL FILL

4- #4 TEMP. BARS 4" THICK PROPERLY COMPACTED

STRUCTURAL FILL, ASTM D448 NO. 67 GRAVEL

#4 BAR AT 8" O.C.

CONC. RETAINING WALL,

SEE SCHEDULE

2"2"

VERT. BARS E.F., TYP.

HORIZ. BARS E.F., TYP.

4' - 6"

#5 TOP BAR AT 6" AND

BOTTOM BAR AT 12" O.C.,

TYP.

PROPERLY COMPACTED

STRUCTURAL FILL

PIPE 1 1/2" SCHED. 80 SS

RAILPOST, TYP.

PIPE 1 1/2 SCHED.40 SS

HANDRAIL, TYP.

PIPE 1 1/2 SCHED.40

SS HANDRAIL, TYP.

3/4" DIA. ROUND BAR

S-704A

B4

S-704A

A4

PROPERLY COMPACTED

STRUCTURAL FILL

4"

PIPE 1 1/2" SCHED. 40 SS

RAILPOST, TYP.

1/2" THK. EMBEDDED SS PLATE

WITH 2- 5/8" DIA. STUDS

4"

B5

S-704A

2 1/2" 2 1/2"

3/16

TYP.

5" 1 1/2"3"1 1/2"

PIPE 1 1/2" SCHED. 40

SS RAILPOST, TYP.

PIPE 1 1/2" SCHED. 40

SS GUARDRAIL, TYP.

1/2" THK. EMBEDDED

SS PLATE WITH 2- 5/8"

DIA. STUDS

6"

WAGNER RB15030.4 WITH

3- 1/4" x 2" SS SCREW

PIPE 1 1/2 SCHED.40

SS HANDRAIL, TYP.

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M U

S N

A V

S U

P A

C T

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

GRAPHIC SCALE(S)

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

04/28/2028

W

S tr u c tu ra l P ro je c ts

\2 .0

P

E I

P -6

G

U M

J O

IN

T

C O

M M

C T

R F

U L L D

E S

IG

N

\C o n tr a c t

D o c s \0

W o rk in g d ra w in g \L

M B

L D

G C

O M

M -1

-S

R

L o c a l.

rv t /1

/2

:3

:4

A

M

S-704A

S T

A

IR

A T

R E

T A

IN

IN

G W

A

LL

LM EL BF

17332689

BC

3/8" = 1'-0" C1

STAIR AT RETAINING WALL

3/8" = 1'-0" A1

STAIR DETAILED SECTION

3/4" = 1'-0" C4

SECTION

3/8" = 1' - 0" 0 5' 10'1' 2' 3' 4'

3/4" = 1' - 0" 0 1' 5'6" 2' 3' 4'

1" = 1'-0" B4

DETAIL

1" = 1'-0" B5

DETAIL

1" = 1'-0" A4

DETAIL

1" = 1' - 0" 0 6" 1' 3'2'

A D

D E

D C

A

LL

O U

T A

N D

D

IM

E N

S

IO

N S

/28

/20

LM

SEALLIC. EXP. DATE 4/30/26

BENNET T Y . FUNG

HA W A II, U.S .A

LICENSED

PROFESSIONAL

ENGINEER

No. 6293-S

4/14/25

UP

H

2 3 4

G

F

E

NETWK DIST/GOV ENTRY

COMM POP

COMSEC VAULT

STAIR 2

CORRIDOR 5

M A

T C

H

LI

N E

S E

E S

H E

E T

-1

A

A

B

C

D A-205A

D1

A

B

C

D A-209A

A1

A

B

C

D A-210A

B1

A

B

C

D A-212A

A1

30'-0" 30'-0"

45'-6" 24'-6"

10'-11 1/8"

'-8

A-408A

C1

'-0

'-0

'-5

'-2

'-2

'-0

12'-6"

26'-4"

1'-1" 3'-8" 1'-1" 8'-0"

3' -0

13'-10"

6'-6"7'-0"2'-8"29'-4"

45'-6"

3' -0

'-5

'-7

1' -0

C

LR

'-0

7' -1

3'

-4

11'-0"

126A

127A 128A

125A

129 131

126B

125B

H

H

H

E2 D2

E2

D2

P

A2

H

E2P

A

P

P

PPD2

A-411A

C2

24'-0 1/2"

MATCHLINE SEE SHEET A-110A

125A

121A

126A

126 124125

E2

E2

D2

FEC

A-515A

B4

FEC

FEC

A-515A

B2

FEC

A-515A

B4

A-507A

A4

D

4'-0"

TYP

DSDSDS

DS

KNOX BOX

A-515A

B5

SIM

A-513A

C1

RAISED FLOORING - LUXURY VINYL TILE

CONCRETE SLAB

CONCRETE WALL

CERAMIC TILE

RAISED FLOORING - HIGH PRESSURE LAMINATE

RAISED FLOORING - CARPET

SYMBOL

FLOOR PLAN LEGEND

DESCRIPTION

PLAN

NORTH

A6

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

KEY PLAN

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

NTS

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/2

/2

:5 :3

P

M

A-109A

P A

R T

IA

L

F

IR

S T

F

LO

O R

P

LA

N

FL DA DK

17332710

KYM

3/16" = 1'-0"A1

PARTIAL FIRST FLOOR PLAN - 2

3/16" = 1' - 0" 0 5' 10' 20'

1. DIMENSIONS MUST BE TAKEN AT THE FACE OF STUDS UNLESS OTHERWISE NOTED.

2. WHERE STUD WALLS ARE FLUSHED WITH THE FACE OF CONCRETE WALLS,

DIMENSIONS ARE TAKEN TO THE FINISH SURFACE OF THE STUD WALL.

3. SEE STRUCTURAL FOR COLUMN SIZES AND CONCRETE WALL THICKNESSES.

4. REFER TO DETAILS FOR FLOOR TRANSITIONS. REFER TO DOOR THRESHOLD DETAILS

WHERE FLOOR TRANSITIONS OCCUR AT DOOR OPENINGS.

/2

8/2

R

E V

IS

E

D W

A

LL

T Y

P E

S D

K

04/28/2025

EXPIRES: 4/30/26

WALL TYPE H WALL TYPE K WALL TYPE M

WALL TYPE N WALL TYPE P

INTERIOR EXTERIOR

CEILING AS SCHED

PAINT FINISH AS SCHED

5/8" THK GYP BD ON 2-1/2" 16 GA

MTL STUDS AT 16" OC W/ 1/2 AIR

SPACE

FLR FIN AS SCHED

BASE AS SCHED

BOTTOM RUNNER

ON 30# FELT

BLOCKING AT CEILING

EXTERIOR CONC WALL

5/8" THK GYP BD ON 16 GA 1-1/2"

FURRING HAT CHANNEL

FLR FIN AS SCHED

BASE AS SCHED

ACOUSTICAL SEALANT

BOTTOM OF CONC DECK

ACOUSTICAL SEALANT

CEILING AS SCHED

CONC COLUMN OR

WALL

FLR FIN AS SCHED

BASE AS SCHED,

BOTH SIDES

BOTTOM OF CONC DECK

CEILING AS SCHED

10" CONC WALL

FLR FIN AS SCHED

BASE AS SCHED,

BOTH SIDES

BOTTOM OF DECK

8" CONC WALL

BASE AS SCHED,

BOTH SIDES

CEILING AS SCHED

8" CONC WALL

BOTTOM OF CONC DECK

BLOCKING AT CEILING

FLR FIN AS SCHED

PAINT FINISH AS SCHED

BOTTOM OF CONC DECK

TOP RUNNER

CONT SEALANT

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

CONT SEALANT

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

PAINT FINISH AS SCHED,

BOTH SIDES

PAINT FINISH AS SCHED,

BOTH SIDES

CEILING AS SCHED

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

(2) LAYERS OF 5/8" THK GYP BD

ON 2-1/2" 16 GA MTL STUDS AT

16" OC W/ 1/2 AIR SPACE

PAINT FINISH AS SCHED

16 GA CLIP AT EACH STUD

SPACED AT 6'-0" OC

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

TOP RUNNER

ACOUSTICAL SEALANT

ACOUSTICAL SEALANT

2-1/2" BLANKET INSULATION

WALL TYPE N2

2 HR

FLR FIN AS SCHED

BASE AS SCHED,

BOTH SIDES

BOTTOM OF DECK

8" CONC WALLPAINT FINISH AS SCHED,

BOTH SIDES

CEILING AS SCHED

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

WALL TYPE M2

2 HR

FLR FIN AS SCHED

BASE AS SCHED,

BOTH SIDES

BOTTOM OF CONC DECK

CEILING AS SCHED

10" CONC WALL

PAINT FINISH AS SCHED,

BOTH SIDES

FLR FIN AND BASE AS

SCHED ON RAISED

FLOOR WHERE OCCURS

16 GA ANGLE CLIP AT EACH

STUD SPACED AT 6'-0" OC

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

GRAPHIC SCALE(S)

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/2

/2

:5 :3

P

M

A-502A

W A

LL

T

Y P

E S

FL DA DK

17332797

KYM

1" = 1'-0"

WALL TYPES - 2

1" = 1' - 0"

0 6" 1' 3'2'A1

/0

3/

04/28/2025

R E

V

IS

E D

W A

LL

T

Y P

E S

D K

/2

8/2

D

E

LE

T E

D W

A

LL

T Y

P E

D K

NAVFAC DRAWING NO.

1 2 3 4 5

D

C

B

A

C

B

EPROJECT NO.:

SCALE:

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

DES DRW CHK

SATISFACTORY TO

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

SEAL

DATE

FIRE PROTECTION

1737021

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

TE

M

S C

O M

M A

N D

P

A C

IF

IC

A N

D E

R S

E N

G

U A

M

JR

M

1 2 3

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y

F Y

M

C O

N P

R O

JE

C

T P

V F

A C

P A

C

IF

IC

JO

IN

T

R E

G

IO

N M

A R

IA

N

A S

D

A

SHEET OF

4 5

CONSTR. CONTR. NO.

JO

IN

T C

O N

S O

LI

D

A T

E D

C O

M M

U N

IC

A

T

IO

N C

E N

T E

R

A/E INFO

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

AS NOTED

WMH

JKS

JCC

COL SHERI KRAUS,

36TH MISSION SUPPORT GROUP,

AAFB GUAM

11/21/2024

C

U s e rs

\d o u g la s \O n e D ri v e

A rc h it e c ts

P a c if ic

In c \D e s k to p \D

A L o c a l\ P

-6 L o c a l R e v it S

E C

U R

E \B

L D

G C

O M

M -1

-A d o u g la s Z

T J G

V .r v t

/2

/2

:5 :3

P

M

A-602A

M A

T E

R

IA

L S

C H

E D

U

LE

FL DA DK

17332815

KYM

MATERIAL SCHEDULE

MATERIAL

KEY MATERIAL DESCRIPTION

SPEC

SECTION

SOURCE /

MANUFACTURER

(FOR

REFERENCE

ONLY)

SIZE / PATTERN /

FINISH

COLOR NAME /

PRODUCT NO.

REFERENCE REMARKS

ACT-1 ACOUSTICAL CEILING TILE 09 51 00 ARMSTRONG 24" X 24" CIRRUS HIGH

NRC

ANGULED TEGULAR NRC 0.75, CAC 35, 7/8" THICK PANEL

AP-1 ACOUSTICAL WALL PANEL 09 84 20 MDC ZINTRA 1" THK, POLYESTER CADET / BATTEN 6

CPT -1 CARPET TILE SHAW CONTRACT 24"X24" CARPET TILE ALCHEMY 5T135, SILVER ONYX 30 OZ SOLUTION DYED. SYNTHETIC

MOISTURE BARRIER BACKING

CS-1 CONCRETE SEALER 03 30 00

CT-1 PORCELAIN CERAMIC TILE 09 30 10 DAL-TILE 12" X 24", 3/8" THK,

UNPOLISHED

IMAGICA, HAZE, IG97 1/8" GROUT JOINTS; RESTROOM FLOORS

CT-2 PORCELAIN CERAMIC TILE 09 30 10 AMERICAN OLEAN 12"X 24", 5/16" THK, MINIMUM, LIGHT-GRAY, MN43 1/8" GROUT JOINTS; RESTROOM

WAINSCOT 1

CT-3 PORCELAIN CERAMIC MOSAIC TILE 09 30 10 DAL-TILE 2" X 2", 3/8" THK, MOSAIC,

HONED

HAUT MONDE, ELITE GRAY, HM05 1/8" GROUT JOINTS; SHOWER FLOORS

CT-4 PORCELAIN CERAMIC TILE 09 30 10 AMERICAN OLEAN 12"X 24", 5/16" THK, MINIMUM, TAUPE, MN42 1/8" GROUT JOINTS: RESTROOM

WAINSCOT 2

CT-5 PORCELAIN CERAMIC TILE 09 30 10 AMERICAN OLEAN 12"X 24", 5/16" THK, MINIMUM, WHITE, MN40 1/8" GROUT JOINTS: SHOWER WAINSCOT

CT-6 PORCELAIN CERAMIC TILE 09 30 10 DAL-TILE 12" X 24", 3/8" THK,

UNPOLISHED

IMAGICA, VISION, IG95 1/8" GROUT JOINTS; CORRIDOR FLOOR 1

CT-7 PORCELAIN CERAMIC TILE 09 30 10 DAL-TILE 12" X 24", 3/8" THK,

UNPOLISHED

HAUT MONDE, ELITE GRAY, HM05 1/8" GROUT JOINTS; CORRIDOR FLOOR 2

EFS-1 EXTERIOR FINISH SYSTEM 07 24 00 FINE TEXTURE ANTIQUE LINEN - FED SPECS 23578 EXTERIOR WALL - FIELD

EFS-2 EXTERIOR FINISH SYSTEM 07 24 00 FINE TEXTURE TOBACCO BROWN - FED SPECS

20117

EXTERIOR WALL - ACCENT

FAR-1 FLUID-APPLIED ROOF MEMBRANE 07 56 00 WHITE ROOF

FAR-2 FLUID-APPLIED ROOF MEMBRANE 07 56 00 MISSION RED - FED SPEC 22144 LOWER ROOF

FAR-3 FLUID-APPLIED ROOF MEMBRANE 07 56 00 ANTIQUE LINEN - FED SPECS 23578 OTHER SURFACES

FC-1 FLOOR COATING, POLYURETHANE 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS HAZE GRAY / HS POLYURETHANE INTERIOR SHOP, STORAGE

FC-2 FLOOR / WALL COATING, EPOXY 09 67 23.15 SHERWIN WILLIAMS SEMI-GLOSS HAZE GRAY / 650 SL/RC ENTRY VAULT

FM-1 FLOOR ENTRY DRAINABLE WALK-OFF

MATT

12 48 13 CS-GROUP POURED ABRASIVE

INSERTS

943 LOAM

GLZ-1 IMPACT SECURITY GLAZING 08 81 00 TOTAL SECURITY

SOLUTIONS

1 1/4" INSULATED TSS 3-500-1 1/4" ,SECURITY LEVEL

III

BALLISTIC AND FORCED ENTRY

GLZ-2 TEMPERED SAFETY GLAZING 10 28 19 VIGO INDUSTRIES 3/8" TEMPERED GLASS CLEAR FRAMELESS SHOWER ENCLOSURE

GT-1 TILE GROUT 09 30 10 MAPEI KERAPOXY SAHARA BEIGE - 11 COORDINATES W/ CT-1, CT-3, CT-7

GT-2 TILE GROUT 09 30 10 MAPEI KERAPOXY IRON - 107 COORDINATES W/ CT-1

GT-3 TILE GROUT 09 30 10 MAPEI KERAPOXY DRIFTWOOD - 105 COORDINATES W/ CT-5, CT-6, CT-2

GT-4 TILE GROUT 09 30 10 MAPEI KERAPOXY BAHAMA BEIGE - 04 COORDINATES W/ CT-4

HPL-1 HIGH PRESSURE LAMINATE 06 41 16.00 10 FORMICA MATTE FLINT CRYSTAL, 3518-65 DATA ROOM, RAISED ACCESS FLOORING

LVT-1 LUXURY VINYL TILE 09 65 00 MANNINGTON 12" X 12" LULWORTH STONE, AROSSST41 ELEVATOR FLOOR

LVT-2 LUXURY VINYL TILE 09 65 00 MANNINGTON 12" X 12" LINEAR METALLIC STEEL,

AROALA21

ELEVATOR FLOOR

LVT-3 LUXURY VINYL TILE 09 65 00 TARKETT IQ WARM SAND, 0467 CORRIDOR, RAISED ACCESS FLOORING

PLAM-1 PLASTIC LAMINATE 06 41 16.00 10 FORMICA MATTE BURNT STRAND, 6307-58 BASE CABINETS AND WALL CABINETS

-BREAK ROOM

PLAM-4 PLASTIC LAMINATE 06 41 16.00 10 FORMICA MATTE GREIGE SOFTWOOD, 4924-NG EXECUTIVE DESK

PT-1 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS DRIFT OF MIST SW9166 INTERIOR PAINT - FIELD COLOR

PT-2 PAINT 09 90 00 SHERWIN WILLIAMS FLAT FINISH FUTON SW7101 INTERIOR PAINT (GYP BD) - CEILING

PT-3 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS PUSSYWILLOW SW7643 INTERIOR PAINT - MEDIUM NEUTRAL

ACCENT

PT-4 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS DOVETAIL SW7018 INTERIOR PAINT, DARK NEUTRAL ACCENT, DOOR & WINDOW FRAMES

PT-5 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS STOLEN KISS SW7586 INTERIOR PAINT - RED ACCENT

PT-6 PAINT 09 90 00 SHERWIN WILLIAMS SEMI-GLOSS TOBACCO BROWN - FED SPECS

20117

EXTERIOR PAINT - DOORS, DOOR FRAMES,

LOUVERS

RB-1 RESILIENT BASE 09 65 00 ROPPE 4" PINNACLE RUBBER BASE, BLACK

COORDINATES W/ CPT-1

RB-2 RESILIENT BASE 09 65 00 ROPPE 4" PINNACLE RUBBER BASE, SLATE

COORDINATES W/ CT-4

SS-1 SOLID SURFACE 06 61 16 FORMICA 1/2" THICK GRAY RENEW 749 BREAK ROOM, KITCHENETTE

COUNTERTOPS

SS-2 SOLID SURFACE 06 61 16 CORIAN 1/2" THICK WHITE JASMINE RESTROOM COUNTERTOPS

SST-1 TYPE 316 STAINLESS STEEL ,

SST-2 STAINLESS STEEL PANELS 14 21 23 - BRUSHED SATIN SILVER ELEVATOR PANELING - TYPE 316

STAINLESS STEEL

SST-3 STAINLESS STEEL CEILING 14 21 23 - BRUSHED SATIN SILVER ELEVATOR T-FRAME WITH LEXAN

DIFFUSERS - TYPE 316 STAINLESS STEEL

ST-1 MARBLE THRESHOLD 09 30 10 GEORGIA MARBLE

COMPANY

DIAMOND SATIN FINISH WHITE CHEROKE RESTROOMS

TP-1 PHENOLIC TOILET PARTITION 10 21 13 BOBRICK CORP 1/2", 3/4" DURALINE

SERIES 1080/1180

PEWTER MESH 4878-38 OVERHEAD BRACED, MENS RESTROOMS

TP-2 PHENOLIC TOILET PARTITION 10 21 13 BOBRICK CORP 1/2", 3/4" DURALINE

SERIES 1080/1180

EVENING TIGRIS 4674-60 OVERHEAD BRACED, WOMENS

RESTROOMS

WP-1 WALL PROTECTION - HIGH IMPACT

WALL COVERING

10 26 00 CS ACROVYN 5/64" #934 PEARL CORRIDOR WAINSCOT - 36" HI

WP-2 WALL PROTECTION - CORNER GUARD 10 26 00 CS ACROVYN 3 1/2" X 3 1/2" X 48", #4

SATIN FINISH

CO-8, 304 STAINLESS STEEL CORRIDOR

WP-3 WALL PROTECTION - CRASH RAIL 10 26 00 CS ACROVYN 5 1/2" X 1 1/2", 16 GA SS SCR-16SSV CORRIDOR

NOTES:

- FOR COMMUNICATIONS FACILITY, SEE DRAWING A-601A FOR ROOM FINISH SCHEDULE.

- SEE SPECIFICATIONS FOR MATERIAL PERFORMANCE DATA AND CHARACTERISTICS.

- MANUFACTURER REFERENCES INDICATE COLORS, PATTERNS AND TEXTURES REQUIRED FOR EXTERIOR AND INTERIOR FINISHES. PRODUCTS FROM OTHER MANUFACTURERS MEETING THE

REQUIRED COLOR, PATTERN AND TEXTURE MAY BE SUBMITTED FOR APROVAL.

EXTERIOR FINISH SCHEDULE

EXTERIOR KEY EXTERIOR MATERIAL DESCRIPTION REMARKS

EFS-1 DIRECT-APPLIED EXTERIOR FINISH SYSTEM, FIELD

EFS-2 DIRECT-APPLIED EXTERIOR FINISH SYSTEM, ACCENT

FAR-1 FLUID-APPLIED ROOF MEMBRANE, ROOF

FAR-2 FLUID-APPLIED ROOF MEMBRANE, LOWER ROOF

FAR-3 FLUID-APPLIED ROOF MEMBRANE, SURFACES OTHER THAN ROOF

EXPOSED EXTERIOR SIDE OF INTEGRAL CONCRETE GUTTER, VERTICAL SURFACES AND UNDERSIDE OF CONC SLABS TO

MATCH EXTERIOR WALL

PT-6 EXTERIOR PAINT DOORS, DOOR FRAMES, LOUVERS, DOWNSPOUTS, AND OTHER MISCELLANEOUS METALS

SST-1 STAINLESS STEEL RAILINGS

/2

6/

R

E V

IS

E

D M

A T

E R

IA

L

S C

H E

D U

LE

D

K

04/28/2025

/1

1/

R

E V

IS

E

D S

C H

E D

U

LE

S D

K

TYPICAL FOR EXTERIOR WALL FIELD AT COMM BUILDING, ALL ENCLOSURES, AND RETAINING WALLS

TYPICAL FOR EXTERIOR WALL BASE AT COMM BUILDING, 3'-0" HIGH

/2 8/2

D K

R E

V

IS

E D

M A

T E

R

IA

L S

C H

E D

U

LE

CS124A - PCC JOINTING PLAN - 4
CS508A - PAVEMENT DETAILS (2 OF 2)
S-400A - ENLARGED ENTRY VAULT FOUNDATION PLAN
S-442A - TRASH ENCLOSURE FOUNDATION PLAN AND DETAILED SECTION
S-704A - STAIR AT RETAINING WALL
A-109A - PARTIAL FIRST FLOOR PLAN - 2
A-502A - WALL TYPES
A-602A - MATERIAL SCHEDULE
2025-04-29T11:21:30-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:39-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:40-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:40-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:40-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:40-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:40-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.
2025-04-29T11:21:40-1000
EVAN MIZUE
I am signing to certify the authenticity of this document.

File details come from the government source that posted it. Updated .