25R1303 P614 Note14.pdf
PDF 612 KB Posted
- Attached to
- FY24 MCON P-614 JOINT CONSOLIDATED COMMUNICATIONS CENTER, US JOINT REGION MARIANAS, ANDERSEN, GUAM
- Solicitation number
- N6274225R1303
About this file
This document is a Pre-Proposal Questions & Answers (Q&A) document for a federal contract solicitation for the FY24 MCON Project P-614 Joint Consolidated Communications Center at Joint Region Marianas Andersen, Guam. The document contains 53 technical and procedural questions from potential contractors, with corresponding responses from the Naval Facilities Engineering Systems Command Pacific regarding various specifications, drawing details, material requirements, and project logistics.
Key highlights include multiple requests for bid deadline extensions, clarifications on specific technical specifications like electrical systems, wall and ceiling details, environmental controls, and confirmation of requirements for specialized systems like precision cooling, uninterruptible power supply, and clean agent fire suppression. The government consistently defers some detailed responses, indicating potential forthcoming amendments, and maintains the core requirements for the project, which involves constructing a two-story reinforced concrete communications center with sensitive facility construction requirements, estimated between $100-250 million with a 1,286 calendar day completion period.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
Notice No. 14
06 May 2025
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-25-R-1303
FY24 MCON PROJECT P-614 JOINT CONSOLIDATED COMMUNICATIONS
CENTER JOINT REGION MARIANAS ANDERSEN, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
RESPONSES DEFERRED FROM NOTICE NO. 8 DATED 14 April 2025
69. RFP Document 00 22 00, page 2 & Attachment A – Concerning the response for Non-Price Proposal Factor 1 – Experience, the definition of a relevant construction project and the individual feature Precision Cooling System states “New construction of a chiller type technology cooling system engineered specifically for data center/electronic/IT networking environments.” However, in referring to the Attachment A – Construction Experience Project Data Sheet that is to be completed and submitted within an Offeror’s proposal, Block 8 states (emphasis added to denote difference) “…new construction or replacement of a chiller type technology “Precision” cooling system engineered specifically for data center/electronic/IT networking environments”. Please clarify the requirement and revise the RFP as necessary in order that the requirement is clear.
ANSWER: Document 00 22 00 and Attachment A will be revised in a forthcoming amendment.
70. RFP Document 00 22 00, page 2 & Attachment A – Concerning the response for Non-Price Proposal Factor 1 – Experience, the definition of a relevant construction project and the individual feature Uninterruptable Power Supply System states “New construction of an Uninterruptible Power Supply (UPS) system that is 225 kVA size or more.” However, in referring to the Attachment A – Construction Experience Project Data Sheet that is to be completed and submitted within an Offeror’s proposal, Block 8 states (emphasis added to denote difference) “…new construction or replacement of an Uninterruptible Power Supply (UPS) system that is 225 KVA size or more”. Please clarify the requirement and revise the RFP as necessary in order that the requirement is clear.
ANSWER: See response to Q69.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
71. RFP Document 00 22 00, pages 5-6 – Concerning the response for Non-Price Proposal Factor 3 – Safety, the RFP requires Offerors to provide the DART and TRC Rate information, along with supporting OSHA 300 log and OSHA Form 300A summary, for the five previous complete calendar years; however, the RFP notes years 2023, 2022, 2021, 2020, and 2019.
Please confirm that those specified years are indeed the years of information the government indeed desires that Offerors submit information for.
ANSWER: See response to Q69.
RESPONSES DEFERRED FROM NOTICE NO. 12 DATED 02 May 2025
119. The current bid due date is set at 14th May 2025. With all of the recent RFPs and Guam MACC Phase 2 bids, it is a very big strain on the estimating and subcontracting community to meet this deadline, especially considering the specialist requirements of this bid. In order to offer the Government the lowest cost proposal, we respectfully request a four (4)-week extension to the bid date.
ANSWER: The proposal due date will be extended in a forthcoming amendment.
RESPONSES FOR NOTICE NO. 14
162. DIV 25; In the absence of UFGS 25 08 11.00 20 Risk Management Framework for Facility Related Control Systems specification, requesting confirmation if cybersecurity contractor is responsible for RMF and eMASS as outlined in DoDI 8510.01, or if the government will be responsible for this scope.
ANSWER: The goal of the UFGS 25 05 11 is not to achieve an ATO, it is to fundamentally incorporate cybersecurity into construction, in support of the RMF process outlined in the DODI
8510.01. The absence of the 25 08 11.00 20 indicates that administering eMASS and going through the complete RMF process is a separate effort that the government will have to pursue if required.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
163. The specified 50,000 Gal fuel tanks present multiple and expensive logistical shipping challenges. A tank of this dimensions is too large and too heavy to be shipped to Guam. There are weight limitations to unload a tank of this magnitude at the Port of Guam. Also, to transport the tanks from the Port of Guam to the actual jobsite will present multiple challenges significantly increasing the cost. Special permits for transportation of cargo this size within Guam will cause unnecessary delays to the project. A 12,000 gal tank has the weight and dimensions that can be accommodated as regular cargo for ocean shipping and transport within Guam. 12,000 gal tanks and/or combination of them have been successfully specified and installed in recent similar projects in Guam. Please consider replacing the 50,000 gal fuel tanks for a combination of 12,000 gal fuel tanks that can provide the same amount of fuel storage at a fraction of the price.
ANSWER: It has been confirmed with the freight forwarding company and the basis of design tank manufacturer that it is possible to ship 50000gal tanks through the Port of Guam.
Additionally, a larger quantity of smaller tanks will not fit within the existing site constraints. As such, the 50,000gal tank design stands as-is.
164. SF1442; The Price Proposal Schedule CLIN 0001AD is based on a Lump Sum. Please consider changing this CLIN to a unit price ($/CY) based on 6,000 CY to match CLIN 0001AC.
Otherwise, bidders would have to assume that the entire volume of dirt under footings, SOG, pavements, and utility beddings is unsatisfactory unnecessarily increasing the cost to the Government.
ANSWER: See response to Q120.
165. SF1442; CLIN 0002AB has a 5% “Handling and Administrative Rate” for the Contractor to handle the FFE scope of work. Five percent is not enough to cover the scope and only covers the Guam Gross Receipts Tax. Please advise what CLIN should the bidders use to include the complete handling and administration such as staffing (bidding process, contracting, submittals, tracking materials, schedule updates, etc.), general conditions, general requirements, bonds and insurance, contingency, profit, etc.
ANSWER: Bid according to RFP.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
166. 00 70 00; Document 00 70 00 NEGOTIATED CONTRACT CLAUSES includes FAR clauses incorporated by reference. 1.51 FAR 52.222-21 PROHIBITION OF SEGREGATED FACILITIES, 1.52 FAR 52.22-26 EQUAL OPPORTUNITY, and 1.53 FAR 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION are listed. Please confirm whether or not the above listed FARS are still applicable to this contract.
ANSWER: Please see Amendment 0004.
167. 00 70 00; Document 00 70 00 NEGOTIATED CONTRACT CLAUSES, Paragraph 1.71
FAR 52.225-11, BUY AMERICAN – CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (NOV 2023). Previous Free Trade Agreements are no longer in place due to the recently imposed tariffs by the current Administration. Please indicate how NAVFAC will handle material cost increases due to the volatility of market futures and uncertainty of the world markets. A 150 day award period is too long and difficult to forecast.
ANSWER: The solicitation remains unchanged. A contract resulting from this solicitation will be administered according to terms and conditions stated in the solicitation.
168. 01 35 13.04 30; Specification Section 01 35 13.04 30 INDUSTRIAL CONTROL SYSTEMS PROCUREMENT FOR AIR FORCE CONTROLS SYSTEMS/3.1.1 Contractor Personnel Requirements, the last sentence of the first paragraph states that a favorable security background check in accordance with IT-II designation.
A. Please provide details of what the IT-II designation requirements are for a favorable security background check.
B. Please indicate the duration of the security background check.
C. Please indicate the cost of the security background check.
D. Please indicate the entity responsible for performing the security background check.
ANSWER: Response deferred.
169. 01 50 00; Specification Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS/3.2.1/b. states that Contractor shall provide electric generation and controls for all AAFB sites that will be temporarily without electricity due to the outages required to connect P-614 to circuits P81 and P95.
A. Please provide size and quantity of the generators required.
B. Please provide electrical loads required and hours of operation of buildings to be serviced by temporary generators.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
C. Please provide the type of controls (including compatibility requirements and functions) required.
ANSWER: A. If a circuit outage is required to connect the new JC3 (P614) building to P81 and/or P95, the Contractor should coordinate with the AAFB to determine how existing switches can be employed to isolate manholes MH-166 and MH 95-12 while minimize outages to existing buildings and base facilities. Existing base circuit maps and one-line diagrams can support plans for switching circuits on/off.
For MH 166:
There are two circuits that currently exist in this manhole. (P68 and P81). It is estimated that the following buildings will require some generation in order to connect the new JC3 (P614) building o Building 23008 fed from SW166 fed by T23008 (300KVA) o Building 23028 fed from SW166 fed by T23028 (750KVA) o Building 23010 fed from SW166 fed by T23010 (225KVA)
Note 1: Contractor to verify the number of circuits in manhole.
Note 2: Contractor may be able to use existing, on-site generation for one or more of these buildings. GOV will need to coordinate this.
For MH 95-12:
There is one circuit that currently exists in this manhole. (P95) It is estimated that no building or other base facilities will require temporary generation if this manhole is isolated via switching.
Note 1: Contractor to verify the number of circuits in manhole.
B. Government to provide hours of operations for building and base facilities that require temporary generation.
C. Government to provide a list of buildings that can provide on-site generation if disconnected from the AAFB grid.
170. 01 50 00; Specification Section 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS/3.5.1 Administrative Field Offices. Please clarify if these field office facilities are for the Government or for the Contractor. Also, the description includes providing a heater. Usually, space heaters are not required in Guam. Please confirm a heater is not required for this project.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
ANSWER: Section 3.5 is for Contractor’s Temporary Facilities. A space heater will not be required for Guam.
171. 01 57 19.03 20; Specification Section 01 57 19.03 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS Munitions Response Explosives Safety Submission (MRESS) Guam Construction. Please provide the Annex developed for this specific site, if available.
ANSWER: Please see Amendment 0008.
172. 01 57 19.03 20; Specification Section 01 57 19.03 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS Munitions Response Explosives Safety Submission (MRESS) Guam Construction/1.3 ANOMALIES. The last sentence of the second paragraph states: “Contractor assumes the risk that the number of anomalies encountered at the project site may differ from historic averages.” Please consider removing this sentence from the RFP. The Government should assume this risk as the Government has all the pertinent information and the Contractor does not. If Contractor shall assume this risk, a sizeable contingency will be added to the cost of the project in order to deter the risk. This would not be the best use of taxpayers monies.
173. 02 61 13; Specification Section 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL/1.1.2 Payment states that compensation for excavation and onsite transportation of contaminated material will be paid as a unit cost. However, Form SF1442 Price Proposal Schedule doesn’t have a CLIN for such unit price.
A. Please advise how the bidders are to provide such unit price.
B. Please provide a quantity in cubic yards to use as a base to establish the unit price.
174. 02 61 13; Specification Section 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL/1.3 DESCRIPTION OF WORK. The second sentence of the first paragraph states that excavated soil material will be moved within AAFB to the North Ramp stockpile area. Please provide exact location of such stockpile area or provide distance from jobsite in order to establish the transportation cost.
ANSWER: Use of North Ramp stockpile location is confirmed. Haul distance is approximately 12 miles.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
175. 02 61 13; Specification Section 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL/1.3 DESCRIPTION OF WORK. The fourth sentence of the first paragraph states that approximate locations and characterization data of contaminated material are shown on the Hazardous Material Survey and Soil Screening Report for FY24 MCON Project P-614 Guam Joint Consolidated Communications Center. Please provide such report.
ANSWER: Please see Amendment 0009.
176. 02 61 13; Specification Section 02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL/3.6.3 Sampling Beneath Storage Units. This paragraph talks about collecting samples from beneath each storage unit prior to construction and after removal of storage unit. What storage units are these? Please provide a sheet number where these storage units can be found on the drawings.
ANSWER: These are storage units for contaminated soil or materials. The Contractor may or may not use storage units; however, if needed, contractor will propose the location for Government approval.
177. 02 61 23; Specification Section 02 61 23 REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS. Please confirm that if PCB contaminated soil is found, it will be treated as a differing site condition and Contractor will be compensated via Change Order for all work related. Also, please confirm that Certified Industrial Hygienist testing shall be included with the Base Bid.
ANSWER: Confirming that should PCB contaminated soil be discovered, it will be treated as a differing site condition and addressed via Change Order, subject to Government review approval.
CIH testing will be included in the base bid for four (4) PCB soil samples.
178. 02 61 23; Specification Section 02 61 23 REMOVAL AND DISPOSAL OF PCB CONTAMINATED SOILS/3.6.2 Disposal. Please confirm there is an available regulated landfill in Guam that will receive PCB contaminated soil in accordance with 40 CFR 761 at TSCA and meeting the requirements of 40 CFR 761.75.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
ANSWER: PCB-contaminated soil exceeding 50 ppm does not meet 40 CFR 761.75 criteria and must be disposed of at an approved off-island TSCA facility. Contractor will coordinate transportation, manifesting, and disposal in full compliance with applicable federal regulations and contract specifications.
179. 02 81 00; Specification Section 02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS. Please provide the exact scope to be covered by this specification section (characterization of material, location, depth, quantity, area to be disposed off, etc.).
Also, please provide guidance as how the Contractor will be compensated (Unit price, Change Order, Unforeseen Condition, etc.)
ANSWER: Contractor shall characterize encountered materials and submit a Hazardous Waste Management Plan per paragraph 3.1. If unforeseen hazardous waste is found during earthwork, such as asbestos cement pipe, a Change Order may be submitted under the Differing Site Condition clause.
180. 02 82 00; Specification Section 02 82 00 ASBESTOS REMEDIATION/1.2.13 Disturbance mentions that there is a possibility to uncover utilities which may have potential asbestos containing materials. Please confirm that if this is the case, the Government will treat this as an unforeseen condition and the Contractor shall be compensated accordingly. Otherwise, please provide a complete Hazardous Material Investigation report for the project site.
ANSWER: In section 02 82 00, paragraph 1.2.13, disturbance of hidden or underground utilities that may contain asbestos is possible. Sampling of underground utility pipes or manhole interiors was not scoped in AE’s hazardous material surveys. Therefore, materials were assumed to be asbestos-containing material (ACM) and must be treated accordingly until proven otherwise through testing. If confirmed as ACM, the contractor may qualify for compensation under a Differing Site Condition via Change Order.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
181. 01 57 19.03 20; Specification Section 01 57 19.03 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS Munitions Response Explosives Safety Submission (MRESS) Guam Construction. There is a Memorandum for Assistant Secretary of the Navy for Energy, Installations and Environment Chief of Naval Operations Commandant of the Marine Corps Department of Defense Explosives Safety Board; Subject: Explosive Safety Risk Acceptance Within Joint Region Marianas; stating that in order to accelerate infrastructure and readiness efforts, the memorandum conditionally exempts Department of the Navy construction, maintenance, and repair projects in the U.S. Indo-Pacific are of responsibility from the explosives safety requirements set forth in Department of Defense Explosives Safety Regulation (DESR 6055.09) and other corresponding Department of Defense policies. Please refer to the attached Memorandum.
Please indicate if this Memorandum is applicable to this project and if the MEC requirements for this project will be deleted.
Explosive Safety Waiver_2 (002).pdf
ANSWER: Per NAVFAC PM email direction on 4/24/25, no change to MEC requirement for P- 614 until further guidance is received from JRM on implementation of the Explosive Safety Waiver memo.
207. Reference: Mechanical Enclosure, Drawing A-413A, A-414A. Please provide details Ladder Platform with Guards shown on Mechanical Enclosure Floor Plan (drawing A-413A, A- 414A). Please see clouded item below for reference.
ANSWER: Will provide details for ladder platform at mechanical enclosure in forthcoming amendment.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
208. Reference: Communication Building Drawing A-407A to A409A, A514A, Spec Section 05 50 13. Safety nosing is specified in Spec Section 05 50 13, Para. 2.12. However, nosing is not indicated in Enlarged Stair Plans and Sections - Stair No. 1 - 3 (drawing A-407A to A-409A, A- 512A). Please confirm if nosing is required for all concrete stairs tread.
ANSWER: Stair nosing is required. Will provide stair nosing details in forthcoming
209. Drawing TY101A - ESS Site Plan, Handholds, ESS Site Plan Shows 7E. Handholds. Please provide Handhold Details and Specifications.
ANSWER: Handholes for electronic security systems shall include concrete walls and metal, bolt down cover with minimum interior dimension of 16” x 24” x 12”. Handhole cover shall include non-slip surface and grounding connection to bond the cover to the interior latch.
Handholes shall be located on the secure side of the security perimeter. Conduits entering handholes shall be plugged to prevent moisture and rodent ingress. Handholes covers shall be located flush with grade in paved areas and handhole assembly shall be suitable for heavy duty loading in traffic areas. Handhole covers shall be 2” above finished grade in non-paved areas.
Handholes shall not be located at low points in the site to prevent puddling on the handhole lid.
Handhole shop drawings and locations shall be reviewed by the Government prior to rough-in for coordination with government furnished equipment and cabling.
210. PCCP Thickness - Detail A1/CS507A calls for 8" thick PCCP Concrete. Conversely, some joint details on CS508A state 9" thick. Please advise which thickness to use and revise details accordingly.
ANSWER: Sheet CS508A will be revised in forthcoming amendment to reflect 8”.
211. A 28 March 2025 SECNAV memorandum related to Explosive Safety Risk Acceptance within Joint Region Marianas has been circulating within the Guam contractor community.
Please specify if this memorandum will change the MEC requirements/specifications associated with this solicitation and issue an amendment that reflects the applicable change. If there is no impact, please confirm that contractors should be bidding to conduct a full MEC Clearance Ahead of Construction as currently prescribed by Guam MRESS Amendment 08.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
ANSWER: The memorandum in question is not expected to impact the MEC/UXO scope for the project at this time. Confirmed that contractors should include full MEC clearance.
212. Request that the Government provide the contracting community with at least three weeks of time to incorporate answers to all RFI. I.e., once all RFIs have been addressed, contractors have three weeks to prepare their bids for submission.
There are still many deferred responses from the Government that the contractor community needs answers to proceed with, and those answers aren't simple for our subcontractors to apply to their bids due to the complexity of work that this project entails.
ANSWER: See response to Q119.
213. Reference specification 12 00 01.00 20 Furniture, Fixtures and Equipment (FF&E) Package.
Should a modification be executed for the FF&E package on the project, please advise if the government-selected vendor(s) for the Fixed Facility FF&E will consider secure shipment to the project site and installation by personnel meeting the requirements of the CSP.
ANSWER: FF&E vendor will install all FF&E items, including anything required by potential modifications.
215. Communication Center; Blanket Insulation; Please provide the R-Value for the Blanket Insulation, as the drawing and Specification 07 21 16 do not provide details.
ANSWER: There are no thermal requirements for the blanket insulation, so R-Value is not provided. Refer to Wall Types for size of insulation.
216. Communication Center; Conflict between Material Schedule (A-602A) and Spec Section (09 90 00) Paints and Coatings; There is a conflict between the Material Schedule (A-602A) and the Spec Section (09 90 00). Please revisit and clarify.
In Material Schedule PT-6, paint to Exterior Doors is in Semi-Gloss, but in Specification 09 90 00 para 3.14.1.2 it is Gloss Finish.
ANSWER: PT-6 is Gloss Finish. A-602A will be revised in forthcoming amendment.
217. Communication Center; Insulation for the Perimeter Walls (interior Side); Please confirm if the intention is to keep the interior perimeter walls bare and without insulation.
ANSWER: Confirming to keep the interior perimeter walls bare and without insulation.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
218. Specification Section 31 00 00; Disposition of Surplus Material paragraph 3.9; On the previous projects for tender, any surplus soil that is reused or disposed of outside of Government property must be evaluated for potential soil contamination in accordance with applicable section in the specifications and soil recipient requirements.
Necessary soil sampling and testing and waste characterization is required by the recipients if surplus soils are disposed of or reused outside of Government property.
In the absence of directions to the contrary, please confirm that this requirement does not apply to this bid.
ANSWER: As noted in specification section 31 00 00 paragraph 3.9, “Properly disposed of in accordance with all applicable laws and regulations.”
219. Please advise the thickness of the CMF-3 concrete footing shown on Sheet S-400A.
ANSWER: Please see response to RFI Set 19, Item 159 and AMD0010 for details.
220. We would like to respectfully request for a four-week extension to the bid deadline in order to for suppliers and contractors to review the RFP more thoroughly to provide more accurate and competitive pricing. Please confirm this is acceptable.
222. As per drawing A-602A (Material Schedule), there is WP-1 (Wall Protection - High Impact Wall Covering), however, no drawings show any wall covering. Please clarify or provide the location.
ANSWER: See response to RFI Q76.
223. Specification Section 10 28 13 (Toilet Accessories) mentioned the following items but not reflected in any drawings.
a. Item A5090 Disposal, Sanitary Napkin, SS, Surface Mounted
b. Item A5135 Shelf, Utility W/ Mop/Broom Holders, SS, Surf Mounted
c. Item A5145 Hook, Garment, Double, SS, Surface Mounted
d. Dispenser, Toilet Tissue/Toilet Seat Cover, SS, Partition Mounted
Please clarify or provide their location.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
ANSWER:
a. Refer to Toilet Tissue/Toilet Seat Cover Dispenser on Sht. A-505A
b. Sheets A-208A and A-601A will be revised in forthcoming amendment to show
Item 5135.
c. Sheets A-403A, A-406A, and A-505A will be revised in forthcoming amendment to show Item 5145.
d. Sheets A-401A thru A-405A will be revised in forthcoming amendment to show
Dispenser.
224. As per Drawing A-403A - Enlarged Floor Plan And Interior Elevations - RM 141 & 143/ A3, the Soap Holder is reflected on the drawing B1, however, no specification is provided.
Please clarify.
ANSWER: Specifications to be revised in forthcoming amendment to include soap holder.
225. Please provide the specification of Mirrors as shown in drawing A-401A - Enlarged Floor Plan and Interior Elevations- RM 118/ A1. Please clarify which will govern.
ANSWER: Mirrors are specified in Section 08 81 00 Glazing.
226. In Section 09 84 20 Acoustical Wall Panels, Item 2.2.2, it is mentioned that the panel Height must be 108 inches. However, in drawing B1/A206A Interior Elevations - First Floor, the height of the acoustic panel is only 48 inches. Please clarify
ANSWER: Specifications to be revised in forthcoming amendment.
227. As per drawing A-602A (Material Schedule), there is PLAM-4 (Plastic Laminate), however, no drawings show any PLAM-4. Please clarify or provide the location.
ANSWER: Delete PLAM-4. Sheets A-602A will be revised in forthcoming amendment.
228. In drawing A-109A - Partial First Floor Plan- 2, Room 124 Comsec Vault reflects wall type "P2"; however, no drawings show the wall Type P2. Please clarify.
ANSWER: See response to RFI Q144.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
229. Please confirm the size of for downspout. On detail A3 Gutter Detail at DS (drawing A- 506A) calls out for a 4'' diameter Stainless Steel, while detail C4 Downspout Section Detail (drawing A-507A) specifies a 5'' diameter.
ANSWER: Size of downspout is 5” diameter. Sheet A-506A will be revised in forthcoming
230. We respectfully request a four-week extension to the current bid deadline to allow adequate time for our team, subcontractors, and suppliers to thoroughly review the RFP and prepare accurate, competitive pricing. Given the number of concurrent bids we are actively pursuing, additional time will help ensure a complete and responsive proposal for this project.
231. As per Drawing Sheet No A-602A Material Schedule, it shows two types of phenolic toilet partitions, TP-1 and TP-2. Please clarify which Toilet Rooms, TP-1 and TP-2 be applied.
ANSWER: See response to RFI Q75.
232. Please provide the location of Ladder Platform (with Guard) as mentioned in specification 05 51 33 Metal Ladder, Par. 2.4.1.
ANSWER: See response to RFI Q207.
233. In reference to drawing sheet no A-407A, A-408, A-409A (Stair 1-3 Plans and Sections), Stainless Steel Railings are shown on the first floor of Stairs 1-3, however, there are no provided details. Please provide.
ANSWER: Will provide first floor stainless steel railing details in forthcoming amendment.
234. As per Drawing Sheet No. A-407A and A-408A (Stairs 1 and 2 Plans and Sections), Guard Rails are shown on the upper roof level of Stairs 1 and 2. Please provide details.
ANSWER: Will provide guardrail details at upper roof level in forthcoming amendment.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
235. Please provide the location of Security Grille, Access Hatch and Frames, and Guy Cable as mentioned in specification 05 50 13 Miscellaneous Metal Fabrications, par 2.4, 2.9, and 2.14.
ANSWER: Will delete Security Grille, Access Hatch and Frames, and Guy Cable in forthcoming
236. As per Drawing Sheet No A-602A Material Schedule, it includes finishes for Elevators, which include the Stainless Steel Panels and Ceilings. Please provide details.
ANSWER: Will provide elevator finish details in forthcoming amendment.
237. As per Drawing Sheet No. A-101B, Generator Building Floor Plan, shows trench grating requirements on the floor; however, there is no section or detail provided. Please provide.
ANSWER: Refer to structural drawings for details.
238. In reference to drawing sheet no A-518A, Ladder Details and specification 05 51 33 Metal Ladders, the required metal finish of stainless steel ladders is not mentioned. Please clarify.
ANSWER: Refer to para 2.2 MATERIALS of specification 05 51 33.
239. Drawings A-501A, A-502A, A-503A, and A-504A indicate 5/8" Type “X” gypsum board for various wall types. Specification 09 29 00 references two types:
i. Glass mat-covered gypsum board (Sec. 2.1.1)
ii. Factory-laminated sound-dampening gypsum board (Sec. 2.1.3)
Please confirm which wall types or locations each type is intended for.
ANSWER: Will delete factory laminated sound dampening gypsum board in forthcoming
244. Specification Section 05 12 00.00/1.3 call out for an AISC Certified Steel erector to be utilized. There are no AISC Certified Steel erectors in Guam. It will be very costly to bring an AISC Certified Steel erector from off island to perform the steel erection. Since the Structural Steel in the project is not critical for the structural integrity, we respectfully recommend waving this requirement. There are other Quality Control measures (Special Inspections) that can be taken and implemented to ensure the quality of the welding and the installation in general.
ANSWER: There are AISC Certified Steel erectors in Guam, such as Smith Bridge. AISC Certified Steel erectors must be used.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
245. Dwg ES-601D calls for the intercept and routing of 13.8kV circuits 81 & 95 at existing manhole locations. Dwg ES-601 shows the intercepted circuits to be routed to pad mounted switches SW-81-1 and SW-95-3 and terminated in a radial feed configuration. Dwg E-600D shows these same 13.8kV feeds in what appears to be a tap configuration with a single set of conductors routed to SW-81-1 & SW-95-3. Please provide the desired circuit routing method.
ANSWER: E-600D to be revised to match ES-601D arrangement showing looped feed in forthcoming amendment.
246. Specification Sections 26 23 00 & 26 24 13 - 2.2.2.1-d calls for "bases, frames and channels of enclosure: corrosion resistant and fabricated as indicated on the drawings.” The electrical drawings do not address enclosure material types. Paragraph 2.2.2.1-f calls for galvanized steel and galvanizing after fabrication where practicable. With the electric rooms being air-conditioned spaces and the switchgear installed on equipment pads, can the switchgear enclosures be provided as NEMA 1, constructed from powder coated mild steel?
ANSWER: Switchgear and Switchboard to be NEMA 1 with galvanized steel.
248. Bid Submission Date Extension; The recent bulk release of the three Amendments dated April 29, 2025 does not allow sufficient time for dissemination of the revised information and supplier/subcontractor re-quoting. Adding to the predicament is the due date of the RFI submission deadline.
In order to incorporate the recent information and offer best value to the Government, we urgently request the Government a 2-week time extension to the current bid date of May 14, 2025. Please advise.
249. Specs Section 26 32 15.00, para. 2.1 c. & 2.1.1 Engine-Generator Parameter Schedule;
Engine-Generator Set Stationary 15-2500KW with Auxiliaries; Spec Section 26 32 15.00, para.
2.1 c & 2.1.1 requires the manufacturer for the Engine-Generator Set must be Cummins in compliance with the Air Force Class Justification and Approval (J&A) document. However, there is no J&A Document for this purpose that was included in the RFP Package. Another issue is that we are not getting a response to our request for proposal from Cummins as of this date.
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
Please provide Air Force Class Justification and Approval (J&A) document for the Engine- Generator Set together with the contact information for Cummins.
ANSWER: Specs Section 26 32 15.00 will be revised to include the POC Rep and J&A to be provided in a forthcoming amendment.
250. In Specification 09 69 13 Rigid Grid Access Flooring, there are two varieties of access flooring, the Hollow Formed Steel (section 2.2.3.1) and Cementitious-Filled Formed Steel (Composite Panels) (section 2.3.3.2). Please clarify what kind of raised access flooring will be used.
251. As per Drawing Sheet No A-511A, Ceiling Details, Seismic Separation Joint is required for a ceiling with area greater than 2500 SF, however there are no details provided.
Please provide details for seismic separation joints.
252. As per Drawing Sheet No A-511A, Ceiling Details, Horizontal Restraint Wire / Rigid Bracing is required for ceiling with area greater than 1000 SF however there is no details provided. Please provide details for Horizontal Restraint Wire / Rigid Bracing.
253. The following buildings/enclosures are not included in the Room Finish Schedule.
Please provide Wall, Floor, and other required finishes for this building.
1. Electrical Yard