25R1303 P614 Note 10.pdf
PDF 372 KB Posted
- Attached to
- FY24 MCON P-614 JOINT CONSOLIDATED COMMUNICATIONS CENTER, US JOINT REGION MARIANAS, ANDERSEN, GUAM
- Solicitation number
- N6274225R1303
About this file
This document is a Pre-Proposal Questions & Answers (Notice No. 10) for RFP N62742-25-R-1303, dated 28 April 2025, related to the FY24 MCON Project P-614 Joint Consolidated Communications Center at Joint Region Marianas Andersen, Guam. The document provides responses to several technical and project-specific questions from potential contractors, addressing topics such as utility line demolition, manhole demolition, and permitting duration.
Key details include a response to a question about the MEC Annex, which will be provided in a forthcoming amendment, and clarification that existing utility lines being demolished are not expected to contain asbestos. The Government has allocated six months for permitting, specifically for GEPA permitting required for clearing and grubbing work on site. The document emphasizes that these questions and answers are for information only and do not change the original RFP unless amended in writing on a Standard Form 30.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
Notice No. 10
28 April 2025
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-25-R-1303
FY24 MCON PROJECT P-614 JOINT CONSOLIDATED COMMUNICATIONS
CENTER JOINT REGION MARIANAS ANDERSEN, GUAM
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
RESPONSES DEFERRED FROM NOTICE NO. 8 DATED 14 April 2025
43. Reference: Non-CUI Spec Section 01 57 19.03 20: MEC Annex; Has a MEC Annex been prepared for this project site? If so, please provide.
ANSWER: MEC Annex has been prepared, and will be provided in a forthcoming amendment.
44. Reference: Non-CUI Dwgs CD102A, CD103A, CD104A; Existing Utility Lines to be Demolished; Dwgs CD102A, CD103A, and CD104A show existing toned underground lines to be demolished. We have the following questions:
1. For the basis of the bid, what material and diameter of the line shall be considered?
2. Are any of these lines to be considered as containing asbestos? If so, please provide pipe size and lineal feet to consider.
ANSWER: 1. Assume utility lines are buried with depth to top of duct bank as noted, and dimensions of 2-feet wide x 1-foot thick.
2. Lines being demolished are currently not expected to contain asbestos.
46. Reference: Non-CUI Dwg ET101A; MH Global Hawk MH480; On drawing ET101A, Global Hawk Manhole 480 has a call out for Sheet Note “3” for demolition of duct bank and cabling. Should the callout be for note “4” for core drill existing manhole? Or does the manhole get demolished? Please advise.
ANSWER: Global Hawk Manhole 480 must be demolished.
49. Reference: Non-CUI; Secure Storage Area;
1. Please provide location and dimensions for the Secure Storage Area.
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
RFP N62742-25-R-1303
2. Please Prime Contractor requirements for the secure storage area: Aggregates, Fencing & Gates, Utilities (Lighting, CCTV, etc.)
3. Please provide any construction schedule restraints from the time the secure storage area is constructed to when SUS or general construction may begin.
ANSWER:
1. Not required. Refer to CSP for CUI requirements para 6.8.c and 6.9.
2. N/A
3. N/A
72. With regards to the Government’s Answer to Question 4 in Notice 1, please provide the duration that the Government is allocating in the Period of Performance for “permitting”, and specifically, for GEPA permitting that is required to perform any clearing/grubbing work on site.
ANSWER: A duration of (6) months has been allocated by the Government.