About this file

This is a General Decision wage determination document (NY20260012) issued by the U.S. Department of Labor establishing prevailing wage rates for construction work in Nassau and Suffolk Counties, New York, effective May 18, 2026.

The determination covers building, heavy, and highway construction projects in the specified counties and lists detailed wage classifications with corresponding hourly rates and fringe benefits. Classifications include skilled trades such as carpenters (with subcategories for different specialties ranging from $53.56 to $75.46 per hour), electricians ($42.93–$64.55), ironworkers ($48.15–$92.02), painters ($44.75–$49.20), plumbers ($36.05–$60.73), roofers ($51.25), sheet metal workers ($35.79–$53.60), truck drivers ($45.65), cement masons ($59.87), and laborers ($41.15–$51.43), among others. Specialized roles such as power equipment operators are organized by equipment group with tiered hazmat premiums (levels A through D) reflecting equipment complexity and associated risk levels. Fringe benefits are separately itemized and range from approximately $12.95 to $92.02 per hour depending on classification. The document includes two modification dates (January 30, 2026, and May 18, 2026) reflecting rate updates. Additional notes address paid holidays, vacation accruals based on tenure, paid sick leave requirements under Executive Order 13786, and the wage determination appeals process through the Department of Labor's Wage and Hour Division.

View the file

Other files

File Type Posted
Amendment 0005 - N4008526R0161.pdf PDF
Amendment 0004 Phase III Groundwater Treatment Plant.pdf PDF
Attachment O- 43 21 13_R1.pdf PDF
Attachment R- A-112G08005-WE24 Phase III- A-102.pdf PDF
Attachment L- 43 3113.13 10.pdf PDF
Attachment N- 08 71 00 R1.pdf PDF
Attachment Q- 50 03 01 R1.pdf PDF
Amendment 0003 Phase III Groundwater Treatment Plant.pdf PDF
Interested Vendors List N4008526R0161.docx DOCX document
Attachment P- M101-R1.pdf PDF
Attachment L - Section 43 31 13.13 10.pdf PDF
Amendment 0002 Phase III Groundwater Treatment Plant.pdf PDF
Attachment M - BP Phase III Spec Mod 06102026.pdf PDF
Attachment J- Site Location Map.pdf PDF
Attachment 1- Basis of Design-PHASE III GWTP_BODR_Feb 26 IFB To Navy_REDACTED.pdf PDF
Amendment 0001 Phase III Groundwater Treatment Plant.pdf PDF
Attachment K- Phase_III_Photo_Log.pdf PDF
Attachment 3-Appendix E Phase III DWGs-CUI-REDACTED-NEW.pdf PDF
Attachment H- Price Proposal Form.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
ATTACHMENT 2- Appendix D_Combined Specs_Signed.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment H- Price Proposal Form.docx DOCX document
Attachment I - Wage Determination NY20260012.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Historical SB Utilization.pdf PDF
Attachment G - Individual SB Subcontracting Plan.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
Solicitation - N4008526R0161.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - SBPCD.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .