Attachment D - Past Performance Questionnaire.pdf

PDF 362 KB Posted

Attached to
DESIGN-BID-BUILD (DBB) PHASE III GROUNDWATER TREATMENT PLANT CONSTRUCTION, NWIRP BETHPAGE, NEW YORK (PREVIOUS NOTICE ID N4008526R0045)
Solicitation number
N4008526R0161
Issued by

About this file

This is Attachment D to a federal contract solicitation for the Design-Bid-Build, Phase III Groundwater Treatment Plant project at Naval Weapons Industrial Reserve Plant, Bethpage, New York (Contract N40085-26-R-0161). It provides instructions and forms for Past Performance Questionnaire (PPQ) submissions required as part of the proposal evaluation process for Factor 1 Corporate Experience.

The document establishes that offerors must submit either completed Contractor Performance Assessment Reporting System (CPARS) evaluations or the NAVFAC Form PPQ-0 for each project included in their corporate experience section. If a CPARS evaluation is available, it must be submitted instead of a PPQ; offerors are explicitly prohibited from submitting both. For projects where CPARS is unavailable, offerors should submit completed PPQs from clients or, if unable to obtain full completion before the proposal deadline, submit at minimum the first page of the PPQ containing contract and client information. Clients may submit questionnaires directly to the Government point of contact, Shayna Eichner (shayna.t.eichner.civ@us.navy.mil), prior to proposal closing. The form itself collects contractor information (Blocks 1-4), including firm details, work role (prime/subcontractor/joint venture), contract specifics, and project description, followed by client evaluation sections (Blocks 5-8) with performance ratings across seven categories: Quality, Schedule/Timeliness, Customer Satisfaction, Management/Personnel/Labor, Cost/Financial Management, Safety/Security, and General. Rating scales use adjective definitions ranging from Exceptional (E) to Unsatisfactory (U), with guidance provided on appropriate application of each rating level.

View the file

Other files

File Type Posted
Amendment 0005 - N4008526R0161.pdf PDF
Wage Determination NY20260012 5.18.2026.pdf PDF
Amendment 0004 Phase III Groundwater Treatment Plant.pdf PDF
Attachment O- 43 21 13_R1.pdf PDF
Attachment N- 08 71 00 R1.pdf PDF
Attachment L- 43 3113.13 10.pdf PDF
Amendment 0003 Phase III Groundwater Treatment Plant.pdf PDF
Interested Vendors List N4008526R0161.docx DOCX document
Attachment P- M101-R1.pdf PDF
Attachment Q- 50 03 01 R1.pdf PDF
Attachment R- A-112G08005-WE24 Phase III- A-102.pdf PDF
Attachment M - BP Phase III Spec Mod 06102026.pdf PDF
Amendment 0002 Phase III Groundwater Treatment Plant.pdf PDF
Attachment L - Section 43 31 13.13 10.pdf PDF
Amendment 0001 Phase III Groundwater Treatment Plant.pdf PDF
Attachment K- Phase_III_Photo_Log.pdf PDF
Attachment 3-Appendix E Phase III DWGs-CUI-REDACTED-NEW.pdf PDF
Attachment 1- Basis of Design-PHASE III GWTP_BODR_Feb 26 IFB To Navy_REDACTED.pdf PDF
Attachment J- Site Location Map.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H- Price Proposal Form.docx DOCX document
Attachment I - Wage Determination NY20260012.pdf PDF
Solicitation - N4008526R0161.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - SBPCD.pdf PDF
Attachment H- Price Proposal Form.pdf PDF
ATTACHMENT 2- Appendix D_Combined Specs_Signed.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.pdf PDF
Attachment E - Historical SB Utilization.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
Attachment F - SBPCD.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build, Phase III - Groundwater Treatment Plant N40085-26-R-0161

Naval Weapons Industrial Reserve Plant, Bethpage, New York

Attachment D

1. The NAVFAC Form PPQ shall be utilized for all evaluations that require a Past Performance

Questionnaire (PPQ).

2. Solicitations utilizing PPQs shall include the language cited below in the RFP. The current

NAVFAC Form PPQ-0 is available in BMS S-17.2.15 Source Selection.

If a completed Contractor Performance Assessment Reporting

System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for construction and design experience. If there is not a completed CPARS evaluation, the

Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 Corporate

Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS

AVAILABLE.

If a CPARS evaluation is not available, completed PPQs should be submitted with your proposal. If the

Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Shayna Eichner , via email at shayna.t.eichner.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

mailto:shayna.t.eichner.civ@us.navy.mil

ATTACHMENT D

NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: Unique Entity ID (UEI):

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other

(Explain)

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information

Name:

Title:

Phone Number:

Email Address:

7. Date Questionnaire was completed (mm/dd/yy):

NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND

SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE

COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE

THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE

HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.

HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE

CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES

THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an

Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and

The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the

Contractor successfully performed a significant event that was a benefit to the

Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the

Government/Owner.

(U)

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not

Applicable

No information or did not apply to your contract Rating will be neither positive nor negative.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

Contractor Information (Firm Name):

Client Information (Name):

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

1. QUALITY:

a) Quality of technical data/report preparation efforts E VG S M U N

b) Ability to meet quality standards specified for technical performance E VG S M U N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E

VG

S

M

U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below) identified in the contract

E VG S M U N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project? E VG S M U N

b) Contractor was reasonable and cooperative in dealing with your staff

(including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication)

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U N

d) Overall customer satisfaction E VG S M U N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U N

b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N

c) Government Property Control E VG S M U N

d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N

e) Utilization of Small Business concerns E VG S M U N

f) Ability to simultaneously manage multiple projects with multiple disciplines

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U N

Contractor Information (Firm Name):

Client Information (Name):

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

c) If this is/was a Government cost type contract, please rate the with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns) tracking of costs? If no, please explain in Remarks section.

Yes

No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations

(including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

b) Compliance with contractual terms/provisions (explain if specific issues)

c) Would you hire or work with this firm again? (If no, please explain below)

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U N

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .