Attachment P- M101-R1.pdf
PDF 778 KB Posted
- Solicitation number
- N4008526R0161
About this file
This is a piping plan schematic for a final floor to 14-foot above finished floor elevation, issued for bid in February 2026. The drawing depicts a comprehensive mechanical system layout for what appears to be an industrial or laboratory facility, featuring multiple interconnected components including hydrogen peroxide storage and handling systems, caustic rooms, peroxide injection lines, and various tanks with associated piping networks.
The schematic identifies critical system elements across five vertical zones, including a hydrogen peroxide room with storage and pump systems on the left side, a central processing area containing multiple tanks (T-230, T-250, T-300, and LGAC units), mechanical rooms with ventilation systems, and control/electrical rooms on the lower right. Key piping details include 12-inch cart filter systems, 8-inch basket strainers, peroxide injection lines, plant effluent systems, and overflow provisions. The drawing specifies numerous PVC piping connections, tank-mounted equipment, blower exhaust ducts, and operational support systems. References to engineering drawings (DWG. M-103, M-108, M-111, and M-503) provide supplementary technical specifications. This piping plan serves as a construction and procurement document for the facility's fluid handling and treatment systems, with notations indicating coordination with structural and mechanical design elements throughout the multi-zone installation area.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026-06-30T08:19:31-0400
| Norfolk, VA |
| James E. Donahue, R.A. |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
2026-06-30T08:19:56-0400
File details come from the government source that posted it. Updated .