Attachment O- 43 21 13_R1.pdf
PDF 122 KB Posted
- Solicitation number
- N4008526R0161
About this file
This is a technical specification section for the installation of recovery well pumps as part of the Phase III Groundwater Treatment Plant project.
The specification requires the contractor to furnish and install four submersible, shrouded centrifugal pumps with complete appurtenances including pump controls, level switches, connectors, clamps, couplings, discharge hose, support cables, electrical cables, and related equipment. The pumps must be Grundfos make or approved equivalent, preassembled as single units, and sized to fit within a 12-inch nominal well casing diameter. Three specific pump models are identified: P-8 (GRUNDFOS MODEL 625S300-2AA) with 30 HP motor at 460V, 3 phase, 60Hz serving recovery well RW-8 at 450-600 gpm design flow and 107-111 feet total dynamic head; P-9 (GRUNDFOS MODEL 625S300-2AA) with 30 HP motor at 230V, 3 phase, 60Hz serving RW-9 at 450-600 gpm and 115-126 feet TDH; and P-10A (GRUNDFOS MODEL 625S400-2) with 40 HP motor at 230V, 3 phase, 60Hz serving RW-10A at 600-700 gpm and 145-159 feet TDH. Materials must be stainless steel (304 SS for most components, 316 SS for coupling and support cables) with PTFE components for valve seats, impeller seal rings, and intermediate bearings. The contractor must provide tools, spare parts, shop drawings, product data, factory and field test reports, operation and maintenance manuals, and arrange for manufacturer's representative supervision during 5 working days of installation and testing, plus 4 hours of video-recorded training for operating and maintenance staff.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE III GROUNDWATER TREATMENT PLANT
Section 43 21 13 Page 1
SECTION 43 21 13
RECOVERY WELL PUMPS
PART 1. GENERAL
1.1 SCOPE OF WORK
Furnish all labor, materials, equipment and incidentals required to install four Well Pumps as detailed in this section. Installation shall be complete and include, but not be limited to: pump controls, level switches, connectors, clamps, couplings, discharge hose, support cables, electrical cables, and appurtenances as shown on the Technical Drawings and referenced in the Technical Specifications.
1.2 RELATED SECTIONS
A. Section 01 01 00 Scope of Work
B. Section 01 33 00 Submittal Procedures
C. Section 01 78 00 Closeout Submittals
D. Section 01 78 23 Operation and Maintenance (O&M) Data
E. Section 41 10 02 Process Piping and Appurtenances
F. Section 26 00 00 Basic Electrical Materials and Methods
1.3 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced.
HYDRAULIC INSTITUTE STANDARDS FOR CENTRIFUGAL, ROTARY, AND
RECIPROCATING PUMPS (HI)
ANSI/HI 1.1-1.6 Centrifugal Pumps
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM A 240 316/316L Stainless Steel
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION
(ISO)
ISO 9001 Quality Systems
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
Section 43 21 13 Page 2
NEMA MG1 Motors and Generators.
1.4 SUBMITTALS
A. The following shall be submitted in accordance with Section 01 33 00 Submittals:
1. Shop Drawings: Submit shop drawings for pumps including, dimensions, materials of construction, bills of materials, motor data, certified performance curves, parts lists, pumps mounting arrangement, and tie in connections.
2. Product Data: Submit product data describing equipment features, materials of fabrication, general dimensions, pump curves, and general operating parameters.
3. Factory Tests: Test reports in booklet form showing the results of factory tests performed.
4. Field Tests and Inspections: Test reports in booklet form showing results of the field tests performed to adjust each component following the installation of the system and the field tests performed to prove compliance with the specified performance criteria. Each test report shall indicate the final position of controls.
5. Submit the operation and maintenance (O&M) manual and required number of copies in accordance with Section 01 78 23.
1.5 DELIVERY AND STORAGE, AND HANDLING
A. All equipment shall be protected against damage during shipment.
B. All equipment shall be preassembled to the largest extent possible, compatible with transportation limitations and equipment protection considerations.
C. All equipment shall be properly protected so that no damage or deterioration will occur during a prolonged delay from the time of shipment until installation is completed and the units and equipment are ready for operation. Exposed iron or steel surfaces shall be properly protected to prevent rust and corrosion.
1.6 QUALIFICATIONS AND WARRANTY
A. Manufacturer Qualification
1. The Pumps shall be supplied by a reputable Manufacturer having at least ten
(10) years’ experience in the design and fabrication of pumps for the treatment of groundwater and water.
B. Warranty
1. Manufacturer shall provide warranty in accordance with Section 01 78 00 of the specifications.
Section 43 21 13 Page 3
1.7 TOOLS AND SPARE PARTS
A. All tools required for normal operation and maintenance of each piece of equipment shall be furnished. Special tools recommended by the Manufacturer shall also be furnished. The tools shall be stored in a dedicated cabinet or tool box and labeled “Groundwater Extraction Well Pumps”. An inventory log shall be maintained and stored with the tools. All items shall be suitably packed and protected for long periods of storage.
1.8 EQUAL PRODUCTS
A. The Contract Drawings and Technical Specifications are based on using Grundfos pumps. Should the Contractor propose to furnish equal equipment of a different configuration, the Contractor shall be responsible for all revisions necessary to incorporate the proposed pumps into the design, and submit the necessary revised Contract Drawings and Technical Specifications for review and approval by the COR.
PART 2. PRODUCTS
2.1 PUMPS
A. Provide the pumps shown below in the pump list. The proposed equipment is subject to verification of capacity per the field pump test as performed by the Contractor.
1. Recovery pumps and motors shall be preassembled as a single unit, submersible, shrouded, centrifugal, and of “Grundfos” make, or approved equivalent.
2. Built-in check valve with spring.
3. Check Valve Housing, Check Valve, Diffuser Chamber, Impeller, Suction Interconnector, Inlet Screen, Pump Shaft, Straps, Cable Guard, Priming Inducer: 304 SS
4. Check valve seat: PTFE
5. Impeller Seal Ring: PTFE
6. Coupling: 316 SS
7. Intermediate Bearings: PTFE
8. Pumps shall fit inside the well casing diameter as specified in the Contract Drawings (12” nominal).
9. Motors for P-8 shall have a 1.60 service factor and Motor for P-9 and P-10A shall have 1.15 service factor.
Section 43 21 13 Page 4
10. Motor for P-8 shall be suitable for 460V, 3 phase, 60Hz whereas motors for P-9 and P-10A shall be suitable for 230V, 3 phase, 60Hz power source.
11. Motors shall be furnished with a lifting eye and a power cable from the pump motor to the terminal box.
PUMPING SYSTEM LIST:
Pump ID Manufacturer / Model
Connection Size
Operating Flow (gpm)
TDH
(ft)
Motor
(HP)
P-8 (for RW-8)
GRUNDFOS
(MODEL 625S300-2AA) 6 inch Design=450
Maximum=600 111 30
P-9 (for RW-9)
GRUNDFOS
(MODEL 625S300-2AA) 6 inch Design=450
Maximum=600 126 30
P-10A (for RW-10A)
GRUNDFOS
(MODEL 625S400-2) 6 inch Design=600
Maximum=700 159 40
2.2 MATERIALS FABRICATION
A. Pumps shall be fabricated from Stainless Steel material and chemically compatible with the groundwater contaminants. Impeller Seal Ring, Intermediate Bearings and Valve seat shall be PTFE (Teflon®).
B. The pump and applicable connections shall be rated for a minimum of
175 psi.
C. Each pump shall be supported by one 316 stainless steel support cable. Support cable shall be sized and connected in accordance with the pump manufacturer’s recommendations.
PART 3. EXECUTION
3.1 EXAMINATON
A. After becoming familiar with all details of the work, verify dimensions in the field, and advise the COR of any discrepancy before performing the work.
3.2 INSTALLATION
A. Installation of the pumps and all appurtenances shall be in accordance with the manufacturer’s recommendations.
Section 43 21 13 Page 5
B. The pump shall be inspected visually prior to installation.
C. Equipment installation shall be in accordance with the manufacturer's written instructions and in the presence of the Manufacturer’s representative.
D. Pumps discharge pipe, lifting cable and cables will extend thru a well cap located inside a valve pit. A level transducer will also be installed at each location and related control wire will be extended thru the well cap.
3.3 FIELD TESTS AND INSPECTIONS
A. Field tests shall not be conducted by the Contractor until such time that the entire installation is complete and ready for testing.
B. As part of the installation inspection, the Contractor shall operate the pumps and check for excessive noise, vibration or heating, and for discharge adequacy. The pumps shall be tested over the full range of flow conditions.
C. The pump and suction/discharge piping shall be inspected by the
Contractor in the presence of the COR for leakage.
D. If the installation inspection reveals deficiencies, corrective measures shall be taken by the Contractor until the pumps satisfy the specified requirements.
3.4 MANUFACTURERS SERVICES
A. Installation, Adjustment, and Testing: Provide a manufacturer's representative who is experienced in the installation, adjustment, and operation of the equipment to supervise the installation, adjustment and testing of the equipment for a period of 5 working days (8 hours a day).
B. Conduct a video recorded training course for designated operating, maintenance and support staff members. The training period shall be a total of 4 hours of normal working time. Field training shall cover each item contained in the operating and maintenance manual.
END OF SECTION