This document is a photographic site survey consisting of 16 images documenting a Phase III environmental remediation project location. The images provide multiple directional views of the site, including the access gate entrance, internal site conditions, interim groundwater treatment infrastructure, and designated areas for future treatment building construction.
The photographic documentation shows a wooded site with gravel and dirt access roads. Key site features visible include a locked Phase III access gate with signage, open areas cleared for operations, an interim groundwater treatment system enclosed by fencing with multiple tanks and equipment, white geotextile materials, orange and red traffic control cones, fallen trees and brush, a small storage shed structure, and designated areas marked for future treatment building placement. Multiple photographs are oriented toward cardinal directions (north, south, east, west, northeast, northwest, southwest) to provide comprehensive site documentation. The surrounding area consists of dense tree coverage, with proximity to the Southern State Parkway and Seamans Neck Road Overpass visible in some views. A stormwater basin appears in the southern portion of the site. The photographic survey documents site conditions suitable for environmental remediation project planning and construction coordination purposes.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VIN.VARRICCHIO
Text Box Phase III Site Access Gate Looking North
Just Inside Access Gate Looking North
Just Inside Access Gate Looking East
Middle of Site Looking East
Middle of Site Looking West
Looking Northeast Towards Future Site of Treatment Building
Looking East at Interim Groundwater Treatment System
Looking North Towards Future Site of Treatment Building
Looking Northwest Towards Future Site of Treatment Building
Looking West at Interim Groundwater Treatment System
Looking South at Stormwater Basin
Looking North Towards Southern State Parkway
Looking East at Future Site of Treatment Building
Looking Southwest at Future Site of Treatment Building From the Seamans Neck Rd Overpass
Looking West at Future Site of Treatment Building From the Seamans Neck Rd Overpass
Looking Northwest at Future Site of Treatment Building From the Seamans Neck Rd Overpass
| IMG_2144(1) |
| IMG_2145(2) |
| IMG_2146(2) |
| IMG_2147(1) |
| IMG_2148(1) |
| IMG_2149(3) |
| IMG_2150(2) |
| IMG_2151(2) |
| IMG_2152(3) |
| IMG_2153(3) |
| IMG_2154(1) |
| IMG_2155(1) |
| IMG_2156(1) |
| IMG_2157(2) |
| IMG_2158 |
| IMG_2159(1) |
File details come from the government source that posted it. Updated .