This is a technical specification section for the installation of a floating decanter system as part of the Phase III Groundwater Treatment Plant project. The specification details the requirements for furnishing, fabricating, installing, and testing one floating decanter unit (FD-xx) designed to decant the Backwash Waste Storage Tank (T-xx) contents while minimizing disturbance to the sludge blanket.

The decanter system shall be constructed entirely of Type 316L stainless steel and feature a ring design filled with suitable flotation material to maintain buoyancy while supporting its own weight. The system must be moored inside the tank using three cables and compression springs attached near the tank's top lip and be compatible with installation on a rail system per Drawing M-505. The unit shall discharge decant water by gravity through a 4-inch flexible hose with flange connection and cam-and-groove fittings to a sanitary sewer manhole, with on/off control provided by valve BFV-xx. The maximum flow rate is specified at 220 gallons per minute. All components shall be assembled, piped, and tested in the manufacturer's shop prior to shipment, with field assembly minimized. The contractor must submit product data, shop drawings with installation and clearance details, manufacturer's certificates confirming compliance with specifications, and an operation and maintenance manual prior to construction. The decanter manufacturer must demonstrate at least ten years of industry experience. The contractor shall provide lifting lugs for equipment over 100 pounds, a stainless steel identification plate mounted at eye level, one set of recommended spare parts, special tools for assembly and adjustment, a lifting and installation plan, functional testing and test reports, and a manufacturer's field representative to supervise installation, conduct staff training, and prepare a video recording of the field training course.

View the file

Other files

File Type Posted
Amendment 0005 - N4008526R0161.pdf PDF
Wage Determination NY20260012 5.18.2026.pdf PDF
Amendment 0004 Phase III Groundwater Treatment Plant.pdf PDF
Attachment O- 43 21 13_R1.pdf PDF
Attachment N- 08 71 00 R1.pdf PDF
Attachment L- 43 3113.13 10.pdf PDF
Attachment R- A-112G08005-WE24 Phase III- A-102.pdf PDF
Amendment 0003 Phase III Groundwater Treatment Plant.pdf PDF
Interested Vendors List N4008526R0161.docx DOCX document
Attachment P- M101-R1.pdf PDF
Amendment 0002 Phase III Groundwater Treatment Plant.pdf PDF
Attachment L - Section 43 31 13.13 10.pdf PDF
Attachment M - BP Phase III Spec Mod 06102026.pdf PDF
Amendment 0001 Phase III Groundwater Treatment Plant.pdf PDF
Attachment K- Phase_III_Photo_Log.pdf PDF
Attachment 1- Basis of Design-PHASE III GWTP_BODR_Feb 26 IFB To Navy_REDACTED.pdf PDF
Attachment J- Site Location Map.pdf PDF
Attachment 3-Appendix E Phase III DWGs-CUI-REDACTED-NEW.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H- Price Proposal Form.docx DOCX document
Attachment I - Wage Determination NY20260012.pdf PDF
ATTACHMENT 2- Appendix D_Combined Specs_Signed.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment G - Individual SB Subcontracting Plan.pdf PDF
Attachment E - Historical SB Utilization.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
Attachment F - SBPCD.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Solicitation - N4008526R0161.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - SBPCD.pdf PDF
Attachment H- Price Proposal Form.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 50 03 01 Page 1

PHASE III GROUNDWATER TREATEMENT PLANT

SECTION 50 03 01

FLOATING DECANTER

PART 1. GENERAL

1.1 SCOPE OF WORK

Furnish all labor, equipment, materials, and incidentals to install one floating decanter system (FD-xx) for decanting the Backwash Waste Storage Tank T-xx contents. The system supplier shall provide materials and equipment which are as specified below, as shown on the design drawings, and are suitable for the service intended.

The unit shall be furnished and installed with equipment for mooring the decanter inside the tank from three cables and compression springs attached near the top lip of the open tank.

The decanter system shall be designed to cause minimal disturbance of the sludge blanket. Decanter shall discharge by gravity through a 4” flexible hose with flange connection, cam and groove fittings. Hose shall connect to the tank nozzle fitting inside the tank.

All equipment shall be Type 316L Stainless Steel.

1.2 RELATED SECTIONS

Section 01 01 00 Scope of Work

Section 01 33 00 Submittals Procedures

Section 01 78 00 Closeout Submittals

Section 01 78 23 Operation and Maintenance (O&M) Data

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN IRON & STEEL INSTITUTE (AISI)

AISI 1045 Steel

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM A 240 316/316L Stainless Steel

Section 50 03 01 Page 2

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO 9001 Quality Systems

1.4 SUBMITTALS

The following shall be submitted in accordance with Section 01 33 00 Submittals:

Pre-construction submittal:

Product Data: Manufacturer's descriptive data and technical literature and engineering data sheets for the equipment.

Product data shall include selected model number, rated flow capacity, dimensions, weights, accessories, and warranty coverage.

Shop Drawings, including:

a. General arrangement drawings and manufacturer's data covering installation instructions, dimensions, weight, detailed specifications, materials of construction, parts, devices, and other information required to verifycompliance with these specifications.

b. Proposed layout and anchorage requirements.

c. Clearances for maintenance and operation.

Manufacturer's certificates, including the name and address of the production facility. Provide manufacturer’s certification in writing, that the equipment and materials of construction will meet or exceed minimum requirements as specified.

Operation and Maintenance Manual

Submit the operation and maintenance (O&M) manual and required number of copies in accordance with Section 01 78 23.

1.5 DELIVERY AND STORAGE

Protect all equipment, delivered, and designated for storage, from the weather, humidity and temperature variations, dirt and dust, and other contaminants.

1.6 EQUAL PRODUCTS

Should the Contractor propose to furnish an equivalent system of a different configuration, the Contractor shall be responsible for all revisions necessary to incorporate the proposed floating decanter into the design and submit the necessary revised Contract Drawings and Technical Specifications for review and approval.

1.7 QUALIFICATION AND WARRANTY

Section 50 03 01 Page 3

Manufacturer Qualification:

The decanter shall be supplied by a reputable Manufacturer having at least ten (10) years’ experience.

Warranty

Manufacturer shall provide warranty in accordance with Section 01 78 00 of the specifications.

PART 2. PRODUCTS

2.1 MATERIALS AND EQUIPMENT

The floating decanter shall be compatible with installation on a rail system as identified in Drawing M-505.”

The floating decanter and components shall be assembled, piped, and tested in the shop prior to shipment. Field assembly shall be minimized.

The manufacturer shall furnish all tools, materials, labor, and appurtenances necessary for the complete fabrication, testing and shipment of the floating decanter system.

The decanter and connecting hose shall be new and unused.

2.2 SYSTEM REQUIREMENTS

2.3

Service: The floating decanter shall be designed to remove decant water inside the Backwash Waste Storage Tank (T-xx) with the rise and fall of the water surface. The decant will discharge by gravity to sanitary sewer manhole. On and Off control of decant water will be provided by BFV-xx.

Maximum Flow rate: 220 gpm

EQUIPMENT DESCRIPTION

The floating decanter shall be constructed of 316 stainless steel. The decanter shall have a ring design that is filled with suitable material to allow the decanter to float on the water surface and support its own weight.

Section 50 03 01 Page 4

2.4 EQUIPMENT APPURTENANCES

Lifting Lugs: Individual equipment and or each field assembled part over 100 pounds in weight shall be provided with lifting lugs for ease of handling.

Equipment Identification Plate: A stainless steel identification plate shall be securely mounted on the floating decanter in a location that visible is at eye level. The plate shall bear the Manufacturer’s name, address, phone number, equipment model number (according to P&IDs), and serial number.

2.5 SPARE PARTS & TOOLS

Contractor shall provide one set of recommended spare parts for floating decanter and related accessories.

Contractor shall supply one set of any special tools required for assembly, disassembly, or for adjustment of the equipment supplied.

PART 3. EXECUTION

3.1 INSTALLATION

Verify all dimensions in the field and advise COR of any discrepancy before performing the work. All products shall be carefully inspected for defects in workmanship and material.

Prior to installation, the Contractor shall submit a lifting and installation plan for this decanter.

Installation shall be in accordance with manufacturer's printed instructions and in the presence of the manufacturer’s field representative.

The Contractor or installer shall provide certification from the manufacturer that the equipment has been properly installed.

3.2 FIELD TESTS

Functional Testing: Prior to startup, all equipment components shall be inspected by the Contractor for proper setting, connections, and satisfactory installation. Testing shall be coordinated with that of the Backwash Waste Storage Tank (T-xx).

Test Report: Contractor shall provide a test report that shall include as a minimum a description of the test, methodology used, data and time when test was performed and the results of the testing. All testing results shall be reported, including test results that failed to meet the requirements. Should test runs fail to meet the requirements, an explanation shall be provided with the rationale for failure of the test.

3.3 REMEDY

If the Installation, Inspection or Field Tests reveals deficiencies, corrective measures shall be taken until the System satisfies all of the specified requirements. Remedies shall be completed at no additional cost to the Owner.

Section 50 03 01 Page 5

3.4 MANUFACTURER SERVICES

Contractor shall provide equipment manufacturer’s field representative during the installation, adjustment, and operation of the equipment specified. The representative shall supervise the installing, adjusting, and testing of equipment. The representative shall also conduct a field training course for the designated operating and maintenance staff members. Training shall be coordinated with the onsite Owner’s Representative. The field instructions shall cover the items contained in the Operating and Maintenance Instructions, as well as demonstrations of routine maintenance operations. Prepare a video of the field training course for a permanent record for future training use.

END OF SECTION

00 00 00 Phase III - Spec Cover
00 00 01 TOC (4.22.26)
01 01 00 Scope of work_Master File
01 14 00
01 30 00
01 33 00
01 35 26
01 35 29.13
01 45 00.00 20
01 45 35
01 45 35a - si_schedule
01 45 35b - Statement_of_Special_Inspections
01 57 19
01 58 00
01 78 00
01 78 23
01 78 24.00 20
01 79 00 Functional Testing
01 91 00.15 10
01 91 13 Equipment Testing and Startup-NRS
01 91 13-1 Form & Table
03 30 00
03 45 00
04 20 00
05 05 23.16
05 12 00
05 21 00
05 30 00
05 40 00
05 50 13
05 52 00
06 10 00
06 41 16.00 10
06 61 16
06 71 33
06 73 01
06 82 14
07 19 00
07 21 13
07 21 16
07 27 10
07 27 19.01
07 60 00
07 61 14.00 20
07 84 00
07 92 00
08 11 13
08 22 20
08 33 23
08 51 13
08 60 45
08 71 00
08 91 00
09 22 00
09 29 00
09 30 10
09 51 00
09 65 00
09 65 30
09 90 00
09 96 00
10 14 00.10
10 28 13
10 44 16
10 51 13
13 34 19
13 48 73
22 00 00
26 05 00.00 20
26 05 19.10 10
26 05 26.00 20
26 05 71.00 20
26 24 16.00 20
26 24 19.00 20
26 28 01.00 10
26 29 23
26 41 00
26 51 00
27 10 00
27 13 23.00 20
28 10 05
31 10 00
31 23 00.00 20
32 11 20
32 11 26
32 12 13
32 16 19
32 17 23
32 31 13
32 92 19
33 11 00
33 30 00
33 31 23.00 10
33 40 00
33 61 13.19
33 71 02
33 82 00
40 60 00 00 Control Description_021826
Part 1. General
1.1 Description
1.2 Definitions
1.3 Abbreviations:
1.4 Submittals
Part 2. Not Used
Part 3. Execution
3.1 General Operating Discription
3.2 GROUNDWATER Extraction / RECOVERY System (MI602 THRu MI604)
3.3 Equalization Tank / FILTER FEED System (MI605)
3.4 MULTI-MEDIA FILTRATION (MMF) SYSTEM (MI606)
3.5 BAG FILTER System (MI606)
3.6 advanced oxidation process (aop) SYSTEM (MI607 and mi608)
3.7 Liquid Phase Granular Activated (LGAC) FEED System (MI609)
3.8 Liquid Phase Granular Activated (LGAC) carbon System (MI610)
3.9 PLANT EFFLUENT SYSTEM (MI610, MI611 & MI612)
3.10 MMF/LGAC Backwash System (MI611)
3.11 bACKWASH wASTE / DISCHARGE SYSTEM(mi621)
3.12 Caustic Feed System (MI614)
3.13 Hypochlorite Feed System (MI613)
3.14 HYDROGEN PEROXIDE Feed System (MI615)
3.15 Air Compressor System (MI618)
3.16 Building Sump System and BUILDING CONTAINMENt SYSTEM (mi616/MI620)
3.17 Eye Wash/safety Shower System (mi619)
3.18 PROCESS TANK VENTING SYSTEM (MI617)
3.19 NON-POTABLE WATER SYSTEM (mi617)
3.20 GAS MONITORS (MI607)
3.21 BUILDING AUTOMATION SYSTEM & FIRE ALARM CONTROL PANEL (MI620)
3.22 Loss of Power Mode
3.23 Plant Restart
3.24 E-Stop Mode
3.25 Human Machine Interface Requirements
3.26 Trending, Historical Archiving requirements:
3.27 Reports
3.28 Web Interface Requirements
3.29 Alarming Software and Configuration Requirements
3.30 Loss of Communication
40 60 00 2.4.4.1 Magnetic Flowmeter and Transmitter_021426
40 60 00 2.4.5.1 Ultrasonic Gap Level Switch_021226
40 60 00 2.4.5.3 Ultrasonic Level Transmitter_021226
40 60 00 2.4.5.5 Float Level Switch_021226
40 60 00 2.4.5.6 Hydrostatic Level Transmitter_021326
40 60 00 2.4.6 Pressure Gauge__021226
40 60 00 2.4.6.1 Pressure Transmitter__021226
40 60 00 2.4.6.2 Pressure Switch__021226
40 60 00 2.4.7.1 pH & ORP Measurement_021226
40 60 00 2.4.8.1 Bldg Temp Sensor_021226
40 60 00_2-20-2026
40 60 00_Control Description_021826
Part 1. General
1.1 Description
1.2 Definitions
1.3 Abbreviations:
1.4 Submittals
Part 2. Not Used
Part 3. Execution
3.1 General Operating Discription
3.2 GROUNDWATER Extraction / RECOVERY System (MI602 THRu MI604)
3.3 Equalization Tank / FILTER FEED System (MI605)
3.4 MULTI-MEDIA FILTRATION (MMF) SYSTEM (MI606)
3.5 BAG FILTER System (MI606)
3.6 advanced oxidation process (aop) SYSTEM (MI607 and mi608)
3.7 Liquid Phase Granular Activated (LGAC) FEED System (MI609)
3.8 Liquid Phase Granular Activated (LGAC) carbon System (MI610)
3.9 PLANT EFFLUENT SYSTEM (MI610, MI611 & MI612)
3.10 MMF/LGAC Backwash System (MI611)
3.11 bACKWASH wASTE / DISCHARGE SYSTEM(mi621)
3.12 Caustic Feed System (MI614)
3.13 Hypochlorite Feed System (MI613)
3.14 HYDROGEN PEROXIDE Feed System (MI615)
3.15 Air Compressor System (MI618)
3.16 Building Sump System and BUILDING CONTAINMENt SYSTEM (mi616/MI620)
3.17 Eye Wash/safety Shower System (mi619)
3.18 PROCESS TANK VENTING SYSTEM (MI617)
3.19 NON-POTABLE WATER SYSTEM (mi617)
3.20 GAS MONITORS (MI607)
3.21 BUILDING AUTOMATION SYSTEM & FIRE ALARM CONTROL PANEL (MI620)
3.22 Loss of Power Mode
3.23 Plant Restart
3.24 E-Stop Mode
3.25 Human Machine Interface Requirements
3.26 Trending, Historical Archiving requirements:
3.27 Reports
3.28 Web Interface Requirements
3.29 Alarming Software and Configuration Requirements
3.30 Loss of Communication
40 60 00_IO List_021826
Worksheets
SUMMARY
41 10 02 Process Piping
PART 1 - GENERAL
1.1 SCOPE OF WORK
1.1.1 Furnish all labor, materials, equipment and incidentals required to install all Process Piping and Appurtenances as shown on the drawings and specified herein. This specification covers the requirements for above and below grade groundwater and ...
1.1.2 All the process water piping as shown on drawings shall be PVC, except small bore piping (1” and below) for connecting to pressure gauges, instruments, sample ports, pipe drains, and pipe vents, which shall be as shown on drawings.
1.1.3 Piping shall include:
1.1.3.1 Water process piping from extraction vault and manholes to GWTP shall be PVC and HDPE piping as shown on contract drawings. HDPE piping shall be PE4710 SDR 11.
1.1.3.2 Water process piping from recovery well pumps to casing shall be stainless steel and piping inside extraction vaults shall be Schedule 80 PVC as shown on contract drawings.
1.1.3.3 Water process piping inside manholes shall be Schedule 80 PVC as shown on contract drawings.
1.2 RELATED SECTIONS
1.2.1 Sections Include:
1.2.1.1 Section 01 33 00 Submittals Procedures
1.2.1.2 Section 22 11 13 Facility Water Distribution Piping
1.2.1.3 Section 22 13 16 Sanitary Waste and Vent Piping
1.2.1.4 Section 22 42 13 Plumbing Fixtures
1.2.1.5 Section 31 00 00 Excavation, Backfill & Compaction
1.2.1.6 Section 46 30 00 Water and Wastewater Chemical Feed Systems
1.3 REFERENCES
1.3.1 The publications listed below form a part of this specification to the extent referenced.
1.3.1.1 American Society of Mechanical Engineers International (ASME)
1.3.1.1.1 B1.1: Unified Inch Screw Threads (UN and UNR Thread Form)
1.3.1.1.2 B1.20.1: Pipe Threads, General Purpose (Inch)
1.3.1.1.3 B1.20.7: Standard for Hose Coupling Screw Threads (Inch)
1.3.1.1.4 B16.11: Forged Fittings, Socket-Welding and Threaded
1.3.1.1.5 B16.21: Nonmetallic Flat Gaskets for Pipe Flanges
1.3.1.1.6 B16.3: Malleable Iron Threaded Fittings, Classes 150 and 300
1.3.1.1.7 B16.39: Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
1.3.1.1.8 B16.5: Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard
1.3.1.1.9 B16.9: Standard for Factory-Made Wrought Steel Butt-welding Fittings
1.3.1.1.10 B18.2.1: Square and Hex Bolts and Screws (Inch Series)
1.3.1.1.11 B18.2.2: Standard for Square and Hex Nuts
1.3.1.1.12 B31.3: Process Piping
1.3.1.1.13 B36.19M: Stainless Steel Pipe
1.3.1.1.14 BPVC SEC VIII D1: BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
1.3.1.2 American Society for Testing and Materials (ASTM)
1.3.1.2.1 A181/A181M: Standard Specification for Carbon Steel Forgings, for General-Purpose Piping
1.3.1.2.2 D1784: Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds
1.3.1.2.3 D1785: Standard Specification for Poly (Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
1.3.1.2.4 D2104: Standard Specification for Polyethylene (PE) Plastic Pipe, Schedule 40
1.3.1.2.5 D2105: Standard Test for Longitudinal Tensile Properties of Reinforced Thermosetting Plastic Pipe and Tube
1.3.1.2.6 D2122: Standard Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings
1.3.1.2.7 D 2241: Standard Specification for Poly (Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
1.3.1.2.8 D2412: Standard Test for External Loading Properties of Plastic Pipe by Parallel-Plate Loading
1.3.1.2.9 D2447: Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter
1.3.1.2.10 D2464: Standard Specification for Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
1.3.1.2.11 D2466: Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
1.3.1.2.12 D2467: Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
1.3.1.2.13 D2564: Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems
1.3.1.2.14 D2609: Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe
1.3.1.2.15 D2737: Polyethylene (PE) Plastic Tubing ASTM D2774 (2012) Underground Installation of Thermoplastic Pressure Piping
1.3.1.2.16 D2855: Standard Practice for Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings
1.3.1.2.17 F2164: Standard Practice for Field Leak Testing of Polyethylene (PE) Pressure Piping Systems Using Hydrostatic Pressure
1.3.1.2.18 F2620: Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings
1.3.1.2.19 D3261: Standard Specification for Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing
1.3.1.2.20 F477: Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
1.3.1.2.21 F593: Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs
1.3.1.2.22 F656: Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings
1.3.1.2.23 F714: Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter
1.3.1.3 American Welding Society (AWS):
1.3.1.3.1 B3.0: Welding Procedure and Performance Qualification
1.3.1.3.2 A5.11/A5.11M: Specification for Nickel and Nickel Alloy Welding Electrodes for Shielded Metal Arc Welding
1.3.1.3.3 A5.14/A5.14M: Specification for Nickel and Nickel Alloy Bare Welding Electrodes and Rods
1.3.1.3.4 D1.1/D1.1M: Structural Welding Code – Steel
1.3.1.4 American Water Works Association (AWWA)
1.3.1.4.1 C901: Polyethylene (PE) Pressure Pipe, Tubing and Fittings, 1/2" through 3" for Water
1.3.1.4.2 C906: Polyethylene (PE) Pressure Pipe and Fittings, 4" through 63", For Water Distribution
1.3.1.5 Manufacturers Standardization Society (MSS)
1.3.1.5.1 SP-25: Standard Marking System for Valves, Fittings, Flanges and Unions
1.3.1.5.2 SP-58: Standard for Pipe Hangers and Supports - Materials, Design and Manufacture
1.3.1.5.3 SP-69: Standard for Pipe Hangers and Supports - Selection and Application
1.3.1.5.4 SP-80: Bronze Gate, Globe, Angle, and Check Valves
1.3.1.5.5 SP-89: Pipe Hangers and Supports - Fabrication and Installation Practices
1.3.1.6 Plastics Pipe Institute (PPI)
1.3.1.6.1 TR-21: Thermal Expansion and Contraction in Plastic Piping Systems
1.3.1.7 Rubber Manufacturers Association (RMA)
1.3.1.7.1 IP-2: Hose Handbook
1.4 SUBMITTALS
1.4.1 The following shall be submitted in accordance with Section 01 33 00 Submittal Procedures:
1.4.1.1 Shop Drawings: Shop drawings and support system detail drawings showing piping and appurtenances including mechanical joints, valves, hangers, and pipe supports. Include a complete list of equipment and materials on the drawings.
1.4.1.2 Product Data: Manufacturer's descriptive and technical literature for each piping system, including design recommendations; pressure and temperature ratings; dimensions, type, grade and strength of pipe and fittings and chemical resistance.
1.4.1.3 Material safety data sheet in conformance with 29 CFR 1910 Section 1200(g) for each chemical (solvents, solvent cements, and glues) delivered for use in pipe installation.
1.4.1.4 Pipe Schedule: Provide a list of piping systems, pressure ratings and source of supply for each piping system broken out by material, size and application as indicated on the Contract Drawings. Provide a list of any special tools necessary for...
1.4.1.5 Valve and Valve Operator Schedule: Provide a list of valve materials, pressure ratings, and valve operator materials and reference identification as indicated in the Contract Drawings. Provide a list of any special tools necessary for each val...
1.4.1.6 Test Reports: Submit Pipe Leakage Tests, Hydrostatic Tests, Valve Testing; copies of all field test reports including Pipe Leakage Tests and Hydrostatic Tests.
1.4.1.7 As-built drawings: Show pipe anchors and guides, and layout of piping systems relative to other parts of the work including clearances for maintenance and operation. Submit as-built piping and instrumentation diagrams (P&IDs) identifying and ...
1.4.1.8 Instruction Manuals: Submit sufficient detail in the Operation Manuals to demonstrate the step-by-step procedures required for startup, operation and shutdown of piping systems, and include the manufacturer's name, model number, parts list and...
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Materials delivered and placed in storage shall be stored with protection from the weather, excessive humidity variation, excessive temperature variation, dirt, dust and/or other contaminants. Proper protection and care of material before, duri...
1.6 BUILDING PIPING SYSTEMS
1.6.1 Buried piping systems shall be suitable for design conditions, considering the piping both with and without internal pressure. Consideration shall be given to all operating and service conditions including forces both internal and external to th...
1.7 ABOVE GRADE PIPING SYSTEMS (WITHIN GWTP)
1.7.1 Above ground piping systems shall be suitable for design conditions, considering the piping both with and without internal pressure, and installation factors such as insulation, support spans, and ambient temperatures. Consideration shall be giv...
1.8 SEQUENCING AND SCHEDULING
1.8.1 For slab, floor, wall, and roof penetrations, keep on site pertinent wall pipes and sleeves before they are required for placement in concrete forms. Verify and coordinate the size and location of building pipe penetrations before forming and pl...
1.9 MAINTENANCE
1.9.1 Service
1.9.1.1 A manufacturer’s representative who is experienced in the installation, adjustment and operation of the valves specified shall provide inspection services for automatic valve systems. The representative shall inspect the installation, and sup...
1.9.2 Extra Materials
1.9.2.1 Contractor shall provide the manufacturer’s recommended spare parts that are expected to be replaced within the first 3 years of service of the piping system.
PART 2 - PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Provide piping materials and appurtenances as specified and as shown on the Drawings. Piping materials, valves, and appurtenances supplied as part of this contract shall be of equal material and ratings as the connecting pipe, new and unused ex...
2.1.2 Piping systems shall be rated for at least 1.5 times the deadhead pressure of the pump feeding the piping.
2.1.3 Standard Products: Provide material which are the standard products of a manufacturer regularly engaged in the manufacturing of the products and that essentially duplicate items that have been in satisfactory use for at least 10 years prior to b...
2.1.4 Identification and Tagging: Each piece of pipe shall bear the ASTM designation and all other markings required for that designation. The service, valve identification number shown on the Contract Drawings, the manufacturer's name, and the valve...
2.1.5 Pipe Supports: Pipe shall be provided with supports spaced not farther than the manufacturer’s recommended spacing for 70 F service. For PVC pipe 2” or smaller, supports shall be every 5’ or less; for 3” pipe every 6’; for 4” pipe every 8’, and ...
2.1.6 The Contractor shall provide slip-type PVC expansion joints with joint material as recommended by the manufacturer for the type of service. Joints shall be installed not more than 100 feet apart only on all straight runs of pipe that exceed 100 ...
2.2 PLASTIC, DUCTILE IRON, AND CARBON STEEL PIPING AND FITTING FOR WATER PROCESS SERVICE
2.2.1 PVC Pipe: PVC pipe shall be Schedule 80, seamless, unplasticized polyvinyl chloride normal impact type, conforming to ASTM D-1784, Class 12454-B and D-1785, PVC 1120, for Type I, Grade 1. PVC pipe system shall be as manufactured by CertainTeed ...
2.2.2 PVC Joints: The piping system shall be joined by flanged or mechanical connections except where connecting to unions, valves, and equipment with threaded connections that may require future disassembly. Connections at those points shall be thre...
2.2.3 PVC Fittings: The schedule rating for the fittings shall not be less than that for the associated pipe. All pipe and fittings shall conform to ASTM D2467 and joints shall be solvent socket welded where threaded or flanged fittings are not used.
2.2.4 Flanged Fittings: Flanges shall be used at all valves, pumps, equipment, tanks, and vessels. Flanges will be of the same material as the piping. Flanges shall be the Van-Stone type complete with gaskets, bolts, and nuts. Flanges will be flat f...
2.2.5 PVC Solvent Cement: Joints shall be assembled using approved solvent cement in accordance with the manufacturer’s recommendations and ASTM D2564 and ASTM D2855. No cementing shall be done in the rain or when the air temperature is below 40 F or ...
2.2.6 The Contractor is cautioned to exercise care in handling, loading, unloading, and storing plastic pipe, valves, and fittings. All plastic pipe, valves, and fittings shall be stored under cover before using and shall be transported in a vehicle w...
2.2.7 All PVC piping, fittings, and valves shall not be painted.
2.2.8 Ductile Iron Pipe for pump discharge: Ductile iron piping shall meet requirements of ANSI/AWWA C151/A21.51 and ANSI/AWWA C150/A21.50. The pipes shall be flanged of Pressure Class 350 with nominal pipe thickness of 0.25 inches. Ductile iron pipe ...
2.2.9 Condensate Pipe: Piping for condensate shall be 316L stainless steel pipe meeting ASTM A312/AS312M standards.
2.2.10 Carbon Steel Pipe for recovery well and extraction vaults: Carbon steel piping shall meet requirements of A252 Grade and A500 Grade Carbon Steel pipe, ASTM A181/A181M for forged fittings, general process piping application and ASTM/ASME A106/SA...
2.3 PLASTIC PIPING AND FITTINGS FOR TANK VENTS
2.3.1 Plastic vent piping shall be Schedule 40 PVC pipe, seamless, unplasticized polyvinyl chloride normal impact type, conforming to ASTM D-1784, Class 12454-B and D-1785, PVC 1120, for Type I, Grade 1. PVC vent pipe system shall be as manufactured...
2.3.2 Vent piping shall be 8-inch diameter unless shown otherwise on the drawings. Standards: ASTM D 2665 and NSF approved for DWV; ASTM D 3034 for SDR.
2.3.3 Fittings: PVC material, solvent weld, Type 1, ASTM D 2466 for Schedule 40, and ASTM 2665 for DWV; ASTM D 3212 for SDR.
2.3.4 Joint material: Use solvent cement in accordance with industry standards and manufacturer's recommendations.
2.3.5 All vent pipe discharging outside shall have a rain guard and bird screen that is compatible.
2.4 VALVES AND SPECIALTIES (PVC PROCESS SERVICE)
2.4.1 General. The Contractor shall furnish and install all valves and specialties as specified herein and shown on the Drawings. In addition, valve-operator and other accessories shall be furnished and installed by the Contractor where specified for...
2.4.2 Check valves 2 inches and smaller for liquid service shall be Schedule 80 double-union ball check as manufactured by Nibco, Hayward, Chemline, or approved equal. Check valves shall be capable of operating in either the horizontal or the vertical...
2.4.3 Ball Valves (General Purpose). Ball valves upto 4 inch, shall be Schedule 80 PVC double-union ball valves with handle as manufactured by Nibco, Hayward, Chemline, or approved equal.
2.4.3.1 All sampling valves and drain a valves shall be 316 SS, provided with a spring return handle with a locking device similar to manufactured J Flow Controls LLC or equal.
2.4.4 Butterfly Valves. Butterfly valves, 3 inch and larger, shall be Schedule 80 PVC with lugs for flanged service. Butterfly valves shall have hand wheel or chain wheel operators. Butterfly valves shall be as manufactured by Nibco, Hayward, Cheml...
2.4.5 Pressure/Vacuum Relief Valve: Two pressure/vacuum pressure/vacuum breather valves shall be provided (one of which will be a backup). The valves shall be of stainless steel construction and shall be rated for atmospheric pressure (14.7 psi) and ...
2.4.6 Air/Vacuum release valves(vent valves)
2.4.6.1 Air/Vacuum release valves up to 3 inches, shall be combination air/vacuum release automatic PVC valves and provided as shown on the drawings. The valves shall have flanged ends and manufactured by Nibco, Hayward, Chemline or approved equal. Th...
2.4.7 Solenoid Valves
Solenoid valves shall be ASCO General Service Solenoid Valves with brass bodies and manufactured by Emerson or Approved Equal. Provide and install solenoid valves where shown on drawings.
Valve Actuation: Solenoid
Body Material: Brass
Seals and Discs: PTFE
Core Tube: 305 Stainless Steel
Core and Plugnut: 430F Stainless Steel
Spring: 302 Stainless Steel
Shading Coil: Copper
Media: Air, Inert Gas, Water, Light Oil
Pipe Size: 2”
Orifice Size: 1 ¾”
Port Type: NPTF
Function: 2 way-2/2 Normally Closed
Flow: 43 Cv
Voltage: 24 AC, 110AC, 115 AC, 12 DC, 12 to 24 DC
Voltage Ranging, 120 AC, 120 DC
Max Differential / Max Operating Pressure: Up to 150 psi
Operating Environment: Indoor, Outdoor
UL listed and CSA certified
2.6.7 Electric Actuators
Electric Actuators: Series 70 manufactured by Bray International Inc. or approved equal
Motor Service: 120 VAC, 1 phase, 60 Hz
Enclosure: Designed to meet NEMA Type 4X and IP65 specification
Certification: UL, CSA and CE approved
Torque output range: For 6” to 12” Butterfly valves from 1200 lb-in to 5000 lb-in with a safety factor of 1.3
OPEN/CLOSED limit switches
Manual Override: The actuator shall be equipped with a manual override handwheel to rotate the valve without electrical power. The manual override system shall ensure efficient manual operation without the use of extra tools or levers. A motor power c...
2.5 DRAINS AND VENT VALVES
2.5.1 All drain and vent valves may not be shown on the detailed drawings for individual pipelines; their absence will not relieve the Contractor of the responsibility for providing and installing them to complete the piping system for the use intende...
2.5.1.1 Locations
2.5.1.1.1 All pipeline shall have a drain valve at low point.
2.5.1.1.2 All pressured pipeline shall have a vent valve at high point.
2.5.1.2 Sizes
2.5.1.2.1 For pipelines 2.5 inch and larger, drains shall be 0.75 inch and equipped with ball valves. For pipelines 2 inch and smaller, drains shall be 1/2 inch and equipped with ball valves.
2.6 SAMPLE PORTS
2.6.1 Sample ports, shown on the piping and instrument diagrams of the Contract Drawings, may not be shown on the detailed drawings of the individual pipelines; their absence shall not relieve the Contractor of the responsibility for providing them. ...
2.7 STRAINERS
2.7.1 Strainers for recovery well and process piping service shall be Basket Strainers-Type, constructed of PVC Body and Basket material (Cell Class 12454 per ASTM D1784) of size specified in table below with flanged end connections. Basket strainers ...
2.7.2 PVC strainers shall be located as per drawings and the following schedule. Strainers shall be Strainers shall be 6” and 8” SB Series Simplex Model as manufactured by Hayward Industrial Products or approved equal. Cast iron strainer shall be loc...
2.7.3 Strainer Schedule
2.8 MISCELLANEOUS PIPING COMPONENTS
2.8.1 Air Release Valves
2.8.1.1 Air release vents shall be located, and vented, such that a hazardous atmosphere will not be created upon operation. Air release shall be located as indicated on the Contract Drawings and at all high points.
2.8.2 Expansion Joints
2.8.2.1 Provide all structural work and equipment required to control expansion and contraction of piping. Verify that the anchors, guides, and expansion joints provided, adequately protect the piping systems. Provide rubber expansion joints for pip...
2.8.3 Pipe Insulation Material
2.8.3.1 All exposed process piping shall have foam insulation and PVC jacketing as shown on the Drawings. Insulation shall be per Section 22 09 19.
2.8.4 Static Mixers and Injection Quill
2.8.4.1 All static mixers and injection quill shall be manufactured by Koflo Corporation or Approved equal.
The two (2) static mixers SM-200 and SM-300 as shown on drawings shall be:
12-80-4-3-9.I(.50)
12" Koflo Static Mixer
12" Schedule 80 (0.688" Wall) PVC Housing
Three (3) Fixed PVC Mixing Elements
12" PVC Class 150 Van-Stone Style Socket Flanged Ends
One (1) 0.5" PVC NPT Female Threaded Injection Port
Lifting Lug
Length: 60"
Net Weight: ~128.8 lb
Model Type: KD-1026
Pressure Loss: 4.46 psi @ 1,800 GPM
The injection quill for the above two (2) static mixers shall be:
QR-.5P-.5PV-7
PVC Retractable Injection Quill
PVC Ball Valve
0.5" Male NPT Process Connection
0.5" Female NPT Inlet Connection
7" Insertion Length with 45 Beveled Tip
Integrated check valve with Viton seal, corrosion-resistant Hastelloy® C-276 spring, ceramic ball, and 5 PSI cracking pressure
2.8.5 Equalization Tank Mixer
The equalization tank mixer shall be side mounted as shown on drawings and manufactured by Dynamix Agitators (Dynamix Model SMX1-5-3 (Premium), SPX Flow, or Approved equal).
This tank mixer shall meet the following requirements:
Drive: 3.0 HP 3/60/230-460V TEFC Severe Duty
Reducer Helical Gear 365 rpm
SF 1.5, Synthetic Lubricant
Mount: Pedestal Mount with 6in flange connection, Single Cartridge Mechanical Seal & Shut-off Valve.
Shaft: 1.5” Dia x 24” Length (316SS)
Bottom Impeller: 14.5” P3B Impeller / 3-Blades Welded with Keyed Hub (316SS)
Torque: 389 [lb inch]
Mixing cycle and class: Blending in Batch.
Min Level: Mixer must not be running when the liquid level is below 5ft.
Mixer mounting (inclination angle, angle facing away from the center & mounting height) shall be field determined. Mixer shall be provided with Pedestal, Mechanical seal and Shut-off valve for ease of maintenance and removing the drive without the nee...
2.9 PIPE SUPPORTS AND PENETRATIONS
2.9.1 Provide auxiliary steel where the support of piping systems and equipment is required between building structural elements. Light gauge and structural steel shapes shall conform to the requirements of ASTM A 36/A 36M. The Contractor has the op...
2.9.1.1 Pipe Supports
2.9.1.1.1 Pipe supports shall conform to the requirements of MSS SP-58, MSS SP-69, and MSS SP-89. Where pipe supports contact bare piping or in-line devices, provide supports of compatible material (or dielectric separation) so that neither shall hav...
2.9.1.1.1.1 Beam Clamps
2.9.1.1.1.1.1 For upper attachments on structural steel, provide beam clamps of stainless steel and MSS SP-58 Types 19 through 23, 25 or 27 through 30. Holes drilled in structural steel for hanger support rods shall not be permitted. Clamps shall be...
2.9.1.1.1.2 Riser Clamps
2.9.1.1.1.2.1 Vertical runs of piping shall be supported on the floor, or closer where required, with stainless steel clamps bolted around pipes and attached to the building construction. Two bolt-type clamps designed for installation under insulatio...
2.9.1.1.1.3 Brackets
2.9.1.1.1.3.1 Where piping is run adjacent to walls or steel columns, provide welded stainless steel brackets, pre-punched with a minimum of two fastener holes.
2.9.1.1.1.4 Offset Pipe Clamp
2.9.1.1.1.4.1 Where pipes are indicated as offset from wall surfaces, supply a double-leg design two-piece stainless steel pipe clamp.
2.9.1.1.1.5 Racks
2.9.1.1.1.5.1 Multiple pipe racks or trapeze hangers shall be fabricated from stainless steel, and designed to suit the conditions at the points of installation. Pipes shall be kept in their relative positions to each other by the use of clamps or cl...
2.9.1.1.1.6 Hangers
2.9.1.1.1.6.1 Hangers shall be fabricated of stainless steel. All hangers shall be of a uniform type and material for a given pipe run and application. Coated or plated hangers shall be used to isolate steel hangers from dissimilar metal tube or pip...
2.9.1.1.1.7 Hanger Rods
2.9.1.1.1.7.1 Hanger rods shall be stainless steel. The diameter of the rods for the piping system support shall conform to ASME B31.1.
2.9.2 Wall Penetrations
2.9.2.1 Above Grade Wall Penetrations
2.9.2.1.1 Plastic pipe penetrations shall be fitted with galvanized steel collars that have intumescent inlays.
2.9.2.2 Below-Grade Wall Penetrations
2.9.2.2.1 Below-grade wall penetrations shall be provided with seals manufactured by Link Seal or approved equal. The locations where this will be used are:
2.9.2.2.1.1 Groundwater conveyance pipe entering the building.
2.9.2.2.1.2 Potable water line entering the building.
2.9.2.2.1.3 Electrical and instrumentation lines entering the building.
2.9.2.3 Galvanizing
2.9.2.3.1 Galvanizing shall be hot-dip applied and meet the requirements of ASTM A 153/A 153M. Stainless steel components may be substituted where galvanizing is specified.
PART 3 - EXECUTION
3.1 EXAMINATION
3.1.1 After becoming familiar with all details of the work, verify all dimensions in the field, and advise Owner’s Representative of any discrepancy before performing the work.
3.2 PREPARATION
3.2.1 Pipe and equipment openings shall be closed with caps or plugs during installation. Equipment shall be protected from dirt, water, and chemical or mechanical damage. Pipe and fittings shall be inspected before piping is installed. Clean the e...
3.3 EXPOSED PIPING INSULATION
3.3.1 Exposed piping shall be run as straight as practical along the alignment shown on the Contract Drawings and with a minimum number of joints. Piping and appurtenances shall be installed in conformance with approved shop drawings, manufacturer's ...
3.3.1.1 FIELD Piping Flexibility Provisions
3.3.1.1.1 Thrust protection shall be provided as required. Additional pipe anchors and flexible couplings beyond those shown on the Contract Drawings shall be provided to facilitate piping installation, in accordance with approved shop drawings.
3.3.1.2 Couplings, Adapters and Service Saddles
3.3.1.2.1 Pipes shall be thoroughly cleaned of oil, scale, rust, and dirt in order to provide a clean seat for gaskets. Gaskets shall be wiped clean prior to installation. Flexible couplings and flanged coupling adapter gaskets shall be lubricated wit...
3.3.1.3 Piping Equipment/Component Installation
3.3.1.3.1 Piping components and instrumentation shall be installed in accordance with manufacturer's instructions. Required upstream and downstream clearances, isolation valves, and miscellaneous devices shall be provided for an operable and servicea...
3.3.1.3.2 Local Instrumentation: All direct-reading instrumentation and pressure gauges shall be installed so that they can be easily read from floor level, and are readily accessible for maintenance and service. Pressure gauges shall be installed whe...
3.3.1.4 Pipe Flanges
3.3.1.4.1 Pipe flanges shall be set level, plumb, and aligned. Flanged fittings shall be installed true and perpendicular to the axis of the pipe. The bolt holes shall be concentric to the centerline of the pipe and shall straddle the vertical cente...
3.3.1.5 Valve Locations
3.3.1.5.1 Valves shall be located in accordance with the Contract Drawings where actuators are shown. Where actuators are not shown, valves shall be located and oriented to permit easy access to the valve operator, and to avoid interferences. Valves...
3.3.1.6 PVC Pipe Installation
3.3.1.6.1 All PVC pipe shall be cut, made up, and installed in accordance with the pipe manufacturer's recommendations. Solvent-cemented joints shall be constructed in accordance with ASTM D 2855. Pipe shall not be laid in the rain and when the air ...
3.4 CONNECTING DISSIMLAR PIPE
3.4.1 Flexible transition couplings, dielectric fittings and isolation joints shall be installed in accordance with the manufacturer's instructions.
3.5 VALVE INSTALLATION
3.5.1 Flanged valve bolt holes shall be installed so as to straddle the vertical centerline of pipe. Flanged faces shall be cleaned prior to inserting the gasket and bolts, and then the nuts shall be tightened progressively and uniformly. Threaded en...
3.5.1.1 Valve Orientation
3.5.1.1.1 The operating stem of a manual valve shall be installed in a vertical position when the valve is installed in horizontal runs of pipe having centerline elevations 4.5 feet or less above finished floor, unless otherwise shown on Contract Draw...
3.6 PIPING SUPPORT SYSTEMS INSTALLATION
3.6.1 The absence of pipe supports and details on the Contract Drawings shall not relieve the Contractor of the responsibility for sizing and providing adequate supports throughout the plant.
3.6.1.1 General Support Requirements
3.6.1.1.1 Large or heavy valves, fittings, and/or equipment shall be supported independently of associated piping. Pipes shall not be supported off other pipes, equipment, or tanks. Pipes shall be supported by engineered supports independent of equip...
3.6.1.2 Support Methods
3.6.1.3 Piping support and spacing shall be provided as specified and as shown in the Contract Drawings, in addition to supplemental support as needed in the field. Adjustable swivel-ring hangers shall support single horizontal suspended piping. Tra...
3.6.1.4 Pipe support locations shown on the drawings are the minimum requirements and does not relieve the Contractor from providing adequate support and meeting the intent of this specification.
3.7 FIELD QUALITY CONTROL
3.7.1 Exposed Piping
3.7.1.1 Hydrostatic testing shall be conducted in accordance with ASME B31.3. Piping systems shall be tested under normal service conditions to demonstrate compliance. Potable water shall be used as the hydrostatic test fluid. Provide clean test wat...
3.7.1.2 Tests for above ground pressure piping shall be conducted after the piping has been completely installed, including all supports, hangers, and anchors, and inspected for proper installation but prior to installation of insulation.
3.7.1.3 Drain lines shall not be pressure tested.
3.7.2 Pipe Leakage Tests
3.7.2.1 Should leakage be observed during testing, the leaks should be located and repaired at no cost to the Owner.
3.7.3 Leak Testing Air Lines
3.7.3.1 Following installation of the air piping , the piping shall be checked for leaks at joints. At the design air flow rate the system shall be tested at a pressure of 5 psi. , The test pressure shall be applied within the pipe and soap water sh...
3.7.4 Leak Testing Vent Piping
3.7.4.1 PVC piping for tank atmospheric vents shall not be pressure tested.
3.7.5 Valve Testing
3.7.5.1 Valves may be tested while testing pipelines. It shall be demonstrated to the Owner’s Representative that valves open and close smoothly and fully under operating pressure.
3.8 FINAL CLEANING
3.8.1 Following assembly and testing, and prior to final acceptance, liquid piping systems shall be flushed with water to remove accumulated construction debris and other foreign matter. The piping shall be flushed until all foreign matter is removed...
3.8.2 Blow out all compressed air and vent vapor lines prior to connecting to equipment. Remove metal and plastic debris and other foreign matter from air and vapor lines before making final connections.
3.9 WASTE WATER DISPOSAL
3.9.1 All water generated during the flushing, and pressure testing of pipes shall be collected, stored temporarily onsite, tested, and disposed off-site in accordance with all Local, State, and Federal regulations and at a facility that appears on th...
43 11 00.10 Blower for GAC
43 21 13 Recovery Well Pumps
PART 1. GENERAL
1.2 RELATED SECTIONS
1.3 REFERENCES
HYDRAULIC INSTITUTE STANDARDS FOR CENTRIFUGAL, ROTARY, AND RECIPROCATING PUMPS (HI)
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
1.4 SUBMITTALS
1.5 DELIVERY AND STORAGE, AND HANDLING
1.6 QUALIFICATIONS AND WARRANTY
1.7 TOOLS AND SPARE PARTS
1.8 EQUAL PRODUCTS
PART 2. PRODUCTS
2.2 MATERIALS FABRICATION
PART 3. EXECUTION
3.2 INSTALLATION
3.3 FIELD TESTS AND INSPECTIONS
3.4 MANUFACTURERS SERVICES
43 31 13.13 10 LGAC System
part 1. GENERAL
1.1 SCOPE OF WORK
A. Furnish all labor, materials, equipment and incidentals required to install Gas and Liquid Phase Granular Activated Carbon (LGAC) units for the removal of organic compounds. The Contractor shall provide materials and equipment which are new and unu...
B. This section specifies the performance requirements for the design, fabrication, installation, and operation of the Liquid Phase Granular Activated Carbon (LGAC) system as shown on the Contract Drawings and as specified. The Contractor shall provid...
C. All piping shall be provided and installed in accordance with Section 41 10 02.
1.2 RELATED SECTIONS
A. Section 01 01 00 Scope of Work
B. Section 01 33 00 Submittals Procedures
C. Section 01 78 00 Closeout Submittals
D. Section 01 78 23 Operation and Maintenance (O&M) Data
E. Section 41 10 02 Process Piping
1.3 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASME Section VIII, Division 1 – American Society of Mechanical Engineers Boiler and Pressure Vessel Code.
ASME/ANSI B16.5 – American Society of Mechanical Engineers/American National Standard Institute.
ASME Section II, American Society of Mechanical Engineers – Materials, Parts A, B & C.
ASME B40.100 (2005) Pressure Gauges and Gauge Attachments.
1.4 SUBMITTALS
A. Pre-Construction Submittals:
1. Manufacturer's technical and engineering data sheets for the LGAC system including system features, materials of construction of the adsorber vessel, LGAC media, general dimensions, and operational parameters. Product data shall include selected m...
2. Shop Drawings, including:
a. General arrangement drawings with dimensions of adsorber vessel, skid, valve packs, clearance requirements, and Manufacturer's data covering installation instructions, weight, detailed specifications, materials of construction, parts, devices, and ...
b. Show on the Drawings proposed layout, location of valves and interface points, and anchorage requirements. Show location of piping, valves, pressure/vacuum relief devices, lifting lugs, anchor bolt locations. Indicate all sizes, capacities, and d...
c. Process flow diagrams and instrumentation diagrams(s) showing all major pieces of process equipment with valves. Show on the drawings complete piping, wiring and schematic diagrams and any other details required to demonstrate that the system has ...
d. Clearances for maintenance and operation.
e. Details on vessel internals including underdrain and top distributor.
3. Empty bed contact time for each vessel, and pressure drop information across each carbon vessel for all plant flow conditions (min: 600 gpm, Average:1600 gpm, and Maximum: 1800 gpm).
4. Backwash requirements – flow and pressure drop.
5. Specification of each type of granular activated carbon to be utilized including iodine number, moisture content, effective size, uniformity coefficient, abrasion number, apparent density, and screen size. Projected granular activated carbon usage...
6. Calculations:
a. Structural and anchorage calculations. Contractor shall submit detailed calculations illustrating the seismic characteristics and anchorage of the proposed skid. Calculations shall be signed and sealed by a professional engineer licensed to practi...
7. Manufacturer's certificates, including the name and address of the production facility, attesting that the activated carbon furnished meets the specified requirements.
8. Material specifications for pipe, valves, fittings and instrumentation, and specifications for vessel lining and painting (interior and exterior).
9. A comprehensive instrument, valve, and actuator list and associated datasheets. Contractor shall supply drawings detailing wiring between field instruments/valve actuators to Manufacturer supplied junction box. Manufacturer shall provide instrument...
B. Informational Submittal, including:
1. Equipment delivery schedule.
2. Manufacturer’s hydrostatic test report at manufacturing facility.
3. Coating manufacturer certification of internal coating application.
4. Recommended spare parts list.
C. Contractor shall submit a Test Report describing the findings of the field inspection of the installed equipment and the results of the functional testing, hydrostatic testing, and performance testing – see paragraph 3.4 for details.
D. Operation and Maintenance Manual
1. Submit the operation and maintenance (O&M) manual and required number of copies in accordance with Section 01 78 23.
1.5 SEISMIC LOADS
1.6 DELIVERY AND STORAGE
1.7 EQUAL PRODUCTS
1.8 QUALIFICATION AND WARRANTY
A. Manufacturer Qualification
1. The LGAC System shall be supplied by reputable Manufacturers having at least ten (10) years’ experience in the design and fabrication of such systems for the treatment of groundwater and water.
B. Warranty
1. Manufacturer shall provide warranty in accordance with Section 01 77 00 of the specifications.
PART 2. PRODUCTS
2.1 MATERIALS AND EQUIPMENT
A. Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of LGAC systems and components, and that essentially duplicates items that have been in satisfactory use at other locations for a...
B. GAC system shall be skid mounted, assembled, piped, and tested in the shop prior to shipment. Field assembly shall be minimized to the maximum extent possible. The Owner’s Representative may desire to witness a factory acceptance test at the manu...
C. This equipment shall be manufactured/ supplied by: TIGG, Calgon, Carbonair, Evoqua, or approved equal.
2.2 GAC SYSTEM REQUIREMENTS
A. Service: The LGAC system (LGAC-410, LGAC-420 and LGAC-430) shall be designed to remove any residual hydrogen peroxide and organics.
B. Anticipated Influent Characteristics
C. Performance Requirements
* ND – Non-Detect
D. Design Criteria
1. Number of LGAC Units: 3 (LGAC-410, LGAC-420 and LGAC-430) for Hydrogen Peroxide and Organics Removal
2. Headloss: 8 psi during normal operation and maximum 15 psi
3. Maximum flow Rating: 785 gpm per unit
4. Flow direction : Three (3) units operating in parallel
5. Empty bed contact time : 12 minutes per vessel flow of 700 gpm per unit
6. Hydraulic loading rate: 8.9 gpm/ft2 at flow of 700 gpm per unit
7. Backwash loading rate & water source : Atleast 12 gpm/ft2
2.3 EQUIPMENT DESCRIPTION
A. GAC Vessel: The vessel shall have a diameter of 10 feet, a total height of 18 feet, and shall be oriented vertically. The vessels shall be of welded carbon steel construction and shall be tested to withstand a maximum allowable working pressure o...