This is a Technical Specification Section for the Phase III Groundwater Treatment Plant, specifically governing the design, fabrication, installation, and operation of Liquid Phase Granular Activated Carbon (LGAC) filter systems. The Contractor must furnish and install three LGAC filter units (LGAC-410, LGAC-420, and LGAC-430) plus one carbon canister vessel (C-100) to remove residual organic compounds and hydrogen peroxide after multimedia filtration and advanced oxidation processes. The LGAC system shall be skid-mounted with all equipment supplied new and unused. Acceptable manufacturers include TIGG, Calgon, Carbonair, Evoqua, or approved equivalents. The system must be designed for a maximum flow of 1,800 gallons per minute and average flow of 1,600 gallons per minute across three parallel units operating at 700 gallons per minute each, with an empty bed contact time of 12 minutes per vessel and headloss limited to 8 pounds per square inch during normal operation and maximum 15 pounds per square inch.

Each LGAC vessel shall be 10 feet in diameter, 18 feet tall, welded carbon steel construction rated for 125 pounds per square inch maximum allowable working pressure, and filled with 20,000 pounds of virgin activated carbon meeting AWWA B604 standards and ANSI/NSF Standard 61. The specification requires comprehensive pre-construction submittals including manufacturer technical data, shop drawings, process flow diagrams, structural and seismic calculations signed by a licensed professional engineer, backwash requirements, and granular activated carbon specifications and testing reports. The Contractor must provide functional, hydrostatic, and three-day performance testing at maximum design flow rates with sampling and analysis for volatile organic compounds, semi-volatile organic compounds, and residual hydrogen peroxide. Additional requirements include manufacturer's representative support for up to 10 days during installation and 15 days during testing, video-recorded training totaling 16 hours for operating and maintenance staff, and delivery of operations and maintenance manuals. All interior vessel surfaces must be coated with Plasite 4110 at 40 milligrams per liter dry film thickness, exterior surfaces with two coats of epoxy paint, and the system must meet 2021 International Building Code seismic design requirements for Seismic Design Category B.

View the file

Other files

File Type Posted
Amendment 0005 - N4008526R0161.pdf PDF
Wage Determination NY20260012 5.18.2026.pdf PDF
Amendment 0004 Phase III Groundwater Treatment Plant.pdf PDF
Attachment O- 43 21 13_R1.pdf PDF
Attachment N- 08 71 00 R1.pdf PDF
Attachment L- 43 3113.13 10.pdf PDF
Attachment R- A-112G08005-WE24 Phase III- A-102.pdf PDF
Amendment 0003 Phase III Groundwater Treatment Plant.pdf PDF
Interested Vendors List N4008526R0161.docx DOCX document
Attachment P- M101-R1.pdf PDF
Attachment Q- 50 03 01 R1.pdf PDF
Attachment M - BP Phase III Spec Mod 06102026.pdf PDF
Amendment 0002 Phase III Groundwater Treatment Plant.pdf PDF
Amendment 0001 Phase III Groundwater Treatment Plant.pdf PDF
Attachment K- Phase_III_Photo_Log.pdf PDF
Attachment J- Site Location Map.pdf PDF
Attachment 3-Appendix E Phase III DWGs-CUI-REDACTED-NEW.pdf PDF
Attachment 1- Basis of Design-PHASE III GWTP_BODR_Feb 26 IFB To Navy_REDACTED.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H- Price Proposal Form.docx DOCX document
Attachment I - Wage Determination NY20260012.pdf PDF
Attachment E - Historical SB Utilization.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
Attachment F - SBPCD.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Solicitation - N4008526R0161.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - SBPCD.pdf PDF
Attachment H- Price Proposal Form.pdf PDF
ATTACHMENT 2- Appendix D_Combined Specs_Signed.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment G - Individual SB Subcontracting Plan.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE III GROUNDWATER TREATMENT PLANT

43 31 13.13 10 - 1

SECTION 43 31 13.13 10

ACTIVATED CARBON-GAS AND LIQUID PURIFICATION FILTERS

PART 1. GENERAL

SCOPE OF WORK

Furnish all labor, materials, equipment and incidentals required to install Gas and Liquid Phase Granular Activated Carbon (LGAC) units for the removal of organic compounds. The Contractor shall provide materials and equipment which are new and unused.

This section specifies the performance requirements for the design, fabrication, installation, and operation of the Liquid Phase Granular Activated Carbon (LGAC) system as shown on the Contract Drawings and as specified. The Contractor shall provide three (3) LGAC filters (LGAC-410, LGAC-420 and LGAC-430). The three units will be used to remove any organics that remains after Multimedia Filters and Advanced Oxidation Process (AOP). The contractor shall also provide and install one (1) carbon cannister vessel (C-100) as specified and shown on the contract drawings.

All piping shall be provided and installed in accordance with Section 41 10 02.

RELATED SECTIONS

Section 01 01 00 Scope of Work

Section 01 33 00 Submittals Procedures

Section 01 78 00 Closeout Submittals

Section 01 78 23 Operation and Maintenance (O&M) Data

Section 41 10 02 Process Piping

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF MECHANICAL ENGINEERS INTERNATIONAL

ASME Section VIII, Division 1 – American Society of Mechanical Engineers Boiler and Pressure Vessel Code.

ASME/ANSI B16.5 – American Society of Mechanical Engineers/American National Standard Institute.

ASME Section II, American Society of Mechanical Engineers – Materials, Parts A, B & C.

43 31 13.13 10 - 2

ASME B40.100(2005) Pressure Gauges and Gauge Attachments.

AMERICAN SOCIETY OF TESTING MATERIALS INTERNATIONAL (ASTM)

ASTM D 1784 (2011) Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds ASTM D 1785 (2006) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120 ASTM D 2241 (2009) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series) ASTM D 2564 (2004; R 2009e1) Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems ASTM D 3139 (1998; R 2005) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals ASTM F 477(2010) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe American Water Works Association (AWWA) – B604, Standard for Granular Activated Carbon

SUBMITTALS

The following shall be submitted in accordance with Section 01 33 00 file://emis109fs1.tt.local/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/prntdata/01%2033%2000.doc

43 31 13.13 10 - 3

Submittals:

Pre-Construction Submittals:

Manufacturer's technical and engineering data sheets for the LGAC system including system features, materials of construction of the adsorber vessel, LGAC media, general dimensions, and operational parameters. Product data shall include selected model number, rated flow capacity, dimensions, weights (dry and operating), accessories, instrumentation list, and warranty coverage. List of all instrumentation shall include descriptive information for each component including, but not limited to, instrument number, manufacturer, and ranges measured.

Shop Drawings, including:

General arrangement drawings with dimensions of adsorber vessel, skid, valve packs, clearance requirements, and Manufacturer's data covering installation instructions, weight, detailed specifications, materials of construction, parts, devices, and other information required to verify compliance with these specifications.

Show on the Drawings proposed layout, location of valves and interface points, and anchorage requirements. Show location of piping, valves, pressure/vacuum relief devices, lifting lugs, anchor bolt locations. Indicate all sizes, capacities, and dimensions.

Process flow diagrams and instrumentation diagrams(s) showing all major pieces of process equipment with valves. Show on the drawings complete piping, wiring and schematic diagrams and any other details required to demonstrate that the system has been coordinated and shall properly function as a unit.

Clearances for maintenance and operation.

Details on vessel internals including underdrain and top distributor.

Empty bed contact time for each vessel, and pressure drop information across each carbon vessel for all plant flow conditions (min: 600 gpm, Average:1600 gpm, and Maximum: 1800 gpm).

Backwash requirements – flow and pressure drop.

Specification of each type of granular activated carbon to be utilized including iodine number, moisture content, effective size, uniformity coefficient, abrasion number, apparent density, and screen size. Projected granular activated carbon usage rates.

Reports of testing granular activated carbon in accordance with AWWA B604. Material safety data sheets in conformance with 29 CFR 1910 Section 1200(g) for activated carbon.

Calculations:

43 31 13.13 10 - 4

Structural and anchorage calculations. Contractor shall submit detailed calculations illustrating the seismic characteristics and anchorage of the proposed skid. Calculations shall be signed and sealed by a professional engineer licensed to practice in the State of New York.

Manufacturer's certificates, including the name and address of the production facility, attesting that the activated carbon furnished meets the specified requirements.

Material specifications for pipe, valves, fittings and instrumentation, and specifications for vessel lining and painting (interior and exterior).

A comprehensive instrument, valve, and actuator list and associated datasheets. Contractor shall supply drawings detailing wiring between field instruments/valve actuators to Manufacturer supplied junction box. Manufacturer shall provide instrumentation per Contract Documents.

Informational Submittal, including:

Equipment delivery schedule.

Manufacturer’s hydrostatic test report at manufacturing facility.

Coating manufacturer certification of internal coating application.

Recommended spare parts list.

Contractor shall submit a Test Report describing the findings of the field inspection of the installed equipment and the results of the functional testing, hydrostatic testing, and performance testing – see paragraph 3.4 for details.

Operation and Maintenance Manual

Submit the operation and maintenance (O&M) manual and required number of copies in accordance with Section 01 78 23.

SEISMIC LOADS

The structural aspects of the LGAC shall be sufficient to meet the 2021 International Building Code requirements for Seismic Design Category = B. See structural sheet S-001 for additional Design Criteria information.

DELIVERY AND STORAGE

Protect all equipment, delivered and designated for storage, from the weather, humidity and temperature variations, dirt and dust, or other contaminants.

EQUAL PRODUCTS

The Contract Drawings and Technical Specifications are based on a

43 31 13.13 10 - 5 conceptual arrangement of the three LGAC vessels and piping (TIGG Model CP-20K-10-GA system with 3 units). Should the Contractor propose to furnish an equivalent system of a different configuration, the Contractor shall be responsible for all revisions necessary to incorporate the proposed LGAC into the design and submit the necessary revised Contract Drawings and Technical Specifications for review and

43 31 13.13 10 - 6 approval.

QUALIFICATION AND WARRANTY

Manufacturer Qualification

The LGAC System shall be supplied by reputable Manufacturers having at least ten (10) years’ experience in the design and fabrication of such systems for the treatment of groundwater and water.

Warranty

Manufacturer shall provide warranty in accordance with Section 01 77 00 of the specifications.

PRODUCTS

MATERIALS AND EQUIPMENT

Provide materials and equipment which are the standard products of a manufacturer regularly engaged in the manufacture of LGAC systems and components, and that essentially duplicates items that have been in satisfactory use at other locations for at least 10 years.

GAC system shall be skid mounted, assembled, piped, and tested in the shop prior to shipment. Field assembly shall be minimized to the maximum extent possible. The Owner’s Representative may desire to witness a factory acceptance test at the manufacturer’s shop.

This equipment shall be manufactured/ supplied by: TIGG, Calgon, Carbonair, Evoqua, or approved equal.

GAC SYSTEM REQUIREMENTS

Service: The LGAC system (LGAC-410, LGAC-420 and LGAC-430) shall be designed to remove any residual hydrogen peroxide and organics.

Anticipated Influent Characteristics

Flow : 1800 gpm (max) and 1600 gpm (average)

Compound Units LGAC Influent Value (maximum)

Hydrogen Peroxide ppm 3 maximum

Trichloroethene ppb

Tetrachloroethene ppb

Freon 113 ppb

1,1-Dichloroethene ppb 1 cis-1,2- Dichloroethene ppb 1

1,4-Dioxane ppb 1.5

43 31 13.13 10 - 7

Performance Requirements

The LGAC System shall be designed to meet the discharge limits given below for 1800 gpm (max) and 1600 gpm (average) flow:

Compound Units Discharge Requirement

Hydrogen peroxide ppm ND*

Trichloroethene ppb ND

Tetrachloroethene ppb

ND

Freon 113 ppb

ND

1,1-Dichloroethene ppb

ND

cis-1,2-Dichloroethene ppb

ND

1,4-Dioxane ppb <0.1

* ND – Non-Detect

Design Criteria

Number of LGAC Units: 3 (LGAC-410, LGAC-420 and LGAC-430) for Hydrogen Peroxide and Organics Removal

Headloss:8 psi during normal operation and maximum 15 psi

Maximum flow Rating: 785 gpm per unit

Flow direction: Three (3) units operating in parallel

Empty bed contact time: 12 minutes per vessel flow of 700 gpm per unit

Hydraulic loading rate: 8.9 gpm/ft2 at flow of 700 gpm per unit

Backwash loading rate & water source : Atleast 12 gpm/ft2

43 31 13.13 10 - 8

EQUIPMENT DESCRIPTION

GAC Vessel: The vessel shall have a diameter of 10 feet, a total height of 18 feet, and shall be oriented vertically. The vessels shall be of welded carbon steel construction and shall be tested to withstand a maximum allowable working pressure of 125 psi. Lifting lugs, supports, connections and appurtenances shall be provided as detailed on the drawings including pressure relief and vacuum relief valves for each vessel. The vessel shall be designed and fabricated in accordance with the ASME BPVC SEC VIII D1 and does not have to be stamped and certified.

Underdrain System: The underdrain shall be of the standard manufacturer's design particular to the supplied LGAC unit and furnished with the constructed package unit except that it shall not be of plastic material. The LGAC underdrain/ backwash distributor shall be slotted septa constructed of 316L stainless steel. The underdrain system shall be designed to withstand all loads due to design pressures, design loading rates, forces from backwash flows, and loads from the media to be installed in the tank. The slot size or perforations in the underdrain shall not permit media to pass through it.

Activated Carbon: Material shall be free from impurities that affect the serviceability and appearance of the finished product.

Twenty thousand (20,000) pounds of virgin LGAC shall be provided and installed within each vessel.

The activated carbon shall be virgin liquid phase coal- or coconut-based activated carbon specifically designed to removal low concentration of weakly adsorbed organics from water. The media shall be produced in the United States.

Granules shall be clean and hard. The LGAC shall conform to AWWA B604 (Potable Water Service) standard for LGAC and comply with ANSI/NSF Standard 61. The activated carbon which is manufactured to the following specification:

1. Manufacturer & Commercial Name: TIGG-5DC 0830

2. TIGG-5DC 0830 or Approved Equal

3. Iodine Number, mg/g (minimum) (ASTM D 4607): 1100

US Sieve, 90 wt% min: 8 x 30

Abrasion Number (minimum):85

Apparent Density, g/cc (ASTM D 2854): 0.42 – 0.47

An analysis sheet certifying compliance with the specifications and indicating point of manufacture shall accompany the delivered activated carbon.

Appurtenances and Instrumentation:

43 31 13.13 10 - 9

Pressure relief at each vessel shall be provided by a pressure/vacuum relief valve to relieve pressure at the Maximum Allowable Working Pressure (125 psi) of the vessel. One shall be provided for each liquid-phase LGAC vessel. Each of the vessels shall also be provided with a pressure relief/vacuum relief valve.

The pressure/vacuum relief valve shall be mounted on the lines shown on the P&IDs.

Provide all skid-mounted interconnecting piping and valves between LGAC-410, LGAC-420 and LGAC-430. The process piping at each vessel shall be equipped with a differential pressure gauge to indicate the pressure drop across each adsorber and the system. The differential pressure gauge shall have a 4” face diameter with an encapsulated sensing element in a brass case housing (0 to 20 psig range). The differential pressure gauge shall have the ability to provide a field configurable, 120 VAC discrete input indicating a differential pressure of up to 10 psid.

The carbon fill and discharge shall be fitted with hose connections, such that carbon transfer to and from the adsorbers can be facilitated using carbon transfer hoses. These connectors shall be 3” Quick Disconnect Adaptors constructed of corrosion resistant materials (nylon) as manufactured by Dover Corp. as Kamlock connectors or approved equal.

Two (2) flush connections shall be provided on each LGAC fill line, one upstream and one downstream of the fill isolation valve. One

(1) flush connection shall be provided on each LGAC discharge line, downstream of the fill isolation valve. The connections shall be welded into the steel or stainless steel pipe. Flush connections shall consist of a short section of ¾” pipe, a ¾” full port ball valve and a ¾” quick disconnect adaptor to match with water hose fittings.

Equipment Control: The LGAC system shall be provided with manual butterfly valves. The appropriate valves will be opened or closed to place LGAC in normal operation model or to initiate backwash.

Valves: Transfer of water to and from the LGAC unit shall be accomplished by a manual butterfly valve.

Control System Junction Box: Manufacturer shall provide a local, prewired, NEMA 4X junction box to terminate all skid mounted instrumentation and equipment wiring. Signals from the junction box shall be transmitted to the plant PLC to alarm, and notify when to initiate backwash due to high differential pressure, or place specific LGAC vessels back in service. Backwash initiation shall be by manual initiation. The valves shall be completely assembled, tested at the factory prior to shipment.

Carbon Cannister (vessel):

Furnish and install one (1) carbon cannister (vessel) from TIGG (Model: N-1200 PDB), Carbonair, Evoqua or approved equal.

43 31 13.13 10 - 10

The carbon cannister shall be rated for upto flow rate 1200 CFM with 1000 pounds of carbon capacity. Carbon media shall be 4mm pellet virgin carbon media.

Bed Depth 36 inch Carbon Tetrachloride Number 60% (minimum) Apparent density (dense packing) 30 lbs/ft3 Hardness Number 95 (minimum) Moisture Content (as packed) 2% (maximum)

PAINT

The interior and exterior of fabricated ferrous metal components shall be treated after fabrication to prevent corrosion. The surfaces of the vessels shall be sandblasted and completely factory finish painted prior to shipment. Insulating components such as gaskets, couplings, or bushing or dielectric-type which will prevent corrosion of bimetallic-type contacts, shall be used at connections between dissimilar metals.

Exterior Surfaces: All ferrous surfaces shall be coated or painted.

Ferrous metal surfaces shall be prepared with two coats of epoxy paint.

Interior Surfaces: All interior surfaces shall be coated with Plasite 4110 applied at 40 mil dry film thickness (DFT).

ACCESSORIES

Supporting Skid: The LGAC system and all appurtenances shall be supported on a steel skid and legs.

Lifting Lugs: Individual equipment and or each field-assembled part over 100 pounds in weight shall be provided with lifting lugs for ease of handling.

Anchor Bolts: Contractor shall size and provide 316 SS anchor bolts, and shall provide installation template for positioning the bolts. The support system shall be designed to resist seismic forces. The seismic forces shall be based on the vessels and all appurtenances full of water.

Equipment Identification Plate: A stainless steel identification plate shall be securely mounted on the equipment (each LGAC vessel) in a location that is visible at eye level. The plate shall bear the Manufacturer’s name, address, phone number, equipment model number, serial number, and equipment ID number that matches the P&IDs.

SPARE PARTS & TOOLS

Contractor shall provide one set of recommended spare parts for LGAC and related accessories supplied.

Contractor shall supply one set of any special tools required for assembly, disassembly, or adjustment of the equipment supplied.

EXECUTION

43 31 13.13 10 - 11

GENERAL

The LGAC System shall be manufactured in accordance with the best trade practices and in accordance with all applicable codes and regulations.

FABRICATION & SHIPMENT

The Contractor shall allow the Owner’s Representative access to the manufacturing facility should the Owner’s Representative decide to inspect the equipment during the manufacturing of the system or any part of the equipment. The Owner’s Representative may desire to witness a factory acceptance test at the manufacturer’s shop prior to shipping to demonstrate maximum processing flow rate and full functionality of all service/backwash modes of operation.

LGAC units shall be shipped dry without any media.

All open piping shall be fitted with blank flanges prior to shipment.

Work not required to be performed in the field shall be performed in the factory under controlled conditions. Field assembly of the equipment will be performed by the Contractor under the supervision of the Manufacturer.

The Contractor shall provide all installation documents and O&M Manuals in accordance with the Contract Documents.

INSTALLATION

Verify all dimensions in the field and advise the Owner’s Representative of any discrepancy before performing the work.

The LGAC system shall be installed in accordance with the Manufacturer's Instructions, as shown on the Contract Drawings, and in the presence of the Manufacturer’s representative.

The installed LGAC system shall be visually inspected for plumb and nozzle alignment, smoothness, and evenness.

Factory painted items shall be touched up as needed. Factory painted items requiring touching up in the field shall be thoroughly cleaned of all foreign material, wire brushed, sanded, primed and top-coated with the manufacturer's standard factory finish to match the desired color.

All valves and piping shown on the P&ID within the skid limits shall be factory installed.

43 31 13.13 10 - 12

After installation of the LGAC vessels, the Contractor shall load (fill/ transfer) each LGAC vessel with virgin LGAC. The Contractor shall provide all related equipment for the carbon fill to each LGAC unit including utilities such as air and potable water. Contractor shall assume that approximately 24,000 gallons of potable water will be required for two LGAC units for initially backwashing the carbon units for LGAC segregation prior to placing the units in service. Use care in loading carbon media and clean up all spills after they occur.

Wear dust masks and/or other protective equipment to avoid breathing carbon dust.

Dispose of waste generated during the startup and placement of the units in service, including backwash waste generated during backwash of the units to segregate the carbon prior to startup, and all other related wastes.

TESTING

Functional Testing: Prior to startup, all equipment components shall be inspected by the Contractor for proper alignment, proper connections, and satisfactory installation. All products shall be carefully inspected for defects in workmanship and material; debris and foreign matter shall be cleaned out of valve openings and seats;

all operating mechanisms shall be operated to check their proper functioning; and all nuts and bolts shall be checked for tightness.

Valves and other equipment which do not operate easily or are otherwise defective shall be repaired or replaced. Proper installation and tightness of all underdrains and inlet distributors shall be checked.

Photographs of each vessel internals shall be taken prior to loading

LGAC.

Hydrostatic Tests: After installation, all LGAC pressure vessels/tanks shall be tested for water tightness. Testing shall be performed with potable water provided by the Contractor. Testing plugs or caps, all necessary pressure pumps, pipe connections, gauges, other equipment, potable water, and all labor required shall be included.

The Contractor shall ensure all the air is removed from the system prior to pressure testing. Test pressures shall be 100 psi for 2 hours.

No leaks are allowed; and a decrease in pressure of 0.5 psi is permissible. System shall be checked for leaks after one hour. Piping systems shall be isolated from the tanks for pressure testing at the specified test pressure.

Performance Tests: An Operating Performance Test shall be performed to demonstrate that the LGAC System conforms to the requirements of this specification. The performance test shall be performed for 3 days. Field tests shall not be conducted until such time that the entire treatment plant has been installed, and after startup and shakedown is complete, and the plant is ready for testing.

43 31 13.13 10 - 13

For the purpose of performance testing, system throughput will be continuously monitored on the plant flow meters. LGAC Influent and Effluent samples from all units will be collected, marked, preserved, and analyzed for any VOCs, SVOCs organics and residual hydrogen peroxide. The samples will be collected and analyzed once a day for three (3) days at the maximum design flow rate. The data will be compared to the influent characteristics and effluent requirements specified to verify that they are within the specified ranges. The system performance will be considered acceptable if the influent and effluent concentrations are per the concentrations specified in Paragraph 2.2 of this section.

Test Report: Contractor shall provide a test report that shall include as a minimum a description of the test, methodology used, data and time when test was performed, and the results of the testing. All testing results shall be reported, including test results that failed to meet the requirements. Should test runs fail to meet the requirements, an explanation shall be provided with the rational for failure of the test.

REMEDY

If the Installation, Inspection or Operating Performance Test reveals deficiencies, corrective measures shall be taken until the system satisfies all of the specified requirements. Remedies shall be at no additional cost to the Owner.

MANUFACTURER SERVICES

The Contractor shall provide the following personnel:

One (1) representatives of the Manufacturer who is experienced in the installation and adjustment of the equipment specified. The representative shall supervise the installation and adjustment of equipment – for up to 10 days (8 hours a day).

A representative of the Manufacturer for 15 days (3 trips) during Testing described in Paragraph 3.4.

Conduct a video recorded training course for designated operating, maintenance and support staff members. The training period shall be a total of 16 hours of normal working time. Field training shall cover each item contained in the operating and maintenance manual.

Application of the internal vessel coating shall be witnessed and certified by the coating manufacturer.

FIELD PAINTING

Do not paint stainless steel, galvanized steel, and nonferrous surfaces.

Touch-Up Painting

43 31 13.13 10 - 14

Factory painted items requiring touching up in the field shall be thoroughly cleaned, and wire brushed of all foreign material, and shall be sanded, primed and top coated with the Manufacturer's standard factory finish.

SAFETY MESSAGE

Wet activated carbon preferentially removes oxygen from air. In closed or partially closed containers and vessels, oxygen depletion may reach hazardous levels. If workers are to enter a vessel containing carbon, appropriate sampling and work procedures for potentially low oxygen spaces should be followed, including all applicable Federal and State requirements.

Contractor shall take all necessary health and safety precautions including the use of appropriate personal protective equipment (PPE) when unloading activated carbon.

END OF SECTION

00 00 00 Phase III - Spec Cover
00 00 01 TOC (4.22.26)
01 01 00 Scope of work_Master File
01 14 00
01 30 00
01 33 00
01 35 26
01 35 29.13
01 45 00.00 20
01 45 35
01 45 35a - si_schedule
01 45 35b - Statement_of_Special_Inspections
01 57 19
01 58 00
01 78 00
01 78 23
01 78 24.00 20
01 79 00 Functional Testing
01 91 00.15 10
01 91 13 Equipment Testing and Startup-NRS
01 91 13-1 Form & Table
03 30 00
03 45 00
04 20 00
05 05 23.16
05 12 00
05 21 00
05 30 00
05 40 00
05 50 13
05 52 00
06 10 00
06 41 16.00 10
06 61 16
06 71 33
06 73 01
06 82 14
07 19 00
07 21 13
07 21 16
07 27 10
07 27 19.01
07 60 00
07 61 14.00 20
07 84 00
07 92 00
08 11 13
08 22 20
08 33 23
08 51 13
08 60 45
08 71 00
08 91 00
09 22 00
09 29 00
09 30 10
09 51 00
09 65 00
09 65 30
09 90 00
09 96 00
10 14 00.10
10 28 13
10 44 16
10 51 13
13 34 19
13 48 73
22 00 00
26 05 00.00 20
26 05 19.10 10
26 05 26.00 20
26 05 71.00 20
26 24 16.00 20
26 24 19.00 20
26 28 01.00 10
26 29 23
26 41 00
26 51 00
27 10 00
27 13 23.00 20
28 10 05
31 10 00
31 23 00.00 20
32 11 20
32 11 26
32 12 13
32 16 19
32 17 23
32 31 13
32 92 19
33 11 00
33 30 00
33 31 23.00 10
33 40 00
33 61 13.19
33 71 02
33 82 00
40 60 00 00 Control Description_021826
Part 1. General
1.1 Description
1.2 Definitions
1.3 Abbreviations:
1.4 Submittals
Part 2. Not Used
Part 3. Execution
3.1 General Operating Discription
3.2 GROUNDWATER Extraction / RECOVERY System (MI602 THRu MI604)
3.3 Equalization Tank / FILTER FEED System (MI605)
3.4 MULTI-MEDIA FILTRATION (MMF) SYSTEM (MI606)
3.5 BAG FILTER System (MI606)
3.6 advanced oxidation process (aop) SYSTEM (MI607 and mi608)
3.7 Liquid Phase Granular Activated (LGAC) FEED System (MI609)
3.8 Liquid Phase Granular Activated (LGAC) carbon System (MI610)
3.9 PLANT EFFLUENT SYSTEM (MI610, MI611 & MI612)
3.10 MMF/LGAC Backwash System (MI611)
3.11 bACKWASH wASTE / DISCHARGE SYSTEM(mi621)
3.12 Caustic Feed System (MI614)
3.13 Hypochlorite Feed System (MI613)
3.14 HYDROGEN PEROXIDE Feed System (MI615)
3.15 Air Compressor System (MI618)
3.16 Building Sump System and BUILDING CONTAINMENt SYSTEM (mi616/MI620)
3.17 Eye Wash/safety Shower System (mi619)
3.18 PROCESS TANK VENTING SYSTEM (MI617)
3.19 NON-POTABLE WATER SYSTEM (mi617)
3.20 GAS MONITORS (MI607)
3.21 BUILDING AUTOMATION SYSTEM & FIRE ALARM CONTROL PANEL (MI620)
3.22 Loss of Power Mode
3.23 Plant Restart
3.24 E-Stop Mode
3.25 Human Machine Interface Requirements
3.26 Trending, Historical Archiving requirements:
3.27 Reports
3.28 Web Interface Requirements
3.29 Alarming Software and Configuration Requirements
3.30 Loss of Communication
40 60 00 2.4.4.1 Magnetic Flowmeter and Transmitter_021426
40 60 00 2.4.5.1 Ultrasonic Gap Level Switch_021226
40 60 00 2.4.5.3 Ultrasonic Level Transmitter_021226
40 60 00 2.4.5.5 Float Level Switch_021226
40 60 00 2.4.5.6 Hydrostatic Level Transmitter_021326
40 60 00 2.4.6 Pressure Gauge__021226
40 60 00 2.4.6.1 Pressure Transmitter__021226
40 60 00 2.4.6.2 Pressure Switch__021226
40 60 00 2.4.7.1 pH & ORP Measurement_021226
40 60 00 2.4.8.1 Bldg Temp Sensor_021226
40 60 00_2-20-2026
40 60 00_Control Description_021826
Part 1. General
1.1 Description
1.2 Definitions
1.3 Abbreviations:
1.4 Submittals
Part 2. Not Used
Part 3. Execution
3.1 General Operating Discription
3.2 GROUNDWATER Extraction / RECOVERY System (MI602 THRu MI604)
3.3 Equalization Tank / FILTER FEED System (MI605)
3.4 MULTI-MEDIA FILTRATION (MMF) SYSTEM (MI606)
3.5 BAG FILTER System (MI606)
3.6 advanced oxidation process (aop) SYSTEM (MI607 and mi608)
3.7 Liquid Phase Granular Activated (LGAC) FEED System (MI609)
3.8 Liquid Phase Granular Activated (LGAC) carbon System (MI610)
3.9 PLANT EFFLUENT SYSTEM (MI610, MI611 & MI612)
3.10 MMF/LGAC Backwash System (MI611)
3.11 bACKWASH wASTE / DISCHARGE SYSTEM(mi621)
3.12 Caustic Feed System (MI614)
3.13 Hypochlorite Feed System (MI613)
3.14 HYDROGEN PEROXIDE Feed System (MI615)
3.15 Air Compressor System (MI618)
3.16 Building Sump System and BUILDING CONTAINMENt SYSTEM (mi616/MI620)
3.17 Eye Wash/safety Shower System (mi619)
3.18 PROCESS TANK VENTING SYSTEM (MI617)
3.19 NON-POTABLE WATER SYSTEM (mi617)
3.20 GAS MONITORS (MI607)
3.21 BUILDING AUTOMATION SYSTEM & FIRE ALARM CONTROL PANEL (MI620)
3.22 Loss of Power Mode
3.23 Plant Restart
3.24 E-Stop Mode
3.25 Human Machine Interface Requirements
3.26 Trending, Historical Archiving requirements:
3.27 Reports
3.28 Web Interface Requirements
3.29 Alarming Software and Configuration Requirements
3.30 Loss of Communication
40 60 00_IO List_021826
Worksheets
SUMMARY
41 10 02 Process Piping
PART 1 - GENERAL
1.1 SCOPE OF WORK
1.1.1 Furnish all labor, materials, equipment and incidentals required to install all Process Piping and Appurtenances as shown on the drawings and specified herein. This specification covers the requirements for above and below grade groundwater and ...
1.1.2 All the process water piping as shown on drawings shall be PVC, except small bore piping (1” and below) for connecting to pressure gauges, instruments, sample ports, pipe drains, and pipe vents, which shall be as shown on drawings.
1.1.3 Piping shall include:
1.1.3.1 Water process piping from extraction vault and manholes to GWTP shall be PVC and HDPE piping as shown on contract drawings. HDPE piping shall be PE4710 SDR 11.
1.1.3.2 Water process piping from recovery well pumps to casing shall be stainless steel and piping inside extraction vaults shall be Schedule 80 PVC as shown on contract drawings.
1.1.3.3 Water process piping inside manholes shall be Schedule 80 PVC as shown on contract drawings.
1.2 RELATED SECTIONS
1.2.1 Sections Include:
1.2.1.1 Section 01 33 00 Submittals Procedures
1.2.1.2 Section 22 11 13 Facility Water Distribution Piping
1.2.1.3 Section 22 13 16 Sanitary Waste and Vent Piping
1.2.1.4 Section 22 42 13 Plumbing Fixtures
1.2.1.5 Section 31 00 00 Excavation, Backfill & Compaction
1.2.1.6 Section 46 30 00 Water and Wastewater Chemical Feed Systems
1.3 REFERENCES
1.3.1 The publications listed below form a part of this specification to the extent referenced.
1.3.1.1 American Society of Mechanical Engineers International (ASME)
1.3.1.1.1 B1.1: Unified Inch Screw Threads (UN and UNR Thread Form)
1.3.1.1.2 B1.20.1: Pipe Threads, General Purpose (Inch)
1.3.1.1.3 B1.20.7: Standard for Hose Coupling Screw Threads (Inch)
1.3.1.1.4 B16.11: Forged Fittings, Socket-Welding and Threaded
1.3.1.1.5 B16.21: Nonmetallic Flat Gaskets for Pipe Flanges
1.3.1.1.6 B16.3: Malleable Iron Threaded Fittings, Classes 150 and 300
1.3.1.1.7 B16.39: Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
1.3.1.1.8 B16.5: Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard
1.3.1.1.9 B16.9: Standard for Factory-Made Wrought Steel Butt-welding Fittings
1.3.1.1.10 B18.2.1: Square and Hex Bolts and Screws (Inch Series)
1.3.1.1.11 B18.2.2: Standard for Square and Hex Nuts
1.3.1.1.12 B31.3: Process Piping
1.3.1.1.13 B36.19M: Stainless Steel Pipe
1.3.1.1.14 BPVC SEC VIII D1: BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
1.3.1.2 American Society for Testing and Materials (ASTM)
1.3.1.2.1 A181/A181M: Standard Specification for Carbon Steel Forgings, for General-Purpose Piping
1.3.1.2.2 D1784: Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds
1.3.1.2.3 D1785: Standard Specification for Poly (Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
1.3.1.2.4 D2104: Standard Specification for Polyethylene (PE) Plastic Pipe, Schedule 40
1.3.1.2.5 D2105: Standard Test for Longitudinal Tensile Properties of Reinforced Thermosetting Plastic Pipe and Tube
1.3.1.2.6 D2122: Standard Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings
1.3.1.2.7 D 2241: Standard Specification for Poly (Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
1.3.1.2.8 D2412: Standard Test for External Loading Properties of Plastic Pipe by Parallel-Plate Loading
1.3.1.2.9 D2447: Standard Specification for Polyethylene (PE) Plastic Pipe, Schedules 40 and 80, Based on Outside Diameter
1.3.1.2.10 D2464: Standard Specification for Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
1.3.1.2.11 D2466: Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
1.3.1.2.12 D2467: Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
1.3.1.2.13 D2564: Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems
1.3.1.2.14 D2609: Standard Specification for Plastic Insert Fittings for Polyethylene (PE) Plastic Pipe
1.3.1.2.15 D2737: Polyethylene (PE) Plastic Tubing ASTM D2774 (2012) Underground Installation of Thermoplastic Pressure Piping
1.3.1.2.16 D2855: Standard Practice for Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings
1.3.1.2.17 F2164: Standard Practice for Field Leak Testing of Polyethylene (PE) Pressure Piping Systems Using Hydrostatic Pressure
1.3.1.2.18 F2620: Standard Practice for Heat Fusion Joining of Polyethylene Pipe and Fittings
1.3.1.2.19 D3261: Standard Specification for Butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing
1.3.1.2.20 F477: Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
1.3.1.2.21 F593: Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs
1.3.1.2.22 F656: Primers for Use in Solvent Cement Joints of Poly(Vinyl Chloride) (PVC) Plastic Pipe and Fittings
1.3.1.2.23 F714: Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter
1.3.1.3 American Welding Society (AWS):
1.3.1.3.1 B3.0: Welding Procedure and Performance Qualification
1.3.1.3.2 A5.11/A5.11M: Specification for Nickel and Nickel Alloy Welding Electrodes for Shielded Metal Arc Welding
1.3.1.3.3 A5.14/A5.14M: Specification for Nickel and Nickel Alloy Bare Welding Electrodes and Rods
1.3.1.3.4 D1.1/D1.1M: Structural Welding Code – Steel
1.3.1.4 American Water Works Association (AWWA)
1.3.1.4.1 C901: Polyethylene (PE) Pressure Pipe, Tubing and Fittings, 1/2" through 3" for Water
1.3.1.4.2 C906: Polyethylene (PE) Pressure Pipe and Fittings, 4" through 63", For Water Distribution
1.3.1.5 Manufacturers Standardization Society (MSS)
1.3.1.5.1 SP-25: Standard Marking System for Valves, Fittings, Flanges and Unions
1.3.1.5.2 SP-58: Standard for Pipe Hangers and Supports - Materials, Design and Manufacture
1.3.1.5.3 SP-69: Standard for Pipe Hangers and Supports - Selection and Application
1.3.1.5.4 SP-80: Bronze Gate, Globe, Angle, and Check Valves
1.3.1.5.5 SP-89: Pipe Hangers and Supports - Fabrication and Installation Practices
1.3.1.6 Plastics Pipe Institute (PPI)
1.3.1.6.1 TR-21: Thermal Expansion and Contraction in Plastic Piping Systems
1.3.1.7 Rubber Manufacturers Association (RMA)
1.3.1.7.1 IP-2: Hose Handbook
1.4 SUBMITTALS
1.4.1 The following shall be submitted in accordance with Section 01 33 00 Submittal Procedures:
1.4.1.1 Shop Drawings: Shop drawings and support system detail drawings showing piping and appurtenances including mechanical joints, valves, hangers, and pipe supports. Include a complete list of equipment and materials on the drawings.
1.4.1.2 Product Data: Manufacturer's descriptive and technical literature for each piping system, including design recommendations; pressure and temperature ratings; dimensions, type, grade and strength of pipe and fittings and chemical resistance.
1.4.1.3 Material safety data sheet in conformance with 29 CFR 1910 Section 1200(g) for each chemical (solvents, solvent cements, and glues) delivered for use in pipe installation.
1.4.1.4 Pipe Schedule: Provide a list of piping systems, pressure ratings and source of supply for each piping system broken out by material, size and application as indicated on the Contract Drawings. Provide a list of any special tools necessary for...
1.4.1.5 Valve and Valve Operator Schedule: Provide a list of valve materials, pressure ratings, and valve operator materials and reference identification as indicated in the Contract Drawings. Provide a list of any special tools necessary for each val...
1.4.1.6 Test Reports: Submit Pipe Leakage Tests, Hydrostatic Tests, Valve Testing; copies of all field test reports including Pipe Leakage Tests and Hydrostatic Tests.
1.4.1.7 As-built drawings: Show pipe anchors and guides, and layout of piping systems relative to other parts of the work including clearances for maintenance and operation. Submit as-built piping and instrumentation diagrams (P&IDs) identifying and ...
1.4.1.8 Instruction Manuals: Submit sufficient detail in the Operation Manuals to demonstrate the step-by-step procedures required for startup, operation and shutdown of piping systems, and include the manufacturer's name, model number, parts list and...
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Materials delivered and placed in storage shall be stored with protection from the weather, excessive humidity variation, excessive temperature variation, dirt, dust and/or other contaminants. Proper protection and care of material before, duri...
1.6 BUILDING PIPING SYSTEMS
1.6.1 Buried piping systems shall be suitable for design conditions, considering the piping both with and without internal pressure. Consideration shall be given to all operating and service conditions including forces both internal and external to th...
1.7 ABOVE GRADE PIPING SYSTEMS (WITHIN GWTP)
1.7.1 Above ground piping systems shall be suitable for design conditions, considering the piping both with and without internal pressure, and installation factors such as insulation, support spans, and ambient temperatures. Consideration shall be giv...
1.8 SEQUENCING AND SCHEDULING
1.8.1 For slab, floor, wall, and roof penetrations, keep on site pertinent wall pipes and sleeves before they are required for placement in concrete forms. Verify and coordinate the size and location of building pipe penetrations before forming and pl...
1.9 MAINTENANCE
1.9.1 Service
1.9.1.1 A manufacturer’s representative who is experienced in the installation, adjustment and operation of the valves specified shall provide inspection services for automatic valve systems. The representative shall inspect the installation, and sup...
1.9.2 Extra Materials
1.9.2.1 Contractor shall provide the manufacturer’s recommended spare parts that are expected to be replaced within the first 3 years of service of the piping system.
PART 2 - PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Provide piping materials and appurtenances as specified and as shown on the Drawings. Piping materials, valves, and appurtenances supplied as part of this contract shall be of equal material and ratings as the connecting pipe, new and unused ex...
2.1.2 Piping systems shall be rated for at least 1.5 times the deadhead pressure of the pump feeding the piping.
2.1.3 Standard Products: Provide material which are the standard products of a manufacturer regularly engaged in the manufacturing of the products and that essentially duplicate items that have been in satisfactory use for at least 10 years prior to b...
2.1.4 Identification and Tagging: Each piece of pipe shall bear the ASTM designation and all other markings required for that designation. The service, valve identification number shown on the Contract Drawings, the manufacturer's name, and the valve...
2.1.5 Pipe Supports: Pipe shall be provided with supports spaced not farther than the manufacturer’s recommended spacing for 70 F service. For PVC pipe 2” or smaller, supports shall be every 5’ or less; for 3” pipe every 6’; for 4” pipe every 8’, and ...
2.1.6 The Contractor shall provide slip-type PVC expansion joints with joint material as recommended by the manufacturer for the type of service. Joints shall be installed not more than 100 feet apart only on all straight runs of pipe that exceed 100 ...
2.2 PLASTIC, DUCTILE IRON, AND CARBON STEEL PIPING AND FITTING FOR WATER PROCESS SERVICE
2.2.1 PVC Pipe: PVC pipe shall be Schedule 80, seamless, unplasticized polyvinyl chloride normal impact type, conforming to ASTM D-1784, Class 12454-B and D-1785, PVC 1120, for Type I, Grade 1. PVC pipe system shall be as manufactured by CertainTeed ...
2.2.2 PVC Joints: The piping system shall be joined by flanged or mechanical connections except where connecting to unions, valves, and equipment with threaded connections that may require future disassembly. Connections at those points shall be thre...
2.2.3 PVC Fittings: The schedule rating for the fittings shall not be less than that for the associated pipe. All pipe and fittings shall conform to ASTM D2467 and joints shall be solvent socket welded where threaded or flanged fittings are not used.
2.2.4 Flanged Fittings: Flanges shall be used at all valves, pumps, equipment, tanks, and vessels. Flanges will be of the same material as the piping. Flanges shall be the Van-Stone type complete with gaskets, bolts, and nuts. Flanges will be flat f...
2.2.5 PVC Solvent Cement: Joints shall be assembled using approved solvent cement in accordance with the manufacturer’s recommendations and ASTM D2564 and ASTM D2855. No cementing shall be done in the rain or when the air temperature is below 40 F or ...
2.2.6 The Contractor is cautioned to exercise care in handling, loading, unloading, and storing plastic pipe, valves, and fittings. All plastic pipe, valves, and fittings shall be stored under cover before using and shall be transported in a vehicle w...
2.2.7 All PVC piping, fittings, and valves shall not be painted.
2.2.8 Ductile Iron Pipe for pump discharge: Ductile iron piping shall meet requirements of ANSI/AWWA C151/A21.51 and ANSI/AWWA C150/A21.50. The pipes shall be flanged of Pressure Class 350 with nominal pipe thickness of 0.25 inches. Ductile iron pipe ...
2.2.9 Condensate Pipe: Piping for condensate shall be 316L stainless steel pipe meeting ASTM A312/AS312M standards.
2.2.10 Carbon Steel Pipe for recovery well and extraction vaults: Carbon steel piping shall meet requirements of A252 Grade and A500 Grade Carbon Steel pipe, ASTM A181/A181M for forged fittings, general process piping application and ASTM/ASME A106/SA...
2.3 PLASTIC PIPING AND FITTINGS FOR TANK VENTS
2.3.1 Plastic vent piping shall be Schedule 40 PVC pipe, seamless, unplasticized polyvinyl chloride normal impact type, conforming to ASTM D-1784, Class 12454-B and D-1785, PVC 1120, for Type I, Grade 1. PVC vent pipe system shall be as manufactured...
2.3.2 Vent piping shall be 8-inch diameter unless shown otherwise on the drawings. Standards: ASTM D 2665 and NSF approved for DWV; ASTM D 3034 for SDR.
2.3.3 Fittings: PVC material, solvent weld, Type 1, ASTM D 2466 for Schedule 40, and ASTM 2665 for DWV; ASTM D 3212 for SDR.
2.3.4 Joint material: Use solvent cement in accordance with industry standards and manufacturer's recommendations.
2.3.5 All vent pipe discharging outside shall have a rain guard and bird screen that is compatible.
2.4 VALVES AND SPECIALTIES (PVC PROCESS SERVICE)
2.4.1 General. The Contractor shall furnish and install all valves and specialties as specified herein and shown on the Drawings. In addition, valve-operator and other accessories shall be furnished and installed by the Contractor where specified for...
2.4.2 Check valves 2 inches and smaller for liquid service shall be Schedule 80 double-union ball check as manufactured by Nibco, Hayward, Chemline, or approved equal. Check valves shall be capable of operating in either the horizontal or the vertical...
2.4.3 Ball Valves (General Purpose). Ball valves upto 4 inch, shall be Schedule 80 PVC double-union ball valves with handle as manufactured by Nibco, Hayward, Chemline, or approved equal.
2.4.3.1 All sampling valves and drain a valves shall be 316 SS, provided with a spring return handle with a locking device similar to manufactured J Flow Controls LLC or equal.
2.4.4 Butterfly Valves. Butterfly valves, 3 inch and larger, shall be Schedule 80 PVC with lugs for flanged service. Butterfly valves shall have hand wheel or chain wheel operators. Butterfly valves shall be as manufactured by Nibco, Hayward, Cheml...
2.4.5 Pressure/Vacuum Relief Valve: Two pressure/vacuum pressure/vacuum breather valves shall be provided (one of which will be a backup). The valves shall be of stainless steel construction and shall be rated for atmospheric pressure (14.7 psi) and ...
2.4.6 Air/Vacuum release valves(vent valves)
2.4.6.1 Air/Vacuum release valves up to 3 inches, shall be combination air/vacuum release automatic PVC valves and provided as shown on the drawings. The valves shall have flanged ends and manufactured by Nibco, Hayward, Chemline or approved equal. Th...
2.4.7 Solenoid Valves
Solenoid valves shall be ASCO General Service Solenoid Valves with brass bodies and manufactured by Emerson or Approved Equal. Provide and install solenoid valves where shown on drawings.
Valve Actuation: Solenoid
Body Material: Brass
Seals and Discs: PTFE
Core Tube: 305 Stainless Steel
Core and Plugnut: 430F Stainless Steel
Spring: 302 Stainless Steel
Shading Coil: Copper
Media: Air, Inert Gas, Water, Light Oil
Pipe Size: 2”
Orifice Size: 1 ¾”
Port Type: NPTF
Function: 2 way-2/2 Normally Closed
Flow: 43 Cv
Voltage: 24 AC, 110AC, 115 AC, 12 DC, 12 to 24 DC
Voltage Ranging, 120 AC, 120 DC
Max Differential / Max Operating Pressure: Up to 150 psi
Operating Environment: Indoor, Outdoor
UL listed and CSA certified
2.6.7 Electric Actuators
Electric Actuators: Series 70 manufactured by Bray International Inc. or approved equal
Motor Service: 120 VAC, 1 phase, 60 Hz
Enclosure: Designed to meet NEMA Type 4X and IP65 specification
Certification: UL, CSA and CE approved
Torque output range: For 6” to 12” Butterfly valves from 1200 lb-in to 5000 lb-in with a safety factor of 1.3
OPEN/CLOSED limit switches
Manual Override: The actuator shall be equipped with a manual override handwheel to rotate the valve without electrical power. The manual override system shall ensure efficient manual operation without the use of extra tools or levers. A motor power c...
2.5 DRAINS AND VENT VALVES
2.5.1 All drain and vent valves may not be shown on the detailed drawings for individual pipelines; their absence will not relieve the Contractor of the responsibility for providing and installing them to complete the piping system for the use intende...
2.5.1.1 Locations
2.5.1.1.1 All pipeline shall have a drain valve at low point.
2.5.1.1.2 All pressured pipeline shall have a vent valve at high point.
2.5.1.2 Sizes
2.5.1.2.1 For pipelines 2.5 inch and larger, drains shall be 0.75 inch and equipped with ball valves. For pipelines 2 inch and smaller, drains shall be 1/2 inch and equipped with ball valves.
2.6 SAMPLE PORTS
2.6.1 Sample ports, shown on the piping and instrument diagrams of the Contract Drawings, may not be shown on the detailed drawings of the individual pipelines; their absence shall not relieve the Contractor of the responsibility for providing them. ...
2.7 STRAINERS
2.7.1 Strainers for recovery well and process piping service shall be Basket Strainers-Type, constructed of PVC Body and Basket material (Cell Class 12454 per ASTM D1784) of size specified in table below with flanged end connections. Basket strainers ...
2.7.2 PVC strainers shall be located as per drawings and the following schedule. Strainers shall be Strainers shall be 6” and 8” SB Series Simplex Model as manufactured by Hayward Industrial Products or approved equal. Cast iron strainer shall be loc...
2.7.3 Strainer Schedule
2.8 MISCELLANEOUS PIPING COMPONENTS
2.8.1 Air Release Valves
2.8.1.1 Air release vents shall be located, and vented, such that a hazardous atmosphere will not be created upon operation. Air release shall be located as indicated on the Contract Drawings and at all high points.
2.8.2 Expansion Joints
2.8.2.1 Provide all structural work and equipment required to control expansion and contraction of piping. Verify that the anchors, guides, and expansion joints provided, adequately protect the piping systems. Provide rubber expansion joints for pip...
2.8.3 Pipe Insulation Material
2.8.3.1 All exposed process piping shall have foam insulation and PVC jacketing as shown on the Drawings. Insulation shall be per Section 22 09 19.
2.8.4 Static Mixers and Injection Quill
2.8.4.1 All static mixers and injection quill shall be manufactured by Koflo Corporation or Approved equal.
The two (2) static mixers SM-200 and SM-300 as shown on drawings shall be:
12-80-4-3-9.I(.50)
12" Koflo Static Mixer
12" Schedule 80 (0.688" Wall) PVC Housing
Three (3) Fixed PVC Mixing Elements
12" PVC Class 150 Van-Stone Style Socket Flanged Ends
One (1) 0.5" PVC NPT Female Threaded Injection Port
Lifting Lug
Length: 60"
Net Weight: ~128.8 lb
Model Type: KD-1026
Pressure Loss: 4.46 psi @ 1,800 GPM
The injection quill for the above two (2) static mixers shall be:
QR-.5P-.5PV-7
PVC Retractable Injection Quill
PVC Ball Valve
0.5" Male NPT Process Connection
0.5" Female NPT Inlet Connection
7" Insertion Length with 45 Beveled Tip
Integrated check valve with Viton seal, corrosion-resistant Hastelloy® C-276 spring, ceramic ball, and 5 PSI cracking pressure
2.8.5 Equalization Tank Mixer
The equalization tank mixer shall be side mounted as shown on drawings and manufactured by Dynamix Agitators (Dynamix Model SMX1-5-3 (Premium), SPX Flow, or Approved equal).
This tank mixer shall meet the following requirements:
Drive: 3.0 HP 3/60/230-460V TEFC Severe Duty
Reducer Helical Gear 365 rpm
SF 1.5, Synthetic Lubricant
Mount: Pedestal Mount with 6in flange connection, Single Cartridge Mechanical Seal & Shut-off Valve.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .