Attachment H- Price Proposal Form.docx

DOCX document 37 KB Posted

Attached to
DESIGN-BID-BUILD (DBB) PHASE III GROUNDWATER TREATMENT PLANT CONSTRUCTION, NWIRP BETHPAGE, NEW YORK (PREVIOUS NOTICE ID N4008526R0045)
Solicitation number
N4008526R0161
Issued by

About this file

This is a Bid Price Schedule form for a Design-Bid-Build Phase III Groundwater Treatment Plant construction project at Naval Weapons Industrial Reserve Plant in Bethpage, New York under solicitation N4008526R0161. Bidders must provide pricing for a comprehensive groundwater treatment plant that includes planning documents, mobilization/demobilization, civil site work, foundation and structural work, two treatment plant buildings (main facility and office building), two process tanks, seven pumps (process, well, and fire protection), filtration systems, advanced oxidation process system, granular activated carbon system, mechanical piping, instrumentation and controls, electrical work, fire protection systems with sprinklers and alarms, process performance testing and startup activities, and exterior sitework including paving, site preparation, and landscaping. The pricing structure requires bidders to submit a total price for the entire project under Line Item 0001, with subtotals for each of the sixteen component line items (0001A through 0001Q). For Line Items 0001G and 0001H, which involve unit pricing for the two process tanks and seven pumps respectively, bidders must provide both unit prices and extended totals. The evaluation criteria states that award will be based solely on the total proposed price for Line Item 0001, and failure to enter any required price will result in proposal rejection. If discrepancies exist between unit prices and extended totals, the unit price will be considered the intended bid.

View the file

Other files

File Type Posted
Amendment 0005 - N4008526R0161.pdf PDF
Wage Determination NY20260012 5.18.2026.pdf PDF
Amendment 0004 Phase III Groundwater Treatment Plant.pdf PDF
Attachment R- A-112G08005-WE24 Phase III- A-102.pdf PDF
Attachment O- 43 21 13_R1.pdf PDF
Attachment N- 08 71 00 R1.pdf PDF
Attachment L- 43 3113.13 10.pdf PDF
Amendment 0003 Phase III Groundwater Treatment Plant.pdf PDF
Interested Vendors List N4008526R0161.docx DOCX document
Attachment P- M101-R1.pdf PDF
Attachment Q- 50 03 01 R1.pdf PDF
Attachment M - BP Phase III Spec Mod 06102026.pdf PDF
Amendment 0002 Phase III Groundwater Treatment Plant.pdf PDF
Attachment L - Section 43 31 13.13 10.pdf PDF
Attachment J- Site Location Map.pdf PDF
Amendment 0001 Phase III Groundwater Treatment Plant.pdf PDF
Attachment K- Phase_III_Photo_Log.pdf PDF
Attachment 3-Appendix E Phase III DWGs-CUI-REDACTED-NEW.pdf PDF
Attachment 1- Basis of Design-PHASE III GWTP_BODR_Feb 26 IFB To Navy_REDACTED.pdf PDF
Attachment E - Historical SB Utilization.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
Attachment F - SBPCD.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment I - Wage Determination NY20260012.pdf PDF
Solicitation - N4008526R0161.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - SBPCD.pdf PDF
Attachment H- Price Proposal Form.pdf PDF
ATTACHMENT 2- Appendix D_Combined Specs_Signed.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment G - Individual SB Subcontracting Plan.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build, Phase III - Groundwater Treatment PlantN40085-26-R-0161
Naval Weapons Industrial Reserve Plant, Bethpage, New YorkBid Price Schedule

BID PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Subtotal
Total Price
0001
BASE PRICE: Total Price for the entire work for Phase III Groundwater Treatment Plant Planning and Construction.
1
EA
0001A
Price for entire work for Planning Documents
1
EA
0001B
Price for the entire work for Mobilization/ Demobilization Activities
1
EA
0001C
Price for the entire work for the Civil (Site) Work, including all subsurface piping and utilities from the 5-foot to the utility interconnect, in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001D
Price for the entire work for the Foundation and Structural Work, in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001E
Price for the entire work for the Main Treatment Plant Building, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001F
Price for the entire work for the Office Building, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001G
Unit Price for the entire work for the Process Tanks, in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
$_________
$____________
0001H
Unit Price for the entire work for the Process, Well, and Fire Protection Pumps, in accordance with the drawings and specifications, but excluding work provided in another line item
7
EA
$_________
$____________
0001I
Price for the entire work for Mixed Media and Cartridge Filtration Systems, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001J
Price for the entire work for Advanced Oxidation Process System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001K
Price for the entire work for Granular Activated Carbon System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001L
Price for the entire work, for Mechanical – Piping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001M
Price for the entire work, for Instrumentation and Controls, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001N
Price for the entire work, for Electrical Work, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001O
Price for the entire work, for Fire Protection System – Sprinkler and Alarms, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001P
Price for the entire work, for Process Performance Testing and Startup, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001Q
Price for the entire project sitework, outside the facilities 5-foot line, for Paving, Site Prep, and Landscaping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA

GENERAL BID NOTES

0. Award will be evaluated on the total proposed price for Line Item 0001. The subtotal of Line Item 0001A-0001Q is included in Line Item 0001.

0. Failure to enter a price for any Line Item will result in a proposal being rejected.

0. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

File details come from the government source that posted it. Updated .