Attachment H- Price Proposal Form.pdf
PDF 120 KB Posted
- Solicitation number
- N4008526R0161
About this file
Bid Price Schedule Summary
This is a Bid Price Schedule for Design-Bid-Build, Phase III of a Groundwater Treatment Plant project at Naval Weapons Industrial Reserve Plant, Bethpage, New York (Contract N40085-26-R-0161). Bidders must provide line item prices for all work categories, with award evaluation based on the total proposed price for the base contract (Line Item 0001), which encompasses the subtotal of all component line items (0001A through 0001Q).
The pricing structure includes 17 distinct work categories: Planning Documents (0001A); Mobilization/Demobilization Activities (0001B); Civil Site Work including subsurface piping and utilities (0001C); Foundation and Structural Work (0001D); Main Treatment Plant Building completion to the 5-foot line (0001E); Office Building completion to the 5-foot line (0001F); Process Tanks at unit price for 2 units (0001G); Process, Well, and Fire Protection Pumps at unit price for 7 units (0001H); Mixed Media and Cartridge Filtration Systems (0001I); Advanced Oxidation Process System (0001J); Granular Activated Carbon System (0001K); Mechanical-Piping (0001L); Instrumentation and Controls (0001M); Electrical Work (0001N); Fire Protection System—Sprinkler and Alarms (0001O); Process Performance Testing and Startup (0001P); and Project Sitework for Paving, Site Prep, and Landscaping outside the 5-foot facility line (0001Q). Failure to enter a price for any line item will result in proposal rejection. For unit price items, unit prices take precedence over extended totals; if only a total is provided, the unit price will be calculated by dividing the total by the specified quantity.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Bid-Build, Phase III - Groundwater Treatment Plant N40085-26-R-0161
Naval Weapons Industrial Reserve Plant, Bethpage, New York Bid Price Schedule
BID PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line
Item
Description Quantity Unit Unit Price Subtotal Total Price
0001 BASE PRICE: Total Price for the entire work for Phase
III Groundwater Treatment
Plant Planning and
Construction.
1 EA $____________
0001A Price for entire work for
Planning Documents
1 EA $____________
0001B Price for the entire work for
Mobilization/
Demobilization Activities
1 EA $____________
0001C Price for the entire work for the Civil (Site) Work, including all subsurface piping and utilities from the
5-foot to the utility interconnect, in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
0001D Price for the entire work for the Foundation and
Structural Work, in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
0001E Price for the entire work for the Main Treatment Plant
Building, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $____________
0001F Price for the entire work for the Office Building, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, 1 EA $____________ but excluding work provided in another line item
0001G Unit Price for the entire work for the Process Tanks, in accordance with the drawings and specifications, but excluding work provided in another line item
2 EA $_________ $____________
0001H Unit Price for the entire work for the Process, Well, and
Fire Protection Pumps, in accordance with the drawings and specifications, but excluding work provided in another line item
7 EA $_________ $____________
0001I Price for the entire work for
Mixed Media and Cartridge
Filtration Systems, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001J Price for the entire work for
Advanced Oxidation Process
System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001K Price for the entire work for
Granular Activated Carbon
System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001L Price for the entire work, for
Mechanical – Piping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001M Price for the entire work, for
Instrumentation and
Controls, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001N Price for the entire work, for
Electrical Work, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
0001O Price for the entire work, for
Fire Protection System –
Sprinkler and Alarms, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001P Price for the entire work, for
Process Performance Testing and Startup, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1 EA $____________
0001Q Price for the entire project sitework, outside the facilities 5-foot line, for
Paving, Site Prep, and
Landscaping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
GENERAL BID NOTES
a. Award will be evaluated on the total proposed price for Line Item 0001. The subtotal of Line Item
0001A-0001Q is included in Line Item 0001.
b. Failure to enter a price for any Line Item will result in a proposal being rejected.
c. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
File details come from the government source that posted it. Updated .