About this file

Bid Price Schedule Summary

This is a Bid Price Schedule for Design-Bid-Build, Phase III of a Groundwater Treatment Plant project at Naval Weapons Industrial Reserve Plant, Bethpage, New York (Contract N40085-26-R-0161). Bidders must provide line item prices for all work categories, with award evaluation based on the total proposed price for the base contract (Line Item 0001), which encompasses the subtotal of all component line items (0001A through 0001Q).

The pricing structure includes 17 distinct work categories: Planning Documents (0001A); Mobilization/Demobilization Activities (0001B); Civil Site Work including subsurface piping and utilities (0001C); Foundation and Structural Work (0001D); Main Treatment Plant Building completion to the 5-foot line (0001E); Office Building completion to the 5-foot line (0001F); Process Tanks at unit price for 2 units (0001G); Process, Well, and Fire Protection Pumps at unit price for 7 units (0001H); Mixed Media and Cartridge Filtration Systems (0001I); Advanced Oxidation Process System (0001J); Granular Activated Carbon System (0001K); Mechanical-Piping (0001L); Instrumentation and Controls (0001M); Electrical Work (0001N); Fire Protection System—Sprinkler and Alarms (0001O); Process Performance Testing and Startup (0001P); and Project Sitework for Paving, Site Prep, and Landscaping outside the 5-foot facility line (0001Q). Failure to enter a price for any line item will result in proposal rejection. For unit price items, unit prices take precedence over extended totals; if only a total is provided, the unit price will be calculated by dividing the total by the specified quantity.

View the file

Other files

File Type Posted
Amendment 0005 - N4008526R0161.pdf PDF
Wage Determination NY20260012 5.18.2026.pdf PDF
Amendment 0004 Phase III Groundwater Treatment Plant.pdf PDF
Attachment R- A-112G08005-WE24 Phase III- A-102.pdf PDF
Amendment 0003 Phase III Groundwater Treatment Plant.pdf PDF
Interested Vendors List N4008526R0161.docx DOCX document
Attachment P- M101-R1.pdf PDF
Attachment Q- 50 03 01 R1.pdf PDF
Attachment O- 43 21 13_R1.pdf PDF
Attachment N- 08 71 00 R1.pdf PDF
Attachment L- 43 3113.13 10.pdf PDF
Attachment M - BP Phase III Spec Mod 06102026.pdf PDF
Amendment 0002 Phase III Groundwater Treatment Plant.pdf PDF
Attachment L - Section 43 31 13.13 10.pdf PDF
Attachment J- Site Location Map.pdf PDF
Attachment 3-Appendix E Phase III DWGs-CUI-REDACTED-NEW.pdf PDF
Amendment 0001 Phase III Groundwater Treatment Plant.pdf PDF
Attachment K- Phase_III_Photo_Log.pdf PDF
Attachment 1- Basis of Design-PHASE III GWTP_BODR_Feb 26 IFB To Navy_REDACTED.pdf PDF
Attachment E - Historical SB Utilization.pdf PDF
Attachment E - Historical SB Utilization.docx DOCX document
Attachment F - SBPCD.docx DOCX document
Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Solicitation - N4008526R0161.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment F - SBPCD.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H- Price Proposal Form.docx DOCX document
Attachment I - Wage Determination NY20260012.pdf PDF
ATTACHMENT 2- Appendix D_Combined Specs_Signed.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment G - Individual SB Subcontracting Plan.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Bid-Build, Phase III - Groundwater Treatment Plant N40085-26-R-0161

Naval Weapons Industrial Reserve Plant, Bethpage, New York Bid Price Schedule

BID PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line

Item

Description Quantity Unit Unit Price Subtotal Total Price

0001 BASE PRICE: Total Price for the entire work for Phase

III Groundwater Treatment

Plant Planning and

Construction.

1 EA $____________

0001A Price for entire work for

Planning Documents

1 EA $____________

0001B Price for the entire work for

Mobilization/

Demobilization Activities

1 EA $____________

0001C Price for the entire work for the Civil (Site) Work, including all subsurface piping and utilities from the

5-foot to the utility interconnect, in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

0001D Price for the entire work for the Foundation and

Structural Work, in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

0001E Price for the entire work for the Main Treatment Plant

Building, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item

1 EA $____________

0001F Price for the entire work for the Office Building, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, 1 EA $____________ but excluding work provided in another line item

0001G Unit Price for the entire work for the Process Tanks, in accordance with the drawings and specifications, but excluding work provided in another line item

2 EA $_________ $____________

0001H Unit Price for the entire work for the Process, Well, and

Fire Protection Pumps, in accordance with the drawings and specifications, but excluding work provided in another line item

7 EA $_________ $____________

0001I Price for the entire work for

Mixed Media and Cartridge

Filtration Systems, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001J Price for the entire work for

Advanced Oxidation Process

System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001K Price for the entire work for

Granular Activated Carbon

System, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001L Price for the entire work, for

Mechanical – Piping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001M Price for the entire work, for

Instrumentation and

Controls, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001N Price for the entire work, for

Electrical Work, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

0001O Price for the entire work, for

Fire Protection System –

Sprinkler and Alarms, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001P Price for the entire work, for

Process Performance Testing and Startup, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

1 EA $____________

0001Q Price for the entire project sitework, outside the facilities 5-foot line, for

Paving, Site Prep, and

Landscaping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.

GENERAL BID NOTES

a. Award will be evaluated on the total proposed price for Line Item 0001. The subtotal of Line Item

0001A-0001Q is included in Line Item 0001.

b. Failure to enter a price for any Line Item will result in a proposal being rejected.

c. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

File details come from the government source that posted it. Updated .