Attachment D - Past Performance Questionnaire.docx
DOCX document 303 KB Posted
- Solicitation number
- N4008526R0161
About this file
This is a Past Performance Questionnaire (PPQ) template for use in evaluating contractor performance on the Design-Bid-Build Phase III Groundwater Treatment Plant construction project at Naval Weapons Industrial Reserve Plant (NWIRP) in Bethpage, New York (Contract N40085-26-R-0161). The NAVFAC Form PPQ-0 serves as the standardized evaluation instrument for assessing past performance of offerors and their team members submitting proposals for this solicitation.
The questionnaire is completed in two sections: contractors provide contract and project information in Blocks 1-4, including firm details, contract specifics, project description, and relevance to the current solicitation; clients complete Blocks 5-8 with their assessment using a five-point adjective rating scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, or Not Applicable). Evaluation criteria span seven major categories: Quality (technical data preparation, quality standards compliance, problem resolution, and quality assurance); Schedule/Timeliness of Performance (delivery and milestone compliance); Customer Satisfaction (end-user satisfaction, contractor cooperation, and overall satisfaction); Management/Personnel/Labor (on-site management, workforce capability, property control, personnel expertise, small business utilization, multi-project management, change management, and overall effectiveness); Cost/Financial Management (price compliance, cost reduction innovations, budget tracking, financial viability, and termination history); Safety/Security (safety plan adherence and security compliance); and General (emergency response, contractual compliance, and willingness to re-engage). Clients may submit completed questionnaires directly to offerors or to the Government POC, Shayna Eichner, prior to proposal closing. Offerors must provide accurate client contact information and follow up to ensure timely submission.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Bid-Build, Phase III - Groundwater Treatment Plant N40085-26-R-0161 Naval Weapons Industrial Reserve Plant, Bethpage, New York
Attachment D
1. The NAVFAC Form PPQ shall be utilized for all evaluations that require a Past Performance Questionnaire (PPQ).
2. Solicitations utilizing PPQs shall include the language cited below in the RFP. The current NAVFAC Form PPQ-0 is available in BMS S-17.2.15 Source Selection.
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for construction and design experience. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 Corporate Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.
If a CPARS evaluation is not available, completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment D), which will provide contract and client information for the respective project(s). Offerors should ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Shayna Eichner , via email at shayna.t.eichner.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
ATTACHMENT D
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
| 1. Contractor Information | |
| Firm Name: | CAGE Code: |
| Address: | Unique Entity ID (UEI): |
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify): Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable): Explain Differences:
| 4. Project Description: | |||
| Complexity of Work | High | Med | Routine |
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number: Email Address:
7. Date Questionnaire was completed (mm/dd/yy):
NOTE: NAVFAC REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO NAVFAC WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON NAVFAC SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO NAVFAC. PLEASE CONTACT THE OFFEROR FOR NAVFAC POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
Design-Bid-Build, Phase III - Groundwater Treatment Plant N40085-26-R-0161 Naval Weapons Industrial Reserve Plant, Bethpage, New York
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
RATING DEFINITION NOTE
| (E) Exceptional |
| Performance meets contractual requirements and |
The contractual performance of the element or sub- element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
| (VG) Very Good |
| Performance meets contractual requirements and |
The contractual performance of the element or sub- element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
| (S) Satisfactory |
| Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the |
contract.
| (M) Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented. |
| A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner. |
(U) Unsatisfactory
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective. |
| An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. |
| (N) Not Applicable |
| No information or did not apply to your contract |
| Rating will be neither positive nor negative. |
Contractor Information (Firm Name):
Client Information (Name):
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
1. QUALITY:
| a) Quality of technical data/report preparation efforts |
| E |
| VG |
| S |
| M |
| U |
| N |
| b) Ability to meet quality standards specified for technical performance |
| E |
| VG |
| S |
| M |
| U |
| N |
| c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance |
| E |
| VG |
| S |
| M |
| U |
| N |
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E
VG
S
M
U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
VG
S
M identified in the contract
| E |
| VG |
| S |
| M |
| U |
| N |
3. CUSTOMER SATISFACTION:
| a) To what extent were the end users satisfied with the project? |
| E |
| VG |
| S |
| M |
| U |
| N |
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
VG
S
M
| c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? |
| E |
| VG |
| S |
| M |
| U |
| N |
| d) Overall customer satisfaction |
| E |
| VG |
| S |
| M |
| U |
| N |
4. MANAGEMENT/ PERSONNEL/LABOR
| a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? |
| E |
| VG |
| S |
| M |
| U |
| N |
| b) Ability to hire, apply, and retain a qualified workforce to this effort |
| E |
| VG |
| S |
| M |
| U |
| N |
| c) Government Property Control |
| E |
| VG |
| S |
| M |
| U |
| N |
| d) Knowledge/expertise demonstrated by contractor personnel |
| E |
| VG |
| S |
| M |
| U |
| N |
| e) Utilization of Small Business concerns |
| E |
| VG |
| S |
| M |
| U |
| N |
| f) Ability to simultaneously manage multiple projects with multiple disciplines |
| E |
| VG |
| S |
| M |
| U |
| N |
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
VG
S
M
U
N
| h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) |
| E |
| VG |
| S |
| M |
| U |
| N |
5. COST/FINANCIAL MANAGEMENT
| a) Ability to meet the terms and conditions within the contractually agreed price(s)? |
| E |
| VG |
| S |
| M |
| U |
| N |
Contractor Information (Firm Name):
Client Information (Name):
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E
VG
S
M
U
N
c) If this is/was a Government cost type contract, please rate the with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
VG
S
M tracking of costs? If no, please explain in Remarks section.
Yes
No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes
No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes
No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E
VG
S
M
U
N
| b) Contractor complied with all security requirements for the project and personnel security requirements. |
| E |
| VG |
| S |
| M |
| U |
| N |
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
VG
S
M
U
N
| b) Compliance with contractual terms/provisions (explain if specific issues) |
| E |
| VG |
| S |
| M |
| U |
| N |
Design-Bid-Build, Phase III - Groundwater Treatment Plant N40085-26-R-0161 Naval Weapons Industrial Reserve Plant, Bethpage, New York
c) Would you hire or work with this firm again? (If no, please explain below)
Yes
No
| d) In summary, provide an overall rating for the work performed by this contractor. |
| E |
| VG |
| S |
| M |
| U |
| N |
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image1.png
File details come from the government source that posted it. Updated .