About this file

This is a comprehensive set of design and construction drawings (Volume 3 of 4) for the Composite Repair Facility located at Marine Corps Air Station Cherry Point, North Carolina, prepared by Naval Facilities Engineering Systems Command (NAVFAC). The facility is a 105,755 square-foot consolidated depot-level composite and rotor blade repair facility designed to consolidate advanced composites and rotor blade repair operations.

The drawings detail extensive mechanical, plumbing, and HVAC systems required for the facility's specialized operations. Plumbing systems include domestic water supply and distribution, waste and vent piping, floor drains, backflow prevention, water heaters (including 100-gallon and 30-gallon units), sump pump systems, and specialized piping for compressed air, breathing air, low-pressure vacuum, high-pressure vacuum, nitrogen, and contaminated waste streams. HVAC design incorporates 15 rooftop units (RTU-1 through RTU-15), dedicated outdoor air systems (DOAS), ductless split systems, chilled and hot water piping loops with boilers and chillers, variable air volume (VAV) terminal boxes, humidity control, and specialized exhaust systems for paint and sanding booths. Mechanical systems include air compressors, vacuum pumps, breathing air purification, dehumidification, and air quality monitoring for controlled clean room environments. Design coordination addresses fire-rated penetrations, seismic bracing per Design Category B, operational continuity in occupied spaces, and compliance with UFC and NFPA codes. The project includes specialized equipment for autoclaves, composite ovens, sanding and paint booths, honeycomb machining, and X-ray facilities, with manufacturer-delegated design requirements for booth systems and process equipment integration.

View the file

Other files

File Type Posted
AMENDMENT 0012.pdf PDF
AMENDMENT 0012 Attachment F - Price Proposal Form Revised.docx DOCX document
AMENDMENT 0011 Attachment F - Price Proposal Form Revised.docx DOCX document
AMENDMENT 0011.pdf PDF
Amendment 0010 Wage Determination NC20260018 05 18 26.pdf PDF
AMENDMENT 0010.pdf PDF
Amendment 0010 PPI Responses.pdf PDF
Amendment 0010 P-993 Updated Dwgs Specs Geotech Report.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0009 PPI Responses.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0006 1786799dwg10of28Volume2Part-1r1.pdf PDF
Amendment 0006 Landscape.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
Amendment 0006 Specs P993 Addendum No. 1_Div 01.pdf PDF
Amendment 0006 P993 Submittal Register.pdf PDF
Amendment 0006 1786799dwg11of28Volume2Part-2.pdf PDF
Amendment 0006 1786799dwg08of28Volume1Part-8.pdf PDF
Amendment 0006 1786799dwg04of28Volume1Part-4.pdf PDF
Amendment 0006 1786799dwg02of28Volume1Part-2.pdf PDF
Amendment 0006 1786799dwg05of28Volume1Part-5.pdf PDF
Amendment 0006 1786799dwg09of28Volume1Part-9.pdf PDF
Amendment 0006 1786799dwg01of28Volume1Part-1r1.pdf PDF
Amendment 0006 1786799dwg06of28Volume1Part-6.pdf PDF
Amendment 0006 1786799dwg07of28Volume1Part-7.pdf PDF
Amendment 0006 1786799dwg03of28Volume1Part-3.pdf PDF
AMENDMENT 0006.pdf PDF
Amendment 0005 PPI Responses.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0004 - P995 1786799dwg01of01.pdf PDF
Amendment 0004 PPI Responses.pdf PDF
Amendment 0004 - CJA ML-25-03 Class FRCS Cherry Point.pdf PDF
Amendment 0004 - P995 Spec 25 10 10.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0004 - P995 Spec 12 24 13.pdf PDF
Amendment 0004 - P995 Spec 45 52 00.pdf PDF
Amendment 0003 - 08 33 23.pdf PDF
Amendment 0003 - 08 71 00.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 - A-116 REV1.pdf PDF
Amendment 0003 Pre-Proposal Inquiries.pdf PDF
Amendment 0003 - A-407 REV1.pdf PDF
Amendment 0003 - 08 11 16.pdf PDF
Amendment 0003 - 45 52 00.pdf PDF
AMENDMENT 0002 Pre-Proposal Inquiries.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0002 Attachment F - Price Proposal Form Revised.docx DOCX document
Amendment 0001.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R U

C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

F ile

P ri n t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

M

A

P.

STCETIHCRA

FB

BERN N.C

.NEW

CERT. NO.

UTCETIHCRA

DERET

SI

G E R

NO

IT

AR

OP

RO

C

LAR

CAROLINANORTH

50679

T

T C

E

TI

HCRAD

R E

G I S

ERE

A N

I

L

ORA

N O

R

T H

C

N

D A

R

N

DE

.J UE

ER

III

C

N

NRB E

E W

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C U s e rs \g ri ff it h \D o c u m e n ts

\2

A

R C

H g ri ff ith m b fa rc h it e c ts

.c o m .r v t

/1

/2

:0 :3

P

M

T

IT

L E

S H

E E

T

G-001

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938149

12/24/2025

DLG DLG DJE

KTB/SOM

CGM

JWJ

HPN

24 DECEMBER 2025

MARINE CORPS AIR STATION CHERRY POINT, NC

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

MID-ATLANTIC

DESIGN AND CONSTRUCTION

FACILITIES ENGINEERING AND ACQUISITION DIVISION

NORFOLK, VIRGINIA

P-995 COMPOSITE REPAIR FACILITY

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

R

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R U

C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C n t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

M

A

P.

STCETIHCRA

FB

BERN N.C

.NEW

CERT. NO.

UTCETIHCRA

DERET

SI

G E R

NO

IT

AR

OP

RO

C

LAR

CAROLINANORTH

50679

T

T C

E

TI

HCRAD

R E

G I S

ERE

A N

I

L

ORA

N O

R

T H

C

N

D A

R

N

DE

.J UE

ER

III

C

N

NRB E

E W

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C U s e rs \g ri ff it h \D o c u m e n ts

\2

A

R C

H g ri ff ith m b fa rc h it e c ts

.c o m .r v t

/1

/2

:0 :4

P

M

L O

C A

T

IO

N M

A P

S N

O T

E S

G-002

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12931850

12/24/2025

DLG DLG DJE

KTB/SOM

CGM

JWJ

HPN

24 DECEMBER 2025

ARCHITECT

MBF ARCHITECTS, P.A.

317-C POLLOCK STREET

NEW BERN, NC 28560

CIVIL

STANTEC

801 JONES FRANKLIN ROAD, SUITE 300

RALEIGH NC 27606

LANDSCAPE

STANTEC

229 PEACHTREE STREET NE, SUITE 1900

ATLANTA GA 30303

GEOTECHNICAL

TERRACON

5465 GREENWICH ROAD

VIRGINIA BEACH, VA 23462

LIFE SAFETY

JENSEN HUGHES

4445 CORPORATION LANE, SUITE 211

VIRGINIA BEACH, VA 23455

STRUCTURAL

KAYDOS-DANIELS ENGINEERS, PLLC

400-201 WEST MORGAN STREET

RALEIGH, NC 27603

COMPREHENSIVE INTERIOR DESIGN

WITHIN INTERIOR DESIGN, INC.

1008 GRANBY STREET

NORFOLK, VA 23510

FIRE ALARM /FIRE PROTECTION

JENSEN HUGHES

4445 CORPORATION LANE, SUITE 211

VIRGINIA BEACH, VA 23455

PLUMBING / MECHANICAL / ELECTRICAL

CRENSHAW CONSULTING ENGINEERS

3516 BUSH STREET, SUITE 200

RALEIGH, NC 27609

REGIONAL MAP

VICINITY MAP

INSTALLATION MAP

PROJECT LOCATION

N

TELECOMMUNICATIONS

CRENSHAW CONSULTING ENGINEERS

3516 BUSH STREET, SUITE 200

RALEIGH, NC 27609

LIGHTNING PROTECTION

CRENSHAW CONSULTING ENGINEERS

3516 BUSH STREET, SUITE 200

RALEIGH, NC 27609

AUDIOVISUAL

THORBURN ASSOCIATES, INCORPORATED

2500 GATEWAY CENTRE BLVD., SUITE 800

MORRISVILLE, NC 27560

DESIGN TEAM

GENERAL PROJECT NOTES GOVERNING REGULATIONS

BUILDING CODE:

UNIFIED FACILITIES CRITERIA (UFC) 1-200-01 (01 SEP 2022, W/ CHANGE 3, 26 FEB 2024) UNIFIED FACILITIES CRITERIA (UFC) 1-200-02 (01 DEC. 2020, W/CHANGE 02, 01 JUN 2022) UNIFIED FACILITIES CRITERIA (UFC) 3-110-03 (01 MAY 2012, W/CHANGE 5, 12 JUN 2020)

ACCESSIBILITY CODE:

UNIFORM ACCESSIBILITY STANDARDS (UFAS)

AMERICANS WITH DISABILITIES ACT (ADA)

ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAAG)

MECHANICAL CODE:

INTERNATIONAL MECHANICAL CODE (IMC) 2021

ELECTRICAL CODE:

NFPA 70, NATIONAL ELECTRIC CODE (2023)

PLUMBING CODE:

INTERNATIONAL PLUMBING CODE (IPC) 2021

FIRE PREVENTION & LIFE SAFETY CODE:

UNIFIED FACILITIES CRITERIA (UFC) 3-600-01 (15 DEC. 2016, W/CHANGE 6, 06 MAY 2021)

NFPA 101, LIFE SAFETY CODE (2024)

1. WHERE EXISTING CONSTRUCTION IS DAMAGED BY CONSTRUCTION REQUIRED BY THESE

DOCUMENTS. REPAIR THE DAMAGED ITEM(S) WITH MATERIALS TO MATCH THE ADJACENT

MATERIAL, TEXTURE AND COLOR.

2. FIELD VERIFY EXISTING DIMENSIONS, PRIOR TO ORDERING MATERIALS OR BEGINNING

DEMOLITION.

3. ALL ITEMS NOT SHOWING AS "EXISTING" MUST BE PROVIDED AND INSTALLED UNDER THE

REQUIREMENTS OF THIS CONTRACT.

4. COORDINATE LAY DOWN AREA WITH THE CONTRACTING OFFICER PRIOR TO THE

PRECONSTRUCTION MEETING. THE ALLOWABLE AREA SIZE MUST BE ESTABLISHED BY THE

CONTRACTING OFFICER.

5. MANUFACTURER'S TRADE NAMES LISTED ARE NOT INTENDED TO BE PROPRIETARY.

PRODUCTS OF OTHER MANUFACTURERS WILL BE ACCEPTABLE PROVIDED THEY MATCH THE

COLOR, FINISHES, TEXTURES AND PATTERNS OF THE MANUFACTURER LISTED, AND MEET THE

TECHNICAL REQUIREMENTS OF THE SPECIFICATIONS.

6. OBSERVE AND MAINTAIN BUILDING AND COMPOUND SECURITY REQUIREMENTS AS DIRECTED

BY THE CONTRACTING OFFICER.

7. CONSTRUCTION WILL BE ACCOMPLISHED IN AND AROUND AREAS WHICH WILL REMAIN

OPERATIONAL. AVOID INTERFERENCE WITH THE OPERATIONAL WORK ROUTINE.

8. ALL SUBMITTALS REQUIRED BY THESE DRAWINGS OR SPECIFICATIONS MUST BE SUBMITTED

TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR TO COMMENCEMENT OF RELATED

WORK.

N

SITE MAP AREA

PROJECT

SITE

SITE MAP

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R U

C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C n t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

M

A

P.

STCETIHCRA

FB

BERN N.C

.NEW

CERT. NO.

UTCETIHCRA

DERET

SI

G E R

NO

IT

AR

OP

RO

C

LAR

CAROLINANORTH

50679

T

T C

E

TI

HCRAD

R E

G I S

ERE

A N

I

L

ORA

N O

R

T H

C

N

D A

R

N

DE

.J UE

ER

III

C

N

NRB E

E W

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C U s e rs \g ri ff it h \D o c u m e n ts

\2

A

R C

H g ri ff ith m b fa rc h it e c ts

.c o m .r v t

/1

/2

:0 :4

P

M

IN

D

E X

O F

D R

A W

IN

G

S

G-003

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12931851

12/24/2025

DLG DLG DJE

KTB/SOM

CGM

JWJ

HPN

24 DECEMBER 2025

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R U

C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C n t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

M

A

P.

STCETIHCRA

FB

BERN N.C

.NEW

CERT. NO.

UTCETIHCRA

DERET

SI

G E R

NO

IT

AR

OP

RO

C

LAR

CAROLINANORTH

50679

T

T C

E

TI

HCRAD

R E

G I S

ERE

A N

I

L

ORA

N O

R

T H

C

N

D A

R

N

DE

.J UE

ER

III

C

N

NRB E

E W

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C U s e rs \g ri ff it h \D o c u m e n ts

\2

A

R C

H g ri ff ith m b fa rc h it e c ts

.c o m .r v t

/1

/2

:0 :4

P

M

IN

D

E X

O F

D R

A W

IN

G

S

G-004

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12931852

12/24/2025

DLG DLG DJE

KTB/SOM

CGM

JWJ

HPN

24 DECEMBER 2025

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

PROJECT NOTES

1. COORDINATE WITH THE ARCHITECTURAL DRAWINGS FOR EXACT

LOCATION OF PLUMBING FIXTURES AND DRAINS.

2. HOSE BIBBS MUST BE PROTECTED WITH AN APPROVED

NON-REMOVABLE TYPE BACKFLOW PROTECTION DEVICE. HOSE BIBBS

MUST BE MOUNTED AT 18" ABOVE FINISH FLOOR UNLESS OTHERWISE

NOTED.

3. COORDINATE AND VERIFY SIZES, LOCATIONS, DEPTHS AND

PIPING PRESSURES OF ALL BUILDING UTILITIES WITH CIVIL.

4. COORDINATE AND SCHEDULE TIMING FOR UTILITY SERVICE CONNECTION.

5. ALL LINES BELOW SLAB OR GRADE TO BE LOCATED AWAY FROM

ALL LOAD BEARING FOOTINGS.

6. ALL VENTS THRU ROOF MUST BE A MINIMUM OF 18" VERTICAL AND TEN

FEET HORIZONTAL AWAY FROM ALL AIR CONDITIONING FRESH AIR INTAKES

AND PROVIDED WITH VANDAL PROOF HOODS.

7. COORDINATE ALL EQUIPMENT LOCATIONS, PIPE PENETRATIONS AND

EQUIPMENT PAD LOCATIONS WITH STRUCTURAL DRAWINGS PRIOR TO

WORK.

8. COORDINATE INSTALLATION OF ALL EQUIPMENT AND PIPING WITH OTHER

TRADES PRIOR TO INSTALLATION. ENSURE THAT ALL CONTROL DEVICES,

SHUT-OFF VALVES, ETC. ARE ACCESSIBLE FOR MAINTENANCE. WHERE ACCESS

PANELS ARE REQUIRED IN FINISHED SPACES, OTHER THAN THAT SHOWN,

CONTRACTOR SHALL PROVIDE AND COORDINATE EXACT LOCATION OF PANELS

WITH ARCHITECT PRIOR TO INSTALLATION.

9. PERFORM ALL WORK IN ACCORDANCE WITH UFC

3-420-01 PLUMBING SYSTEMS.

10. THE C0NTRACTOR IS RESPONSIBLE TO PROVIDE ALL MATERIALS

NECESSARY TO COMPLETE SCOPE OF WORK UNLESS OTHERWISE

SPECIFIED.

11. INSTALLATION OF PLUMBING PIPING MUST BE COORDINATED WITH

OTHER TRADES TO AVOID CONFLICTS.

12. CONTRACTOR MUST NOT ORDER EQUIPMENT OR BEGIN FABRICATION

OF PARTS PRIOR TO SHOP DRAWING APPROVAL.

13. TEST, BALANCE, STERILIZE AND FLUSH PIPING SYSTEMS. CLEAN ALL

EQUIPMENT AND FIXTURES AT THE COMPLETION OF THE PROJECT. KEEP

PREMISES CLEAN DURING CONSTRUCTION.

14. PROVIDE ACCESS DOORS/PANELS AT LOCATION OF VALVES AND OTHER

COMPONENTS WHERE LOCATED ABOVE HARD CEILINGS OR INSIDE WALLS.

15. ALL SLOPES AND INVERT ELEVATIONS MUST BE VERIFIED BEFORE ANY

PIPING IS INSTALLED IN ORDER TO ENSURE THAT PROPER SLOPES ARE

MAINTAINED.

16. ALL WATER LINES MUST HAVE SHUT-OFF VALVES AT CONNECTIONS

OF FIXTURES AND EQUIPMENT. PROVIDE DRAIN VALVES AT PIPING LOW

POINTS.

17. PIPE PENETRATIONS THROUGH FIRE OR SMOKE PARTITIONS, WALLS,

AND/OR FLOORS MUST BE MADE FIRE AND SMOKE TIGHT. MAINTAIN FIRE

RATING OF FLOOR AND WALL ASSEMBLIES IN ACCORDANCE WITH UL SYSTEMS.

INSTALL PIPE PENETRATION ASSEMBLIES IN ACCORDANCE WITH UL LISTED

MANUFACTURER'S RECOMMENDATIONS. PENETRATIONS MUST BE IN

ACCORDANCE WITH IAW UL THROUGH-WALL DIRECTORY.

18. FIELD VERIFY CONDITIONS BEFORE STARTING CONSTRUCTION AND NOTIFY

THE ARCHITECT/ENGINEER OF DISCREPANCIES WITH THE CONSTRUCTION

DOCUMENTS AND/OR POTENTIAL PROBLEMS OBSERVED BEFORE

COMMENCING WORK IN AFFECTED AREAS.

19. PROVIDE ALL NECESSARY HANGERS FOR SUPPORT OF HORIZONTAL

AND VERTICAL PIPING IN ACCORDANCE WITH GOOD PRACTICE AND

MANUFACTURER'S RECOMMENDATIONS. PROVIDE SLEEVES AND

ESCUTCHEONS FOR ALL PIPING PASSING THROUGH WALLS AND FLOORS.

20. IN GENERAL, ALL PIPING MUST BE RUN CONCEALED IN SUSPENDED

CEILING AND PIPE SPACES PROVIDED UNLESS NOTED OR INDICATED

OTHERWISE.

21. DEAD ENDS MUST BE PROHIBITED IN THE INSTALLATION OF ANY

PART OF THE DRAINAGE SYSTEM (EXCEPT FUTURE PROVISIONS).

22. PENETRATIONS FOR SHOWER HEAD ROUGH-INS MUST BE MADE

WATERTIGHT BY CAULKING THE SHOWER HEAD ESCUTCHEON PLATES TO

FINISHED SURFACE.

SYSTEM & MATERIAL

DOMESTIC WATER SYSTEM

WASTE AND VENT SYSTEM

PLUMBING SUMMARY

FIXTURE UNITS

219.50

MAIN SIZE

268.25

BELOW SLAB: PVC DWV SCHEDULE 40 IPS

(SOLID) CONFORMING TO ASTM D-2665 6"

2-1/2"

102 GPM

ABOVE SLAB: TYPE "L" ANNEALED COPPER

WITH 95/5 SOLDER JOINTS.

BELOW SLAB: TYPE "K" SOFT COPPER

WITH NO JOINTS BELOW SLAB

ABOVE SLAB: PVC DWV SCHEDULE 40 IPS

(SOLID) CONFORMING TO ASTM D-2665

PLUMBING LEGEND AND ABBREVIATIONS

SANITARY SEWER PIPING ( W )

VENT PIPING ( V )

DOMESTIC COLD WATER PIPING ( DCW )

TEE TURNS UP

ELL TURNS UP

ELL TURNS DOWN

CHECK VALVE

BALL VALVE

CLEANOUT IN GROUND (GCO)

CLEANOUT IN FLOOR OR SLAB (FCO)

CLEANOUT IN WALL (WCO)

VENT THROUGH ROOF

ABOVE FINISH FLOOR

PLUMBING CONTRACTOR

FLOOR DRAIN - TYPE ( SEE SCHEDULE )

P.C.

V.T.R.

H.B.

FD - X

A.F.F.

HOSE BIBB

BELOW FINISH FLOORB.F.F.

TEE FROM BELOW

DOMESTIC HOT WATER PIPING ( DHW )

DOMESTIC HOT WATER RECIRCULATION PIPING ( DHWR )

CD CONDENSATE PIPING (CD)

ROOF DRAIN (PRIMARY)RD

OVERFLOW ROOF DRAIN (SECONDARY)ORD

COMMON VENTCV

BEGINNING OF CIRCUIT VENTBOCV

WALL HYDRANTWH

SHOCK ABSORBERSA

TRAP PRIMERTP

HPV

CA

HIGH PRESSURE VACUUM SYSTEM PIPING ( HPV )

COMPRESSED AIR PIPING ( CA )

N NITROGEN PIPING ( N )

LPV LOW PRESSURE VACUUM SYSTEM PIPING ( LPV )

BA BREATHING AIR SYSTEM PIPING ( BA )

CONTAMINATED WASTE PIPING ( CW )

FM FORCE MAIN PIPING ( FM )

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

P L

U M

B

IN

G C

O V

E R

S H

E E

T

P-001

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938366

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

3x

A U

TO

C

LA

V

E

COMPOSITE OVEN

VERTICAL LIFT INVENTORY

STORAGE MODULE

14'X18'

E

LE

C C

A B

VAC UU M TR EN CH

ELECTR ICAL T REN CH

CON TR OL

CON SOLE

EL

E

C T

R

IC

A L

C A

BI

N

E T

VA

C

U U

M C

A

BI

N E

T C

O N

TR

O

L T

R E

N C

H

G A

LL

O

N W

A

TE

R T

A N

K

15x40

AUTOCLAVE

BRIDGE BY

AUTOCLAVE

MANUFACTURER

C O

N

TR

O L

S

TA

TI

O

N S

D O

O R

C O

N

TR

O L

E N

C

LO

S U

R E

BLOWER AND VFD CABINET

EXHAUST

SILENCER

PURGE

BLOWER

C O

N

TR

O L

C A

B

IN

E T

M A

IN

P

O W

E R

C A

B

IN

E T

8x20

AUTOCLAVE

PIT DEPTH: 48"

BRIDGE BY

AUTOCLAVE

MANUFACTURER

VAC UU M TR EN CH

ELECTR ICAL T REN CH

CON TR OL

CON SOLE

EL

E

C T

R

IC

A L

C A

BI

N

E T

VA

C

U U

M C

A

BI

N E

T C

O N

TR

O

L T

R E

N C

H

OFFICE

OFFICE

BULLPEN

TRAINING

COMPRESSOR

ELEC

BLADE: DIRTY

COMPOSITE: INCOMING

MAIN CORRIDOR

PRODUCTION SUPPORT

COMPOSITE: DIRTY

HONEYCOMB

HONEYCOMB

MACHINING

TOOL RM.

COMPOSITE: STORAGE

COMPOSITE: OUTGOING

COMPOSITE: CLEAN

BLADE: POST-BONDING

BLADE: BALANCING

PAINT BOOTH

BLADE: CLEAN

BACK CORRIDOR

PREP

COMPRESSOR

MECHANICAL

FIRE PUMP

BREAK

STACKER

SANDING BOOTH

COMM

P-402

A2

4" W

FCO

W

P-401

C1

P-401

A4

P-402

A4

4"FD-A

4" W

4" W

FCO

W

4" W

6" W

ELEC

CLEAN ROOM STAGING

AUTOCLAVES

130 X-RAY

4" W

W

4" W

3" WFCO

W

FCO

W

W

3" W

W

4" W

3" W

W

3" W

4" W

OFFICE

FREEZER

A1 P-402

MECHANICAL

CONFERENCE

ELEC

WELLNESS

PERSONNEL

STAIR

JANITOR

116 COMM

FEMALE

MEN

VESTIBULE

VESTIBULE

VESTIBULE

VESTIBULE

TOILET

FEMALE CLEAN

FEMALE SHOWERS

FEMALE DIRTY

MALE DIRTY

MALE CLEAN

MALE SHOWERS

SANDING BOOTH

FREEZER

FCOFCO FCO

FCO

GCO

FCO FCO

1 2

A

E

F

G

H

K

3 5 6 11 13 14 15 164

C

D

987 10

B

J

17 18

F.1

F.8

G.6

0.1 1.4 2.7

K.1

H.4

4" W

W

C W

W

W

C W

4" CW4" CW

3" CW 3" CWFCO

W

4" W

W

4" W

4" CW

2" FM

INVERT ELEV.

7'-0" BFF

A B C

D E F

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C O

M P

R E

H E

N S

IV

E

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

P-101

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938367

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

1" = 20'-0" A3

COMPREHENSIVE FLOOR PLAN - WASTE AND VENT

GRAPHIC SCALE: 1"=20'

20' 0 40'20'

N

KEY PLAN

NTS

A5 N

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A B C

D E F

TOOL RM.

COMPOSITE: STORAGE

COMPOSITE: OUTGOING

COMPOSITE: CLEAN

FCO

W

CLEAN ROOM STAGING

P-12

P-11

FCO

3"FD-A

4" W

P-12

3"FD-A

2"VTR

W

4" W

4" W

3" W

3" W

3" W

P-11

MAIN CORRIDOR

4" W

2" V 2" V

3"FS-A 1

C W

FCO

C W

4" CW

FCO

3" W

1 2

A

E

F

3 5 64

C

D

B

1.4 2.7

P-12

3"FD-A

2"VTR

3" W

FCO

4" W

FCO

4" W

W

3" CW

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

A

R E

A A

P-102

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938368

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

1/8" = 1'-0" A3

FLOOR PLAN - WASTE AND VENT - AREA A

N

PLAN NOTES - P-102

1 PROVIDE CAST IRON FLOOR SINK BELOW WASHDOWN

STATION.

2 ROUTE 15 FEET OF CAST IRON PIPING BELOW SLAB

FROM FLOOR SINK TO WASTE BRANCH FOR HIGH TEMP

HOT WATER.

3 CONNECT 3" PIPE TO WASHDOWN SYSTEM.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

E L E

C C

A B

VACUUM TRENCH

ELECTRICAL TRENCH

CONTROL

CONSOLE

E

LE

C

TR

IC

A

L C

A B

IN

E

T

V A

C U

U M

C A

B

IN

E T

C O

N

TR

O L

TR

E

N C

H

VACUUM TRENCH

ELECTRICAL TRENCH

CONTROL

CONSOLE

E

LE

C

TR

IC

A

L C

A B

IN

E

T

V A

C U

U M

C A

B

IN

E T

C O

N

TR

O L

TR

E

N C

H

MAIN CORRIDOR

COMPOSITE: DIRTY

HONEYCOMB

HONEYCOMB

MACHINING

SANDING BOOTH

GCO

W

INVERT ELEV.

7'-0" BFF

P-11

P-12

3"FD-A

W

4" W

FCO

4" W

4" W

4" W

2" V

W

3" W

3" W

W

W

A1 P-402

2" FM

FCO

W

W

FCO 4" CW4" CW

FCO 4" W

A

E

F

6 11

C

D

987 10

B

A B C

D E F

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

A

R E

A B

P-103

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938369

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

1/8" = 1'-0" A3

FLOOR PLAN - WASTE AND VENT - AREA B

N

PLAN NOTES - P-103

1 6"W TO SITE UTILITY. SEE SITE PLAN FOR

CONTINUATION OF SANITARY SEWER PIPING.

2 DROP 2"FM PIPING AT THIS LOCATION AND TIE INTO

TOP OF SANITARY MAIN WITH WYE FITTING.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

G A

LL

O

N W

A

TE

R T

A N

K

15x40

AUTOCLAVE

BRIDGE BY

AUTOCLAVE

MANUFACTURER

C O

N

TR

O L

S

TA

TI

O

N S

D O

O R

C O

N

TR

O L

E N

C

LO

S U

R E

BLOWER AND VFD CABINET

EXHAUST

SILENCER

PURGE

BLOWER

C O

N

TR

O L

C A

B

IN

E T

M A

IN

P

O W

E R

C A

B

IN

E T

8x20

AUTOCLAVE

PIT DEPTH: 48"

BRIDGE BY

AUTOCLAVE

MANUFACTURER

A B C

D E F

COMPRESSOR

ELEC

PRODUCTION SUPPORT

GCO

2"VTR

4"FD-A

4" W

W

AUTOCLAVES

X-RAY

P-11

P-12

3"FD-A

2"VTR

3" WFCO3" W

3"FD-A

3" W

W

W

W

3" W 3"

W

W

3" W

W

W

W

4" CW 4" CW

GCO

2"VTR

2" FM2" FM

D-SSP-1

FCO

W

W

FCO4" CW

A

E

F

11 13 14 15 16

C

D

B

F.1

4"FD-A

2" V

W

4" W

GCO

W

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

A

R E

A C

P-104

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938370

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WASTE AND VENT - AREA C

PLAN NOTES - P-104

1 SIMPLEX SUMP PUMP SYSTEM IN SHARED AUTOCLAVE

PIT. SEE SUMP PUMP DETAIL FOR MORE

INFORMATION.

2 2" FORCE MAIN PIPING ROUTED BELOW SLAB.

3 DROP 2"FM PIPING AT THIS LOCATION AND TIE INTO

TOP OF SANITARY MAIN WITH WYE FITTING.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

BLADE: POST-BONDING

BLADE: BALANCING

PAINT BOOTH

BLADE: CLEAN

BACK CORRIDOR

PREP

COMPRESSOR

MECHANICAL

FIRE PUMP

COMM

4" W

FCO

W

4" W

W

4" W

ELEC

P-11

2"VTR

P-11

P-12

3"FD-A

2"VTR

FCO

W

W

3" W

W

P-12

3"FD-A

P-12

3"FD-A

P-11

2"VTR

3" W

W

3" W

C1 P-401

A4 P-401

V 2" V

A2 P-402

FREEZER

FREEZER

MECHANICAL

4" W 4" W

4" W

1 2

F

G

H

K

3 5 64 7

J

0.1 1.4 2.7

K.1

H.4

4" W

W

W

4" W

W

W

A B C

D E F

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

A

R E

A D

P-105

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938371

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WASTE AND VENT - AREA D

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

VERTICAL LIFT INVENTORY

STORAGE MODULE

14'X18'

E L E

C C

A B

A B C

D E F

OFFICE

OFFICE

BULLPEN

TRAINING

MAIN CORRIDOR

BREAK

STACKER

4" W

A2 P-402

A2 P-402

W

A1 P-402

STAIR

PERSONNEL

ELEC

WELLNESS

CORRIDOR

OFFICE

VESTIBULE

JANITOR

116 COMM

FEMALE

FEMALE CLEAN

TOILET

112VESTIBULE

VESTIBULE

VESTIBULE

FEMALE DIRTY

110 FEMALE SHOWERS

MALE SHOWERS

MALE DIRTY

VESTIBULE

MALE CLEAN

TOILET

MEN

CONFERENCE

CORRIDOR

W

FCO

W

2" V

FCO 4" W

F

G

H

6 11987 10

J

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

A

R E

A E

P-106

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938372

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WASTE AND VENT - AREA E

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

BLADE: DIRTY

COMPOSITE: INCOMING

P-11 P-12

3"FD-A

W

W

A2 P-402

W

D-DSP-1

SANDING BOOTH

FCO

C W

3" CW 3" CW

2"VTR

FCO

F

G

H

11 13 14 15 16

J

12 17

F.1

F.8

G.6

A1 P-402

AAV

3"FS-A

A B C

D E F

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

S T

E A

N D

V E

N T

A

R E

A F

P-107

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938373

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WASTE AND VENT - AREA F

PLAN NOTES - P-107

1 DUPLEX SUMP PUMP SYSTEM (FOR CONTAMINATED

WASTE) IN PIT.

2 APPROXIMATE INVERT FOR THIS 3"CW PIPE IS 4'-0" BFF.

3 APPROXIMATE INVERT FOR THIS 4"CW PIPE IS 6'-0" BFF.

4 PROVIDE DRAIN PIPE SHUT OFF VALVE IN ACCESSIBLE

LOCATION FOR WASHDOWN TROUGH.

5 PIPE CONTAMINATED WASTE TO MOVEABLE TOTES.

6 SUMP PUMP CONTROL PANEL LOCATION.

7 ROUTE 2"V PIPING FROM WASHDOWN TABLE BELOW

SLAB AND TURN UP INTO PLUMBING CHASE IN

ADJACENT RESTROOM.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

VERTICAL LIFT INVENTORY

STORAGE MODULE

14'X18'

E

LE

C C

A B

VAC UU M TR EN CH

ELECTR ICAL T REN CH

CON TR OL

CON SOLE

EL

E

C T

R

IC

A L

C A

BI

N

E T

VA

C

U U

M C

A

BI

N E

T C

O N

TR

O

L T

R E

N C

H

G A

LL

O

N W

A

TE

R T

A N

K

15x40

AUTOCLAVE

BRIDGE BY

AUTOCLAVE

MANUFACTURER

C O

N

TR

O L

S

TA

TI

O

N S

D O

O R

C O

N

TR

O L

E N

C

LO

S U

R E

BLOWER AND VFD CABINET

EXHAUST

SILENCER

PURGE

BLOWER

C O

N

TR

O L

C A

B

IN

E T

M A

IN

P

O W

E R

C A

B

IN

E T

8x20

AUTOCLAVE

PIT DEPTH: 48"

BRIDGE BY

AUTOCLAVE

MANUFACTURER

VAC UU M TR EN CH

ELECTR ICAL T REN CH

CON TR OL

CON SOLE

EL

E

C T

R

IC

A L

C A

BI

N

E T

VA

C

U U

M C

A

BI

N E

T C

O N

TR

O

L T

R E

N C

H

OFFICE

168OFFICE

BULLPEN

TRAINING

COMPRESSOR

ELEC

BLADE: DIRTY

COMPOSITE: INCOMING

MAIN CORRIDOR

PRODUCTION SUPPORT

COMPOSITE: DIRTY

HONEYCOMB

HONEYCOMB

MACHINING

TOOL RM.

COMPOSITE: STORAGE

COMPOSITE: OUTGOING

COMPOSITE: CLEAN

BLADE: POST-BONDING

BLADE: BALANCING

PAINT BOOTH

BLADE: CLEAN

155BACK CORRIDOR

PREP

COMPRESSOR

MECHANICAL

FIRE PUMP

BREAK

STACKER

SANDING BOOTH

COMM

2 1/2" DCW

P-404

A1

P-403

C1

P-403

A3

P-404

A4

HB

/4

D

C W

1 1/4" DCW

3/4" DCW

2" DCW 1 1/4" DCW

/4

D C

W

WH

2 1/2" DCW 2 1/2" DCW

/4

D

C W

2 1/2" DCW

1 1/2" DHW

/2

D

H W

1 1/2" DHW

/4

D

C W

/4

D C

W

/4

D H

W

1 1/4" DHW

/4

D C

W

/2

D H

W

1 1/4" CW

1 1/4" DCW

2" DCW

1 1/4" DCW

ELEC

CLEAN ROOM STAGING

1 1/4" DCW 1 1/2" DHW

1 1/4" DHW

/2

D H

W

1 1/4" DCW

1 1/4" DHW

1 1/4" DHW

1" DCW

1 1/4" DHW

3/4" DHWR

/4

D C

W

/4

D H

W

A2 P-404

MECHANICAL

/4

D

C W

OFFICE

CONFERENCE

ELEC

STAIR

PERSONNEL

/4

D

C W

MEN

TOILET

VESTIBULE

VESTIBULE

VESTIBULE

VESTIBULE

JANITOR

116 COMM

CORRIDOR

TOILET

FEMALE SHOWERS

MALE SHOWERS

MALE CLEAN

MALE DIRTY

FEMALE DIRTY

FEMALE CLEAN

FEMALE

SANDING BOOTH

FREEZER

FREEZER

1 1/2" DHW

1 1/2" DHW

1 2

A

E

F

G

H

K

3 5 6 11 13 14 15 164

C

D

987 10

B

J

17 18

F.1

F.8

G.6

0.1 1.4 2.7

K.1

H.4

WH

WH

WH

WH

WH

WH

WH

A B C

D E F

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C O

M P

R E

H E

N S

IV

E

F L

O O

R P

L A

N

W A

T E

R

P-108

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938374

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

1" = 20'-0" A3

COMPREHENSIVE FLOOR PLAN - WATER

GRAPHIC SCALE: 1"=20'

20' 0 40'20'

N

KEY PLAN

NTS

A5 N

PLAN NOTES - P-108

1 2-1/2"DCW TO SITE UTILITY. SEE SITE PLAN FOR

CONTINUATION OF DOMESTIC WATER PIPING.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

TOOL RM.

COMPOSITE: STORAGE

COMPOSITE: OUTGOING

COMPOSITE: CLEAN

WH

/2

D H

W

1 1/2" DHW

/4

D C

W

CLEAN ROOM STAGING

P-12

P-11

1 1/4" DCW

P-12

P-111 1/2" DHW

P-11

P-12

3/4" DCW

1 1/2" DHW

1 1/4" DHW

1 1/4" CW

6 BFP-4

HB

FREEZER

7TP

7 TP

7 TP

1 2

A

E

F

3 5 64

C

D

B

1.4 2.7

1 1/2" DHW

1 1/2" DHW

/2

D H

W

P-12

21/2" DCW

/4

D C

W

/2

D H

W

/4

D C

W

/2

D H

W

/2

D

H W

1 1/2" DHW

D-WH-2

3/4" DCW

BFP-5 8

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

T E

R

A R

E A

A

P-109

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938375

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WATER - AREA A

PLAN NOTES - P-109

1 DROP 3/4"DCW DOWN TO WALL HYDRANT. MOUNT AT

18" AFF.

2 PROVIDE THERMOSTATIC MIXING VALVE FOR

EMERGENCY EYE WASH STATION.

3 PROVIDE 3/4"DHW CONNECTION TO 30 GALLON HOT

WATER HEATER (D-WH-2). PROVIDE THERMOMETER

ON OUTLET SIDE OF HOT WATER TANK. ROUTE 1"

DRAIN PIPE TO NEARBY FLOOR SINK (INDIRECT). SEE

WASHDOWN STATION DETAIL FOR MORE

INFORMATION.

4 3/4" HIGH TEMP HOT WATER CONNECTION WITH

SHUTOFF VALVE FOR WASHDOWN STATION. SET

ELEMENTS IN D-WH-2 TO PROVIDE 150 DEGREE

WATER.

5 3/4" RPZ TYPE BACKFLOW PREVENTER FOR DCW

WASHDOWN STATION'S HOSE BIBB. SEE BACKFLOW

PREVENTER DETAIL FOR MORE INFORMATION.

6 HOSE BIBB DEDICATED TO WASHDOWN STATION.

7 DROP 1/2"DCW TO TRAP PRIMER VALVE. ROUTE

1/2"DCW BELOW SLAB TO FLOOR DRAIN'S TRAP

PRIMER CONNECTION.

8 3/4" HIGH TEMP. RATED RPZ TYPE BACKFLOW

PREVENTER FOR DHW WASHDOWN STATION'S HOSE

BIBB. SEE BACKFLOW PREVENTER DETAIL FOR MORE

INFORMATION.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

E L E

C C

A B

VACUUM TRENCH

ELECTRICAL TRENCH

CONTROL

CONSOLE

E

LE

C

TR

IC

A

L C

A B

IN

E

T

V A

C U

U M

C A

B

IN

E T

C O

N

TR

O L

TR

E

N C

H

VACUUM TRENCH

ELECTRICAL TRENCH

CONTROL

CONSOLE

E

LE

C

TR

IC

A

L C

A B

IN

E

T

V A

C U

U M

C A

B

IN

E T

C O

N

TR

O L

TR

E

N C

H

A B C

D E F

MAIN CORRIDOR

COMPOSITE: DIRTY

HONEYCOMB

HONEYCOMB

MACHINING

STACKER

SANDING BOOTH

2" DCW

WH

/4

D C

W

/2

D H

W

1 1/4" CW

1 1/4" DCW

D C

W

P-11 P-11

P-12

1 1/4" DHW

1 1/2" DHW

A1 P-404

4PERSONNEL

STAIR

160 COMM

JANITOR

1 1/2" DHW

TP

3 TP

A

E

F

6 11

C

D

987 10

B

/2

D H

W

1 1/2" DHW

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

T E

R

A R

E A

B

P-110

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938376

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WATER - AREA B

PLAN NOTES - P-110

1 DROP 3/4"DCW DOWN TO WALL HYDRANT. MOUNT AT

18" AFF.

2 PROVIDE THERMOSTATIC MIXING VALVE FOR

EMERGENCY EYE WASH STATION.

3 DROP 1/2"DCW DOWN WALL TO TRAP PRIMER VALVE.

ROUTE 1/2"DCW BELOW FLOOR TO FLOOR DRAIN'S

TRAP PRIMER CONNECTION.

4 PROVIDE 1/2"DCW & 1/2"DHW BALL VALVES FOR

CONNECTION TO EYEWASH IN SANDING BOOTH BY

OTHERS.

5 SANDING BOOTH PLUMBING PIPING (DCW, DWH,ETC)

TO BE CFCI. COORDINATE INSTALLATION WITH

SANDING BOOTH VENDOR.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

G A

LL

O

N W

A

TE

R T

A N

K 15x40

AUTOCLAVE

BRIDGE BY

AUTOCLAVE

MANUFACTURER

C O

N

TR

O L

S

TA

TI

O

N S

D O

O R

C O

N

TR

O L

E N

C

LO

S U

R E

BLOWER AND VFD CABINET

EXHAUST

SILENCER

PURGE

BLOWER

C O

N

TR

O L

C A

B

IN

E T

M A

IN

P

O W

E R

C A

B

IN

E T

8x20

AUTOCLAVE

PIT DEPTH: 48"

BRIDGE BY

AUTOCLAVE

MANUFACTURER

A B C

D E F

COMPRESSOR

ELEC

PRODUCTION SUPPORT

WH

WH

HB

/4

D

C W

1 1/4" DCW

/4

D

C W

2" DCW 1 1/4" DCW

/4

D C

W

P-11 P-12

/2

D H

W

P-11

P-12

1" DCW

1 1/4" DHW

AUTOCLAVES

3/4" DCW

1 1/4" DCW

/4

D

C W

X-RAY

1 1/2" DHW

COMM

1 1/2" DHW1 1/2" DHW

MAIN CORRIDOR

3TP

3 TP

A

E

F

11 13 14 15 16

C

D

B

F.1

/2

D

H

WBPF-4 8

BPF-4 9

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

T E

R

A R

E A

C

P-111

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938377

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WATER - AREA C

PLAN NOTES - P-111

1 DROP 3/4"DCW DOWN TO WALL HYDRANT. MOUNT AT

18" AFF.

2 PROVIDE THERMOSTATIC MIXING VALVE FOR

EMERGENCY EYE WASH STATION.

3 DROP 1/2"DCW TO TRAP PRIMER VALVE. ROUTE

1/2"DCW BELOW SLAB TO FLOOR DRAIN'S TRAP

PRIMER CONNECTION.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

BLADE: POST-BONDING

BLADE: BALANCING

PAINT BOOTH

BLADE: CLEAN

BACK CORRIDOR

PREP

COMPRESSOR

MECHANICAL

FIRE PUMP

COMM

2 1/2" DCW

WH

2 1/2" DCW

/4

D

C W

/4

D C

W

/4

D H

W

1 1/4" DHW

ELEC

P-11

1 1/4" DHW

P-11

P-12

P-12

P-12P-11

3/4" DHWR

/4

D C

W

/4

D H

W

C1 P-403

A3 P-403

/4

D

H W

R

/2

D C

W

1 1/4" DCW

/4

D C

W

/4

D H

W

1 1/4" DHW

/4

D C

W

MECHANICAL

FREEZER

A2 P-404

FREEZER

4TP

4 TP

4 TP

1 2

F

G

H

K

3 5 64 7

J

1.4 2.7

K.1

H.4

2 1/2" DCW 2 1/2" DCW

1 1/4" DHW

/4

D H

W

/4

D H

W

/2

D

C W

/4

D

H W

R

/2

D H

W

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

T E

R

A R

E A

D

P-112

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938378

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5 N

1/8" = 1'-0" A3

FLOOR PLAN - WATER - AREA D

PLAN NOTES - P-112

1 DROP 3/4"DCW DOWN TO WALL HYDRANT. MOUNT AT

18" AFF.

2 PROVIDE THERMOSTATIC MIXING VALVE FOR

EMERGENCY EYE WASH STATION.

3 2-1/2"DCW TO SITE UTILITY. SEE SITE PLAN FOR

CONTINUATION OF DOMESTIC WATER PIPING.

4 DROP 1/2"DCW TO TRAP PRIMER VALVE. ROUTE

1/2"DCW BELOW SLAB TO FLOOR DRAIN'S TRAP

PRIMER CONNECTION.

5 PAINT BOOTH PLUMBING PIPING (DCW, DHW, ETC) TO

BE CFCI. COORDINATE INSTALLATION WITH PAINT

BOOTH VENDOR.

6 PROVIDE 1/2"DCW & 1/2"DHW BALL VALVES FOR

CONNECTION TO EYEWASH IN PAINTBOOTH BY

OTHERS.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

14'X18'

E L E

C C

A B

A B C

D E F

OFFICE

OFFICE

BULLPEN

TRAINING

BREAK

STACKER

WH

/4

D

C W

2 1/2" DCW

1 1/4" DHW

A2 P-404

2 1/2" DCW

A1 P-404

HB2

OFFICE

VESTIBULE

CONFERENCE

CORRIDOR

WELLNESS

ELEC

PERSONNEL

STAIR

MEN

VESTIBULE

103 TOILET

MALE CLEAN

VESTIBULE

VESTIBULE

VESTIBULE

FEMALE

FEMALE CLEAN

TOILET

FEMALE SHOWERS

MALE SHOWERS

MAIN CORRIDOR

BLADE: DIRTY

A2 P-404

1 1/4" DHW

1/2" DCW

HB2

COMM

JANITOR

1 1/2" DHW

F

G

H

6 11987 10

J

D C

W

2 1/2" DCW

BPF-4

BPF-4 9

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

T E

R

A R

E A

E

P-113

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938379

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WATER - AREA E

PLAN NOTES - P-113

1 DROP 3/4"DCW DOWN TO WALL HYDRANT. MOUNT AT

18" AFF.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

BLADE: DIRTY

COMPOSITE: INCOMING

WH

WH

P-11 P-12

/4

D

C W

HB2

BLADE: DIRTY

A1 P-404

1 1/2" DHW

HB2

A2 P-404

1 1/2" DHW

/4

D

C W

/4

D

C W

SANDING BOOTH

MAIN CORRIDOR

3 TP

F

G

H

11 13 14 15 16

J

F.1

F.8

G.6

/2

D

H W

1/2" DHW

1/2" DCW

BPF-4 8

BPF-4 9

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

W A

T E

R

A R

E A

F

P-114

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938380

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - WATER - AREA F

PLAN NOTES - P-114

1 DROP 3/4"DCW DOWN TO WALL HYDRANT. MOUNT AT

18" AFF.

2 PROVIDE THERMOSTATIC MIXING VALVE FOR

EMERGENCY EYE WASH STATION.

3 DROP 1/2"DCW TO TRAP PRIMER VALVE. ROUTE

1/2"DCW BELOW SLAB TO FLOOR DRAIN'S TRAP

PRIMER CONNECTION.

4 3/4"DCW AND 3/4"DHW DROP DOWN TO HOT/COLD

HOSE BIBBS ON EACH SIDE OF WASHDOWN STATION.

5 PROVIDE ACCESS PANEL FOR PLUMBING SHUT OFF

VALVES.

6 PROVIDE 1/2"DCW & 1/2"DHW BALL VALVES FOR

CONNECTION TO EYEWASH IN SANDING BOOTH BY

OTHERS.

7 SANDING BOOTH PLUMBING PIPING (DCW, DWH,ETC)

TO BE CFCI. COORDINATE INSTALLATION WITH

SANDING BOOTH VENDOR.

8 3/4" RPZ TYPE BACKFLOW PREVENTER FOR DCW

WASHDOWN STATION CONNECTIONS. SEE BACKFLOW

PREVENTER DETAIL FOR MORE INFORMATION.

9 3/4" HIGH TEMP RATED RPZ TYPE BACKFLOW

PREVENTER FOR DHW WASHDOWN STATION

CONNECTIONS. SEE BACKFLOW PREVENTER DETAIL

FOR MORE INFORMATION.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

VERTICAL LIFT INVENTORY

STORAGE MODULE

14'X18'

E

LE

C C

A B

VAC UU M TR EN CH

ELECTR ICAL T REN CH

CON TR OL

CON SOLE

EL

E

C T

R

IC

A L

C A

BI

N

E T

VA

C

U U

M C

A

BI

N E

T C

O N

TR

O

L T

R E

N C

H

G A

LL

O

N W

A

TE

R T

A N

K

15x40

AUTOCLAVE

BRIDGE BY

AUTOCLAVE

MANUFACTURER

C O

N

TR

O L

S

TA

TI

O

N S

D O

O R

C O

N

TR

O L

E N

C

LO

S U

R E

BLOWER AND VFD CABINET

EXHAUST

SILENCER

PURGE

BLOWER

C O

N

TR

O L

C A

B

IN

E T

M A

IN

P

O W

E R

C A

B

IN

E T

8x20

AUTOCLAVE

PIT DEPTH: 48"

BRIDGE BY

AUTOCLAVE

MANUFACTURER

VAC UU M TR EN CH

ELECTR ICAL T REN CH

CON TR OL

CON SOLE

EL

E

C T

R

IC

A L

C A

BI

N

E T

VA

C

U U

M C

A

BI

N E

T C

O N

TR

O

L T

R E

N C

H

OFFICE

OFFICE

BULLPEN

TRAINING

COMPRESSOR

ELEC

BLADE: DIRTY

COMPOSITE: INCOMING

MAIN CORRIDOR

PRODUCTION SUPPORT

COMPOSITE: DIRTY

HONEYCOMB

HONEYCOMB

MACHINING

TOOL RM.

COMPOSITE: STORAGE

138COMPOSITE: OUTGOING

COMPOSITE: CLEAN

BLADE: POST-BONDING

BLADE: BALANCING

PAINT BOOTH

BLADE: CLEAN

BACK CORRIDOR

PREP

COMPRESSOR

MECHANICAL

FIRE PUMP

BREAK

STACKER

SANDING BOOTH

COMM

ELEC

CLEAN ROOM STAGING

P-405

A3

P-405

B1

AUTOCLAVES

MECHANICAL

FREEZER

JANITOR

COMM

STAIR

PERSONNEL

CONFERENCE

OFFICE

169 VESTIBULE

MEN

MALE CLEAN

VESTIBULE

TOILET

MALE DIRTY

VESTIBULE

108 MALE SHOWERS

FEMALE CLEAN

FEMALE

VESTIBULE

TOILET

FEMALE SHOWERS

FEMALE DIRTY

110VESTIBULE

FREEZER

SANDING BOOTH

X-RAY

1 2

A

E

F

G

H

K

3 5 6 11 13 14 15 164

C

D

987 10

B

J

17 18

F.1

F.8

G.6

1.4 2.7

K.1

H.4

NITROGEN TANK

A B C

D E F

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

C O

M P

R E

H E

N S

IV

E

F L

O O

R P

L A

N

C O

M P

R E

S S

E D

A

IR

A N

D V

A C

U U

M

P-115

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938381

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

1" = 20'-0" A3

COMPREHENSIVE FLOOR PLAN - COMPRESSED AIR AND VACUUM

GRAPHIC SCALE: 1"=20'

20' 0 40'20'

N

KEY PLAN

NTS

A5 N

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

E L E

C C

A B

VACUUM TRENCH

ELECTRICAL TRENCH

CONTROL

CONSOLE

E

LE

C

TR

IC

A

L C

A B

IN

E

T

V A

C U

U M

C A

B

IN

E T

C O

N

TR

O L

TR

E

N C

H

VACUUM TRENCH

ELECTRICAL TRENCH

CONTROL

CONSOLE

E

LE

C

TR

IC

A

L C

A B

IN

E

T

V A

C U

U M

C A

B

IN

E T

C O

N

TR

O L

TR

E

N C

H

A B C

D E F

HONEYCOMB

HONEYCOMB

MACHINING

TOOL RM.

COMPOSITE: STORAGE

138COMPOSITE: OUTGOING

COMPOSITE: CLEAN

STACKER

SANDING BOOTH

C A

2" CA

2" CA

3" HPV

3" HPV

CLEAN ROOM STAGING

6" LPV

H P

V

L P

V

6" LPV

2" CA

3" HPV

6" LPV

2" CA

3" HPV

6" LPV

2" CA

3" HPV

L P

V

/4

H

P V

/4

C

A

/4

H

P V

FREEZER

2" LPV

3/4" HPV

3/4" CA

6" LPV

2" CA

3" HPV

3 3 /4

H

P V

/4

C

A

L P

V

H P

V

C A

2" CA

3" HPV

6" LPV

C A

H P

V

L P

V

2" CA

/2

C

A

B A

1" BA

1" CA

1" CA

2" CA

6" LPV

8" VAC

MAIN CORRIDOR

A

E

F

3 5 64

C

D

B

2.7

2 4

5 3

4 6

3 13

/4

C

A

L P

V

/4

H

P V

/4

C

A

/4

H

P V

L P

V

L P

V

13 13

2" LPV

3/4" HPV

3/4" CA

3" HPV

6" LPV

2" CA

3" HPV

6" LPV

2" CA

B A

L P

V

H P

V

C A

B A

1" BA

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

C O

M P

R E

S S

E D

A

IR

A N

D V

A C

U U

M

A R

E A

A

P-116

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938382

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA A

PLAN NOTES - P-116

1 DROP 3/4" COMPRESSED AIR DOWN WALL. PROVIDE

QUICK CONNECT FITTING (MALE & FEMALE), SHUTOFF

VALVE, AND 6" DIRT LEG AT CONNECTION. SEE

COMPRESSED AIR DROP DETAIL FOR MORE

INFORMATION.

2 DROP 2" LOW PRESSURE VACUUM PIPING DOWN TO

CONDUIT TYPE HOOKUP.

3 DROP 3/4" HIGH PRESSURE VACUUM PIPING DOWN TO

HOSE REEL.

4 DROP 3/4" COMPRESSED AIR DOWN TO HOSE REEL.

5 DROP 3/4"HPV PIPING DOWN TO SWING ARM. PROVIDE

HOSE REEL FOR HPV AT END OF SWING ARM.

6 DROP 2" LOW PRESSURE VACUUM PIPING DOWN TO

SWING ARM.

7 DROP 1" HIGH PRESSURE VACUUM PIPING DOWN TO

SUPPLY SLURRY WET BLASTER EQUIPMENT.

8 8" VACUUM LINE CONNECTION TO HONEYCOMB

VACUUM SYSTEM.

9 8" VACUUM LINE ROUTED BELOW FLOOR IN TRENCH.

10 1/2" COMPRESSED AIR LINE DROP FOR HONEYCOMB

EQUIPMENT.

11 SANDING BOOTH PLUMBING PIPING (COMPRESSED AIR,

BREATHING AIR, ETC) TO BE CFCI. COORDINATE

INSTALLATION WITH SANDING BOOTH VENDOR.

12 PROVIDE SHUTOFF VALVE ABOVE SANDING BOOTH

FOR CA AND BA PIPING THAT SERVES THIS BOOTH.

BOOTH MANUFACTURER WILL PROVIDE ALL DROPS,

FITTINGS, EQUIPMENT, AND ASSOCIATED PIPING FOR

THIS BOOTH AND CONNECT TO THESE VALVES.

13 DROP 3/4"CA PIPING DOWN TO SWING ARM. PROVIDE

HOSE REEL FOR CA AT END OF SWING ARM.

PAINT & SAND BOOTH NOTES:

BOOTH MANUFACTURER IS RESPONSIBLE FOR ALL SYSTEMS THAT

SERVE INSIDE THE BOOTH. ONLY UTILITY FEEDS TO THE BOOTH ARE

INCLUDED IN THESE DRAWINGS. BOOTH MANUFACTURER MUST

DESIGN AND PROVIDE SYSTEM CONNECTIONS THAT INCLUDE, BUT

ARE NOT LIMITED TO, COMRESSED AIR PIPING, BREATHING AIR PIPING,

VACUUM SYSTEM(S) AND PIPING. ALL PLUMBING EQUIPMENT, VALVES,

AND DEVICES MUST BE RATED FOR THE ENVIRONMENT IN WHICH THEY

ARE LOCATED.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

A B C

D E F

MAIN CORRIDOR

COMPOSITE: DIRTY

3" HPV

2" CA

3" HPV

2" CA

3" HPV

6" LPV

6" LPV

/4

H

P V

6" LPV

2" CA

3" HPV

6" LPV

/4

C

A

/4

H

P V

/4

C

A

2 1

2 1

2 1 3

L P

V

/4

C A

/4

H

P V

L P

V

/4

C

A

/2

L P

V

/4

H

P V

/4

C

A

6" LPV

2" CA

3" HPV

3 3 /4

H

P V

/4

C

A

C A

H P

V

L P

V

B A

1" BA

1" CA

1" CA

A

E

C

D

98 10

B

5 4

2" LPV

3/4" CA

L P

V

/4

H

P V

C A

/2

L P

V

/4

C

A

2 1/2" LPV

3/4" HPV

1" CA

L P

V

/4

H

P V

C A

L P

V 3 /4

H

P V

/4

C

A

L P

V

/4

H

P V

L P

V

L P

V

/4

C

A

/4

H

P V

15 16

SEE RISER A1

THIS SHEET FOR MORE

INFORMATION

131211

15 16

SEE RISER B1

THIS SHEET FOR MORE

INFORMATION

SEE RISER C1

THIS SHEET FOR MORE

INFORMATION

N

N

1" N

B A

DROP PIPING

DOWN TO

BELOW SLAB

PIPING ROUTED

BELOW SLAB

SHUTOFF VALVES

IN COLUMN

2-1/2"LPV

2-1/2"LPV

3/4"HPV

1"CA

1"CA

3/4"HPV

2-1/2"LPV

3/4"HPV

1"CA

3/4"HPV HOSE REEL (x3)

2"LPV CONNECTION (x3)

3/4"CA HOSE REEL (x3)

2"LPV CONNECTION (x3)

3/4"CA & 3/4"HPV TO

HOSE REEL MOUNTED

ON END OF SWING ARM (x3)

SEE PLANS FOR

CONTINUATION

DROP PIPING

DOWN TO

BELOW SLAB

PIPING ROUTED

BELOW SLAB

3/4"CA QUICK DISCONNECT (x1)

2"LPV CONNECTION (x1)

SHUTOFF VALVES

IN COLUMN

2"LPV

2"LPV3/4"CA

2"LPV

3/4"CA

3/4"CA

SEE PLANS FOR

CONTINUATION

DROP PIPING

DOWN TO

BELOW SLAB

PIPING ROUTED

BELOW SLAB

3/4"HPV HOSE REEL (x3)

2"LPV CONNECTION (x3)

SHUTOFF VALVES

IN COLUMN

2-1/2"LPV

2-1/2"LPV

3/4"HPV

1"CA

1"CA

3/4"HPV

2-1/2"LPV

3/4"HPV

1"CA

3/4"CA HOSE REEL (x3)

2"LPV CONNECTION (x3)

3/4"CA & 3/4"HPV TO

HOSE REEL MOUNTED

ON END OF SWING ARM (x3)

SEE PLANS FOR

CONTINUATION

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

C O

M P

R E

S S

E D

A

IR

A N

D V

A C

U U

M

A R

E A

B

P-117

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938383

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA B

PLAN NOTES - P-117

1 DROP 3/4" COMPRESSED AIR DOWN WALL. PROVIDE

QUICK CONNECT FITTING (MALE & FEMALE), SHUTOFF

VALVE, AND 6" DIRT LEG AT CONNECTION. SEE

COMPRESSED AIR DROP DETAIL FOR MORE

INFORMATION.

2 DROP 2" LOW PRESSURE VACUUM PIPING DOWN TO

QUICK CONNECT WITH FLAPPER.

3 DROP 3/4" HIGH PRESSURE VACUUM PIPING DOWN TO

HOSE REEL.

4 DROP PLUMBING PIPING DOWN WALL TO BELOW SLAB

AND ROUTE TO DIRTY COLUMN AS INDICATED ON

PLANS.

5 PLUMBING PIPING ROUTED BELOW SLAB TO DIRTY

COLUMN.

6 TURN 2" LOW PRESSURE VACUUM PIPING UP ABOVE

SLAB TO QUICK CONNECT WITH FLAPPER.

7 TURN 3/4" COMPRESSED AIR UP ABOVE SLAB AT THIS

LOCATION. PROVIDE QUICK CONNECT FITTING (MALE

& FEMALE), SHUTOFF VALVE, AND 6" DIRT LEG AT

CONNECTION. SEE COMPRESSED AIR DROP DETAIL

FOR MORE INFORMATION.

8 TURN 2-1/2" LOW PRESSURE VACUUM PIPING UP

ABOVE SLAB AT THIS LOCATION.

9 TURN 3/4" HIGH PRESSURE VACUUM PIPING UP ABOVE

SLAB AT THIS LOCATION.

10 TURN 3/4" COMPRESSED AIR PIPING UP ABOVE SLAB

AT THIS LOCATION.

11 3/4"CA TO HOSE REEL AT EACH SIDE OF UTILITY

COLUMN WITH WORK DESK.

12 2" LOW PRESSURE VACUUM CONNECTION AT EACH

SIDE OF UTILITY COLUMN WITH WORK DESK. PROVIDE

QUICK CONNECT WITH FLAPPER.

13 3/4"HPV TO HOSE REEL AT EACH SIDE OF UTILITY

COLUMN WITH WORK DESK.

14 DROP 3/4" COMPRESSED AIR PIPING DOWN TO HOSE

REEL.

15 3/4"CA TO HOSE REEL MOUNTED AT END OF SWING

ARM EACH SIDE OF UTILITY COLUMN WITH WORK

DESK.

16 3/4"HPV TO HOSE REEL MOUNTED AT END OF SWING

ARM EACH SIDE OF UTILITY COLUMN WITH WORK

DESK.

17 DROP 1" NITROGEN DOWN TO AUTOCLAVE.

NTS

B1

3D RISER - AT CENTRAL COLUMN - CA & VAC

NTS

C1

3D RISER - AT UPPER COLUMN - CA & VAC

NTS

A1

3D RISER - AT LOWER COLUMN - CA & VAC

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A U

TO

C

LA

V

E

COMPOSITE OVEN

G A

LL

O

N W

A

TE

R T

A N

K

15x40

AUTOCLAVE

BRIDGE BY

AUTOCLAVE

MANUFACTURER

C O

N

TR

O L

S

TA

TI

O

N S

D O

O R

C O

N

TR

O L

E N

C

LO

S U

R E

BLOWER AND VFD CABINET

EXHAUST

SILENCER

PURGE

BLOWER

C O

N

TR

O L

C A

B

IN

E T

M A

IN

P

O W

E R

C A

B

IN

E T

8x20

AUTOCLAVE

PIT DEPTH: 48"

BRIDGE BY

AUTOCLAVE

MANUFACTURER

A B C

D E F

COMPRESSOR

ELEC

PRODUCTION SUPPORT

2" CA

3" HPV

2" CA

6" LPV

L P

V

H P

V

C A

AUTOCLAVES

B1 P-405

X-RAY

MAIN CORRIDOR

6" LPV

2" CA

3" HPV

6" LPV

/4

C

A

2" CA

6" LPV

2" LPV

3/4" CA

3/4" CA

L P

V

H

P V

3/4" HPV

L P

V

L P

V

H P

V

C A

1" N

6" LPV

2" BA

B A

3/4" CA

A

E

11 13 14 15 16

C

D

B

2" BA

C A

2" LPV

/4

H

P V

/4

H

P V

3/4" HPV

/4

H

P V

3/4" HPV

/4

C

A

L P

V

/4

H

P V

/4

C

A

L P

V

/4

C

A

N

N

1" N

N

2" N

N

H P

V

C A

L P

V

3" HPV

L P

V

/4

C

A

3/4" CA

L P

V

3" HPV

1" N

3" N

B A

B A

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

C O

M P

R E

S S

E D

A

IR

A N

D V

A C

U U

M

A R

E A

C

P-118

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938384

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA C

PLAN NOTES - P-118

1 DROP 3/4" COMPRESSED AIR DOWN WALL. PROVIDE

QUICK CONNECT FITTING (MALE & FEMALE), SHUTOFF

VALVE, AND 6" DIRT LEG AT CONNECTION. SEE

COMPRESSED AIR DROP DETAIL FOR MORE

INFORMATION.

2 DROP 2" LOW PRESSURE VACUUM PIPING DOWN TO

CONDUIT TYPE HOOKUP.

3 DROP 3/4" HIGH PRESSURE VACUUM PIPING DOWN TO

HOSE REEL.

4 DROP 3/4" COMPRESSED AIR PIPING DOWN TO

AUTOCLAVE.

5 DROP 1" NITROGEN DOWN TO AUTOCLAVE.

6 NITROGEN TANK LOCATED OUTSIDE BY NITROGEN

SUPPLIER. THIS WILL SERVE THE AUTOCLAVES.

7 DROP 3/4" COMPRESSED AIR DOWN TO HOSE REEL.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

BLADE: POST-BONDING

BLADE: BALANCING

BACK CORRIDOR

PREP

COMPRESSOR

MECHANICAL

FIRE PUMP

COMM

C A

ELEC

H P

V

L P

V

A3 P-405

4" LPV

3" HPV

2" CA

C A

/4

H

P V

/4

H

P V

6" LPV

3" HPV

2" CA

H P

V

L P

V

4" LPV

3" HPV

/4

H

P V

6" LPV

3" HPV

2" CA

6" LPV

3" HPV

2" CA

L P

V

3 2

3/4" CA

3/4" HPV

2" LPV

3/4" CA

3/4" HPV

2" LPV

3/4" CA

3/4" HPV

2" LPV

/4

C

A

/4

H

P V

L P

V

/4

C A

3 2 3

2" LPV

2 3

L P

V

/4

H

P V

L P

V

/4

H

P V

L P

V

/4

H

P V

FREEZER

/4

H

P V

/4

H

P V

/4

H

P V

FREEZER

BLADE: CLEAN

MAIN CORRIDOR

2 32 3

MECHANICAL

1 2

F

G

H

K

3 5 64 7

J

1.4 2.7

K.1

H.4

PAINT BOOTH

6" LPV

L P

V

4" CA

H P

V

/4

C A

1" CA1" CA

/2

C A

L P

V

L P

V

C A

6" LPV

H P

V

H

P V

C A

C A

4" HPV

L P

V

3" HPV

L P

V

H P

V

C A

B A

B A

B A

1" BA

H P

V

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

STA. PROJ. NO.:

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

D E S

IG

N A

N D

C O

N S T R

U C T

IO

N

D C

C O

R E

N A V A L S

T A T

IO

N

N O

R F O

L K V A

M A

R

IN

E C

O R

P S

A

IR

S T

A T

IO

N

C H

E R

R Y

P O

IN

T

N

C

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS INDICATED

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

A T

L A

N T

IC

Approved by Erik A. Lewis, Infrastructure Engineering Branch Head, FRCE Cherry Point via Electronic Signature

F L

O O

R P

L A

N

C O

M P

R E

S S

E D

A

IR

A N

D V

A C

U U

M

A R

E A

D

P-119

1692230

P -9

C

O M

P O

S

IT

E R

E P

A

IR

F A

C

IL

IT

Y

12938385

12/24/2025

PRC DJG DLB

KTB/SOM

ALG

JWJ

HPN

GRAPHIC SCALE: 1/8"=1'-0"

8' 0 4' 8' 16'

N

KEY PLAN

NTS

A5

N

1/8" = 1'-0" A3

FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA D

PLAN NOTES - P-119

1 DROP 3/4" COMPRESSED AIR DOWN WALL. PROVIDE

QUICK CONNECT FITTING (MALE & FEMALE), SHUTOFF

VALVE, AND 6" DIRT LEG AT CONNECTION. SEE

COMPRESSED AIR DROP DETAIL FOR MORE

INFORMATION.

2 DROP 2" LOW PRESSURE VACUUM PIPING DOWN TO

CONDUIT TYPE HOOKUP.

3 DROP 3/4" HIGH PRESSURE VACUUM PIPING DOWN TO

HOSE REEL.

4 PAINT BOOTH PLUMBING PIPING (COMPRESSED AIR,

BREATHING AIR, ETC) TO BE CFCI. COORDINATE

INSTALLATION WITH PAINT BOOTH VENDOR.

5 DROP 3/4" HIGH…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .