Amendment 0006 P993 Submittal Register.pdf
PDF 2 MB Posted
- Solicitation number
- N4008526R0002
About this file
This is a Submittal Register form (NAVFAC P993) that establishes the framework for managing contractor submissions throughout the F-35 Sustainment Center and Composite Repair Facility construction project at Marine Corps Air Station Cherry Point, North Carolina. The register serves as a comprehensive tracking document for all required submittals, organized by Construction Specifications (CSI) division and submission type, including shop drawings, product data, samples, design calculations, test reports, certificates, manufacturer's instructions, operation and maintenance data, and closeout documentation.
The submittal requirements span the entire project scope across both the 255,461 square-foot F-35 Sustainment Center hangar and the 105,755 square-foot Composite Repair Facility. Key submission categories include structural elements (precast concrete panels, cross-laminated timber, steel fabrication), mechanical systems (HVAC, plumbing, gas distribution, fire protection), electrical systems (transformers, switchgear, panelboards, lighting controls), site work (excavation, paving, utilities, landscaping), and specialized systems (building enclosure commissioning, RF shielding, cathodic protection, security systems). The register identifies specific approving authorities, required submission and approval dates, and action codes for tracking document flow between contractor, government reviewers, and other designated authorities. All submittals must comply with quality control procedures, include necessary certifications and qualifications, and receive government approval before work proceeds, with particular emphasis on safety, environmental compliance, sustainability requirements, cybersecurity protocols, and commissioning verification across all construction divisions.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 199 PAGES
NAVFAC P993 F-35 Sustainment Center
01 11 00 SD-01 Preconstruction Submittals
1.7Salvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.2.1.1List of Contact Personnel
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 30 02.00 22 SD-02 Shop Drawings
1.5.3 GPreliminary (Pre-Final) AV
Package
1.5.9 GFinal AV Package
1.6 GBest Value Determination
SD-07 Certificates
1.4.1 GContractor's AV Designer's
Qualifications
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2 GList of Contractor's Personnel
01 32 17.00 20 SD-01 Preconstruction Submittals
1.9 GDesignated Project Scheduler
SD-07 Certificates
1.3Weekly Look Ahead Schedule
1.4.1 GMonthly Network Analysis
Updates
SD-11 Closeout Submittals
1.4.2 GAs-Built Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 199 PAGES
01 33 00 SD-01 Preconstruction Submittals
1.7Submittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-06 Test Reports
1.5.3.2 GThird Party Certification Design
Compliance Report
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
1.5.3.2 GAmended Final Sustainability
eNotebook
1.5.3.2 GAmended Final High
Performance and Sustainable
Building Checklist
1.3.1 SEnvironmental Product
Declaration (EPD)
1.3.2 SEnvironmental Product
Declaration (EPD)
1.3.1 SPilot Program Construction Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 199 PAGES
01 33 29 1.3.2 SMaterial GWP Calculator
Spreadsheet
1.3.2 SMaterial GWP Calculator
Spreadsheet
01 35 13 SD-01 Preconstruction Submittals
3.1.4Heavy Equipment and Vehicle
List
3.1.3.2Existing Conditions Survey
3.1.2FAA Form 7460-1
3.1.2FAA Form 7460-2
3.1.3.1Construction Operations Plan
01 35 26 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2Accident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.3.2Standard Lift Plan
1.7.3.3Critical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 199 PAGES
01 35 26 1.14License Certificates
1.14.1Radiography Operation Planning
Work Sheet
1.14.1Portable Gauge Operations
Planning Worksheet
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
SD-07 Certificates
1.6.4.1 GCertificate Of Readiness
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GSIOR Letter of Acceptance
3.1.1 GProject Manual
3.1.1 GProject Manual
3.1.1Written NDT Practices
3.1.3Written NDT Practices
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 199 PAGES
01 45 35 2.1Steel Truss Plant Quality
Assurance Program
2.1AC472 Accreditation
2.1Steel Joist Institute Membership
2.1Certified Plant
2.1Certificate of Compliance
1.5.12 GSpecial Inspector of Record
1.5 GSpecial Inspector
3.1.1Qualification Records
3.1.3Qualification Records
SD-11 Closeout Submittals
3.1.1 GInterim Report
3.1.3 GInterim Report
3.1.1 GComprehensive Final Report
3.1.3 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3Construction Site Plan
3.3.1Traffic Control Plan
2.2.1Haul Road Plan
1.6.1.4Contractor Computer
Cybersecurity Compliance
Statements
1.6.6Contractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 199 PAGES
01 50 00 3.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
3.8.1 GContractor Hazardous Material
Inventory Log
1.5.2Storage Material Inventory
1.6.1Preconstruction Survey
1.6.2 GRegulatory Notifications
1.6.4 GEnvironmental Manager
Qualifications
1.6.5 GEmployee Training Records
1.7 GEnvironmental Protection Plan
3.2.1.1 GDewatering Plan
1.7.9.2 GDirt and Dust Control Plan
1.10 GSolid Waste Management Permit
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2 GStormwater Notice of Intent
3.15.2 GSpill Prevention Control And
Countermeasure (SPCC) Plan
1.6.6 GLaboratory
Certifications/Accreditations
3.2.2.3 GImported Fill Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 199 PAGES
01 57 19 3.7.1 GWaste Management and
Sampling Plan
SD-06 Test Reports
1.10.1 GMonthly Solid Waste Disposal
Report
3.2.1.3Inspection Reports
3.7.2.1.2 GLaboratory Analysis
SD-07 Certificates
1.4.1.1 GECATTS Certificate Of
Completion
1.6.5 GEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.8.1 GContractor Hazardous Material
Inventory Log
3.2.2.4 GImported Fill Summary Report
1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.2.1.5 GAs-Built Topographic Survey
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 199 PAGES
01 57 19 3.7.2 GWaste Determination
Documentation
3.7.3.1 GProject Solid Waste Disposal
Documentation Report
3.7.3.1 GSales Documentation
3.7.4.1 GHazardous Waste/Debris
Management
3.7.4.5 GDisposal Documentation for
Hazardous and Regulated Waste
01 58 00 SD-02 Shop Drawings
1.4.1 GPreliminary Drawing Indicating
Layout And Text Content
SD-04 Samples
1.3.1 GFacility Recognition Plaque
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.4.1Warranty Management Plan
1.4.4Warranty Tags
1.3Spare Parts Data
SD-08 Manufacturer’s Instructions
1.4.1Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 199 PAGES
01 78 00 SD-10 Operation and Maintenance
Data
3.2Operation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1As-Built Drawings
1.4.1As-Built Record of Equipment and Materials
2.1Certification of EPA Designated
Items
2.2Certification Of USDA Designated
Items
01 78 23 SD-10 Operation and Maintenance
Data
1.4Facility Data Workbook
3.1.1Training Plan
3.1.3Training Outline
3.1.2Training Content
3.2.1Operation And Maintenance
Manual, Progress Submittal
3.2.2Operation And Maintenance
Manual, Prefinal Submittal
3.2.3Operation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4Training Video Recording
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 199 PAGES
01 78 23 3.1.6Validation of Training Completion
3.1.1Training Plan
1.6.2.1Record Drawings
01 78 24.00 20 SD-11 Closeout Submittals
1.3.1Facility Data Workbook (FDW), Progress Submittal
1.3.2Facility Data Workbook (FDW), Prefinal Submittal
1.3.3Facility Data Workbook (FDW), Final Submittal
01 78 30.00 22 SD-11 Closeout Submittals
1.3.7GIS Data Deliverables
01 91 00.15 SD-06 Test Reports
3.6Completed Construction
Observation Checklists
3.1Design Review Report
3.5Interim Construction Phase
Commissioning Plan
3.5 SFinal Construction Phase
Commissioning Plan
1.12Issues Log
SD-07 Certificates
1.9Commissioning Firm
SD-11 Closeout Submittals
3.9Final Commissioning Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 199 PAGES
01 91 00.15 3.10Updated Final Commissioning
Report
3.9 SFinal Commissioning Report
(eNotebook)
3.10 SUpdated Final Commissioning
Report (eNotebook)
01 91 19 SD-01 Preconstruction Submittals
1.10.2.1Building Enclosure
Commissioning Specialist
Qualifications
1.7Building Enclosure Testing Work
Plan
SD-03 Product Data
2.3Thermal Imaging Camera
2.1Test Equipment
SD-05 Design Data
3.8.2Envelope Surface Area
Calculations
SD-06 Test Reports
3.7Completed Building Envelope
Inspection Checklists
3.8.5Pressure Test Procedures
1.10.3Air Leakage Test Report
3.8.5.8Air Leakage Test Report
1.10.3Diagnostic Test Report
3.8.6.6Diagnostic Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 199 PAGES
01 91 19 SD-07 Certificates
1.10.2.2Pressure Test Agency
1.10.2.3Thermographer Qualifications
1.12Certificate of Readiness
SD-10 Operation and Maintenance
Data
3.9Training
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.11Existing Conditions
SD-07 Certificates
1.7 GNotification
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Program
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.9Maturity Method Data
1.6.10Thermal Monintoring Control Plan for Mass Concrete
SD-02 Shop Drawings
1.6.2.1Formwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 199 PAGES
03 30 00 1.6.2.2 GReinforcing Steel
SD-03 Product Data
1.8.2 SPilot Program Details and
Requirements
1.8.2 SEmbodied Carbon Footprint
Submittals
2.4.5 SJoint Sealants
2.4.4 SJoint Filler
2.1Formwork Materials
2.3.1 SCementitious Materials
2.3.1.1 SCementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6 SReinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.6Reinforcing Fibers
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
1.8.1 SLocal/Regional Materials
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
1.6.3.4Finishing Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 199 PAGES
03 30 00 2.4.2Nonshrink Grout
1.8.2 GEnvironmental Product
Declarations (EPDs)
SD-04 Samples
1.6.5.1Slab Finish Sample
1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
1.6.4.4 GFiber-Reinforced Concrete
3.10.2.1Tolerance Report
3.14.3.3 GCompressive Strength Tests
3.14.3.5Unit Weight of Structural
Concrete
3.14.3.6Chloride Ion Concentration
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 199 PAGES
03 30 00 1.9Welder Qualifications
1.6.3.3Silica Fume Manufacturer's
Representative
1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.6Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5 SJoint Sealants
2.4.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.6Accessories
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 199 PAGES
03 42 13.00 10 2.1.2 GDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
SD-11 Closeout Submittals
2.2.1 SRecycled content for fly ash and
pozzolan
2.2.1 SRecycled content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled content for Silica Fume
2.2.1 SRecycled content for Synthetic
Fiber Reinforcement
2.2.1 SRecycled content for steel
03 45 00 SD-01 Preconstruction Submittals
1.11.5Pre-Installation Meeting
SD-02 Shop Drawings
1.11.1 GPrecast Drawings
SD-03 Product Data
2.2.2 SPilot Program Details and
Requirements
2.2.2 SEmbodied Carbon Footprint
Submittals
2.3 GCast-In Embedded Items And
Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 199 PAGES
03 45 00 2.3.2 GConnection Devices
2.2.7Admixtures
2.5Gasket
2.6.1Thin Brick Veneer
2.7Bearing Pads
2.2.2 SEnvironmental Product
Declaration (EPD) for each
Cement type and concrete mix
SD-04 Samples
1.11.2 GConcrete Wall Panel Surface
Finish
1.11.4Mock-up
2.6.1Brick Color Chips
2.6.1Form Liner
1.11.2Full Size Sample Wall Panel
SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
1.5.5 GThermal Calculations
SD-06 Test Reports
1.10.2 GStrength Tests
1.10.2Slump
1.10.2Air Content
1.10.1Test for Concrete Materials
2.2.8Water
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 199 PAGES
03 45 00 3.7.4Testing Precast Units for Strength
SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
3.10 GConstruction Records
SD-08 Manufacturer’s Instructions
3.4 GInstallation
3.9 GCleaning
2.6.1Thin Brick
SD-11 Closeout Submittals
1.11.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
2.2.2 SEmbodied Carbon Footprint
Submittals
04 20 00 SD-02 Shop Drawings
3.3.5.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 199 PAGES
04 20 00 2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
3.5.1 GInsulation
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.4 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.6 GClay Masonry Expansion-Joint
Materials
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
2.2.3.3Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Prism Tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 199 PAGES
04 20 00 1.3.2Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.3.2.2 SRecycled Content
05 05 20 SD-01 Preconstruction Submittals
1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 199 PAGES
05 05 20 2.1.1.5 GMechanical and Adhesive
Anchors in Masonry
3.1.3 GNon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Material Safety
Data Sheets
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 199 PAGES
05 05 23.16 3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 GFabrication Drawings
SD-03 Product Data
1.4.4 SPilot Program Details and
Requirements
1.4.4 SEmbodied Carbon Footprint
Submittals
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 199 PAGES
05 12 00 2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
1.4.4 SEnvironmental Product
Declaration (EPD) for each type of structural steel
SD-05 Design Data
1.4.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 199 PAGES
05 12 00 1.3AISC Structural Steel Fabricator
Quality Certification
1.3AISC Structural Steel Erector
Quality Certification
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
1.3.4Welder Qualification
SD-02 Shop Drawings
1.3.3 GSteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports
3.3Erection Inspection
3.3Welding Inspections
SD-07 Certificates
1.3.4Certification of Compliance
05 30 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 199 PAGES
05 30 00 1.3.5 GFabrication Drawings
SD-03 Product Data
2.2 GAccessories
2.1 GDeck Units
2.1.4Galvanizing Repair Paint
2.2.16 GMechanical Fasteners
2.1.4Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.1.1Metal Roof Deck Units
2.2.4Flexible Closure Strips
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.2.11 GStud Manufacture's Certification
2.2.11 GStud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 199 PAGES
05 40 00 1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
05 50 13 SD-02 Shop Drawings
2.6 GFloor Gratings
2.7 GBollards/Pipe Guards
2.9 GAngles and Plates
2.2.9 GIntermediate Diaphragms For
Bridge
2.11Countertop Brackets
SD-03 Product Data
2.4 GCover Plates and Frames
2.5 GMetal Angle Trim
2.6 GFloor Gratings
2.8 GDownspout Terminations
2.1 SRecycled Content
SD-07 Certificates
2.1 GCertificates of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 199 PAGES
05 50 13 2.2 GCertified Mill
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
1.4.1 GFabrication Drawings
SD-03 Product Data
2.2.1 GConcrete Inserts
2.2.4 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
SD-05 Design Data
1.4.2 GDesign Calculations
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.2.4 GProtective Coating
05 51 33 SD-02 Shop Drawings
2.3Ladders
2.3.3Ship's Ladder
SD-03 Product Data
2.3Ladders
2.3.3Ship's Ladder
2.3.2Ladder Safety Devices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 199 PAGES
05 51 33 SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
1.5.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.7 GConcrete Inserts
2.1.2 GProtective Coating
2.2.9 GSteel Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-05 Design Data
1.5.2 GDesign Calculations For Steel
Connections
SD-06 Test Reports
1.4.1 GWelding Inspections
2.3 GMill Test Reports
SD-07 Certificates
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 199 PAGES
05 52 00 3.2Installation Instructions
05 52 16 SD-02 Shop Drawings
1.5.1 GFabrication Drawings
1.5.1 GFabrication Drawings
1.2.1 GIron And Steel Hardware
1.2.1 GSteel Shapes, Plates, Bars And
Strips
SD-03 Product Data
2.3 GProtective Coating
2.3 GProtective Coating
1.2.1 GSteel Railings And Handrails
1.2.1 GAluminum Railings And Handrails
1.2.1 GAnchorage And Fastening
Systems
SD-05 Design Data
1.5.2 GDesign Calculations
SD-06 Test Reports
1.4.1 GWelding Inspections
2.8 GMill Test Reports
2.8 GMill Test Reports
SD-07 Certificates
1.4.2 GWelder Qualification
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 199 PAGES
06 10 00 1.9.1 GFabricated Structural Members
2.2.1 GNailing Strips
SD-03 Product Data
2.1.2Plastic Lumber
1.9.1Fabricated Structural Members
1.8Fire-retardant Treatment
1.4.3Structural-use and OSB Panels
2.3Oriented Strand Board
1.7Preservative Treatment
2.4.2Adhesives
SD-05 Design Data
1.9.2 GModifications of Structural
Members
SD-06 Test Reports
1.4.4Preservative-treated
SD-07 Certificates
1.11.1Certificates of Grade
2.1.1 SCertified Sustainably Harvested
Virgin Lumber
2.2.1 SCertified Sustainably Harvested
Framing Lumber
2.4.2 SIndoor Air Quality for Aerosol
Adhesives
2.4.2 SIndoor Air Quality for Non-aerosol
Adhesives
06 17 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 199 PAGES
06 17 19 3.2 GInstaller Qualifications
SD-03 Product Data
1.3.4 SPilot Program Embodied Carbon
Footprint Submittals for each
CROSS-LAMINATED TIMBER
product
2.2.2.1 SStress Grade and Structural
Properties
2.2.5 GTimber Hardware
2.2.3 GWood Sealer
1.3.4 SEmbodied Carbon Footprint
Submittals
SD-04 Samples
1.3.3 GExposed-To-View Surfaces
SD-05 Design Data
2.1.1 GInstallation Drawings
SD-07 Certificates
1.3.1 GAITC Quality Mark or APA-EWS
Trademark
1.3.2 GCross-Laminated Timber Panels
2.1.2 GConformance Certification
SD-08 Manufacturer’s Instructions
1.4 GErection Procedures
1.4 GHandling
1.4.1 GMoisture Management Plan
1.4.1 GMoisture Management Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 199 PAGES
06 20 00 SD-02 Shop Drawings
1.3 G AEDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.1 G AEWood Products
1.4 G AETreated Wood Products
2.5 G AEHardware and Accessories
SD-04 Samples
1.5 G AESamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
2.1.4 SCertified Sustainably Harvested
Hardwood Plywood
2.1.4 SIndoor Air Quality for Hardwood
Plywood
2.6.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.6.1.2 SIndoor Air Quality for Aerosol
Adhesives
06 41 16.00 10 SD-02 Shop Drawings
1.5.2Shop Drawings
2.9Shop Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1Wood Materials
2.9.8.3Finish Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 199 PAGES
06 41 16.00 10 1.5.3 G AECertification
SD-04 Samples
2.3Plastic Laminates
2.5 GCabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 G AEDetail Fabrication Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1.1 G AESolid Polymer
2.2.2 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 G AEMaterial
2.3.6Counter Tops
SD-06 Test Reports
2.1.1Test Report Results
SD-07 Certificates
1.4.1Qualifications
2.1.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
2.1.1Solid Polymer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 199 PAGES
07 13 53 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GElastomeric Waterproofing Sheet
Material
2.6 GProtection Board
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
SD-06 Test Reports
2.2 GElastomeric Waterproofing Sheet
Material
3.6 GField Quality Control
3.7 GProtective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
1.4 GProtective Coverings
1.8 GSpecial Warranties
1.8 GSpecial Warranties
2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
SD-08 Manufacturer’s Instructions
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 199 PAGES
07 13 53 2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
07 16 19 SD-04 Samples
1.4Metallic Waterproofing
SD-06 Test Reports
1.3Iron Content
1.3Oxidizing Agent Content
SD-08 Manufacturer’s Instructions
3.3Mixing
07 21 13 SD-02 Shop Drawings
1.3 GManufacturer's Standard Details
SD-03 Product Data
1.4 GEnvironmental Data for Materials
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.3 GPressure Sensitive Tape
2.4 GProtection Board or Coating
2.5 GAccessories
2.1.5 SRecycled Content for Block or
Board Insulation
SD-07 Certificates
2.1.6 SIndoor Air Quality For Block Or
Board Insulation
SD-08 Manufacturer’s Instructions
3.3.1Insulation Installation and
Handling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 199 PAGES
07 21 13 2.5.1Adhesive
SD-11 Closeout Submittals
1.7.1 GDraft Guarantee
1.7.1 GFinal Guarantee
1.7.2 GDraft Warranty
1.7.2 GFinal Warranty
07 21 16 SD-03 Product Data
2.1 GBlanket Insulation
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SEnergy Star Label for Insulation
Materials
2.3Accessories
1.3.1 SEnvironmental Product
Declarations for each Insulation product
1.3.1 SEnvironmental Product
Declaration (EPD) for each mineral fiber blanket product
SD-07 Certificates
2.1.4 SIndoor Air Quality for Insulation
Materials
2.3.1 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.3.1Insulation
07 22 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 199 PAGES
07 22 00 1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
2.4 GFasteners
1.10.1 GAsphalt
2.1.2 SRecycled Content For Insulation
SD-05 Design Data
1.7 GWind Resistance
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
2.1.3 SIndoor Air Quality For Insulation
2.1.4 SAcceptable Foam Blowing Agents
SD-08 Manufacturer’s Instructions
2.4 GFasteners
2.1 GInsulation
07 27 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 199 PAGES
07 27 10 SD-04 Samples
3.1.2 GMock-Up
2.1 GMaterial Samples For Air Barrier
System
SD-05 Design Data
1.8 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4.1 GSelf-adhering Air Barrier Shop
Drawings
SD-03 Product Data
2.1 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GSelf-adhering Air Barrier System
Mockup
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 199 PAGES
07 27 19.01 1.7.3 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
3.4.1 GSite Inspections and Testing
SD-08 Manufacturer’s Instructions
1.4.2 GSelf-adhering Air Barrier
Manufacturer's Printed Instructions
2.2 GPrimers, Adhesives, and Mastics
07 27 26 SD-01 Preconstruction Submittals
1.9.1 GQualifications of Manufacturer
1.9.2 GQualifications of Installer
SD-02 Shop Drawings
1.4.1 GFluid-Applied Membrane Air
Barrier Shop Drawings
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.4 GField Peel Adhesion Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 199 PAGES
07 27 26 1.4.4 GFlame Propagation of Wall
Assemblies
3.4.1 GSite Inspections
SD-08 Manufacturer’s Instructions
1.4.2 GFluid-Applied Membrane Air
Barrier Manufacturer's Printed
Instructions
1.4.2 GPrimers, Adhesives, and Mastics
Printed Manufacturer's Instructions
07 42 13 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.5.4.1 GQualification of Welders
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.1 SRecycled Content;
2.2.1 GWall Panels
2.2.2Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.3.1Galvanizing Repair Paint
1.5.3.1Enamel Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 199 PAGES
07 42 13 1.5.5Accessories
2.5Accessories
1.5.3.1.2 SEnvironmental Product
Declaration (EPD) for each metal panel
SD-04 Samples
2.2.1 GWall Panels
1.5.3.1 GFasteners
2.5.3 GMetal Closure Strips
2.2.2.5 GColor chart
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
3.7.2 GLeakage Tests
1.3.2 GWind Load Tests
2.2.2.6 GCoating
2.2.2.6 GChalking
1.3.2 GSeismic Tests
SD-07 Certificates
1.5.3.1 GCoil Stock
1.5.3.1 GFasteners
1.5.3.1 GGalvanizing Repair Paint
1.5.3.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 199 PAGES
07 42 13 SD-09 Manufacturer’s Field
Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
1.8.120 year 'No Dollar Limit' warranty for labor and material
07 42 43 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.5.4.1 GQualification of Welders
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.1Recycled Content;
1.5.1 GWall Panels
1.5.1 GWall Panels
2.2.3Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.3.1Galvanizing Repair Paint
1.5.3.1Enamel Repair Paint
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .