About this file

This is Amendment 0004 to Solicitation N4008526R0002 issued by NAVFACSYSCOM Mid-Atlantic for a Design-Build project (P993/995) at the F35 Sustainment Center & Composite Repair Facility, Marine Corps Air Station Cherry Point, North Carolina.

The proposal due date has been extended from 28 April 2026 to 20 May 2026, no later than 2:00 PM EDT. The amendment incorporates revised drawings for P995 addressing modifications to the Large Autoclave knockout panel opening size, restroom plans and elevations, wall type details, room finish schedules, and mechanical details. Revised specifications have been provided for roofing systems (including a 5-year weathertightness warranty for winds up to 139 mph), roller window shades, plumbing materials (vacuum piping systems must be 304 stainless steel per ASTM A269/A269M or A312/A312M standards), chilled-hot water piping (above-ground 4-inch and smaller piping must be Type L copper), a new cybersecurity control system section, monorail hoists (revised nominal length to 419 feet), and aerospace X-ray testing equipment. Additionally, the amendment provides a Class Justification & Approval (CJ&A) ML-25-03 FRCS Cherry Point for Johnson Controls and includes additional Pre-Proposal Inquiry responses organized under Section 00 73 00 Supplementary Conditions. All previously specified terms and conditions remain unchanged and in full force and effect except as modified herein.

View the file

Other files

File Type Posted
AMENDMENT 0012.pdf PDF
AMENDMENT 0011 Attachment F - Price Proposal Form Revised.docx DOCX document
Amendment 0010 P-993 Updated Dwgs Specs Geotech Report.pdf PDF
AMENDMENT 0010.pdf PDF
Amendment 0010 PPI Responses.pdf PDF
Amendment 0010 Wage Determination NC20260018 05 18 26.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0006 1786799dwg05of28Volume1Part-5.pdf PDF
Amendment 0006 1786799dwg01of28Volume1Part-1r1.pdf PDF
Amendment 0006 Landscape.pdf PDF
Amendment 0006 Specs P993 Addendum No. 1_Div 01.pdf PDF
Amendment 0006 P993 Submittal Register.pdf PDF
Amendment 0006 1786799dwg09of28Volume1Part-9.pdf PDF
Amendment 0006 1786799dwg04of28Volume1Part-4.pdf PDF
Amendment 0006 1786799dwg02of28Volume1Part-2.pdf PDF
Amendment 0006 1786799dwg11of28Volume2Part-2.pdf PDF
Amendment 0006 1786799dwg08of28Volume1Part-8.pdf PDF
Amendment 0004 - P995 1786799dwg01of01.pdf PDF
Amendment 0004 - P995 Spec 25 10 10.pdf PDF
Amendment 0004 PPI Responses.pdf PDF
Amendment 0004 - CJA ML-25-03 Class FRCS Cherry Point.pdf PDF
Amendment 0004 - P995 Spec 12 24 13.pdf PDF
Amendment 0003 - A-407 REV1.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 - 08 33 23.pdf PDF
Amendment 0003 Pre-Proposal Inquiries.pdf PDF
Amendment 0003 - 08 71 00.pdf PDF
Amendment 0003 - A-116 REV1.pdf PDF
Amendment 0003 - 08 11 16.pdf PDF
Amendment 0003 - 45 52 00.pdf PDF
AMENDMENT 0002 Pre-Proposal Inquiries.pdf PDF
AMENDMENT 0002 Attachment F - Price Proposal Form Revised.docx DOCX document
AMENDMENT 0002.pdf PDF
Amendment 0001 Attachment F - Price Proposal Form Revised.docx DOCX document
Amendment 0001.pdf PDF
P995 1692230 Drawings Volume 3 of 4.pdf PDF
P995 1692230 Drawings Volume 1 of 4.pdf PDF
P995 1692230 SpecsAsOne - DIV ONE DELETED.pdf PDF
P995 1692230 Drawings Volume 2 of 4.pdf PDF
P995 1692230 Drawings Volume 4 of 4.pdf PDF
N4008526R0002.pdf PDF
Attachment A - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment F - Price Proposal Form.docx DOCX document
Attachment E - SBSP.docx DOCX document
Attachment D - SBPCD.docx DOCX document
Attachment C - Historical Small Business Utilization.docx DOCX document
Attachment G - DOD-CUI_Non-Disclosure Agreement.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On:

22 Apr 2026, 21:10 PM Greenwich Mean Time

1.

2.

3.

4.

5.

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 28 Apr 2026 20 May 2026

Section 00 30 00 - Available Information

Miscellaneous text in this section has been added to:

The purpose of this amendment is to incorporate the following:

Extend proposal due date to 20 May 2026 NLT 2:00 PM EDT Provide Class Justification & Approval (CJ&A) ML-25-03 FRCS Cherry Point for Johnson Controls Revised Drawings for P995 (attached separately) Revised Specifications for P995 (attached separately) Additional Pre-Proposal Inquiry (PPI) responses (attached separately)

Proposal due date has been extended from 28 April 2026 to 20 May 2026 NLT 2:00 P.M. EDT.1.

Provide Class Justification & Approval (CJ&A) ML-25-03 FRCS Cherry Point for Johnson Controls2.

(ATTACHED SEPARATELY)

REVISED DRAWINGS FOR P995:3.

(ATTACHED SEPARATELY)

(P995) DWG A-104 - FLOOR PLAN - AREA C

Revised opening size for the 'Knockout Panel' for the Large Autoclave

(P995) DWG A-201 - EXTERIOR ELEVATIONS

Revised opening size for the 'Knockout Panel' for the Large Autoclave

(P995) DWG A-401 - ENLARGED RESTROOM PLANS AND DETAILS

Plan A4/A-401 for clarifications on shower and chase wall type

(P995) DWG A-403 - ENLARGED RESTROOM PLANS AND ELEVATIONS

Clarifications on shower and chase wall type

(P995) DWG A-404 - ENLARGED RESTROOM ELEVATIONS AND SHOWER DETAILS

For revised shower wall detailing

N4008526R00020004

(P995) DWG A-501 - WALL TYPE DETAILS

Revised "WALL TYPE B" and "WALL TYPE C" (revised stud size to deck)

(P995) DWG A-502 - WALL TYPE DETAILS

Revised WALL TYPE D", "WALL TYPE F" and "WALL TYPE G" (revised stud overhead bracing)

Revised "WALL TYPE H", "WALL TYPE J" (revised furring wall anchorage).

(P995) DWG A-503 - WALL TYPE DETAILS

Revised "WALL TYPE L" (revised furring wall anchorage).

(P995) DWG I-601 - SCHEDULES & LEGENDS

Revised ROOM FINISH SCHEDULE

(P995) DWG I-602 - SCHEDULES & LEGENDS

Revised FINISH LEGEND

(P995) DWG M-502 - MECHANICAL DETAILS

Omit Detail A1 (sheet not revised)

4. REVISED P995 SPECIFICATIONS:

(ATTACHED SEPARATELY)

(P995) SECTION 07 61 14.00 20 CP STEEL STANDING SEAM ROOFING

Revise the last sentence of paragraph 1.7 Warranty to read "In addition, provide a 5 year general contractor bonded weathertightness warranty covering labor costs for roofing system damages caused by winds having a velocity of 139 mph or less during the applicable warranty period"

(P995) SECTION 12 24 13 ROLLER WINDOW SHADES

Replace entire section.

Change made to paragraph 2.1.2.1 Chain and Clutch Operating Mechanisms. Paragraph 2.1.3.2 Bead Chains has been added.

(P995) SECTION 22 00 00 PLUMBING, GENERAL PURPOSE

In paragraph 2.1 Materials add the following sentence to the end of the paragraph: "High Pressure and Low Pressure Vacuum piping systems must be 304 stainless steel that meets ASTM A269/A269M or ASTM A312/A312Mstandards."

(P995) SECTION 23 64 26 CHILLED-HOT WATER PIPING SYSTEMS

Add the following to the end of paragraph 2.2.1 Pipe: "Above ground piping 4 inch and smaller must be Type L copper."

(P995) SECTION 25 05 11.01CYBERSECURITY FOR FA/MNS FACILITY-RELATED CONTROL SYSTEM

This a new section to add to the project. Addition to submittal register for this section is located at the end of the PDF.

(P995) SECTION 41 22 23.19 MONORAIL HOISTS

In Paragraph 1.3.1.1 General, revise Nominal length to be 419 feet

(P995) SECTION 45 52 00 AEROSPACE X-RAY TESTING EQUIPMENT

Replace entire section

Revision and additions made to paragraph 3.4 AEROSPACE X-RAY TESTING EQUIPMENT SCHEDULE, XTE-1 Aerospace X-ray Testing Equipment

5. PRE-PROPOSAL INQUIRY RESPONSES:

(ATTACHED SEPARATELY)

Section 00 73 00 - Supplementary Conditions

The following attachments were added:

Amendment 0004 Pre-Proposal Inquiry Responses

IDCode: J
Page: 1
Pages: 4
AmendNo: 0004
EffDate: 22 Apr 2026
ReqNo: See Continuation Sheet
ProjNo: P993/995
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

Brittany Cristelli, Email: brittany.n.cristelli.civ@us.navy.mil Telephone: 757-341-1978 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008526R0002
SolDate: 06 Mar 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: N4008526R0002; DESIGN-BID-BUILD, P993/995 F35 SUSTAINMENT CENTER & COMPOSITE REPAIR FACILITY, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA

The proposal due date has been extended to 20 May 2026 NLT 2:00 P.M. EDT.