This is Amendment 0007 to solicitation N4008526R0002 for design-build services at Marine Corps Air Station Cherry Point, North Carolina. The amendment extends the proposal due date from 20 May 2026 to 27 May 2026 at 2:00 P.M. EDT. The project, designated P993/995, concerns a Sustainment Center and Composite Repair Facility at the North Carolina installation.
The amendment provides minor revisions to the evaluation factors for award for Segment II (construction services). Segment II evaluation requires assessment of price for construction services and two non-price factors: Management Approach & Schedule (Factor 5) and Small Business Utilization (Factor 6). These technical factors are of equal importance to each other and are collectively weighted as approximately equal to the price for construction services. Segment I factors—which evaluated Corporate Experience, Pre-Construction Services Approach, Safety, Past Performance, and Price for Pre-Construction Services—are excluded from the Segment II tradeoff decision. The amendment emphasizes that no additional PPIs (Program Price Increases or similar documents) will be accepted beyond this point. The issuing activity is NAVFACSYSCOM MID-ATLANTIC located in Norfolk, Virginia, with contract administration details provided for communication purposes.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date 20 May 2026 27 May 2026
Section 00 22 00 - Supplementary Instructions
Miscellaneous text in this section has been added to:
The purpose of this amendment is to incorporate the following:
1. Extend proposal due date to 27 May 2026 NLT 2:00 P.M. EDT
2. Provide minor revisions to EVALUATION FACTORS FOR AWARD (see below)
***PLEASE NOTE: NO ADDITIONAL PPI'S WILL BE ACCEPTED***
1. Proposal due date has been extended from 20 May 2026 to 27 May 2026 NLT 2:00 P.M. EDT.
2. PROVIDE MINOR REVISIONS TO EVALUATION FACTORS FOR AWARD
( )revisions are in red
3. EVALUATION FACTORS FOR AWARD
The solicitation requires the evaluation of price and the following non-price factors:for Segment II for construction services
Segment II:
Factor 5 - Management Approach & Schedule
Factor 6 - Small Business Utilization
For Segment I, offerors were selected based on their Corporate Experience, Pre-Construction Services Approach, Safety, Past Performance, and Price for Pre-Construction Services.
For Segment II and determining the best value for award of the construction services, Segment I factors are excluded from the tradeoff The relative order of importance of the non-price evaluation factors is the technical factors of equal . decision (Factors 5 and 6) are importance to each other. When the proposal, for Segment II, is evaluated as a whole, the technical (i.e., the non-price evaluation factors) are approximately equal to .the price for construction services
(End of Summary of Changes)
N4008526R00020007
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0007 |
| EffDate: 14 May 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: P993/995 |
| IssCode: N40085 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM MID-ATLANTIC |
9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395
NORFOLK, VA 23511-0395
UNITED STATES
Brittany Cristelli, Email: brittany.n.cristelli.civ@us.navy.mil Telephone: 757-341-1978 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N4008526R0002 |
| SolDate: 06 Mar 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section 00 70 00 - Conditions of the Contract |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: N4008526R0002; DESIGN-BID-BUILD, P993/995 F35 SUSTAINMENT CENTER & COMPOSITE REPAIR FACILITY, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA |
The proposal due date has been extended to 27 May 2026 NLT 2:00 P.M. EDT.
**PLEASE NOTE: NO ADDITIONAL PPI'S WILL BE ACCEPTED**
| ContNameTitle: |
| CoNameTitle: BRITTANY N. CRISTELLI |
| ContDate: |
| CODate: 14 May 2026 |