Amendment 0006 1786799dwg06of28Volume1Part-6.pdf

PDF 42 MB Posted

Attached to
P993/995, F-35 Aircraft Sustainment Center and Composite Repair Facility located at the Marine Corps Air Station (MCAS) Cherry Point, NC
Solicitation number
N4008526R0002
Issued by

About this file

This file comprises technical design drawings for erosion and sediment control (ESC) plans and grading/drainage improvements for the P993/F-35 Sustainment Center and Composite Repair Facility project at MCAS Cherry Point, North Carolina. The document includes detailed engineering drawings across three construction phases covering site preparation, erosion control measures, stormwater management, and final stabilization across approximately 419 pages. The plans incorporate multiple erosion and sediment control features including sediment basins with skimmer configurations, sediment fences, temporary seeding, rock check dams, turbidity curtains, inlet protection devices, and temporary diversion ditches designed to meet North Carolina Department of Environmental Quality (NC DEQ) standards and Army Corps of Engineers (ACOE) requirements for wetland protection.

The grading and drainage component addresses stormwater conveyance through PVC storm drain piping, reinforced concrete pipe (RCP) culverts, concrete catch basins, drop inlets, storm drain manholes, and junction boxes. Site improvements include trapezoidal channels, riprap outlets, and control structures to manage runoff from developed areas including parking lots, taxiways, aircraft aprons, and associated infrastructure. The plans reference geotechnical recommendations, identify wetland assessment limits subject to MCAS Cherry Point and ACOE approval, and incorporate airfield-specific design considerations including traffic-rated storm cleanouts and coordination with taxiway and apron construction. All construction details reference standard specifications and NCDOT standard drawings for stormwater infrastructure, with sequencing notes indicating phased removal of temporary erosion control measures as permanent grading and stabilization are completed.

View the file

Other files

File Type Posted
AMENDMENT 0012.pdf PDF
AMENDMENT 0012 Attachment F - Price Proposal Form Revised.docx DOCX document
AMENDMENT 0011 Attachment F - Price Proposal Form Revised.docx DOCX document
AMENDMENT 0011.pdf PDF
Amendment 0010 Wage Determination NC20260018 05 18 26.pdf PDF
AMENDMENT 0010.pdf PDF
Amendment 0010 PPI Responses.pdf PDF
Amendment 0010 P-993 Updated Dwgs Specs Geotech Report.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0009 PPI Responses.pdf PDF
Amendment 0008 PPI Responses.pdf PDF
AMENDMENT 0008.pdf PDF
AMENDMENT 0007.pdf PDF
Amendment 0006 1786799dwg10of28Volume2Part-1r1.pdf PDF
Amendment 0006 Landscape.pdf PDF
Amendment 0006 PPI Responses.pdf PDF
Amendment 0006 Specs P993 Addendum No. 1_Div 01.pdf PDF
Amendment 0006 P993 Submittal Register.pdf PDF
Amendment 0006 1786799dwg11of28Volume2Part-2.pdf PDF
Amendment 0006 1786799dwg08of28Volume1Part-8.pdf PDF
Amendment 0006 1786799dwg04of28Volume1Part-4.pdf PDF
Amendment 0006 1786799dwg02of28Volume1Part-2.pdf PDF
Amendment 0006 1786799dwg05of28Volume1Part-5.pdf PDF
Amendment 0006 1786799dwg09of28Volume1Part-9.pdf PDF
Amendment 0006 1786799dwg01of28Volume1Part-1r1.pdf PDF
Amendment 0006 1786799dwg07of28Volume1Part-7.pdf PDF
Amendment 0006 1786799dwg03of28Volume1Part-3.pdf PDF
AMENDMENT 0006.pdf PDF
Amendment 0005 PPI Responses.pdf PDF
AMENDMENT 0005.pdf PDF
Amendment 0004 - P995 1786799dwg01of01.pdf PDF
Amendment 0004 PPI Responses.pdf PDF
Amendment 0004 - CJA ML-25-03 Class FRCS Cherry Point.pdf PDF
Amendment 0004 - P995 Spec 25 10 10.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0004 - P995 Spec 12 24 13.pdf PDF
Amendment 0004 - P995 Spec 45 52 00.pdf PDF
Amendment 0003 - 08 33 23.pdf PDF
Amendment 0003 - 08 71 00.pdf PDF
AMENDMENT 0003.pdf PDF
Amendment 0003 - A-116 REV1.pdf PDF
Amendment 0003 Pre-Proposal Inquiries.pdf PDF
Amendment 0003 - A-407 REV1.pdf PDF
Amendment 0003 - 08 11 16.pdf PDF
Amendment 0003 - 45 52 00.pdf PDF
AMENDMENT 0002 Pre-Proposal Inquiries.pdf PDF
AMENDMENT 0002.pdf PDF
AMENDMENT 0002 Attachment F - Price Proposal Form Revised.docx DOCX document
Amendment 0001.pdf PDF
Amendment 0001 Attachment F - Price Proposal Form Revised.docx DOCX document
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20 20

21 21

S

S

SAN

SAN

ASPHALT

SURFACE

SD

SD

SD

SD

24"C&G

24"C&G

24"C&G

24"C&G

"C

&G

"C

&G

E O I

E O

I

E O I

E O

I

EOI

E O

I

E O

I

S

24"C&G

SAN SAN

24"C&G

24"C&G

SAN

SAN

SAN

SAN

SAN

SAN

E O

I

E O

I

E O

I

EO

I

E O

I

SAN

SAN

SAN

SAN

SAN

SAN

E O

I

WETLAND LIMITS SHOWN

WERE ASSESSED BY HDR

STAFF ON 13 AUGUST 2024

AND SUBJECT TO REVIEW

AND APPROVAL BY MCAS

CHERRY POINT AND ACOE.

SFSFSFSFSFSFSFSF

SFSFSFSFSFSFSFSFSFSFSF

SF

SFSFSF

SF

SF

SF

SF

SF

SF SF SF SF SF SF

LO

D

LO

D

LO

D

LO

D

LOD LOD LOD LOD

LODLODLODLODLOD

LODLODLODLODLODLODLODLOD

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG127A

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

7A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

4p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

CUI

DES DRW CHK

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

MC

AS

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

, N

MCAS CHERRY POINT

1786799

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O R

E

F

IN

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

M

AT

C

H

LI

N E

- A 1/

C G

6A

MATCHLINE - A1/ CG117A

M

AT

C H

LI

N

E

- A

1/ C

G

8A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934715

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG126A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG100A-CG117A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG128A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

EO

I

E O I

6' C

LF

W

/B W

CB

W

SD

SD

SF

SF

SF

SF

SF

SF

SF

SF

SFSFSFSF

SF SF

SF

SF

SF

SF

SF

LOD LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LODLODLOD

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

8A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

5p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

M

AT

C

H

LI

N E

- A 1/

C G

7A

MATCHLINE - A1/ CG118A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG128A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934716

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG127A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG100A-CG118A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

CO

SD

E S

T

CONC. WALK

24"C&G

GATE

7'CLF

W/BW

CONC.

SD

7'CLF W

/BW

POST

POST

GATE

SIGN

POST (4)

GATE

SIGN (TYP.)

SD

SD

FO

SD

E

E

EP

FO

S

T

GUARD HOUSE

LOCKBOX ON METAL POST

CONC. WALK

POST

W/BARRIER

(TYP.)

GUARDRAIL

GUARDRAIL

7'CLF W

/BW

7'CLF W

/BW

CONC.

7'CLF W

/BW

SIGN (TYP.)

GR

AV

EL

GR

AV

EL

GUARD HOUSE

6' C

LF

W

/B W

CPT

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SD

SD

SD

CB

SD

E E

E E

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

COM

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COM

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

C O

M M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

COMM

COMM

COM

M

CO

M

M

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COMM

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

CO

M

M

COM

M

COM

M COMM

CO

M

M

COM

M

CO

M

M

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

E

EOI

EOI

EOI

EOI

EOI

EOI

EOI

E O

I

EOI

EOI

EOIEOI

EOI

EOI

EOI

EOI

EOI

E O I

EOI

ES

ES

ES

ES

ES

ES

ES

EOI

EOI

EOIEOI

EOI

(QL-B)

(Q L-B)

(QL-B)

(Q L-B)

EOI

CUNNING

HAM

BLVD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

2A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

5p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

M

AT

C H

LI

N

E

- A

1/ C

G

3A

MATCHLINE - A1/ CG122A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG132A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934717

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG133A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG100A-CG122A EROSION AND SEDIMENT CONTROL PLAN - PHASE I

ES

CB

CB

W

CONC. S

URFACECONC.

CONC.(TYP.)

CONC.

CONC.

CONC.

6"I

RONPIPE

CONC.

STAIRS

SIGN

SD

SD

SD

SD

6'CLF W/BW

CONC.

WEIR

COL

(TY

P.)

BOL(T

YP.)

E

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

G

W

W

W

W

W

W

W

W

W

C

PUMP

EOI

W W

ES

ES

ES

ES

ES

ES

ES

ES ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

3A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

6p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

M

AT

C

H

LI

N E

- A 1/

C G

2A

MATCHLINE - A1/ CG123A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

M

AT

C H

LI

N

E

- A

1/ C

G

4A

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG133A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934718

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG132A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG100A-CG123A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG134A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

30 30

161617 17

18 19

23 24 26 27 28 29 31 32

131314 14

23 24

20 25

18 19

212121 22 23 24 26

SD

SD

H

SIGN

HH

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

COMM

H

H

EOI

EOI

EOI

EOI

CB

ES

ES

ES

ES

ES

ES

ES

ES

EOI

EOI EOI

EO

I

H

H H

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

RUNWAY 05

R

MARYLO

U R

D

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF SF SF

SF

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD LOD LOD

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

4A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

7p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

MATCHLINE - A1/ CG124A

MATCHLINE - A1/ CG144A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

M

AT

C H

LI

N

E

- C

G

5A

PLAN

NORTH

TR

U

E N

M

AT

C H

LI

N

E

- A

1/ C

G

3A

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG134A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934719

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG100A-CG124A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG144A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG135A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG133A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

212223

181819

CBC

B

SD

SD

METAL I

-B

EAM

W/TW (T

YP.)

7'C

LF

W

/BW

SD

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

MARYLO

U R

D

WETLAND LIMITS SHOWN

WERE ASSESSED BY HDR

STAFF ON 13 AUGUST 2024

AND SUBJECT TO REVIEW

AND APPROVAL BY MCAS

CHERRY POINT AND ACOE.

SF

SF

SF

SF

SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSFSF

SF

SF

SF

SF SF SF SF

SF

SF SF

SF

SF

SF

SF

SF SF

SF

SF

SF

SF

SF SF

SF

SF

SF

SF

SFSFSFSF

SF

SF

SF

SF SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

5A

ER

O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

7p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

MATCHLINE - A1/ CG125A

MATCHLINE - A1/ CG145A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

M

AT

C H

LI

N

E

- A

1/ C

G

4A

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG135A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934720

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG100A-CG125A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG145A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG134A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

H

H

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

SIG

N (2

ES

ES

SD

CB

CB

CB

W

SD

SD

SD

SD

BOL (TYP.)

4'WDF

CONC.

E

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

G

G

G

G

G

G

G

G

G

G

G G

G

G

G

G

G

G

G

G

G

G

W

W

W

W

W

W

W

W

W

W

W

W

W

W

H H

H

H

EOI

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

EOI

EOI

EOI

ES

EO

IEOI

EOI

H

EOI

EO

I

EO

I

H H H

H H

H

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

RUNWAY 05

R

UTLITY SHALL BE INSTALLED

ON DAY WITH NO

PRECIPITATION AND WITH

SAME DAY STABILIZATION

ACROSS DRAINAGE CHANNEL

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

LO

D

LO

D

LO

DLO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

4A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

8p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

MATCHLINE - A1/ CG134A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

M

AT

C H

LI

N

E

- A

1/ C

G

5A

PLAN

NORTH

TR

U

E N

MATCHLINE - A1/CG154A

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG144A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934721

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG134A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG145A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG154A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

21 22 23 24

32 33 34

232323

262626

GATE POST

GATE POST W

/LI

GHT

H

H

SIG

N(2)

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

H

H

EOI

EOI

EOI

SIG

N (2

H

ES

ES

ES

ES

RUNWAY 05

R

MARYLO

U R

D

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

REFER TO AIRFIELD ELECTRICAL

PLAN SHEETS FOR CONTINUATION.

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

5A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :4

9p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

MATCHLINE - A1/ CG135A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

M

AT

C H

LI

N

E

- A

1/ C

G

4A

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG145A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934722

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG135A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG144A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

J

CBCB

CONC.

SD

SD

6'C

LF

W

/BW

SIG

N(TYP.)

1-S

TY.

TRANSFER STATION

ANTENNA SYSTEM

E

CB

CB

CB

CB

CB

D

AC

AC

AC

AC

H

E

FO

T

SD

SD

SD

SD

SD

SD

SD

BOL (

TYP.)

4'BOL FNC(TYP.)

SHEDPAD EYES(TYP.)

SD

SD

METAL

TRAILE

R

FFE=2

3.5

2-S

TY BRIC

K

#1

FFE=1

9.4

SHED

24"C&G

SIG

N(2)

A/C (4

BOL

4"W

ATERLIN

E

E

BOL (

TYP.)

CALL

BOX

GATE

TAYLO

R D

RIVE

FO

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

G

G

G

G

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

COMM

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

H

H

H

H

H

H

E

E

E

FO

FO

T

T

T

W

EOI

EOI

EOIEOI

EOI

W

EOI

SHED

EOI

EOI

EOI

EOI

EOI

EOI

EOI

ES

ES

ES

ES

ES

ES

ES

EOI

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ESGATE

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

4A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :5

0p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

MATCHLINE - A1/ CG144A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

MATCHLINE - A1/ CG164A

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG154A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934723

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG144A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 MULTICORELINK:CUI-1786799-CG126A-CG164A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

ARV

CB

CB

CB

CB

CB

E T

SD

SD

BLD

G 13

"FRC M

ETAL W

AREHOUSE"

CONC.

RAMP

BOL (

TYP.)CONC. S

TEPS

CONC. P

ORCHA/C

4'H

ANDRAIL

CONC.

CONC. RAMP

CONC.

24"C&G

24"C&G

24"C&G

24"C&G CONC.

RAMP

CONC. W

ALL

(TYP)

3'H

ANDRAIL

CONC.

STEPS

A/C

AIRTANK

CONC.

RAMP

A/C

LA

NDSCAPE TIM

BERS(TYP)

CONC. S

TEPS

FFE=2

3.2

FFE=2

3.3

FFE=2

3.2

FFE=2

3.2

FFE=2

3.1

FFE=2

3.2

3'H

ANDRAIL(

TYP)

CONC. W

ALL

AIR VALV

E

TAYLO

R D

RIVEESES

ES

ES

ES

ES

ES

ES

ESES

ES

ES

ES

ES

ES

ES

COMM

COMM

COMM

COMM

COMM

COMM

COMM COMM

COMM

COMM

W

W

W

EOI

EOIW

TAYLO

R D

RIVE

LO

D

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. SEE SHEET C-003 FOR EROSION AND SEDIMENT CONTROL

GENERAL NOTES.

3. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

4. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. TURBIDITY SCREEN

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. TEMPORARY SEDIMENT TRAP, SEE DETAIL C1/C-503

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. CONCRETE WASHOUT

17. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

18. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

6A

.d w g L

AY

O

U T

N

AM

E:

C

G

4A E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :5

0p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

MATCHLINE - A1/ CG154A

WB-67 - Interstate Semi-Trailer

EV EV

VIP VIP VIP VIP VIP

H Y D

HY D

H Y

D

HY

D

H

Y D

H Y D

H YD

H Y D

H Y DHY D

H

Y D

H

Y D

H YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

FIKE DR

CG105ACG106A

CG118ACG117ACG116ACG115ACG114ACG113ACG112A

CG128ACG127ACG126ACG125ACG124ACG122A

CG132A CG135A

CG145A

CG134A

CG144A

CG123A

CG133A

CG154A

CG164A

CG119A

CG107A CG108A CG109A

PLAN

NORTH

TR

U

E N

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

GDH EAA DTB

1" = 40'

CG164A

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934724

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG126A-CG154A EROSION AND SEDIMENT CONTROL PLAN - PHASE 1

H

J

ARV

CB

CB

CBCB

FO

FO

FO

MW

D

T

TRHH

TRHH

CBC

B

CBC

B

CBCB

E

H

H

E

E

FO

MW

ST

CP

TRHH

TRHH

TRHH

CO

TRHH

E S

T

T

FO

E

E

EP

FO

S

T

E

CPT

H

E

CHH

CHHE

FO

D

T

T

TOP OF WATER

ELEV=7.63

04-17-24 @8:25 A.M.

CB

H

S

S

V

S

S

S

S

CB

ASPHALT SURFACE

ASPHALT

SURFACE

S

EEE

G

COCO CO

CO

CO

CO

CO

S

S

TRHH

GG

G

C

H

H

H

HH

M M M

CB

AC ACM

M

RIPRAP

AC

CB

MM

CO

CO

FO

P

FO

G

CPCP

CP

RIPRAP

CB

CB

CB

H

H M

G

CO

CO

CO

ACACAC

M

CB

CB

HH

E

E E E

ARV

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

H

H

H

H

H

H

H

H

E

E

E

E

G

G

T

TRHH

TRHHTRHH

TRHH

TRHH

EOI

EOIM

E O

IEOI

(Q L-

B)

(Q L-

B)

EOI

EOI

EOI

EOI

EOI

(Q L-

B)

(Q L-

B)

(Q L-

B)

(Q L-

B)

EOI

EOI

EOI

EOI

(QL-B)

(QL-B)

EOI

EOI

EOI

EOI

(Q L-B

EOIEOI

(Q L-

B)

(Q L-

B)

(Q L-B)

(Q L-B

(QL-B)

(Q L-B)

(QL-B)

(QL-B)

(Q L-

B)

(QL-B)

(QL-B)

EOI

EOI

EOI

EOI

EOI

EOI

EO

I

EOI

EOI

E O

I

EOI

EOI

EOI

EOI

EOIEOI

EOI

EOI

EOI

EOI

EOI

EO

I

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOIEOI

EOIEOI

ES

ES

EOI

E O I

EOI

EOI

EOI

EOI E

OI

ES

ES

ES

ES

ES

ES

ES

ES

EOI

EOI

GEOI

EOI

EOI

EOI

EOI

EOI

E O I

E O I

E O

I

EOI

EO

I

E O I

EOI

EOI

EOI

EOI

FM FM

ES

ESES

G

G

G G G G G G GCP

H

H

H

FO

FO

FO

G

EOIEOI EOIEOI

EO

I

EOI

EO

I

E O I

EM

EOI

EOI

EOI

EOI

EOI

E O I

EMEM

EO

I

E O

I

EOI

EOIEOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOIEOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EO

I

EOI

EOI

EOI

G

E O I

E O I

EOI

E O

I

EOI

EOI

EOI

EOI

W

CB

CB

W

EOI

E O I

E O I

E O I

.8

.9

.8

.0

.1

.2

.5

.4

.6

.7

.8

.7

.1

.1

.117

.2

.4

.4

.6

.3

.1

.0

.3

.4

.1

.9

.5

.3

.7

.8

.7

.4

.9

.6

.9

.1

CO

CO

W

G

CO

W

W

C

W

W

G

S

DD

D

S

WW

D

FO

G

CO

CO

CO

CO

D

T

MW

W

W

T

T

CPCP

ES

EOI

EOI

EOI

E O

I

E O

I

EOI

EP

CP

E O

I

UNKNOWN UTILITY PAINT

E

EG

W

W

FM

FM

FM

FM

FM

ESES

EOI

EOI

EOI

EOI

EOI

EOI

EOI

EOI

C

E O

I

EOI

EOI

EOI

S

S

W

S

W

C

C

RAINWATER

TANK

UN

KN

OW

N

ST

RU

CT

UR

ES

E

UN

KN

OW

N

ST

RU

CT

UR

ES

UN

KN

OW

N

ST

RU

CT

UR

E

AC

CO

CP

S

S

CO

CO

AC

AC AC AC

AC ACAC

RD

RD

RD

RD

H

ES

EOI

E O

I

E O

I

EO

I

EO

I

EOI

EOI

EOI

E O

I E O

I

E O

I

RD

CB

CB

CB

CB

CB

BM

BM

BM

BM

BM

BM

BM

BM

BMBM

CB

CB

W

CB

CB

CB

CB

CB

CB

CB

CB

CB

CBCB

W

E

E

E

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

D

E

CB

AC

AC

AC

AC

H

E

E

FO

T

T

D

WELL

WELL

BM

CB

CB

G

G

J

CP

FO

G

TRHH

TRHH

CB

CB

TRHH

CB

CB

CB

W

E

E

E

FO

ES

ES

ES

ES

ES

ES

ES

ES

ES

G

G

G

G

G

G

G

G

G

G

G

H

H

H

H

H

H

H H

H

H

E

E

E

FO

FO

GG

G

T

T

T

TRHH

W

EOI

EOI

EOIE

O

I

E O I

E O

I

E O I

EOI

EOI

E O

I

EOI

EOI

W

EOI

EOI

EOI

EOI

EOI

EOI

EOIEOI

EOI

EOI

EOI

EOI

EOI

EO

I

EOI

EOI

EOI

EOI

ES

ES

ES

ES

ES

ESEOI

EOI

EOI

EO

IEOI

EOI

H

EOI

EO

I

EOI

EO

I

EOI EOI

EO

I

H

H H

H H H

H H

H

C

H

EOI

EOI

EOI

EOI

EOI

C

S

S

EOI

EOI

EOI

EOI

FM

SD

SD

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

H Y D

H Y DH Y D

H Y

D

H Y D

H Y D

H

Y D

H Y D

H Y DH Y D

HY D

H Y D

H

Y D

H Y D

H

YD

H

Y D

H

Y D

HYD

HYD

HYD

H

Y D

H

Y

D

H Y D

H Y D

H Y D

H Y D

H Y D

LOD

LOD

LOD

LOD

LOD LOD

LO

D

LO

D

LOD

LO

D

LO

D

LODLODLODLOD

LOD

LO

D

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LO

D

LO

D LO

D

LOD

LOD

LO

D

LOD

LO

D

LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LO

D

LOD

LOD LOD

LOD

LOD

LOD

LOD

LOD

LO

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LO

D

LOD

LOD LOD

LOD LOD

LO

D

LOD

LOD

LOD

LODLOD

LODLOD

LO

D

D C

B

D

CO

D

D

D

D

WET CHECK

WET CHECK

LOW POWER/MBIT

ENGINE TEST AREA

X-###

X#

D

D

D

D

D

DCB

CWS

D

D

SD SD

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB CB

CB

CB

CB

CB

CB

C B

CB

CBCB

CB

D

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

SF

SF

SF

SF

SF SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF SF SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

CBD

SF

SF

SF SF

SF

CB

D

1 2

D

DD DD

D D DDD

CB

CB

C B

C B

D

SF SF

SF

SFSF

SFSF

SF

SFSF

SF

SF SF

SF

SF

SF

SF

SF

SF

SF

SFSFSFSFSF

SF

SF

SF

SF

SF

SF

SF

D

SF

SF

SF

SF

SF

SF

SF

SF

SF

CO

CO

CO CO CO

COCO

CO

CO CO CO

CO

CO

CO

CO

CO

CO

CG105B

CG127BCG126BCG125B

CG135B

CG118B

CG128B

CG134B

CG115BSHEEP RD

CUNNINGHAM BLVD

MARYLOU RD

FONTANA BLVD

FIKE DR

HE

ND

ER

SO

N

AV

E

BLD

G 13

RUNWAY 05

R

CG119B

CG106B

CG145B

CG107B

CG116B CG117B

CG144B

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

3. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003.

4. TIMBER MAT(S) AND TEMPORARY CULVERT CROSSING

SHALL BE INSTALLED EXCLUSIVELY FOR HAUL ROAD USE

DURING EARTHWORK OPERATIONS.

5. REFER TO BRIDGE PLANS FOR ADDITIONAL MEASURES

ASSOCIATED WITH THE CONSTRUCTION OF THE BRIDGE

STRUCTURE.

6. CONTRACTOR SHALL EXERCISE CAUTION TO PREVENT

SEDIMENT FROM ENTERING WETLANDS.

7. GRADING SHOWN FOR P-993 FOOTPRINT TO MEET

SURCHARGE REQUIREMENTS. REFER TO GEOTECHNICAL

REPORT FOR ADDITIONAL INFORMATION.

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 - OVERALL

SCALE: 1" = 300' (22" X 34")

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

1"=300'

0 600 FT.300

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

- O

VE

RA

LL

GDH EAA DTB

1"=300'

CG100B

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

0B

.d w g L

AY

O

U T

N

AM

E:

C

G

0B E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

- O

VE

R

AL

L P

LO

TT

ED

: S at ur da y, D ec em be r 0 6,

- 7

:1 6p m U

SE

R

: E

AR

R O

W O

O D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

GENERAL SHEET NOTES

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934725

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

21 21

SD

FO

SD

P

FO

G

CPCP

INV=20.20 INV=19.98

"C

O

NC

"C

O

NC

FLOW

CONNECTION

NOT FOUND

15"CONC.

INV=20.11

6'METAL FENCE

CONC.

WHEEL STOP

(TYP.)

18"CONC.

SD18"CONC.

FLOW

SD18"CONC.

FLOW

CANOPY

15"CONC.

FLOW

WHEEL STOP

(TYP.)

SIGN(TYP.)

CONC. WALK

HEADWALL

INV=23.64

HEADWALL

INV=23.70

HH

HEADWALL

INV=22.03

HEADWALL

INV=22.85

15"CONC.

SD12"CONC.

FLOW

15"CONC.

FLOW

CO

NC

. W

AL

K

FFE=26.01

DOUBLE DOOR

BOL(TYP.)

CONC.

ARV

E E E E E E E E E E E

E E E E E E E E E E E E E E E E E E E E E E

IN

V=

.6

IN

V=

.6

ARV

E E

FM

FM FM FM FM FM FM FM FM FM FM FM FM FM FM

ES

ES

ES

ES

ES

ES

ES

ES

ES

ES

ESES

ES

ES

ES

ES ES

ES ES ES

ES

ES

ES

ES

ES

ESESESES

ES

ES

ES

ES

ES

ES

ESES

ESES

ES

ES

ES

G G

G G G G G G G G G G G G G G G G G G G G

H

E O I

EOI

EOI

EOI

E O I

E O I

G

G

BOL(2)

BOL(4)

SIGN

SDFLO

W

HEADWALL

INV=21.24

HE

AD

W

AL

L

IN

V=

.4

18"CONC FLOW18"CONC FLOW

HEADWALL

INV=24.25

15"CO

NC

ENDWALL

INV=24.10

FLOW

15"CONC

SDSD SDSDSD

HANDRAIL

CONC. ISLAND

CONC. MEDIAN ISLAND

ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES ES

ESESES

ES

T

CPCP

EOI

EOI

EOI

E O

I

E O

I

EOI

UNKNOWN UTILITY PAINT

BIKE

RACK(2)

BM

FLOW

FL

O

W

FL

O

W

BLDG 4841

FONTANA BLVD

H

EN

D

ER

SO

N

A

VE

H

Y

D

HYD

HYD

H

Y

D

LO

D

LO

D

LO

D

LO

D

LO

D

LOD

LO

D

LO

D

LOD LOD

LOD LOD LOD LOD LOD LOD

SD SD SD SD SD SD

SD SD SD SD SD SD

SD

SD

CB

CB

CB

CB

CB

CB

CB

(TYP.)

SF

SF

SF

SF

SF

SF

SF

SF

SF SF

SF SF SF SF SF SF SF SF

(TYP.)

SFSF

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

3. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003.

4. TIMBER MAT(S) AND TEMPORARY CULVERT CROSSING

SHALL BE INSTALLED EXCLUSIVELY FOR HAUL ROAD USE

DURING EARTHWORK OPERATIONS.

5. REFER TO BRIDGE PLANS FOR ADDITIONAL MEASURES

ASSOCIATED WITH THE CONSTRUCTION OF THE BRIDGE

STRUCTURE.

6. CONTRACTOR SHALL EXERCISE CAUTION TO PREVENT

SEDIMENT FROM ENTERING WETLANDS.

7. GRADING SHOWN FOR P-993 FOOTPRINT TO MEET

SURCHARGE REQUIREMENTS. REFER TO GEOTECHNICAL

REPORT FOR ADDITIONAL INFORMATION.

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. PERMEABLE TYPE II TURBIDITY CURTAIN - SEE NOTES ON

SHEET CG118B

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. CONCRETE WASHOUT

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

17. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

M

AT

C H

L

IN

E

- A

1/ C

G

6B

MATCH LINE - A1/ CG115B

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

WB-67 - Interstate Semi-Trailer

EV EV VI

P

VI

P

VI

P

VI

P

VI

P

H

Y

DH Y D

H

Y D

H

YD

HY D

H YD

HY D

HY D

H YDH Y D

H Y

D

H Y

D

HY D

HY D

HY D

ASPHALT SURFACE

ASPHALT

SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

WOODS 15"SYCAMORE

EOIBOTTOM INV=23.43'

TOP=24.14'

BOTTOM INV=23.26'

TOP=24.17'

TRENCH DRAIN

FULL OF SILT

ASPHALT CONC

FH

FIKE DR

FH

E E

CG105B CG106B

CG118BCG117BCG116BCG115B

CG128BCG127BCG126BCG125B

CG135B

CG145B

CG134B

CG119B

CG107B

CG144B

CG108B

PLAN

NORTH

TR

U

E N

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

- P

AR

KI

NG

LO

T

GDH EAA DTB

1" = 40'

CG105B

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 - PARKING LOT

SCALE: 1" = 40' (22" X 34")

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

0B

.d w g L

AY

O

U T

N

AM

E:

C

G

5B E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :1

6p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934726

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG100B-CG106B EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 MULTICORELINK:CUI-1786799-CG100B-CG115B EROSION AND SEDIMENT CONTROL PLAN - PHASE 2

21 22 23

25 25

21 21

26 26

FM

FM

FM

FM

FM FM

G G G G G G G G G G G G G G G G G G G GFOT

BOL(4)

36"CONC

INV=21.61INV=22.46

FLOW

MW

SIGNMONITORING WELL

ES ES ES ES ES ES ES ES ES ES

FONTANA BLVD

BM

SIGN

G

EOI

EOIE

O

I

E O I

E O

I

FIKE DR

FONTANA BLVD (NOT IN SURVEY)

H

Y

D

HYD

LOD LOD LOD LOD LOD

LO

D

LOD

LOD LOD LOD LOD LOD LOD

LO

D

LOD

LOD

(TYP.)

SD SD

SD SD

SD

SD

SD

SD

SD SD

SD

CB

CB

CB

CB

CB CB >

BLDG P-995

NOT IN CONTRACT

(REFER TO EPROJECTS WORK ORDER #1692230)

(TYP.)

SF SF SF SF SF SF SF SF

SF

SF

SF SF SF SF SF SF SF SF SF

SF

(TYP.)

1 2

NOTE: DIVERSION DITCH MAY BE RELOCATED TO THE SOUTH AS

REQUIRED TO FACILITATE CONSTRUCTION OF P995. MAINTAIN 0.5%

MINIMUM SLOPE FOR RELOCATED DIVERSION DITCH.

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

3. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003.

4. TIMBER MAT(S) AND TEMPORARY CULVERT CROSSING

SHALL BE INSTALLED EXCLUSIVELY FOR HAUL ROAD USE

DURING EARTHWORK OPERATIONS.

5. REFER TO BRIDGE PLANS FOR ADDITIONAL MEASURES

ASSOCIATED WITH THE CONSTRUCTION OF THE BRIDGE

STRUCTURE.

6. CONTRACTOR SHALL EXERCISE CAUTION TO PREVENT

SEDIMENT FROM ENTERING WETLANDS.

7. GRADING SHOWN FOR P-993 FOOTPRINT TO MEET

SURCHARGE REQUIREMENTS. REFER TO GEOTECHNICAL

REPORT FOR ADDITIONAL INFORMATION.

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. PERMEABLE TYPE II TURBIDITY CURTAIN - SEE NOTES ON

SHEET CG118B

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. CONCRETE WASHOUT

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

17. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

MATCH LINE - A1/ CG116B

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

M

AT

C

H L

IN

E

- A 1/

C G

5B

WB-67 - Interstate Semi-Trailer

EV EV VIP VI

P

VI

P

VI

P

VI

P

H

Y

DHY D

H

Y

D

H

YD

H Y D

H Y D

H YD

H Y D

H Y DHY D

H YD

H

Y D

H

YD

H Y D

H YD

ASPHALT SURFACE

ASPHALT

SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

WOODS 15"SYCAMORE

EOIBOTTOM INV=23.43'

TOP=24.14'

BOTTOM INV=23.26'

TOP=24.17'

TRENCH DRAIN

FULL OF SILT

ASPHALT CONC

FH

FIKE DR

FH

E E

CG105B CG106B

CG118BCG117BCG116BCG115B

CG128BCG127BCG126BCG125B

CG135B

CG145B

CG134B

CG119B

CG107B

CG144B

CG108B

PLAN

NORTH

TR

U

E N

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

0B

.d w g L

AY

O

U T

N

AM

E:

C

G

6B E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :1

7p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

SEAL

A/E INFO

OF

EPROJECT NO.:

CU

I

CUI

SATISFACTORY TO DATE

APPROVED

ACTIVITY

DES DRW CHK

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

HDR ENGINEERING INC.

440 S. CHURCH STREET, SUITE 1200

CHARLOTTE, NC 28202

TEL (704)338-6700

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

D

FOR COMMANDER NAVFAC

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

C

HE

RR

Y

PO

IN

T

CH

ER

RY

P

OI

NT

N40085-20-F-4290

FY

M

CO

N

P-

F-

S

US

TA

IN

M

EN

T

CE

NT

ER

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

M

ID

LA

N

T D

C C

O

AL

D

ES

IG

N

SU

BM

IT

TA

L

/16

/20

M

AT

C H

L

IN

E

- A

1/ C

G

7B

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

- P

HA

SE

- P

AR

KI

NG

LO

T

P9

GDH EAA DTB

1" = 40'

CG106B

A1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 - PARKING LOT & P995

SCALE: 1" = 40' (22" X 34")

KTB/SHHKTB/SHH

DLB

JWJ

HPN

Approved by Sally Torgler, Deputy Director Facilities, with NSWDG, via Email.

15 DEC 2025

12934727

APPROVED BY ERIK LEWIS, INFRASTRUCTURE

ENG. BRANCH HEAD WITH FRCE

12/16/2025

MULTICORELINK:CUI-1786799-CG100B-CG116B EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 MULTICORELINK:CUI-1786799-CG100B-CG105B EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 MULTICORELINK:CUI-1786799-CG100B-CG107B EROSION AND SEDIMENT CONTROL PLAN - PHASE 2

ESC KEYNOTES

1. SEE SHEET C-001 FOR LEGEND AND ABBREVIATIONS.

2. NOT ALL KEYNOTES APPLY TO EVERY SHEET.

3. REFER TO EROSION AND SEDIMENT CONTROL

CONSTRUCTION SEQUENCE ON SHEET C-003.

4. TIMBER MAT(S) AND TEMPORARY CULVERT CROSSING

SHALL BE INSTALLED EXCLUSIVELY FOR HAUL ROAD USE

DURING EARTHWORK OPERATIONS.

5. REFER TO BRIDGE PLANS FOR ADDITIONAL MEASURES

ASSOCIATED WITH THE CONSTRUCTION OF THE BRIDGE

STRUCTURE.

6. CONTRACTOR SHALL EXERCISE CAUTION TO PREVENT

SEDIMENT FROM ENTERING WETLANDS.

7. GRADING SHOWN FOR P-993 FOOTPRINT TO MEET

SURCHARGE REQUIREMENTS. REFER TO GEOTECHNICAL

REPORT FOR ADDITIONAL INFORMATION.

1. LIMITS OF DISTURBANCE

2. SEDIMENT FENCE, SEE DETAIL C3/C-503

3. CULVERT INLET PROTECTION

4. INLET PROTECTION

5. PERMEABLE TYPE II TURBIDITY CURTAIN - SEE NOTES ON

SHEET CG118B

6. TEMPORARY SEEDING, SEE DETAIL C1/C-501

7. ROCK CHECK DAM, SEE DETAIL C1/C-500

8. TREE PROTECTION

9. TEMPORARY DIVERSION DITCH, SEE DETAIL A3/C-501

10. CONCRETE WASHOUT

11. SEDIMENT BASIN, SEE DETAIL A1/C-503

12. SKIMMER SEDIMENT BASIN, SEE DETAIL A3/C-503

13. EROSION CONTROL BLANKET / MATTING, SEE DETAIL

C3/C-501

14. POROUS BAFFLE(S), SEE DETAIL C1/C-504

15. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT, SEE

DETAIL A3/C-500

16. SILT SOCK / WATTLE, SEE DETAIL C3/C-504

17. SILT SOCK / WATTLE FOR CHECK DAM, SEE DETAIL A1/C-504

FLO

W

S

S

SD

SD

SD

SD

"C

ONC.

"C

ONC.

CONC. HW

INV=19.60

INV=19.63

A

B

A B

FLO

W

FLO

W

"C

ONC.

"C

ONC.

FLO

W

S

EOI

G G G G G G G G G G G G G G G

CB

CB

G

G

J

CP

"C

O

NC

FL

O W

CONC. HW

INV=21.94

FL

O

W

"C

O

NC

FO

G

TRHH

TRHH

TRHH

SIGN

CONC. HW

INV=22.47

POST

JERSEY

BARRIER (TYP.)

JERSEY

BARRIER (TYP.)

CB

CB

CONC. HW

INV=21.47

CONC. HW

INV=21.92

SDSDSDSDSD

30"CONC

FLOW

30"CONC

FLOW

FL

O

W

"C

O

NC

CO

NC

E. M

ORET AVENUE

FIKE DRIVE FIKE DRIVE

GG

TRHH

EOI

E O I

EOI

EOI

E O

I

EOI

EOI

EOI

EOI

FONTANA BLVD

LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LOD

LOD

LOD

LOD LOD

LOD

LOD

LOD

LO

D

LO

D

LOD

LO

D

LO

D

LOD LOD LOD LOD LOD

LODLODLODLODLOD

LO

D

LOD

LOD

SC

E

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF SF SF SF SF SF SF

SFSFSFSFSFSFSF

SF

SF

21 22 23 24

SEDIMENT BASIN D

BOTTOM ELEVATION = 20.50

BOTTOM AREA = 23,040 MIN. SF

SIDE SLOPES : 4(H):1(V) MIN

MIN. TOP OF BERM = 25.00

SPILLWAY WIDTH 23' MIN

ELEV = 23.70

SKIMMER = 6" WITH 3.50" ORIFICE

42" DIAMETER RISER

RE = 22.50 IE = 20.50

65 LF OF 30" OUTFALL

PIPE @ 1.54%

INV. IN: 20.50'

INV. OUT: 19.50'

PLAN

NORTH

TR

U

E N

GRAPHIC SCALE(S)

KEY PLAN

40 80 FT.0

1"=40'

GENERAL SHEET NOTES

WB-67 - Interstate Semi-Trailer

EV EV VIP VIP VIP VIP VIP

HY D

H

Y D

HY

D

H Y

D

H Y D

H

Y D

H Y D

H

Y D

H

Y

DH

Y D

HY D

H Y D

H Y

D

H Y D

H

Y D

ASPHALT SURFACE

ASPHALT

SURFACE

AS

PH

AL

T

SU

RF

AC

E

ASPHALT SURFACE

ASPHALT SURFACE

WOODS

15"SYCAMORE

EOI

BOTTOM INV=23.43'

TOP=24.14'

BOTTOM INV=23.26'

TOP=24.17'

TRENCH DRAIN

FULL OF SILT

ASPHALT

CONC

FH

FIKE DR

FH

E E

CG105B CG106B

CG118BCG117BCG116BCG115B

CG128BCG127BCG126BCG125B

CG135B

CG145B

CG134B

CG119B

CG107B

CG144B

CG108B

PLAN

NORTH

TR

U

E N

FI

LE

N

AM

E:

in tra ne t.h dr \h dr \N ew fo rm a\

\2

0\

\6

.0 _C

AD

_B

IM

\6

.2 _W

IP

\6

.2 .3

_P ro du ct io n\

_C iv il_

C \0

5.

_S he et s\

C U

I-1

-C G

0B

.d w g L

AY

O

U T

N

AM

E:

C

G

7B E

R O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L

PL

AN

PH

AS

E

P

LO

TT

ED

: S at ur da y, D ec em be r 0

6,

- 7 :1

8p m

U

SE

R : E

AR

R

O W

O O

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 4 5

A

B

C

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .