This is Amendment 0011 to Solicitation N4008526R0002, a federal construction contract for design-bid-build projects at Marine Corps Air Station Cherry Point, North Carolina. The amendment, issued by NAVFACSYSCOM MID-ATLANTIC on June 11, 2026, extends the response due date from May 27, 2026 at 2:00 PM to June 22, 2026 at 4:00 PM and introduces discussion/negotiation questions for offerors in the competitive range.
The amendment significantly reorganizes multiple contract line items (CLINs) for two primary projects: P993/995 F35 Sustainment Center and Composite Repair Facility. Notable changes include renumbering and redefining options related to environmental remediation (soil media and dewatering effluent disposal), equipment procurement (paint spray booths, autoclaves, X-ray booths, composite ovens), facility enhancements (solar arrays, electronic security systems, bridge cranes), and furniture and fixtures. A revised Price Proposal Form dated June 11, 2026 is attached separately. The amendment also incorporates DFARS Clause 252.232-7007 (Limitation of Government's Obligation), establishing incremental funding with $188,346,971 available upon contract execution, followed by FY27 ($77,872,564) and FY28 ($104,806,617) increments, with remaining balance allocated in FY29. FAR Clause 52.222-90 (Addressing DEI Discrimination by Federal Contractors) is added effective April 2026.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Time 02:00 PM 04:00 PM Response Due Date 27 May 2026 22 Jun 2026
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
Option Line Item 0002
INFORMATION FROM TO
Description
Base Price: Total Price for the entire work for P-995 Composite Repair Facility Line Item 2 (includes subtotal of 0002A-0002D) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item
OPTION 01 for P993: Unit Price for handling, hauling, temporary stockpiling, sampling, analysis and disposal of contaminant impacted surplus soil media (including, but not limited to petroleum, PFAS, VOCs, PAHs, and metals) at a licensed facility for the P-993 Project, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
Option No Yes
Option Line Item 0003
INFORMATION FROM TO
Description
OPTION 1 for P993: Unit Price for handling, hauling, temporary stockpiling, sampling, analysis and disposal of contaminant impacted surplus soil media (including, but not limited to petroleum, PFAS, VOCs, PAHs, and metals) at a licensed facility for the P-993 Project, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
OPTION 02 for P993: Unit price for containerizing, handling, testing and treatment of contaminant impacted (including, but not limited to, metals, petroleum, PAHs, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, and disposal, and supervision for P-993, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
Discharge quantities in gallons must be certified and approved by the Contracting Officer.
Option Line Item 0004
INFORMATION FROM TO
Description
OPTION 2 for P993: Unit price for containerizing, handling, testing and treatment of contaminant impacted (including, but not limited to, metals, petroleum, PAHs, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, and disposal, and supervision for P-993, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
Discharge quantities in gallons must be certified and approved by the Contracting Officer.
OPTION 03 for P993: Price for Two paint spray booths equipment. Note: This is the paint booth only.
The associated construction is still in the base bid.
Option Line Item 0005
INFORMATION FROM TO
N4008526R00020011
Description
OPTION 3 for P993: Two additional Paint Spray Booths (includes subtotal of 0005A-0005E) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
OPTION 04 for P993: Two additional Paint Spray Booths (includes subtotal of 0005A-0005E) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
Option Line Item 0006
INFORMATION FROM TO
Description
OPTION 4 for P993: Solar Array in Parking Lot including the canopy, structural and foundation system, complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 05 for P993: Solar Array in Parking Lot including the canopy, structural and foundation system, complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0007
INFORMATION FROM TO
Description
OPTION 5 for P993: Electronic Security System (ESS) complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 06 for P993: Bridge Crane Options complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 6 is to add 4 bridge cranes (Total of 8) which will utilize rails and structure included in Base Bid
CLIN 001A.
Option Line Item 0008
INFORMATION FROM TO
Description OPTION 6 for P993: Bridge Crane Options complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 07 PRICE FOR P995: Total Price for the entire work for P-995 Composite Repair Facility Line Item 2 (includes subtotal of 0008A-0008D) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
Option Line Item 0009
INFORMATION FROM TO
Description
OPTION 7 for P995: Unit Price for handling, hauling, temporary stockpiling, sampling, analysis and disposal of contaminant impacted surplus soil media (including, but not limited to petroleum, PFAS, VOCs, PAHs, and metals) at a licensed facility for the P-995 Project, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
OPTION 08 for P995: Unit Price for handling, hauling, temporary stockpiling, sampling, analysis and disposal of contaminant impacted surplus soil media (including, but not limited to petroleum, PFAS, VOCs, PAHs, and metals) at a licensed facility for the P-995 Project, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
Option Line Item 0010
INFORMATION FROM TO
Description
OPTION 8 for P995: Unit price for containerizing, handling, testing and treatment of contaminant impacted (including, but not limited to, metals, petroleum, PAHs, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, and disposal, and supervision for P-995, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
Discharge quantities in gallons must be certified and approved by the Contracting Officer
OPTION 09 for P995: Unit price for containerizing, handling, testing and treatment of contaminant impacted (including, but not limited to, metals, petroleum, PAHs, and PFAS) construction dewatering effluent. Price for providing work in connection with labor, material, equipment, transportation, spent treatment media characterization, transport, and disposal, and supervision for P-995, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
Discharge quantities in gallons must be certified and approved by the Contracting Officer.
Option Line Item 0011
INFORMATION FROM TO
Description
OPTION 9 for P995: Price for Paint Spray Booth and Sanding Booth equipment complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 10 for P995: Price for Paint Spray Booth and Sanding Booth equipment complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0012
INFORMATION FROM TO
OPTION 10 for P995: Price for Medium and Small Autoclave f complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 11 for P995: Price for Medium and Small Autoclave complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0013
INFORMATION FROM TO
Description
OPTION 11 for P995: X-Ray Booth Equipment complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 12 for P995: X-Ray Booth Equipment complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0014
INFORMATION FROM TO
Description
OPTION 12 for P995: Electronic Security System (ESS) complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 13 for P993: Collateral Equipment (Sheet I-
606) complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0015
INFORMATION FROM TO
Description
OPTION ITEM 13 for P993: Collateral Equipment (Sheet I-606) complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 14 for P993: Collateral Equipment (from Sheet I-606) for Paint Spray Booths Option complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0016
INFORMATION FROM TO
Description
OPTION 14 for P993: Collateral Equipment (from Sheet I-606) for Paint Spray Booths Option complete in accordance with the drawings and specifications but excluding work provided in another Priced line item, OPTION 15 for P993: Subtotal for Stacker Storage Units complete in accordance with the drawings and specifications but excluding work provided in another Priced line item. (APN Funding) Fire Protection System extending to the stackers is included in Base Bid
Option Line Item 0017
INFORMATION FROM TO
Description
OPTION 15 for P993: Subtotal for Stacker Storage Units complete in accordance with the drawings and specifications but excluding work provided in another Priced line item. Fire Protection System extending to the stackers is included in Base Bid
OPTION 16 for P993: Subtotal for Sun Shelters complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0018
INFORMATION FROM TO
Description
OPTION 16 for P993: Subtotal for Sun Shelters complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 17 for P993: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together. OPTION 19 includes cost for all A/V required in ALL options.
Option Line Item 0019
INFORMATION FROM TO
OPTION ITEM 17 for P993: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is
OPTION 18 for P993: Price for providing work in connection with labor, material, equipment, transportation and supervision required for Furniture, Fixtures, and Equipment (FF&E), complete in
Description not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.
accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Option Line Item 0020
INFORMATION FROM TO
Description
OPTION 18 for P993: Price for providing work in connection with labor, material, equipment, transportation and supervision required for Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
OPTION 19 for P993: Price for providing work in connection with labor, material, equipment, transportation and supervision required for Furniture, Fixtures, and Equipment (FF&E) OPTION, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Option Line Item 0021
INFORMATION FROM TO
Description
OPTION 19 for P993: Price for providing work in connection with labor, material, equipment, transportation and supervision required for Furniture, Fixtures, and Equipment (FF&E) OPTION, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
OPTION 20 for P993: AV Design Services Option.
Price for providing the professional services of a Certified Technology Specialist - Design (CTS-D) detailed in Spec Section 01 30 02.00 22
Option Line Item 0022
INFORMATION FROM TO
Description
OPTION 20 for P993: AV Design Services Option.
Price for providing the professional services of a Certified Technology Specialist - Design (CTS-D) detailed in Spec Section 01 30 02.00 22
OPTION 21 for P995: Composite Oven complete in accordance with the drawings and specifications but excluding work provided in another Priced line item
Option Line Item 0023
INFORMATION FROM TO
Description OPTION 21 for P995: Composite Oven complete in accordance with the drawings and specifications but excluding work provided in another Priced line item
OPTION 22 for P995: Collateral Equipment complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
Option Line Item 0024
INFORMATION FROM TO
Description OPTION 22 for P995: Collateral Equipment complete in accordance with the drawings and specifications but excluding work provided in another Priced line item.
OPTION 23 for P995: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together. OPTION 23 includes cost for all A/V required in ALL options.
Option Line Item 0025
INFORMATION FROM TO
Description
OPTION 23 for P995: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together. OPTION 23 includes cost for all A/V required in ALL options.
OPTION 24 for P995: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Option Line Item 0026
INFORMATION FROM TO
OPTION 24 for P995: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
OPTION 25 for P995: AV Design Services Option Price for providing the professional services of a Certified Technology Specialist - Design (CTS-D) detailed in Spec Section 01 30 02.00 22
The following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Item Supplies / Services Quantity Unit Unit Price Amount
Option Line Item
OPTION 25 for P995: AV Design Services Option Price for providing the professional services of a Certified Technology Specialist - Design (CTS-D) detailed in Spec Section 01 30 02.00 22.
Product Service Code: Y1BZ Centralized Unique Program Identification
(CUPID): 000
Program Code: C20 Pricing Arrangement: Firm Fixed Price
1 Project
Section 00 21 16 - Instructions to Proposers
Miscellaneous text in this section has been added to:
AMENDMENT 0011
The purpose of this amendment is to incorporate the following:
1. Issue discussion/negotiation questions to Offerors in the competitive range*
2. Revised Price Proposal Form dated 06/11/2026 (attached separately)
3. Add DFARS Clause 252.232-7007 Limitation of Governments Obligation
1. ISSUE DISCUSSION/NEGOTIATION QUESTIONS TO OFFERORS IN COMPETITIVE RANGE
*For those Offeror's notified that they are included in the Competitive Range, please refer to your Evaluation Notice for the Due Date and Submission Requirements for Revised Proposals.
2. REVISED PRICE PROPOSAL FORM DATED 06/11/2026
ATTACHED SEPARATELY
3. INCORPORATE DFARS CLAUSE 252.232-7007 LIMITATION OF GOVERNMENTS OBLIGATION
SEE SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
(End Summary of Changes)
Section 00 70 00 - Conditions of the Contract
Additional Information/Notes
The following clauses were added:
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0040, Revision 1)
Apr 2026
DFARS Clauses Incorporated by Full Text
252.232-7007 Limitation of Government's Obligation. (Apr 2014)
LIMITATION OF GOVERNMENT'S OBLIGATION (APR 2014)
(a) Contract line item is incrementally funded. For this item, the sum of of the total (CLIN) 0001 (excluding any unexercised options) $188,346,971 price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For item(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "Termination for Convenience of the Government." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit, and estimated termination settlement costs for those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "Termination for Convenience of the Government."
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraphs (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "Disputes."
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph
(a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "Default." The provisions of this clause are limited to the work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) and (e) of this clause.
(h) Nothing in this clause affects the right of the Government to terminate this contract pursuant to the clause of this contract entitled "Termination for Convenience of the Government."
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
On execution of contract: $188,346,971
FY27 Increment: $77,872,564
FY28 Increment: $104,806,617
FY29 Increment: Remaining Balance of CLIN 0001 for P993 Base Price
(End of clause)
| IDCode: J |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0011 |
| EffDate: 11 Jun 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: P993/995 |
| IssCode: N40085 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM MID-ATLANTIC |
9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395
NORFOLK, VA 23511-0395
UNITED STATES
Brittany Cristelli, Email: brittany.n.cristelli.civ@us.navy.mil Telephone: 757-341-1978 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N4008526R0002 |
| SolDate: 06 Mar 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section 00 70 00 - Conditions of the Contract |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: N4008526R0002; DESIGN-BID-BUILD, P993/995 F35 SUSTAINMENT CENTER & COMPOSITE REPAIR FACILITY, MARINE CORPS AIR STATION, CHERRY POINT, NORTH CAROLINA |
SEE CONTINUATION PAGE(S)
| ContNameTitle: |
| CoNameTitle: BRITTANY N. CRISTELLI |
| ContDate: |
| CODate: 11 Jun 2026 |