This document is the General Performance Technical Specification (Section Z10) for a federal contract opportunity. It provides general requirements that apply across multiple Performance Technical Specification (PTS) sections for a design-build project.
The key details include:
- This PTS section must be used in conjunction with all parts of the Design Build Request for Proposal (RFP) to determine the full requirements.
- It provides general requirements related to design standards and codes, materials and equipment identification, commissioning, performance verification and acceptance testing, and submittal requirements.
- The RFP references various industry and government standards that must be followed, including the Unified Facilities Criteria (UFC) and Occupational Safety and Health Administration (OSHA) standards.
- The contractor must obtain government approval for any changes to materials and equipment from the initial facility design when designing and constructing follow-on facilities under this contract.
- Design and construction submittals have specific requirements for content and format.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title Work Order Number
Project Location, City, State
PART 4 - SECTION Z10 - Page 1
SECTION Z10
GENERAL PERFORMANCE TECHNICAL SPECIFICATION
06/23
Z10 GENERAL
RFP Part 3 including the Engineering System Requirements (ESR) provide project specific requirements. The RFP Part 4, Performance Technical
Sections (PTS) provide generalized technical requirements that apply to multiple facility types and include more requirements than are applicable to any one project. Therefore, only the RFP Part 4 requirements that apply to the project and further define the RFP Part 3 project specific requirements are required.
Z10 1.1 NARRATIVE
All Performance Technical Specification (PTS) sections must be used in conjunction with all parts of the Design Build (D/B) Request for
Proposal (RFP) to determine the full requirements of this solicitation.
This PTS section provides general requirements for the other PTS sections of this RFP and is used in conjunction with the other PTS sections.
Refer to Part 2 Section 01 33 10.05 20, Design Submittal Procedures for the Order of Precedence of the RFP Parts. Requirements listed in the
Project Program take precedence over the PTS sections requirements;
therefore, requirements identified in the Project Program eliminate options related to that requirement in the PTS sections.
Z10 1.2 DESIGN GUIDANCE
Provide work in compliance with the following design standards and codes, as a minimum. Government standards listed in this RFP take precedence over industry standards.
The PTS Sections reference published standards, the titles of which can be found in the Unified Master Reference List (UMRL)on the Whole
Building Design Guide at the Unified Facilities Guide Specification
(UFGS) Website . The publications referenced form a part of this specification to the extent referenced. The publications are referred to in the section text by the basic designation only. Industry standards, codes, and Government standards referenced in the section text, and not found in the UMRL, are listed at the beginning of the PTS sections.
The advisory provisions of all referenced codes, standards, and specifications must be mandatory; substitute words such as "must", or
"required" for words such as "should", "may", or "recommended," wherever they appear. The results of these wording substitutions incorporate these code and standard statements as requirements.
Reference to the "authority having jurisdiction" for variance from criteria must be interpreted to mean the "Chief Engineer, NAVFAC" and for contractual obligations on this project must be interpreted to mean the "Contracting Officer". Comply with the required and advisory https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs
PART 4 - SECTION Z10 - Page 2 portions of the current edition of the standard at the time of contract award.
The following list of codes and standards is not comprehensive and is augmented by other codes and standards referenced and cross-referenced in the RFP.
Z10 1.2.1 INDUSTRY CODES
INTERNATIONAL BUILDING CODE (IBC) as modified by UFC 1-200-01.
UFC 1-200-01 applies the IBC to the project and references other commercial standards and UFC criteria that become part of the contract.
Z10 1.2.2 INDUSTRY REQUIREMENTS
WHOLE BUILDING DESIGN GUIDE (WBDG)
WHOLE BUILDING DESIGN GUIDE, Ensure Occupant Safety and Health
(Systems Safety Engineering) at https://www.wbdg.org/design-objectives/secure-safe/occupant-safety-health
Z10 1.2.3 GOVERNMENT STANDARDS
Z10 1.2.3.1 UNIFIED FACILITIES CRITERIA (UFC)
UFC 1-200-01
DoD Building Code (UFC 1-200-01 is a hub document that provides general building requirements and references other critical UFCs. A reference to UFC 1-200-01 requires compliance with the Tri-Service
Core UFCs listed therein.)
UFC 1-200-02
High Performance and Sustainable
Building Requirements
FC 1-300-09N
Navy and Marine Corps Design
Procedures
Z10 1.2.3.2 FEDERAL STANDARDS
Architectural Barriers Act Standards with DEPSECDEF
Memorandum 31 Oct 2008, "Access for People with
Disabilities"
Occupational Safety and Health Administration (OSHA)
Z10 1.3 MATERIALS AND EQUIPMENT REQUIREMENTS IDENTIFICATION
Z10 1.3.1 MATERIALS STANDARD
Refer to the Project Program for identification of Government
Furnished Equipment.
https://www.wbdg.org/design-objectives/secure-safe/occupant-safety-health https://www.wbdg.org/design-objectives/secure-safe/occupant-safety-health
PART 4 - SECTION Z10 - Page 3
The equipment items must be supported by service organizations that are convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
Materials, equipment, fixtures, and other appurtenances must comply with applicable Underwriters Laboratories, (UL) Inc., American National Standards Institute, Inc., and National
Electrical Manufacturer's Association standards or applicable standards of a similar independent testing organization. All materials must be new, and must bear the label of Underwriters
Laboratories whenever standards have been established and label service is normally and regularly furnished by the agency. All equipment provided must be listed and labeled suitable for the specified purpose, environment, and application and installed in accordance with manufacturer’s recommendations. Insulation must be asbestos free.
Z10 1.3.2 EQUIPMENT NAMEPLATE IDENTIFICATION
Each item of equipment must have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place. The nameplate of the distributing agent will not be acceptable.
Z10 1.3.3 FIELD-APPLIED NAMEPLATES
Provide laminated plastic nameplates for each piece of equipment.
Each nameplate must identify the function and, when applicable, the number designation of that piece of equipment as used in the design documents. Provide melamine plastic nameplates, 0.125 inch
(3 mm) thick, white with black center core.
Z10 1.4 COMMISSIONING
Commission the building systems identified in Part 3 Chapter 2.0
"Project Objectives", paragraph titled "Building Commissioning". Refer to Part 2 Section 01 45 00, Quality Control for the Commissioning
Authority's required qualifications and responsibilities and comply with UFGS 01 91 00.15, Building Commissioning modified as necessary to include all applicable systems included in the final design. Test reports must be certified by the Commissioning Authority (CA), that work is in compliance with requirements of the RFP.
Z10 1.5 PERFORMANCE VERIFICATION AND ACCEPTANCE TESTS
Verification of satisfactory construction and system performance must be via Performance Verification Testing, Acceptance Tests, and submittal of test reports certified by the Designer of Record (DOR), that work is in compliance with requirements of the RFP. The
Government reserves the right to witness all Performance Verification and Acceptance Tests, review data, and request other such additional inspections and repeat tests as necessary to ensure that the work and provided services conform to the stated requirements. Contractor must pay the cost of all testing.
PART 4 - SECTION Z10 - Page 4
Refer to each PTS section to identify Performance Verification and
Acceptance Testing required by the work specified in that PTS section.
Z10 1.6 SUBMITTALS
Contractor's design submittals that combines design and construction submittals, must jointly comply with Part 2 Sections 01 33 00.05 20, Construction Submittal Procedures and 01 33 10.05 20, Design Submittal
Procedures. Contractor's construction submittals that are submitted separate from the design submittals must comply with Part 2 Section 01
33 00.05 20, Construction Submittal Procedures.
Refer to "Construction Quality Control" in Part 2 Sections 01 33 00.05
20, Construction Submittal Procedures and 01 45 00, Quality Control to define reviewing and approving Authority of design and construction submittals.
Utilize the same materials and equipment that are approved and provided for an initial facility design, on all follow-on facilities that use the same design with-in this contract. Once the initial facility design is approved by the Government, the Contractor must obtain Government approval to change materials and equipment when designing and constructing follow-on facilities utilizing the same design.
Z10 1.6.1 DESIGN SUBMITTALS
Submit design submittals in accordance with Part 2 Section 01 33
10.05 20, Design Submittal Procedures, FC 1-300-09N, Navy and
Marine Corps Design Procedures, and other discipline-specific guidelines listed in the applicable PTS sections.
Part 2 Section 01 33 10.05 20, Design Submittal Procedures requires the use of UFGS sections in the development of the
Contractor originated specification. The Designer of Record (DOR) must edit the UFGS sections for the project and submit the edited specification as a part of the design submittal. The DOR must edit the UFGS as follows:
(1) Prepare UFGS Specifications as part of the project specification,
(2) Delete only portions of the UFGS specification that are not applicable to the project,
(3) Edit only the bracketed choices that are within the UFGS specification text,
(4) Edit blank bracketed options to include requirements that exercise prudence and adherence to acceptable industry standards,
(5) Comply with the directions, directives, and requirements of all UFGS Criteria Notes. The UFGS Criteria Notes are typically bordered on the top and bottom by a line of asterisks to highlight their location.
(6) If proprietary information is provided or required to
PART 4 - SECTION Z10 - Page 5 streamline the construction submittal process, include proprietary information in the edited UFGS sections and added to the end of each UFGS section. Confirm that the proprietary products, materials, and systems listed in the specifications are in compliance with the requirements of the RFP.
Z10 1.6.2 CONSTRUCTION SUBMITTALS
Submit for approval to the Designer of Record (DOR), construction submittals, product data, manufacturer's information, shop drawings, and test reports on all materials and systems installed in the project, unless the DOR designates submittal for QC approval. Refer to each PTS section for further construction submittal requirements relating to the work identified in that particular PTS section. Some PTS sections reference UFGS sections that will require more construction submittals for DOR approval than is stated above. Refer to Part 2 Section 01 33 00.05 20 for the list of construction submittals reserved for Government
Approval and Government Surveillance.
--End of Section--