5_RR_D109_COMPRESSOR ROOM.pdf

PDF 194 KB Posted

Attached to
P909 SOF SDVT2 Operations Support Facility, JEB Little Creek-Fort Story, VA
Solicitation number
N4008524R2862
Issued by

About this file

This is a room requirements specification document for room D109 (Compressor Room) within the P-909 SDVT-2 Operations Support Facility project at JEB Little Creek-Fort Story, Norfolk, Virginia. The document details the technical requirements for a space designed to house a 5,000 psi rated compressor unit and two 8' x 3' stacked storage tanks.

The specifications require a minimum 12' ceiling height, STC 60 acoustic separation from adjacent spaces, and no regular occupants. Key infrastructure requirements include structurally reinforced concrete slab flooring, 6' x 8' insulated heavy-duty galvanized steel doors with mechanical combination locks, painted CMU walls, epoxy wall coatings, and floor drains. The room must have both dive-quality air compression systems (5,000 psi) and shop-quality air service (120 psi) with dial-down regulators. HVAC, fire alarm/detection, wet pipe sprinkler systems, and industrial LED lighting with manual controls are required. The space must be in close proximity to Dive Maintenance rooms and include provisions for FF&E items like fire extinguishers.

View the file

Other files

File Type Posted
Attachment D - P909 Price Proposal Form R3.docx DOCX document
24R2862 Amendment 0014.docx DOCX document
Attachment D - P909 Price Proposal Form R2.docx DOCX document
P909 Amendments Index.pdf PDF
24R2862 Amendment 0013.pdf PDF
Attachment B Wage Determination.pdf PDF
Attachment X - Lithium Battery Current Quantities.pdf PDF
24R2862 Amendment 0012.pdf PDF
Section 01 14 00 R0824.pdf PDF
24R2862 Amendment 0011.pdf PDF
W_LIttle Creek Oneline.pdf PDF
V_Secured Area Second Floor.pdf PDF
24R2862 Amendment 0010.pdf PDF
24R2862 Amendment 0009.pdf PDF
24R2862 Amendment 0008.pdf PDF
1704761-CS101.pdf PDF
DOD_Anti-ram_Vehicle_Barriers_September_2024.pdf PDF
6_ESR_A20.pdf PDF
---5_RR_G209 WOMENS TOILET.pdf PDF
24R2862 Amendment 0007.pdf PDF
Part 2 General Requirements.pdf PDF
5_RR_D105_MAINTENANCE RM-O2 SAFE.pdf PDF
5_RR_D106_MAINTENANCE RM.pdf PDF
3_site_analysis.pdf PDF
5_RR_D104_BATTERY STORAGE.pdf PDF
NAVFAC High Performance and Sustainable Building Checklist GOALS.pdf PDF
5_RR_G111_MENS TOILET.pdf PDF
6_ESR_D20.pdf PDF
---5_RR_G207 MENS TOILET.pdf PDF
6_ESR_D30.pdf PDF
5_RR G108 WOMENS TOILET AND SHOWER.pdf PDF
Part 3 Chapter 1 changes.pdf PDF
5.0_Room.Requirements_Amendment.0006.pdf PDF
SPACE TABULATION.23Oct2024xlsx.pdf PDF
U_Telecommunication_Point_Of_Connection.pdf PDF
Spec.ESR_Amendment.0006.pdf PDF
24R2862 Amendment 0006.pdf PDF
24R2862 Amendment 0005.pdf PDF
24R2862 Amendment 0004.pdf PDF
24R2862 Amendment 0003 Site Visit Log.pdf PDF
24R2862 Amendment 0002.pdf PDF
Attachment J - PTS_SECTION_Z10.pdf PDF
Attachment I - 1704761 CONTINUATION SHEET Ammendement 0002.pdf PDF
ATTACHMENT G - SECNAV FORM 5512.pdf PDF
ATTACHMENT H - ONE DAY PASS FORM.xls XLS spreadsheet
24R2862 Amendment 0001.pdf PDF
Attachment A- R18_P909_RFP Plans_23.12.11 SITE PLAN.pdf PDF
24R2862 SOF General Requirements.pdf PDF
Attachment C-Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment F - JA ML-22-02 Class FRCS Standardization.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761 JEB Little Creek-Fort Story, Norfolk, Virginia

5.0 ROOM REQUIREMENTS

D109 – COMPRESSOR ROOM

Space Characteristics

FUNCTION: Space to house the 5,000 psi rated compressor unit and (2) 8’ x 3’ storage tanks (stacked).

ADJACENCIES: Close proximity to Dive Maintenance rooms.

SPATIAL REQUIREMENTS:

Ideal Plan Dimensions: See Floor PlansSpace Tabulation Data.

Minimum Ceiling Height: 12’ (min) Clear to bottom of structure

ACOUSTICAL REQUIREMENTS: STC 60 (min) separation from all other spaces

ACCESS REQUIREMENTS:

NUMBER OF OCCUPANTS: 0

OTHER / SPECIAL REQUIREMENTS:

FF&E INFORMATION FOR COORDINATION:

FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:

FF&E: fire extinguisher

UNIFORMAT DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS

A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab.

B201005 EXTERIOR LOUVERS ?

B203001 EXTERIOR SOLID DOORS (1) 6’ x 8’

Pair of Insulated Heavy-Duty, Hot-Dipped Galvanized Steel doors and frame. Factory Primed with Zinc Rich MPI compliant primer.

Provide compatible epoxy-based intermediate & top-coat. Provide active/ inactive leaf.

B203008 EXTERIOR DOOR HARDWARE

Mechanical combination lock with key bypass and panic hardware to meet the requirements of FF-L- 2740 and FF-L-2890B. Continuous Hinge, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep. Provide Door Position Switch and contact connected to security system and

CCTV.

C101001 FIXED PARTITIONS

Concrete Masonry Unit. STC 60 separation from all other spaces.

C103004 IDENTIFYING DEVICES

1 per door

Signage on exterior side of room entry door(s).

Indicate permanent room name(s) and number

C301003 WALL FINISHES AR AR Provide painted CMU

Formatted: Font: 9 pt, Bold

P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761 JEB Little Creek-Fort Story, Norfolk, Virginia

C302007 WALL BASE FINISHES AR AR

Sealed joint at base of wall between CMU and concrete floor surface

C302010 HARDENERS AND SEALERS AR AR Hardened and sealed cured concrete floors

C30309009 CEILING FINISHES AR AR Exposed structure, painted epoxy

C304001 INTERIOR COATINGS / FINISHES

Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.

D203003 FLOOR DRAINS Provide Floor Drain.

D209001 SPECIAL PIPING SYSTEMS

Provide Dive-Quality Air Compressor (5,000 psi) and piping system to required drop locations. See Floor Plans.

D209005

COMPRESSED AIR SYSTEMS (NON-

BREATHING)

Provide Dive-Quality Air Compressor (5,000 psi) and piping system to required drop locations.

Provide Shop-Quality Air Service (120 psi) and piping system to required drop locations. See Floor Plans. Provide Dial-Down Regulator to convert air pressure as required.

D30 HVAC

Provide air conditioning and heating and ventilation for temperature control. HVAC system selection based on results of LCCA performed by

KTR.

D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010

D4040 SPRINKLER SYSTEMS

Provide wet pipe automatic sprinkler protection to provide complete coverage throughout the facility.

See RFP Part 3; ESR D4040.

D502001 BRANCH POWER / WIRING Branch power installed per UFC 3-520-01.

D502002 LIGHTING EQUIPMENT

Suspended linear industrial LED luminaire with 5%-10% up-light component and wire guard. UFC 3-530-01 3-3.3.5 Mechanical Rooms.

D503001 LIGHTING CONTROLS Manual on. Manual off.