This is a room requirements specification document for a women's toilet and shower facility (Room G108) in the P-909 SDVT-2 Operations Support Facility at JEB Little Creek-Fort Story in Norfolk, Virginia. The document details specific construction and equipment requirements for the space.
The facility requirements include a 9'-0" minimum ceiling height, CMU walls with bullnose corners, porcelain tile on all walls, and a 3/16" thick resinous floor coating system. Key components include 3 showers with solid surface surrounds, multiple toilet stalls with HDPE partitions, a 9'-0" solid surface counter with integral sinks, 4 two-tier HDPE lockers (18"x15"x72"), and standard fixtures like toilet tissue dispensers, mirrors, hand dryers, and soap dispensers. The space must have dedicated HVAC, ducted exhaust, sprinkler systems, fire alarm detection, and a public address system. All FF&E and AV equipment will be funded separately as a modification to the construction contract, though infrastructure support must be included in the base contract.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761 JEB Little Creek-Fort Story, Norfolk, Virginia
5.0 ROOM REQUIREMENTS
G108 – WOMEN’S TOILET & SHOWER
Space Characteristics
FUNCTION: Women’s toilets and shower room. Provide adequate fixture counts per Plumbing UFC and associated Occupant loads.
ADJACENCIES: Locate adjacent to the women’s locker, laundry and drying rooms.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Floor Plans.
Minimum Ceiling Height: 9’-0” Ceiling
ACOUSTICAL REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS:
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: (4) shower curtains
UNIFORMAT DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS
A1020 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 3’ x 8’ Heavy-Duty steel door and frame. Factory Primed.
Field-Painted
C102007 INTERIOR DOOR HARDWARE Hinge, Rim Cylinder, Closer, Kick plate & Silencer.
C103001
COMPARTMENTS, CUBICLES &
TOILET PARTITIONS
AR AR
HDPE floor-supported, over-head braced partitions at each water closet/urinal
C103002 TOILET AND BATH ACCESSORIES AR
Double toilet tissue dispensers – jumbo roll size, sanitary napkin disposal, wall mirrors (match width of counter top - minimum 36” high), full height mirror, semi-recessed paper towel dispenser/disposal, wall mounted soap dispensers at each sink, grab bars, high efficiency electric hand dryer, coat hook on back of each toilet compartment door, shower rod, towel hook at each shower
C103004 IDENTIFYING DEVICES
1 per door
Signage on exterior side of room entry door(s).
Indicate permanent room name(s) and number
C103005 LOCKERS (4)
18”d x 15”w x 72”h
Two tier HDPE lockers
C103005 LOCKER BENCHES (1)
18”d x 48”w
HDPE bench with pedestal base
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761 JEB Little Creek-Fort Story, Norfolk, Virginia
C103008 COUNTERS
2-0”d x 9’-0”l
½” thick solid surface counter with 4” high backsplash and side splashes as required; include integral solid surface sink(s) – SEE D20 Section. Provide high pressure laminate apron on stainless steel brackets underneath counter to conceal exposed plumbing.
C301004 TILE WALL FINISHES SF
12” X 12” min
Porcelain tile on all walls; full height to ceiling, with accent tile band. Provide grouted in stainless steel edge protection strips at all inside and outside corners and where wall tile meets the floor finish. Install with epoxy grout. Provide cementitious backer board at all locations to receive wall tile.
C301090 SHOWERS (3)
Min 36”w x 36”d
Solid surface shower surround system (1/4” minimum thickness) extending from top of shower pan/floor receptor to ceiling. Provide matching integral corner shower shelf. Solid surface shower pan must match shower surround – see SECTION D201005
C302007 WALL BASE FINISHES AR 4”h Integral 1” radius, resinous flooring cove base with a stainless steel top cap
C302009 RESINOUS FLOOR COATING SYSTEM SF
3/16” thick standard troweled mortar/quartz broadcast resinous floor coating system
C303003 GYPSUM BOARD CEILING FINISHES AR AR Moisture resistant gypsum wallboard. Epoxy paint.
C304001 INTERIOR COATINGS / FINISHES
Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D201001 WATER CLOSEST AR Provide floor mounted fixtures.
D201005 SHOWERS (3)
Provide wall-mounted shower head (Mounted @ 7’-0” AFF) and faucet – Coordinate with SECTION C301090
D203003 FLOOR DRAINS (2) Provide floor drain. Slope floor finish to drain AR.
D30 HVAC
Provide air conditioning & heating for temperature control.
D304007 EXHAUST SYSTEMS
Provide dedicated, ducted exhaust from bathroom per IBC/ UFC requirements.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility. See Part 3; ESR D4040.
D502002 RECEPTACLE OUTLETS Provide cleaning receptacles
D502001 LIGHTING EQUIPMENT
UFC 3-530-01 3-3.6 Restrooms Type A & B Luminaires
D502002 LIGHTING CONTROLS Per UFC 3-530-01 3-3.6 Restrooms
D503002 PUBLIC ADDRESS SYSTEMS
Provide Public Address system with flush ceiling mounted speakers.