This document is an Amendment (Amendment 0013) to a solicitation for the P909 SOF SDVT2 Operations Support Facility project at JEB Little Creek-Fort Story, Virginia. The amendment includes multiple modifications and clarifications to the original Request for Proposal (RFP), addressing various technical, design, and pricing details. Key changes include:
The amendment provides responses to numerous Proposer Inquiries (PPIs) covering topics such as building design specifications, room requirements, secure areas, electrical and communications systems, foundation and excavation details, and pricing schedule modifications. Significant updates include clarifications on RF shielding requirements, room adjacencies, demountable partitions, foundation design, and specific technical system specifications. The solicitation remains on track with a bid due date of 10 April 2025, and contractors are instructed to refer to bubble diagrams in the RFP for space layouts and requirements, particularly disregarding a previously issued concept plan that is no longer representative of the final program needs.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 35
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
20-MAR-2025
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
See Item 6
8. NAME AND ADDRESS OF CONT RACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
N40085-24-R-2862
X 9B. DATED (SEE ITEM 11)
09/17/24
10A. MOD. OF CONT RACT /ORDER NO.
10B. DAT ED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT
TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008524R2862 P909 SOF SDVT2 OPERATIONS SUPPORT FACILITY, JEB LITTLE CREEK-FORT STORY, VIRGINIA
BEACH, VIRGINIA
Contract POC: Demetrice Jenkins, demetrice.jenkins2.civ@us.navy.mil
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
STANDARD FORM 30 (Rev. 11/16) APPROVED BY OIRM 11-84 Prescribed by GSA
FAR (48 CFR) 53.243
N40085-24-R-2862
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0013
The purpose of this amendment is to incorporate the following:
1. 1704761 Continuation Sheet
2. Provide PPI Responses
3. Attachment B Wage Determination (attached separately)
4. Attachment D-P909 Price Proposal Form_ R2 (attached separately)
5. X_ Lithium Battery Current Quantities (attached separately)
6. P909 Amendments Index (attached separately)
1. Continuation Sheet
RFP: RFP - PART 6, ATTACHMENTS
DELETE Attachment “V – Secured Area Second Floor”.
Note: Utilize the bubble diagrams from Attachment “A – Diagrams / Drawings” to identify secured areas.
RFP - PART 6, ATTACHMENTS
ADD Attachment X – Lithium Battery Current Quantities”.
2. Provide responses to the following PPI’s: 105-106, 681-843
PPI
Reference Question Response
Page Section Paragraph
105 1393 of
Part 6, Attach ment A
CS102 Please clarify extents of "road option, not part of the base bid" (Part 6, CS102). There is a discrepancy between the Attachment A Site Plan and Part 6 sheet CS102.
See Amendment 0005, please reference RFP Part 6 Attachment
106 1393 of
Part 6, Attach ment A
CS102 Please clarify connection along
Intercove Rd. There is a discrepancy between the Attachment A Site Plan and Part 6 sheet CS102 where the roads are connected. It appears
Attachment A does not line up along
Intercove.
The truck through-lane and parking lot entry do not overlap onto
Intercove Road on the sheet CS102, the truck through lane does not lay beneath building P909. CS102 is provided for conceptual reference only. Designer of Record (DOR) must design a site plan that meets the
RFP and UFC requirements
Ame nd
RFP in
Color
The response to PPI 22 states that the
KO will be providing a new file for the RFP in color to include the NAB
IAP. Please advise as to where this has been provided, and if it hasn't, please provide in future Amendment.
See response to PPI 22
682 RFP RFP RFP
The file entitled "Attachment A - DB-
RFP-P909 SDVT 2 Operations
Support Facility.pdf" is neither bookmarked nor does it contain searchable text (OCR). Request that this file along with attachments be provided with bookmarks and in color to responsibly be able to review and respond to the Task Order
Solicitation.
The entire RFP (to include bookmarks was re-issued in
Amendment 0005. The correct file name should be, "DB-RFP-P-909
SDVT 2 Operations Support
Facility.Amendment.0005.11Oct2024
.pdf".
Ame ndme nts
Outstanding
PPIs
We are hearing from our trade partners that they have a substantial amount of submitted PPIs that have been submitted over the past several months that have yet to be responded
to. With the large number of PPIs outstanding along with the anticipated number of PPIs being submitted between now and March 4, recommend and request that the PPI cutoff remain March 4, all government responses be issued NLT
March 20, and the Proposal Due Date be extended to April 10 to be able to review, incorporate, and account for all responses.
PPI cutoff date to remain March 4th.
Due date has been extended to April
10th per Amendment 0012
Ame ndme nts
Index
Upon reviewing all Amendments to date, 0001 thru 0011, there have been numerous issuances of additional files, attachments, and other supplemental information. Some of this information has been posted on
Sam.gov, some sent via email, and some sent via DoD Safe. Can the government please create a detailed document log (outline or an index) of all documents issued to date so we can be sure all documents are accounted for.
See Amendment 0013, reference
P909 Amendments Index (attached separately)
Ame nd
Numerous
Several PPIs respond to questions asked about the Security Engineering
Planning Assessment (SEPA) referenced in Part 3, Chapter 2, Page
9 informing us that the SEPA document is complete and available, but will not be issued until after project award. Please confirm that any cost impacts to project design, cost and/or schedule associated with the information contained in that document will be addressed via contract modification.
Contract modification to cost and schedule are not anticipated.
Adequate information has been provided in the RFP and previous PPI responses indicating that for bidding purpose MEDIUM level of protection should be applied throughout the building.
Ame nd
Numerous PPI Responses instruct us to refer to SSM Lamar Finch -lamar.k.finsh.civ@socom.mil for classification and risk levels for
Tempest Requirements. This does not adequately address the questions being asked nor does it provide any responses provided by Lamar Finch to all bidding MACC Holders. Request that any and all responses provided by
Lamar Finch via email be compiled and issued in a subsequent amendment.
Lamar Finch has not been contacted by any contractors regarding P909.
Lamar Finch has not given any responses to be compiled and issued in a subsequent amendment.
Ame nd
Response to question about the
Government's Commissioning Agent is unclear. Please confirm the
Government will hire it's own
Commissioning Agent first tier and that the contractor is not to hire its own Commissioning Agent.
The Commissioning Agent will be hired by the Government.
Ame nd
363, Commercial
Ice Maker
Please confirm there are to be a total of (3) three commercial grade CFCI ice makers with a capacity of 75 lbs.
each. One in the Men's Laundry, one in the Women's Laundry, and one in the Medical Space. Please confirm that a floor drain is to be added at each ice maker location.
Please provide one each -ice machine connection, commercial grade Ice maker and floor drain- in Men's
Laundry G114, Women's Laundry
G110, and Physical Therapy M105.
Ame nd
Upon full review of Amendment
0006, the following PPI's appear to remain unanswered:3,4,5,6,7,49,51,60,63,64, 65,66,67,105,106,141,190,191,298,29
9,322,323,324,325,326,354,355,356,3
57,358,359,372,374,375,376, and
378.
PPI #s 3, 4, 5, 6, 7, 63, 64, 65, 66, 67 have all been answered in
Amendment 0007 and are PLA related. However, in accordance with
Amendment 0011, the Project Labor
Agreement language from the
General Requirements has been deleted in its entirety. PPI #49 and 60 has been answered in Amendment
0005. PPI#s 141, 141, 190, 191, 298, 322, 323, 324, 325, 326, 354, 355, 356, 357, 358, 359, 372, 374, 375, 376, and 378 have all been answered in Amendment 0007. PPI #299 has been answered in Amendment 0011.
PPI# 51 is to be disregarded as it has been omitted. PPI#105 and #106 have not been responded to. Have been responded to in this amendment.
690 12 Part 3
Ch2 2.4
2.4 Appropriate Design states "The
Platoon storage areas open directly to an exterior fenced in concrete drive-aisle which is intended to be enclosed and attached to the building in the future via forthcoming MILCON P-
931." Please clarify the exterior fencing and gates around the concrete drive-aisle to be provided in this contract.
The exterior fencing and gates around the concrete drive isle is to be designed and constructed in accordance with the SEPA and must meet the requirements of the RFP for what is being designed and constructed for this project P909.
691 5 Part 3
Ch2 2.3.2.5
Please clarify if the RED power and telecommunications in the Secured
Annex Area (SAA) rooms are to be in wall or surface-mounted on the finished walls.
RED power and telecommunications in the Secured Annex Area (SAA) rooms are to be wall mounted on finish walls.
Ame ndme nt 5
Per the response to Amendment 5 response #41, please clarify the discrepency between the direction to calculate plumbing fixtures for 188 occupants at 70/30 ratio and the room requirements for G111 Mens's Toilets requiring (12) water closets, (10) urinals and (8) lavatories.
The quantities are based on current staffing ratios between men and women. The design should allow for flexibility to allow future reconfiguration to adapt to staffing rations.
693 6, 7 Part 3
Ch 2 2.3.2.6.
Please clarify if STC lab tested/ rated assemblies of
STC 55 (min) must be provided for
CAA and SAA perimeter walls, ceilings/roof, perimeter penetrations, doors, and windows. Or, that the result of all constructed assemblie s must achieve field tested separation(
s) of no less than STC 50/ STC 45 in accordance with its associated Sound
Group designation.
The result of all constructed assemblies must achieve a field test separation of no less than STC50 or
STC45 in accordance with its associated sound group designation.
We designated STC55 assemblies in the design documentation with the understanding that label tested results are an ideal and field installed assemblies inevitably perform at a lower efficiency due to many variables.
Part 3
Ch 6
ESR
G40
G403002
Please provide the connection point location for the new 4" conduit for
CATV
Please provide building infrastructure to support CATV. Base CATV provider responsible for connecting to building.
Part 3
Ch 6
ESR
G40
G403001
Per Amendment 6, please confirm handhole 53 is the connection point for the two sets of 144 strand fiber for comm, one 100 pair copper for comm, one 12 strand fiber for ESS, one 12 strand fiber for ICS, and one 12 strand fiber for Cybersecurity
Handhole is for the fiber connection only.
Two sets of 144 strand fiber for comm. ESS, ICS and cybersecurity can utilize bandwidth from the 144 strand fiber. Copper is not required.
Part 3
Ch 6
ESR
G40
G403001
Please clarify if the contractor is responsible for splicing fiber and copper comm cables at handhole 53
Contractor is responsible for splicing into handhole 53
Part 3
Ch 6
ESR
G40
G403001
Four 4" conduits are required from handhole 53 to the building entrance facility for communications. Can these conduits be utilized for ESS, ICS, and Cybersecurity fiber cabling as well, or will additional conduit need to be installed for these systems?
Elect: ESS, ICS and cyber security can use the same 4” conduit.
Part 3
Ch 6
ESR
G40
G401003
Please provide location of switch PS-
313. We cannot locate it in Part 6
Attachment A
The switch is located at coordinate
36.918887, -76.166195
Part 3
Ch 6
ESR
G40
G401003
Please provide more information for switch PS-313 such as size, manufacturer, model number, and number of feeds in and out of it
This information should be found during the Contractor's survey
Part 3
Ch 6
ESR
G40
G403001
Part 6 Attachment A shows locations of existing manholes/handholes and routing of existing pathways. The attachment does not indicate quantities of existing conduits, quantities of existing cabling, or types/sizes of cabling. Please provide this information for the pathways/manholes/handholes that are required to be relocated
This information to be determined during the Field investigation/site surveys conducted by the KTR.
701 Part 6 TS101
Per Amendment 6 attachment U-
Telecommunication Connection
Point, the communications connection point is an existing handhole at the corner of Seabee Dr and Helicopter
Rd. Drawing TS101 shows a pathway and series of handholes running north and south along Intercove Rd. Will the pathways running south be required when the connection point is
Northeast of the facility?
The pathway running south is not needed. Connection to handhole 53 will provide connectivity to building
3806 and building 3808.
Amend ment 6
PPI 314
There are a number of SIPR outlets required in unsecured areas of the first floor. Your answer to this PPI states that a PDS is not allowed outside of the CAA/SAA. Typically, we install a
PDS for SIPR cabling outside of secure areas, not within secure areas.
Please confirm that no PDS is required for SIPR cabling outside of the secure areas.
PDS not required inside CAA/SAA.
Provide category 2 PDS outside the secure areas.
Amend ment 6
PPI 314
Please confirm that a PDS is not required for SIPR cabling within the
CAA/SAA area
PDS is not required inside
CAA/SAA.
Amend ment 6
Room
Requiremen t Sheets Pg
5.0 Room Requirements Sheet for
G107 - Women's Locker calls
"D201003 Provide lavatory faucet for integral countertop lavatory", but no counter material is called out.
Confirm the counter top and lavatory is solid surface material.
Please provide the same counter as listed in Men’s Toilet G111, Uniformat 103008
Amend ment 6
PPI166
Follow Up to PPI 166 - The question was whether or not the "operator cages" is a GFGI item or a construction item. The inquiry was not referring to the "drying cages" which were called out under the
FF&E section. It was referring to the
Operator Cages called out under
Specical Requirements and how those were provided. Although in the
Amend 06 Room Requirements - the updated Room Data Sheets call out
"Operator Cages" out under the
"Other/Special Requirements" section, as it did previously, BUT the drying cages have been removed from the FF&E section in this newly issued
Amendment. Please confirm that an
"operator cage" is the same item as a
"drying cage".
The expectation is for the contractor to furnish and install.
Amend ment 6
PPI166
Follow Up to PPI 166 - Amendment
0006 (page 17) states "Per the Room
Requirements Sheets, the drying cages are to be included as part of the
FF&E." Per the NAVFAC Collateral
Equipment Classification and
Funding Matrix drying cages are to be construction funded. Please confirm the drying cages are not to follow the
NAVFAC CEQ Funding Matrix standard and are to be funded within the FF&E Package.
The expectation is for the contractor to furnish and install.
ment 6
PPI 309
Regarding OSP cabling, the answer to this PPI states that only three 12 strand SMF are required for the facility and the connection point is
Handhole 53. Please confirm this includes the SIPRNET fiber cabling.
The connection point includes the
SIPRNET fiber cabling.
Amend ment 6
PPI 309
The answer for the OSP cabling does not mention the 100 pair copper cabling called for in G403001. Please clarify if this cable is still required
Copper cabling is not required.
Amend ment 6
PPI 243
If the SIPRNET OSP cabling connection point is not at Handhole
53 per U-Telecommunication
Connection Point, please confirm new pathway must be installed to building
3854. Also, please give approximate location of the connection point in building 3854, and whether any equipment will need to be installed in building 3854
The SIPRNET OPS connection point is at handhole 53.
The exact location of the connection point inside building 3854 to be determined by the KTR’s investigation. Provide new equipment to support incoming connection.
Amend ment 6
PPI 308
Please clarify if the four 4" conduits called for in G403001 are to be routed all the way to Handhole 53, or if they are tying into an existing duct bank system and we are just pulling cable to Handhole 53
Provide new Conduit to Handhole 53.
Amend ment 6
PPI 270
PPI #270 requested confirmation whether 6-sided box RF shielding is required for the SAA Secured Area only, or for the entire second floor.
The Government's response to PPI
#270 directed bidders to reference PPI
#191 response. No response has been provided to PPI #191. Please clarify the extent of the RF Shielding scope of work to be provided for the CAA and separately for the SAA.
Please read RFP Part 3 Project
Objectives - 2.3.2.5-Secured Areas.
Amend ment 6
PPI 270
Please confirm that the CAA comprises the entire second floor, excluding Stair 1, Stair 2, Stair 3, and
Elevator.
The CAA comprises only to the secure area, a portion of the second floor as identified in the bubble diagrams.
Amend ment 6
PPI 270
Please confirm that the Secured Area
SAA is located within the CAA, and that the SAA Secured Area is comprised of the spaces located within the RFP Bubble Diagram
Second Floor 'Secured Area' boundary.
CAA is defined by the red boundary on the diagrams. The SSA space is located within the CAA space and is comprised of the N2 Spaces. Please read RFP Part 3 Project Objectives -
2.3.2.5.
ment 6
PPI 256,
370, 406
The Government's response to PPI
#256, #370, #406 confirming 188 occupants and a ratio of 70:30
(Men:Women) for the quantity of plumbing fixtures, conflicts with Amd
0006 5.0 Room Requirements, G111
Men's Toilets (12) water closets, (10) urinals, and (8) lavatories. Please confirm the quantity of plumbing fixtures to be provided for each room, G111 Men's Toilets and G108
Women's Toilet & Shower.
Room Requirements were reissued in
Amendment 0006
Amend ment 6
5.0 Room
Requiremen ts; Space
Tabulation
Amd 0006 5.0 Room Requirements, G111 Men's Toilets specifies (12) water closets, (10) urinals, and (8) lavatories are to be provided. Amd
0006 Space Tabulation specifies 505
SF for the G111 Men's Toilets, which is insufficient area for the specified number of plumbing fixtures. Please confirm the number of plumbing fixtures to be provided for G111
Men's Toilets, and adjust the Space
Tabulation room areas to accommodate the number of required plumbing fixtures.
Room Requirements were reissued in
Amendment 0006
Amend ment 6
PPI 35; 5.0
Room
Requiremen ts
The Government's response to PPI
#35 states, "Room Requirements
Sheets will be provided for P230, P231, P232, P233 and P235. Amd
0006, 5.0 Room Requirements include requirements for rooms P230, P231, P232, P233, and P234. Please confirm that the requirements for
P234 have been added to the contract scope of work and any requirements for P235 have been deleted.
Room Requirements were reissued in
Amendment 0006
Amend ment 6
PPI 36;
Space
Tabulation;
5.0 Room
Requiremen ts
The Government's response to PPI
#36 states, "Space Tabulation Sheet will be updated to show rooms P230, P231, P232, P233 and P235 have been deleted". Amd 0006, Space
Tabulation includes area requirements for rooms P230, P231, P232, P233, and P234. Please clarify the area and room requirements for rooms P230, P231, P232, P233, P234, and P235.
Room Requirements were reissued in
Amendment 0006
Amend ment 6
PPI 40
The Government's response to PPI
#40 states, "P202 should be approx
200 sf". Amd0006 Space Tabulation specifies an area of 130 sf for P202
TU1 HQ Office. Please clarify the area requirements for room P202.
Room Requirements were reissued in
Amendment 0006 ment 6
PPI 80;
Space
Tabulation,
5.0 Room
Requiremen ts
The Government's response to PPI
#80 states, "See Amd 0006 for updated Space Tabulation Sheets and
Room Requirements Sheets for E202, X203, X204, X207, X208, X209, X211, X212, C202, C206, P209, P210, P214-P217, P222-P224, D206, and D207". Amd 0006 Space
Tabulation and 5.0 Room
Requirements do not include any requirements for these rooms. Please confirm that these rooms have been deleted and there are no requirements for these rooms in the contract scope of work.
Room Requirements were reissued in
Amendment 0006
Amend ment 6
PPI 418
The Government's response to PPI
418 states, "The line item for ESR
D209001 has been deleted from all
Room Requirements sheets addressing the compressed air system in Amendment 0007." Amendment
0006 includes D209001 in 5.0 Room
Requirements for D105 O2 Safe Dive
Gear Maintenance Room, D106 Dive
Gear Maintenance Room, and D109
Compressor Room. Amendment
0007 has not been issued. Please clarify the D209001 requirements to be provided by the contractor.
Amendment 0007 was issued in
December of 2024; please refer to amendment for D209001 requirements.
Amend ment 6
PPI 40
The Government's response to PPI
#40 does not provide the length of self-retracting reels required for the compressed air 120 psi and 5,000 psi systems. Please confirm the length of the reels for the compressed air systems that are to be included by the contractor in its bid, so that all contractors are bidding the same scope of work, or delete this undefined scope of work from the
RFP.
The only ask is for LP 120 psi air hose reels, the length should be sufficient to service the space the reel is in. Cancel the 5000 PSI reels ment 6
PPI 343
The Government's response to PPI
#343 does not provide the scope of lithium battery charging stations to be provided by the contractor in the
D104 Battery Storage Room. Please confirm the type, size, and quantity of lithium battery charging stations that are to be included by the contractor in its bid, so that all contractors are bidding the same scope of work, or delete this undefined scope of work from the RFP.
Current Quantities are shown in attachment X (attached separately), provide capacity for 25 percent increase beyond quantities shown in the attachment.
ment 6
PPI 383
The Government's response to PPI
#383 does not clarify the oxygen and specialty gas systems requirements that are to be included by the contractor in its bid. Please confirm the scope of the oxygen and specialty gas systems that the contractor is to include in its bid, so that all contractors are bidding the same scope of work, or delete this undefined scope of work from the
RFP.
Include the following: Oxygen O2, Helium HEO2, Nitrox N2O2, Helium
Oxygen HEO2.
Is contractor responsible for purchasing and providing all components in these diagrams?
ANSWER: Yes
2. Please confirm oxygen is for cylinder charging only and not related to trauma room.
ANSWER: charging only
3. Please confirm what "OTP" stands for in diagram.
ANSWER: Oxygen
Transfer Tank, we have two versions one is AC 110 powered, and the other is low pressure air powered “LP”.
We need to plan for both in that space so having an AC outlet next to the station and the LP hose reel that can reach that station is important.
4. Please confirm what specialty gas is anticipated.
ANSWER:60/40 NITROX,
88/12 HELIOX
5. Please state where oxygen manifold and specialty gas manifold is intended to be located as RDS did not indicate.
ANSWER: Maintenance room 0105, maintenance room 0106
Amend ment 6
PPI 384
The Government's response to PPI
#384 does not clarify the Medical
Suite scope of work to be included by the contractor in its bid. Please confirm the scope of medical oxygen, medical air, and vacuum systems that are to be included by the contractor in its bid, so that all contractors are bidding the same scope of work, or delete this undefined scope of work from the RFP.
Medical does NOT need any oxygen hard piped into the spaces. They also don’t want any built-in vacuum equipment. The request is to have the space on the wall for a portable oxygen and vacuum assembly along with the power to run that equipment directly underneath the space on the wall.
Amend ment 6
PPI 385
The Government's response to PPI
#385 does not clarify the "breathing air" scope of work. Please provide the current programmed locations of
"breathing air" for the contractor to include in its bid, so that all contractors are bidding the same scope of work, or delete this undefined breathing air scope of work from the RFP.
Maintenance room 0105 and maintenance room 0106 divers breathing air
Part 3
Ch 6 G2020
G2020 Parking Lots specifies that 2 designated electric charging stations for government vehicles are to be provided by the contractor. Please clarify the type of EV charging that is to be provided - Level 1 (Slow
Charging), Level 2 (Fast Charging), or Level 3/Type 3 (Rapid Charging), and the kW charging requirements.
Provide Level 2 charging.
Part 3
Ch 3 3.2.4
3.2.4 Site Layout specifies that the
contractor is provide a POV parking lot that accommodates a minimum of
80% of the building occupancy. UFC
3-201-01 Civil Engineering, Appendix B, Table B-1 Parking Space
Guidelines for Non-Organizational
Vehicles (POV), specifies 60% of assigned personnel for the number of parking spaces. Please confirm whether the number of parking spaces to be provided by the contractor is
60% or 80% of the building occupancy.
80%
Amend ment 6
PPI 153
The Government's response to PPI
#153 clarifies that rooms E203 and
E204 are not included the SAA
Secured Area. Please confirm that all of the second level Dive Group rooms, N1-Admin rooms, N-6
Comms rooms, T201 and T202
Training rooms, G203 Break Room, G206 Corridor, G207 Men's Toilet, G208 Janitor's Closet, G209 Women's
Toilet, are inside the Controlled
Access Area CAA.
The bubble diagrams issued in
Amendment 5 clarifies this question.
All items within the red perimeter are in the CAA. Within the CAA there is an SSA which is comprised Soley of the N2 space. Please read RFP Part 3
Project Objectives - 2.3.2.5.
Amend ment 6
PPI 165
The Government's response to PPI
#165 directs bidders to AMD0006 for clarification on the countertop material and lockers to be provided for the G107 Women's Locker Room.
AMD0006 revised Room
Requirements for G107 does not include C103008 Counters and
C103005 Lockers. Please clarify the countertop material and lockers that the contractor is to provide for this room.
Please provide the same Counters as called out in Men's Toilet G111, Uniformat C103008, and the same lockers/benches called out in Men's
Locker G115, Uniformat 103005
730 n/a
Amend
RFI
#313 n/a
The Government response to bidder inquiry #313 states a fully functional
ESS is to be provided. Please confirm that the Base Price is to include system design and permanent supporting infrastructure only and that all ESS equipment, testing, and associated training is included with
Option Item No. 14 as indicated on
Amendment 0008 Price Proposal
Form R1.
Yes, the Base Price is to include system design and permanent supporting infrastructure only and that all ESS equipment, testing, and associated training is included with
Option Item No. 14.
731 n/a
RFI
#677 n/a
The Government response to bidder inquiry #677 provides
"recommendations for building envelope for specific areas identified in SEPA requiring elevated Forced
Entry protection." However, the response does not clearly indicate which areas. This represents significant cost implications to the
Offeror's bid and risk to the
Government.
Please clarify which spaces or program areas are required to meet the recommendations for elevated
Forced Entry protection.
The entirety of the building will require elevated forced entry protection.
ment
2nd Floor
Plan
(1) Please clarify if entire Secured
Area perimeter as shown in
Amendment 0011 Second floor shall receive RF Shielding.
(2) If not, identify departments and / or rooms to receive RF Shielding.
DELETE ATTACHMENT V-
Attachment V in amendment 11 was an early concept developed to work out space needs and is not representative of the final program or requirements. Do not use Attachment
V as a reference. Refer to bubble diagrams in the RFP for general space adjacencies. Please Delete attachment V
Page
3 of
Amend ment
Space
Tabulat ion
Per Amendment 0006, Space
Tabulation, two(2) offices have been added as a part of Training Program -
T203 Training Office and T204
Training Group Office. Amendment
0011 2nd floor plan does not include rooms T203 and T204. Please clarify if room T203 and T204 are part of
Secured or Unsecured Area.
DELETE ATTACHMENT V-
Attachment V in amendment 11 was an early concept developed to work out space needs and is not representative of the final program or requirements. Do not use Attachment
V as a reference. Refer to bubble diagrams in the RFP for general space adjacencies. Please Delete attachment V of and of
Amend ment
Room
Requir ements
Per Amendment 0006, Room
Requirements, rooms T203 and T204 shall be RF shielded. Please clarify if these rooms are within Unsecured
Area, should they still be RF shielded.
T203 and T204 are not in the secure area and do not require RF shielding
RFP
Page of
Amend ment and
Amend ment
RFP
2nd Floor
Plan and
RFP Part 3 -
Chapter 6
Amendment 0011 2nd floor plans shows sliding doors at several offices.
Per Amendment 0005 RFP, page 738 of 2317, C102005 Sliding and
Folding Doors shall not be used.
Please clarify if sliding doors can be used at offices.
DELETE ATTACHMENT V-
Attachment V in amendment 11 was an early concept developed to work out space needs and is not representative of the final program or requirements. Do not use Attachment
V as a reference. Refer to bubble diagrams in the RFP for general space adjacencies. Please Delete attachment V ment
2nd Floor
Plan
Amendment 0011 2nd floor plan shows restrooms within Secured
Area. Such layout would require people using Training Room and
Offices and N1 Suite occupants to go through the secure man trap every time when using restrooms. Please clarify if that is design intent.
DELETE ATTACHMENT V-
Attachment V in amendment 11 was an early concept developed to work out space needs and is not representative of the final program or requirements. Do not use Attachment
V as a reference. Refer to bubble diagrams in the RFP for general space adjacencies. Please Delete attachment V
4 of
Amend ment and previou s 5.0
Room
Requir ements.
C103
With PPI 462 confirming the Cage height to be 8' please clarify whether the C103 / P101 Room Requirement of 16' clear to bottom of structure remains and whether the intent is clear height to structure, versus clear height to any MEP/FP in the space between the top of cages and structure.
The intent is that the MEP equipment would be exposed and installed in the
16’ space under the structure.
RFP pages 1986 thru 2039 are
Attachment O Basic Facility
Requirement Worksheets all believed to be outside the scope of this RFP.
Please confirm.
The BFR is a planning document that was used to generate the program provide. It is included in the RFP for reference.
Please confirm that when Storage is treated as a separate building ("not indoor" per PPI 670) whether the
Allowable Gross remains 60,000 SF for the two-story Operational Support
Facility, or is it reduced by the 1,107
SF Storage Room?
Storage is adequate size and it does
NOT need to be indoor. The 60,000
SF requirements applies to the building.
PPI
N/A N/A
For the six-sided box, please confirm whether the only “control requirement” mentioned in PPI 593 pertains to acoustics and RF-shielding.
All items within the red perimeter are in the CAA. Within the CAA there is an SSA which is comprised Soley of the N2 space. Please read RFP Part 3
Project Objectives - 2.3.2.5.
PPI
N/A N/A
Please confirm whether the 12” wall called for in PPI 677 is only required in the length of interior wall in which the 6” thick door is located, or is the entire yellow highlight in the
Amendment 11 Second Floor plan required to be 12” concrete.
DELETE ATTACHMENT V-
Attachment V in amendment 11 was an early concept developed to work out space needs and is not representative of the final program or requirements. Do not use Attachment
V as a reference. Refer to bubble diagrams in the RFP for general space adjacencies. Please Delete attachment V
UFC 4-
010-01 Table C-3
Follow up on response to PPI 593, UFC 4-010-01 Appendix B – Best
Practices approach references Table
C-3 for determining standoff distance for medium level of protection. Table
C-3 does not provide standoff distance for un-topped metal deck.
Please confirm that bidding should
The design of roof structure shall be performed by Engineer of Record and according to design requirements in
RFP.
include concrete roof or concrete roof w/ concrete topping as provided in the standoff table are required to meet the
Appendix B requirement for determining building standoff distances.
9,11, 103, Amend ment 6
Room
Requir ements
Dive and
Platoon
Storage
Rooms
Room data sheets indicate dive group and platoon storage rooms with ceiling heights greater than 12 ft.
Please confirm that the storage areas must be separated from other occupancies in the building by 1-hour fire barriers and horizontal assemblies in accordance with UFC 3-600-01 §4-
48.1.2, §4-48.5.2.2 and IBC
§508.4.4.1.
This facility is not a storage facility as defined within UFC 3-600-01 4-48.
This facility is a multiple occupancy building as defined by the Life Safety
Code NFPA 101 - 6.1.14. Required separations must be applied to the building design in accordance with
NFPA 101 and UFC 1-200-01 and
UFC 3-600-01. IBC 508.4.4.1 applies as appropriately referenced or not within UFC 1-200-01 - DOD
Building Code. Consult your project
Registered Fire Protection Engineer
Spec 01 45 00.05 20, section 1.4.5.1 for the appropriate application of the required DOD criteria and standards.
744 772
Amend ment 5
RFP
D4010
The RFP states that a DET-16 telegraphic transmitter will be required to transmit fire alarm signals to the base fire reporting station.
Please identify the point(s) in the existing 100mA Gamewell telegraph loop where the loop can be broken and wires routed to the new building so that the distance of the new runs can be accounted for. Please confirm if the loop is routed within the communication service ductbank and whether a dedicated conduit is required.
100mA Gamewell loop traverses existing site must be maintained operational throughout construction to maintain Base Fire Reporting.
Dedicated conduit to the loop connection is required. The 100 mA loop is pole mounted running along the east side Intercove Rd with a line servicing CB123 and CB-125 on the south side of Signal Point Rd. In addition to the DET 16 required for
Fire Reporting, the contractor must provide a complete Monaco BT-X
Transceiver and antenna system capable of reporting Alarm, Supervisory and Trouble conditions to the recently installed Monaco D-21 receiving station. Once accepted by the government, the Monaco D-21 will be the primary Fire Reporting system for the facility. It should not be assumed that the Monaco D-21 receiving station is a replacement of the DET-16 reporting system requirement at this time.
745 771
Amend ment 5
RFP
D4010
Please confirm that LED Text Signs are required for mass notification at all exits and stairs in accordance with
UFC 4-021-01 §4-6.2.1.
UFC standards must be followed.
ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 1. states disposal of surplus soil will be covered under separate Line Item, but the description states to include disposal in unit price.
All unsuitable soils are "surplus".
Please confirm disposal is to be included in this unit price?
"Disposal" will be deleted from this
CLIN. All disposal of the undercut is required under CLIN 0003.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 1. states soils disturbed by the contractor's construction activities will not be considered unsuitable. All soils will be disturbed by construction activities
- this is how contractor uncovers any unsuitable soils. Please remove this statement from the unit price description or better define?
See Amendment 0013, reference
Revised Attachment D Price Proposal
Form. See Line Item 0002.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 1. states any work under this line item will not proceed without prior written approval of the
Contracting Officer and direction of the Government Geotechnical
Engineer. Time is of the essence and the affected subcontractor will have manpower and equipment mobilized to continue with the affected work.
Please confirm that the Contracting
Officer will provide approval to proceed within 24 hours of discovery so as not to delay the project?
Contracting Officer approval will take place upon review of the work completed. The contracting officer plans to provide this approval in a timely manner in accordance with contractor work plans.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 2 has a quantity of
12,000 TONS. This is very excessive for the project scope that includes foundation and utility trench excavation. This high quantity will negatively effect the overall bid price and result in potential negotiations in
Variation of Estimated Quantity.
Please consider reducing the quantity to a realistic project scope amount of
3,000 TONS?
See Amendment 0013, reference
Revised Attachment D Price Proposal
Form. See Line Item 0003.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 2 is requesting a unit price to include contaminant
(including, but not limited to, PFAS, petroleum, and metals) impacted soil media. Testing, treatment, handling and disposal costs can vary greatly for each contaminate, especially
"metals". It is unreasonable to just list "metals" because there are numerous types of heavy metal contaminants. It is also unreasonable to state "including, but not limited" since the costs vary greatly depending on the contaminant. We cannot price
Site specific soil data is provided within the Geotechnical Report withing Part 6 of the RFP. It is the contractors responsibility to review this data, identify an acceptable facility that meets local, State, and
Federal Requirements (including the
OSD PFAS disposal policy located at https://www.acq.osd.mil/eie/eer/ecc/p fas/docs/news/Memorandum_for_Inte rim_Guidance_on_Destruction_or_Di sposal_of_Materials_Containing_PF
AS_in_the_U.S.pdf), and will accept the volume anticipated to a single unit price for this description.
Please turn this unit price into a government provided allowance on the price proposal form for bidding purposes due to the high price volatility for contaminant soil impacted media?
appropriately bid on this construction project.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 2 states to provide the necessary treatment and disposal.
This cannot be determined until the contaminant is determined and the costs can vary greatly depending on the contaminant. We cannot price a single unit price for this description.
Please turn this unit price into a government provided allowance on the price proposal form for bidding purposes due to the high price volatility for contaminant soil impacted media?
Site specific groundwater data is provided within the Geotechnical
Report withing Part 6 of the RFP. It is the contractors responsibility to review this data, identify an acceptable treatment method to meet the acceptable local, State, and
Federal Requirements (including the
OSD PFAS disposal policy located at https://www.acq.osd.mil/eie/eer/ecc/p fas/docs/news/Memorandum_for_Inte rim_Guidance_on_Destruction_or_Di sposal_of_Materials_Containing_PF
AS_in_the_U.S.pdf), and can handle the required volume needed for construction to continue. No allowance is granted; bid as requested within the price schedule.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 2 states the removal and disposal of any contaminant-impacted surplus soil in excess of the
Line Item quantity must be covered under the Base Bid. This is unreasonable. The purpose of the unit price is to cover the project unforeseen conditions. Please consider removing this line for the description?
See response to item PPI 750 above.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 2. states any work under this line item will not proceed without prior written approval of the
Contracting Officer. Time is of the essence and the affected subcontractor will have manpower and equipment mobilized to continue with the affected work. Please confirm that the Contracting Officer will provide approval to proceed within 24 hours of discovery so as not to delay the project?
Contracting Officer approval will take place upon review of the work completed. The contracting officer plans to provide this approval in a timely manner in accordance with contractor work plans.
ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 3. describes unit price is based upon buried concrete and debris greater than 1/2 cubic yard in size. Debris such as piping, etc. is not measured in cubic yard. Please change unit price to just concrete, or provide a specific measure for specific debris?
Please bid per RFP
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 3. includes creosote treated lumber in this unit price.
Creosote treated lumber is typically considered a hazardous material and is required to be handled as such and not included in this unit price. This cost for creosote treated lumber is drastically higher then the removal of a block of concrete or a non creosote treated timber. Please remove from this unit price. We recommend handling any creosote treated lumber as a government provided allowance on the price proposal form for bidding purposes or an unforeseen site condition?
Please bid per RFP
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 3. states any work under this line item will not proceed without prior written approval of the
Contracting Officer. Time is of the essence and the affected subcontractor will have manpower and equipment mobilized to continue with the affected work. Please confirm that the Contracting Officer will provide approval to proceed within 24 hours of discovery so as not to delay the project?
Contracting Officer approval will take place upon review of the work completed. The contracting officer plans to provide this approval in a timely manner in accordance with contractor work plans.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 3. states buried concrete and debris must be field verified by the Contracting Officer prior to removal. Time is of the essence and the affected subcontractor will have manpower and equipment mobilized to continue with the affected work. Please confirm that the Contracting Officer will provide approval to proceed within 24 hours of discovery so as not to delay the project?
Contracting Officer approval will take place upon review of the work completed. The contracting officer plans to provide this approval in a timely manner in accordance with contractor work plans.
Amend ment 8, Revise d Price
Propos
Bid Price
Schedule, Line Item
Option Item No. 4 has a quantity of
1,000,000 gallons. This is very excessive for the project scope that includes foundation and utility trench excavation. This high quantity will negatively effect the over all bid price
Please bid per RFP al
Form and result in potential negotiations in
Variation of Estimated Quantity.
Please consider reducing the quantity to a realistic project scope amount of
100,000 gallons?
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4 is requesting a unit price to include contaminant
(including, but not limited to, PFAS, petroleum, and metals) construction dewatering effluent. Testing, treatment, handling and disposal costs can vary greatly for each contaminate especially metals. It is unreasonable to just list "metals" because their are numerous types of heavy metal contaminants. It is also unreasonable to state "including, but not limited" since the costs vary greatly depending on the contaminant. We cannot price a single unit price for this description.
Please turn this unit price into a government provided allowance on the price proposal form for bidding purposes due to the high price volatility for construction dewatering effluent?
Site specific groundwater data is provided within the Geotechnical
Report withing Part 6 of the RFP. It is the contractors responsibility to review this data, identify an acceptable treatment method to meet the acceptable local, State, and
Federal Requirements (including the
OSD PFAS disposal policy located at https://www.acq.osd.mil/eie/eer/ecc/p fas/docs/news/Memorandum_for_Inte rim_Guidance_on_Destruction_or_Di sposal_of_Materials_Containing_PF
AS_in_the_U.S.pdf), and can handle the required volume needed for construction to continue. No allowance is granted; bid as requested within the price schedule.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4 states this unit price is for ground water and not surface rain water. Surface rain water will mix with ground water in excavations. This cannot be separated. Please confirm this unit price is for all dewatering operations in excavations for foundations and utility trenches?
Confirmed; The unit price is for all construction dewatering, The CLIN will be revised.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4 states to provide decontamination, treatment media management. This can vary in scope and price. Please define the intent and magnitude of this scope? Please confirm the decontamination, treatment media management scope is up to the contractor?
Site specific groundwater data is provided within the Geotechnical
Report withing Part 6 of the RFP. It is the contractors responsibility to review this data, identify an acceptable treatment method to meet the acceptable local, State, and
Federal Requirements (including the
OSD PFAS disposal policy located at https://www.acq.osd.mil/eie/eer/ecc/p fas/docs/news/Memorandum_for_Inte rim_Guidance_on_Destruction_or_Di sposal_of_Materials_Containing_PF
AS_in_the_U.S.pdf), and can handle the required volume needed for construction to continue.
Decontamination and treatment media management must meet the minimum requirements of the OSD PFAS disposal policy and local, State, and
Federal requirements for any contaminant (including PFAS) impacted WASTE generated by the project.
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4 states the removal, treatment and disposal of any contaminant-impacted groundwater in excess of the Line Item quantity must be covered under the Base Bid. This is unreasonable. The purpose of the unit price is to cover the project unforeseen conditions. Please consider removing this line for the description?
This description will be deleted;
please see revised bid schedule
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4 states the contractor is required to minimize the extraction of contaminant-impacted groundwater throughout construction.
This statement is very broad and subjective. Please define this statement more, or remove from the unit price description?
This description will be deleted;
please see revised bid schedule
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4 states the contractor is not entitled to any compensation for properly handling, management, oversight, treatment, decontamination, mob/demob, and disposal of dewatered contaminant impacted groundwater as required per the specifications. This statement completely conflicts with purpose and description of the unit price. In order to price this unit price, please remove this entire statement?
This description will be deleted;
please see revised bid schedule
Amend ment 8, Revise d Price
Propos al
Form
Bid Price
Schedule, Line Item
Option Item No. 4. states any work under this line item will not proceed without prior written approval and field verification from the Contracting
Officer. Please confirm the dewatering unit price is not subject to
Contracting Officer approval prior to starting, or approval is provided prior to any excavation for foundations or utility trenches? The dewatering pumps, hoses, frac tanks, etc. will need to be put in place prior to excavation operations to capture ground water as it occurs.
A dewatering management plan is required for review and approval prior to construction (REF 01 57 19).
Approval of the CLIN will be provided by the contracting officer following government review and approval of the dewatering management plan.
Government approval delays will cause additional dewatering and…