5.0_Room.Requirements_Amendment.0006.pdf
PDF 3 MB Posted
- Solicitation number
- N4008524R2862
About this file
This document is a Room Requirements specification for the P-909 SDVT-2 Operations Support Facility at JEB Little Creek-Fort Story in Norfolk, Virginia. It provides detailed requirements for various spaces within the facility, including communications closets, storage rooms, maintenance areas, offices, and support spaces. The document covers functional requirements, adjacencies, spatial requirements, acoustical requirements, access requirements, special requirements, and coordination of furniture, fixtures, and equipment (FF&E). It specifies construction materials, finishes, and mechanical, electrical, and plumbing systems for each space. This appears to be a technical specification that would be part of the solicitation package for the construction of the P-909 SDVT-2 Operations Support Facility project.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
JEB Little Creek-Fort Story, Norfolk, Virginia
5.0 ROOM REQUIREMENTS
C101 – COMMUNICATIONS CLOSET
Space Characteristics
FUNCTION: Communication Closet to support the telecommunications systems for the first floor of the facility.
ADJACENCIES: Locate to enable maximum efficiency of run lengths to support entire first floor from (2) designated first floor Comm Closets. Criteria requires (2) Communication Closets when a floor exceeds 10,000 sf. Locate Communication closets so that (2) first floor and (2) second floor comm closets align with/ stack with each other.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: Provide 3’-0” (min) clear on all sides of network racks.
Minimum Ceiling Height: 9’-0” Ceiling
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
SPECIAL REQUIREMENTS: Provide (4) full-sized racks for NIPR, SIPR, GREY Network & (1) additional rack for additional capacity.
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:g
FF&E: fire extinguisher uisher
UNIFORMAT DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS
UNIFORMAT
A1030
DESCRIPTION
GROUND FLOOR SLABS
QTY
SIZE SPECIFIC REQUIREMENTS
Structurally Reinforced Concrete Slab.
C101001
FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above.
C102001
STANDARD INTERIOR
DOORS
(1)
3’ x 8’
Solid-Core, flush door panel with natural wood veneer finish hosted in Hollow Metal frame.
Factory Primed. Field-Painted.
C102007
INTERIOR DOOR
HARDWARE
Provide X10 Lock in addition to; Electronic Entry
Control System: Electronic Keypad/Proximity Card
Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Pinned security hinges and door closure device and Kick
Plate.
C103004
IDENTIFYING DEVICES
1 per door
Signage on exterior side of room entry door(s).
Indicate permanent room name(s) and number
C301003
WALL FINISHES
AR
Provide painted CMU. .
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C301090 OTHER WALL FINISHES
Provide ¾” Class A fire-rated plywood on (3) walls
(sides & back).
C302007
WALL BASE FINISHES
Sealed joint at base of wall between CMU and concrete floor surface.
C302010
FLOOR FINISHES
HARDENERS AND SEALER
AR AR
Hardened and sealed cured concrete floors
C303009 CEILING FINISHES AR AR
Exposed structure, painted epoxy
C304001
INTERIOR COATINGS /
FINISHES
Epoxy wall paint. Paint suitable in accordance with
Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D30
HVAC
Provide dedicated air conditioning & heating for temperature control for equipment protection.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
C102 – COMMUNICATIONS CLOSET
Space Characteristics
FUNCTION: Communication Closet to support the telecommunications systems for the first floor of the facility.
ADJACENCIES: Locate to enable maximum efficiency of run lengths to support entire first floor from (2) designated first floor Comm Closets. Criteria requires (2) Communication Closets when a floor exceeds 10,000 sf. Locate Communication closets so that (2) first floor and (2) second floor comm closets align with/ stack with each other.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: Provide 3’-0” (min) clear on all sides of network racks.
Minimum Ceiling Height: 9’-0” Ceiling
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
SPECIAL REQUIREMENTS: Provide (4) full-sized racks for NIPR, SIPR, GREY Network & (1) additional rack for additional capacity.
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:g
FF&E: fire extinguisher uisher
*REFER TO SHEET FOR ROOM # C101 – COMMUNICATIONS CLOSET
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
C103 – COMMUNICATIONS/ INTEL (N6) STORAGE ROOM
Space Characteristics
FUNCTION: Secured storage area where Communications equipment is stored and maintained by the N6 Group.
ADJACENCIES: Close proximity with Platoon Storage spaces, Personnel Cages and future proposed Drive-Thru bay (future MILCON).
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Space Tabulation Data.
Minimum Ceiling Height: 16’ Clear to bottom of structure
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS: N6 Intel/Comm Personnel. Provide controlled access from interior of building and exterior where future proposed drive-thru bay is anticipated within future MILCON.
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS: High Density Rolling Storage units to have a 48” depth each and 10’-12’ Length
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: @ 32 LF of 30”d heavy duty shelving
UNIFORMAT DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS
A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab.
A103001 IN-SLAB STEEL TRACK @ 38’-6”
Provide Steel track within structural slab to support the identified High-Density rolling storage units. See C103006 Shelving
B203001 EXTERIOR SOLID DOORS (1) 6’ x 8’
Pair of Insulated Heavy-Duty, Hot-Dipped Galvanized Steel doors and frames. Factory Primed with Zinc Rich MPI compliant primer. Provide compatible epoxy-based intermediate & top-coat.
Provide active/ inactive leaf.
B203008 EXTERIOR DOOR HARDWARE
Electronic Entry Control System: Electronic Key Pad/ Proximity Card Reader, Electronic Strike, Heavy-Duty pinned hinges, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep. Provide Door Position Switch and contact connected to security system and CCTV. Provide SS flush-bolts at top and bottom of inactive leaf to secure into slab and frame.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 6’ x 8’ Pair of Hollow Metal doors and frame. Factory Primed. Field-Painted. Provide active/ inactive leaf.
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Pinned security hinges, door closure device, Kick Plate and Silencer. Provide SS flush-bolts at top and bottom of inactive leaf to secure into slab and frame.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C103004 IDENTIFYING DEVICES
1 per door
Wall mounted signage on exterior side of room entry door(s). Indicate permanent room name(s) and number. All signage to comply with latest standards and guidelines.
C103006 SHELVING (7)
4 High Density Rolling Storage units on steel tracks secured into concrete slab per manufacturer requirements. Each unit to have a 48” deep shelves and 10’-12’ in Length
C302007 WALL BASE FINISHES AR AR
Sealed join at base of wall between CMU and concrete floor surface.
C302010
FLOOR FINISHES HARDENERS AND
SEALER
AR AR Hardened and sealed cured concrete floors
C303009 CEILING FINISHES AR AR Exposed structure, painted epoxy
C304001 INTERIOR COATINGS / FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D30 HVAC
Provide air conditioning and heating for temperature control for equipment protection.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection to provide complete coverage throughout the facility.
See RFP Part 3; ESR D4040.
D502001 BRANCH WIRING
Provide 125 volt, 20 amp, duplex receptacles @ 14” AFF every 6 linear feet of wall (max).
D502002 LIGHTING EQUIPMENT
Suspended linear LED luminaire per UFC 3-530-01
3-3.4 “Storage Room”.
D503001 LIGHTING CONTROLS Controls per UFC 3-530-01 3-3.4 “Storage Room”.
D503001 TELECOMMUNICATIONS SYSTEMS
Provide (3) NIPR and (3) SIPR accessible in close proximity to High Density Storage Systems – Equally space drops along the length of the room.
D503002 PUBLIC ADDRESS SYSTEMS
Provide Public Address system with flush ceiling mounted speakers.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
C104 – N6 EKMS VAULT
Space Characteristics
FUNCTION: Electronic Key Management System (EKMS) Vault..
ADJACENCIES: Locate a fixed COMSEC facility in an area which provides positive control over access, and as far as possible from areas which are difficult or impossible to control (e.g., parking lots, ground floor exterior walls, multiple corridors or driveways, or surrounded by other uncontrolled buildings or offices).
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Floor Plans.
Minimum Ceiling Height: 9’-0” Ceiling
ACOUSTICAL REQUIREMENTS: Unless Otherwise Noted:
EXTERIOR: Provide STC 55 (min) rated floor, roof and exterior envelope and window assemblies for entire second level.
INTERIOR: Provide STC 55 (min) rated interior partitions for entire second level.
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
SPECIAL REQUIREMENTS: Reference CMS-1A (AMD-1) DEPARTMENT OF THE NAVY (DON) COMSEC POLICY AND
PROCEDURES MANUAL
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: (8) 4 dwr GSA safes
B1010 FLOOR CONSTRUCTION – STC 55 (MIN) AR AR
4" (min) normal weight concrete on 2” (min) deep, 20ga (min) composite steel deck & a minimum total slab thickness of 6”. Reinforce with 6x6-W2.9xW2.9 WWR. STC 55 (min) lab-tested rating.
B1010 FLOOR – RF SHIELDING AR AR
Provide RF Shielding and required RF mitigations within entire second floor assembly.
B301090 OTHER ROOFING – STC 55 (MIN) AR AR
All second floor roof assemblies shall provide an STC 55 (min) lab-tested rating.
B301090 OTHER ROOFING – RF SHIELDING AR AR
Provide RF Shielding & required RF mitigations within all second floor roof assemblies.
C101001 FIXED PARTITIONS
Impact Resistant gypsum board on cold-formed steel studs continuous to underside of structural above. Provide STC 55 (min) lab-tested assembly.
C102001 STANDARD INTERIOR DOORS (1) 4’ x 7’ Heavy-Duty steel door and frame. Factory Primed.
Field-Painted
C102007 INTERIOR DOOR HARDWARE
Provide X10 Lock + Electronic Entry Control System: Electronic Key Pad/ Proximity Card
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Pinned security hinges, door closure device and Kick Plate.
C103004 IDENTIFYING DEVICES
Indicate permanent room number and changeable room name
C301003 WALL FINISHES AR AR Primed and painted gypsum wallboard.
C302004 RESILIENT FLOOR FINISHES SF AR Luxury vinyl tile flooring
C302007 WALL BASE FINISHES AR 4”h Rubber cove base in 120’ coils
C303003
GYPSUM WALLBOARD CEILING
FINISHES
AR AR Gypsum wallboard. Epoxy paint
C304001 INTERIOR COATINGS / FINISHES
Epoxy paint, Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D30 HVAC
Provide air conditioning and heating for temperature control. HVAC system selection based on results of LCCA performed by KTR. Provide dedicated air conditioning for temperature control.ductless mini-split for this room. HVAC system selection based on results of LCCA performed by KTR.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility.
See Part 3; ESR D4040.
D502001 BRANCH WIRING
Provide power for AV System Equipment, Movable Furnishings, Government Furnished Equipment and Other Equipment, D502001 BRANCH WIRING
Provide one receptacle for every 6 ft of wall space at the floor line. When 10 ft or less of wall at the floor line exists in a room, provide a minimum of two receptacles.
D502002 LIGHTING EQUIPMENT
Suspended mounted LED linear luminaire per UFC 3-530-01 3-3.4 Storage Room. Lighting Plate NL-6
D502002 LIGHTING CONTROLS
Manual on, or auto on (to no more than 50% design lighting power) combined with manual on switching, when occupant enters room.
Automatic off within 15 min of no occupant activity.
D503001 TELECOMMUNICATIONS SYSTEMS
Provide a minimum of (4) SIPR data ports located per N6 user preference.
???? CABLING STUFF-TUBE
Provide 4” Antenna cabling “stuff tube” to 10’x10’ roof antenna platform above. Provide removable covers at both tube ends and a gooseneck termination above the roof to impede water intrusion
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
D503005 SECURITY SYSTEMS Provide IDS/ACS
D509002 EMERGENCY LIGHTING AND POWER AR
All mission critical power circuits shall connect to emergency panel and back up by emergency generator.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D101 – CONSOLIDATED RIG STORAGE
Space Characteristics
FUNCTION: High-Density Storage Area where dive gear is stored and checked in/ out from by personnel/ platoon groups.
ADJACENCIES: Close proximity with Dive Maintenance rooms, Dive Staging & Setup, Platoon Storage spaces and Personnel Cages.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Space Tabulation Data.
Minimum Ceiling Height: 20’ Clear to bottom of structure
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS: SDVT-2 Personnel. Provide at minimum (1) card reader access controlled door into the bay from the outside laydown space. Exterior access point can satisfy requirement for both this area and adjacent Staging & Setup area.
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS: High Density Rolling Storage, (12) units to have a 48” depth each and 10’-12’ Length
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E:
A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab. Slope to drain.
A103001 IN-SLAB STEEL TRACK 33’ lf Provide Steel track within structural slab to support the identified High- Density rolling storage units.
A103001 IN-SLAB STEEL TRACK 25’ lf Provide Steel track within structural slab to support the identified High- Density rolling storage units.
B203001 EXTERIOR SOLID DOORS (1) 6’ x 8’ Pair of Insulated Heavy-Duty, Hot-Dipped Galvanized Steel doors and frames. Factory Primed with Zinc Rich MPI compliant primer. Provide compatible epoxy-based intermediate & top-coat.
B203004 EXTERIOR OVERHEAD DOORS (1)
14’ x 16’
Insulated steel coiling door. Hot-dipped galvanized and factory primed with Zinc Rich MPI compliant primer and manufacturer standard corrosive resistant finishes. Plans show this door inside the exterior building perimeter. Due to the environment, door should be treated as an exterior door and appropriately galvanized/ treated.
B203008 EXTERIOR DOOR HARDWARE
Electronic Entry Control System: Electronic Key Pad/ Proximity Card Reader, Electronic Strike, Heavy-Duty pinned hinges, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep. Provide Door Position Switch and contact connected to security system and CCTV.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 6’ x 8’ Pair of Heavy-Duty steel doors and frame. Factory Primed. Field-Painted
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Pinned security hinges, door closure device, Kick Plate and Silencer.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C103004 IDENTIFYING DEVICES
Signage on exterior side of room entry door(s). Indicate permanent room name(s) and number.
C103006 SHELVING (7)
High Density Rolling Storage units on steel tracks secured into concrete slab per manufacturer requirements. Shelves to have a 48” depth, and 10’-12’ in Length
C103006 SHELVING (5)
High Density Rolling Storage units on steel tracks secured into concrete slab per manufacturer requirements. Shelves to have a 48” depth and 10’-12’ in Length
C301003 WALL FINISHES AR AR Provide painted CMU
C302007 WALL BASE FINISHES AR AR Sealed joint at base of wall between CMU and concrete floor surface
C302010 HARDENERS AND SEALERS AR AR Hardened and sealed cured concrete floors
C303009 CEILING FINISHES AR AR Exposed structure, painted epoxy
C304001
INTERIOR COATINGS /
FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for interior architectural surface being finished.
D203003 FLOOR DRAINS (1)
Provide floor drain. Locate so not to inhibit movement of rolling carts, storage and equipment.
D30 HVAC Provide air conditioning & heating for temperature control.
D4010
FIRE ALARM / DETECTION
SYSTEMS
See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility. See Part 3; ESR D4040.
D502001 BRANCH WIRING
Provide 125 volt, 20 amp, duplex receptacles @ 24” AFF every 6 linear feet.
D502002 LIGHTING EQUIPMENT
Suspended direct/indirect linear LED luminaires per UFC 3-530-01;
Section 3-9.1 “Vehicle Maintenance Areas”.
D503001 LIGHTING CONTROLS Controls per UFC 3-530-01; Section 3-9.1 “Vehicle Maintenance Areas”.
D503001
TELECOMMUNICATIONS
SYSTEMS
Provide (2) NIPR and (2) SIPR accessible in close proximity to High Density Storage Systems
D503002 PUBLIC ADDRESS SYSTEMS Provide Public Address system with flush ceiling mounted speakers.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D102 – STAGING & SETUP HIGH-BAY
Space Characteristics
FUNCTION: Interior lay-down, work and staging space where large gear and equipment is used, worked on, maintained and stored.
ADJACENCIES: Adjacent to Consolidated Rig Storage. Close proximity to Dive Maintenance rooms and Dive Systems Office Suite.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Space Tabulation Data. Pressurized Chamber Unit shown is a relevant variable for spatial consideration.
Minimum Ceiling Height: 20’ Clear to bottom of structure
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS: Provide at minimum (1) card reader access controlled door into the bay from the outside laydown space. Exterior access point can satisfy requirement for both this area and adjacent Consolidated Rig Storage area.
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS:
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: (1) fire extinguisher, (4) Vidmar storage cabinets, (1) AED, (1) cell phone locker to be located just outside the exterior man-door.
A1030 GROUND FLOOR SLABS --
Structurally Reinforced Concrete Slab. Slope to floor drain(s).
B203001 EXTERIOR SOLID DOORS (2) 3’ x 8’
Insulated Heavy-Duty, Hot-Dipped Galvanized Steel doors and frames. Factory Primed with Zinc Rich MPI compliant primer. Provide compatible epoxy-based intermediate & top-coat.
B203004 EXTERIOR OVERHEAD DOORS
24’ x 16’
16’ x 16’
Insulated steel coiling door. Hot-dipped galvanized and factory primed with Zinc Rich MPI compliant primer and manufacturer standard corrosive resistant finishes.
B203008 EXTERIOR DOOR HARDWARE (1)
Electronic Entry Control System: Electronic Key Pad/ Proximity Card Reader, Electronic Strike, Heavy-Duty pinned hinges, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep.
Provide Door Position Switch and contact connected to security system and CCTV.
B203008 EXTERIOR DOOR HARDWARE (1)
EGRESS ONLY: Heavy-Duty pinned security hinges, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep. Provide Door Position Switch and contact connected to security system and CCTV.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C103004 IDENTIFYING DEVICES
C103006 SHELVING
6’-0”d x 24’-6”l – 10’-0”h
2 shelf high heavy duty palette racking
C103007 FIRE EXTINGUISHER BRACKET
Provide wall mounted metal extinguisher hanging bracket. Extinguisher unit to be provided via FF&E package. See RFP Part 3; ESR D4090.
C301003 WALL FINISHES AR AR Provide painted CMU
C302007 WALL BASE FINISHES AR AR
Sealed joint at base of wall between CMU and concrete floor surface
C302010 HARDENERS AND SEALERS AR AR Hardened and sealed cured concrete floors
C303009 CEILING FINISHES AR AR .Exposed structure, painted epoxy
C304001 INTERIOR COATINGS / FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D203003 FLOOR DRAINS (2) Provide floor drain.
D209005
COMPRESSED AIR SYSTEMS (NON-
BREATHING)
Provide Shop-Quality Air Service (120 psi). Provide drops on self-retracting reels. See Plans for locations. Provide Dial-Down Regulator to convert air pressure as required.
D30 HVAC
Provide air conditioning and heating for temperature control.
D3040 OTHER HVAC BigAss Fan – Add ESR Section.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility.
See Part 3; ESR D4040.
D502001 RECEPTACLE OUTLETS
Provide one receptacle for every 6 ft of wall space at the floor line. Provide 208V single phase 60hz at 50amp service to Qty 2 interior and 3 exterior outlets made to hookup with Marinco 6364CRN 50amp 125/250V female connector 4 wire 3 pole. 3 exterior outlets are needed to power chambers outside and need to be located on wall closest to laydown area.
D502001 BRANCH WIRING
Provide 125 volt, 20 amp, duplex receptacles @ 24” AFF every 6 linear feet of wall (max). Branch power installed per UFC 3-520-01.
D502002 LIGHTING EQUIPMENT
Suspended direct/indirect linear LED luminaires per UFC 3-530-01; Section 3-9.1 “Vehicle Maintenance Areas”.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
D503001 LIGHTING CONTROLS
Controls per UFC 3-530-01; Section 3-9.1 “Vehicle Maintenance Areas”.
D503001 TELECOMMUNICATIONS SYSTEMS
Provide (2) NIPR and (2) SIPR Drops along wall adjacent to Chamber Unit Work Area.
D503002 PUBLIC ADDRESS SYSTEMS
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D103 – HALL
Space Characteristics
FUNCTION: Circulation between Dive Support spaces.
ADJACENCIES: Dive Maintenance rooms, Dive Systems Office Suite, Battery Storage, Consolidate Rig Storage and Staging & Setup.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Space Tabulation Data.
Minimum Ceiling Height: 9’ Ceiling
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS:
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: fire extinguisher, AED
FF&E: (1) AED
UNIFORMAT DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS
A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 4’ x 8’ Heavy-Duty steel doors and frames. Factory Primed. Field-Painted
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Pinned security hinges, door closure, Exit device, Kick Plate and Silencer.
C103004 IDENTIFYING DEVICES Directional signage, as required.
C103007 FIRE EXTINGUISHER BRACKET
Provide wall mounted metal extinguisher hanging bracket. Extinguisher to be provided via FF&E package. See RFP Part 3; ESR D4090.
C301003 WALL FINISHES AR AR Provide painted CMU
C302007 WALL BASE FINISHES AR 4” high Integral 1” radius, resinous flooring cove base with a stainless steel top cap
C302009 RESINOUS FLOOR COATING SYSTEM SF
3/16” thick standard troweled mortar/quartz broadcast resinous floor coating system
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C303001 ACOUSTICAL CEILING TILES AR 24 X 24 Acoustical Ceiling Tile
C303005 SUSPENSION SYSTEMS AR AR 15/16” suspended ceiling system
C304001 INTERIOR COATINGS / FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D201003 DRINKING FOUNTAINS/ COOLERS (1)
Provide ADA compliant bi-level, anti-microbial, Stainless Steel electric water coolers with integrated water bottle filling station.
D201090 EMERGENCY FIXTURES
Provide emergency combination shower/ eyewash station with tepid water. Locate within battery storage room or just outside. (Shown on plans outside battery room in adjacent D103 HALL)
D203003 FLOOR DRAINS (1) Provide floor drain.
D30 HVAC
Provide air conditioning and heating for temperature control.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility.
See Part 3; ESR D4040.
D502001 BRANCH WIRING
At a minimum, provide (1) 125 volt, 20 amp, duplex receptacle for cleaning.
D502002 LIGHTING EQUIPMENT
Recessed direct/indirect linear and recessed downlight/ wall washers LED luminaires per UFC 3-530-01; Section 3-3.1 “Corridors” (B-ALT Scheme).
D503001 LIGHTING CONTROLS
Controls per UFC 3-530-01; Section 3-3.1 “Corridors” (B-ALT Scheme).
D503002 PUBLIC ADDRESS SYSTEMS
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D104 – BATTERY STORAGE ROOM
Space Characteristics
FUNCTION: Space for storing and charging small lithium ion battery packs used in dive gear self-propulsion devices.
ADJACENCIES: Locate in close proximity with Dive Maintenance rooms, Dive Staging & Setup bay and Consolidated Rig Storage.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Floor Plans.
Minimum Ceiling Height: 20’ clear to underside of structure
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS: SDVT-2 Personnel. Provide access from the interior and egress only, double door exit to the exterior.
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS: Space Requires a 2-3 hour fire rated separation from all other spaces. DOR to confirm requirement based on user provided information related to size of battery units and quantity intended to be stored within.
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: fire extinguisher
UNIFORMAT DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS
A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab. Slope to drain.
B203001 EXTERIOR SOLID DOORS (1) 6’ x 8’
Pair of Insulated Heavy-Duty, Hot-Dipped Galvanized Steel doors and frames. Factory Primed with Zinc Rich MPI compliant primer. Provide compatible epoxy-based intermediate & top-coat.
B203008 EXTERIOR DOOR HARDWARE
EGRESS ONLY: Heavy-Duty pinned security hinges, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep. Provide Door Position Switch and contact connected to security system and CCTV. Provide active/ inactive leaf.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 6’ x 8’ Heavy-Duty steel doors and frames. Factory Primed.
Field-Painted. Provide active/ inactive leaf.
C102003 FIRE DOORS
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Heavy-Duty hinges, door closure, Exit device, Kick Plate and Silencer.
Provide SS flush-bolts and associated connections at top and bottom of inactive leaf to secure into concrete slab and metal frame.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C103004 IDENTIFYING DEVICES AR AR
.Signage on exterior side of room entry door(s).
Indicate permanent room name(s) and number
C103006 SHELVING
LF
22” d Heavy Duty Hot-Dipped Galvanized or Stainless Steel Shelving
C301003 WALL FINISHES AR AR Provide painted CMU
C302007 WALL BASE FINISHES AR 4”h Integral 1” radius, resinous flooring cove base with a stainless steel top cap
C302009 RESINOUS FLOOR COATING SYSTEM SF
3/16” thick standard troweled mortar/quartz broadcast resinous floor coating system
C30309009 CEILING FINISHES AR AR .Exposed structure, painted epoxy
C304001 INTERIOR COATINGS / FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D201090 EMERGENCY FIXTURES
Provide emergency combination shower/ eyewash station with tepid water. Locate within battery storage room or just outside. (Shown on plans outside battery room in adjacent D103 HALL)
D203003 FLOOR DRAINS (1)
Provide floor trench/ pit drain with steel grated floor cover with appropriate acid/ waste collection capabilities.
D30 HVAC
Provide air conditioning and heating for temperature control for equipment protection. HVAC system selection based on results of LCCA performed by
KTR.
D3040 OTHER HVAC
Ventilation?Dedicated exhaust and dedicated 100% outside air make-up in D309090 OTHER SPECIAL MECHANICAL SYSTEMS apply to this room.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D502001 BRANCH WIRING
Multiple 4 gang 125V 20amp outlets and Qty 2 208V single phase 60hz at 50amp service
D502002 LIGHTING EQUIPMENT
LED Lighting 50fc at floor. Installed per UFC 3-530-01. Provide battery backup emergency fixtures as required.
D503001 LIGHTING CONTROLS No dimming required.
D503001 TELECOMMUNICATIONS SYSTEMS TBD
D503002 PUBLIC ADDRESS SYSTEMS
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D105 – O2 SAFE - DIVE GEAR MAINTENANCE ROOM
Space Characteristics
FUNCTION: Maintenance and Instruction space where dive rigs and gear is worked on and maintained. Master Diver’s use this space as an instruction space as well as work is being done.
ADJACENCIES: Adjacent to Consolidated Rig Storage. Close proximity to Dive Maintenance rooms and Dive Systems Office Suite.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Floor Plans. Provide ample clear space around 4’ x 8’ work tables. 8’-0”+ is ideal (6’-0” MIN).
Minimum Ceiling Height: 10’ minimum clear
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS:
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: (1) fire extinguisher, (6) 8’ x 4’ stainless steel work bench unit w/ below-counter VIDMAR storage and utility rack stanchions above, (1) 2’ x 2’ stainless steel locker for regulators, (1) 4’-0” x 2’-0” test bench, (1) stool, (2) trash cans, (1) recycling receptacle
A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 3’ x 8’ Heavy-Duty steel doors and frames. Factory Primed. Field-Painted
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Heavy-Duty hinges, door closure device, Kick Plate and Silencer.
C103003 MARKER BOARDS & TACK BOARDS (2)
36”h x 60”w
Magnetic, Glass White Board. Wall mount.
Centerline of board @ ± 5’-6” AFF.
C103004 IDENTIFYING DEVICES
Provide signage on exterior side of room entry number
C103006 SHELVING (1)
2’d x 13’l x 8’h
Provide drying rack shelving
C103006 SHELVING (1)
1’-6”d x 12’-0”l
Provide 18”d stainless steel shelf 3’-0” above sinks
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C103006 SHELVING (3)
4’d x 9’l x 8’h
Shelving for rig storage
C103006 SHELVING (2)
2’d x 8’l x 6’h
Provide O2 Bottle Storage Racks
C103007 FIRE EXTINGUISHER CABINETS Provide Extinguisher.
C301003 WALL FINISHES AR AR Provide painted CMU
C302007 WALL BASE FINISHES AR 4”h Integral 1” radius, resinous flooring cove base with a stainless steel top cap
C302009 RESINOUS FLOOR COATING SYSTEM SF
3/16” thick standard troweled mortar/quartz broadcast resinous floor coating system
C30309009 CEILING FINISHES AR AR Exposed structure, painted epoxy
C304001 INTERIOR COATINGS / FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D201004 SINKS (2)
6’ x 4’ x 30”d
Provide Stainless Steel sink units
D203003 FLOOR DRAINS Provide Floor Drain.
D209001 SPECIAL PIPING SYSTEMS
Provide Dive Quality Compressed Air Service (5000 psi). Provide drops on self-retracting reels.
See Plans for locations.
D209005
Provide Shop-Quality Air Service (120 psi).
Provide drops on self-retracting reels. See Plans for locations. Provide Dial-Down Regulator to convert air pressure as required.
D30 HVAC
Provide air conditioning and heating for temperature control. HVAC system selection based on results of LCCA performed by KTR.
D3040 OTHER HVAC
Ventilation? Exhaust?Provide minimum required ventilation. This room shall be exhausted as there will be oxygen tanks in the room.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility.
See Part 3; ESR D4040.
D502001 BRANCH WIRING Provide a minimum of (8) 125V 20amp outlets.
D502001 BRANCH WIRING (1)
Provide 125 volt, 20 amp, duplex receptacle @ ±66” on wall to receive wall-mounted TV/ monitor.
D502002 LIGHTING EQUIPMENT (2) 6’ L
ABOVE TABLES: Provide Suspended linear industrial LED luminaires with 5%-10% up-light component and wire guard. UFC 3-530-01;
Section 3-3.5 Mechanical Rooms.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
D502002 LIGHTING EQUIPMENT AR 2’ x 4’
REST OF ROOM: Provide Recessed direct / indirect LED luminaires per UFC 3-530-01;
Section 3-4.4 “Open Offices” (Alternate Scheme).
See Part 6 Attachment - Lighting Plate NL-1.
D503001 LIGHTING CONTROLS
Per UFC 3-530-01; Section 3-4.4 “Open Offices” (Alternate Scheme).
D503001 TELECOMMUNICATIONS SYSTEMS
Provide (2) NIPR and (2) SIPR Drops. Customer to identify desired locations.
D503001 DATA / TELEPHONE (1)
Provide designated NIPR/SIPR data drop(s) and CATV connection @ ±66” on wall to receive wall-mounted TV/ monitor.
D503002 PUBLIC ADDRESS SYSTEMS
Provide Public Address system with flush ceiling
D503004
TELEVISION SYSTEMS
(1) Provide wall-mounted TV
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D106 – DIVE GEAR MAINTENANCE ROOM
Space Characteristics
FUNCTION: Maintenance and Instruction space where dive rigs and gear is worked on and maintained. Master Diver’s use this space as an instruction space as well as work is being done.
ADJACENCIES: Adjacent to Consolidated Rig Storage. Close proximity to Dive Maintenance rooms and Dive Systems Office Suite.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Floor Plans. Provide ample clear space around 4’ x 8’ work tables. 8’-0”+ is ideal (6’-0” MIN).
Minimum Ceiling Height: 10’ minimum clear
ACOUSTICAL REQUIREMENTS:
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 0 PN
OTHER / SPECIAL REQUIREMENTS:
F&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will accommodate, at a minimum, the following:
FF&E: (1) fire extinguisher, (6) 8’ x 4’ stainless steel work bench unit w/ below-counter VIDMAR storage and utility rack stanchions above, (1) 2’ x 2’ stainless steel locker for regulators, (1) 4’-0” x 2’-0” test bench, (1) stool, (2) trash cans, (1) recycling receptacle
B203001 EXTERIOR SOLID DOORS (1) 6’ x 8’
Pair of Insulated Heavy-Duty, Hot-Dipped Galvanized Steel doors and frames. Factory Primed with Zinc Rich MPI compliant primer.
Provide compatible epoxy-based intermediate & top-coat.
B203008 EXTERIOR DOOR HARDWARE
EGRESS ONLY: Heavy-Duty pinned security hinges, Exit Device, Closer, Kick Plate, Threshold, Weather-seal, and sweep. Provide Door Position Switch and contact connected to security system and CCTV.
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above. Provide with bullnose corners and edges.
C102001 STANDARD INTERIOR DOORS (1) 3’ x 8’ Heavy-Duty steel doors and frames. Factory Primed. Field-Painted
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor. Heavy-Duty hinges, door closure device, Kick Plate and Silencer.
C103003 MARKER BOARDS & TACK BOARDS (2)
36”h x 60”w
Magnetic, Glass White Board. Wall mount.
Centerline of board @ ±5’-6” AFF.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C103004 IDENTIFYING DEVICES
Provide signage on exterior side of room entry number
C103006 SHELVING (1)
2’d x 13’l x 8’h
Provide drying rack shelving adjacent to sinks
C103006 SHELVING (1)
1’-6”d x 12’-0”l
Provide 18”d stainless steel shelf 3’-0” above sinks
C103006 SHELVING (3)
4’d x 9’l x 8’h
Shelving for rig storage
C103006 SHELVING (2)
2’d x 8’l x 6’h
Provide O2 Bottle Storage Racks
C103007 FIRE EXTINGUISHER CABINETS Provide Extinguisher.
C301003 WALL FINISHES AR AR Provide painted CMU
C302007 WALL BASE FINISHES AR 4”h Integral 1” radius, resinous flooring cove base with a stainless steel top cap
C302009 RESINOUS FLOOR COATING SYSTEM SF
3/16” thick standard troweled mortar/quartz broadcast resinous floor coating system
C30309009 CEILING FINISHES AR AR Exposed structure, painted epoxy
C304001 INTERIOR COATINGS / FINISHES
Epoxy wall paint. Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D201004 SINKS (2)
6’ x 4’ x 30”d
Provide Stainless Steel sink units
D203003 FLOOR DRAINS Provide Floor Drain.
D209001 SPECIAL PIPING SYSTEMS
Provide Dive Quality Compressed Air Service (5000 psi). Provide drops on self-retracting reels.
See Plans for locations.
D209005
Provide Shop-Quality Air Service (120 psi).
Provide drops on self-retracting reels. See Plans for locations. Provide Dial-Down Regulator to convert air pressure as required.
D30 HVAC
Provide air conditioning and heating for temperature control. HVAC system selection based on results of LCCA performed by KTR.
D3040 OTHER HVAC
Ventilation? Exhaust?Provide minimum required ventilation. This room shall be exhausted as there will be oxygen tanks in this room.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility.
See Part 3; ESR D4040.
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
D502001 BRANCH WIRING Provide a minimum of (8) 125V 20amp outlets.
D502001 BRANCH WIRING (1)
Provide 125 volt, 20 amp, duplex receptacle @ ±66” on wall to receive wall-mounted TV/ monitor.
D502002 LIGHTING EQUIPMENT (2) 6’ L
ABOVE TABLES: Provide Suspended linear industrial LED luminaires with 5%-10% up-light component and wire guard. UFC 3-530-01;
Section 3-3.5 Mechanical Rooms.
D502002 LIGHTING EQUIPMENT AR 2’ x 4’
REST OF ROOM: Provide Recessed direct / indirect LED luminaires per UFC 3-530-01;
Section 3-4.4 “Open Offices” (Alternate Scheme).
See Part 6 Attachment - Lighting Plate NL-1.
D503001 LIGHTING CONTROLS
Per UFC 3-530-01; Section 3-4.4 “Open Offices” (Alternate Scheme).
D503001 TELECOMMUNICATIONS SYSTEMS
Provide (2) NIPR and (2) SIPR Drops. Customer to identify desired locations.
D503001 DATA / TELEPHONE (1)
Provide designated data drop(s) and CATV connection @ ±66” on wall to receive wall-mounted TV/ monitor.
D503002 PUBLIC ADDRESS SYSTEMS
Provide Public Address system with flush ceiling
D503004 TELEVISION SYSTEMS (1) Provide wall-mounted TV
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D107 – DIVE SYSTEMS GROUP OFFICE
Space Characteristics
FUNCTION: Dive Systems open office space. Shared office suite for 8 DIV-SYS personnel. Two will have larger/ assigned workstations and the remaining will share (3) shared locations.
ADJACENCIES: Close proximity with Dive Maintenance rooms, Dive Consolidated Rig Storage and Dive Staging & Setup.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Space Tabulation Data.
Minimum Ceiling Height: 9’-0” Ceiling
ACOUSTICAL REQUIREMENTS: STC 40 (min)
ACCESS REQUIREMENTS: Dive Systems Personnel.
NUMBER OF OCCUPANTS: 9 personnel – Per user direction, Provide (2) permanent workstations + (3) more to be shared by (7) personnel
OTHER / SPECIAL REQUIREMENTS:
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop (CDW). Space will
FF&E: (2) l-shape desk, (3) touchdown stations, (5) task chairs, (6) bookcases, (1) mobile table, trash cans, wall clock
C101001 FIXED PARTITIONS
Concrete Masonry Unit (CMU) walls continuous to underside of structural deck above.
C101001 FIXED PARTITIONS (FURRING)
Impact Resistant gypsum board on resilient furring strips secured into CMU @ 16” OC vertically.
Gypsum furring to stop 6” above ceiling.
C102001 STANDARD INTERIOR DOORS (1) 3’ x 7’ Hollow Metal door and frame. Factory Primed. Field- Painted
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor; Hinges, door closure device, Kick Plate and Silencer.
C103003 MARKER BOARDS & TACK BOARDS (1)
36”h x 48”w
Glass, magnetic white board. Centerline of boards to be mounted at approx. 5’-6” AFF.
C103004 IDENTIFYING DEVICES
Indicate permanent room number and changeable room name
C301003 WALL FINISHES AR AR
Primed and painted gypsum wallboard. Paint (1) wall an accent color
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C302005 CARPETING SF (CPT1) Carpet Tile
C302007 WALL BASE FINISHES AR 4”h Rubber cove base in 120’ coils
C303001 ACOUTICAL CEILING TILES & PANELS SF 24 X 24 Acoustical Ceiling Tile
C303005 SUSPENSION SYSTEMS AR AR 15/16” suspended ceiling system
C304001 INTERIOR COATINGS / FINISHES AR AR
Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D30 HVAC
Provide air conditioning and heating for temperature control.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility. See Part 3; ESR D4040.
D502001 BRANCH WIRING
Provide (1) 125 volt, 20 amp, Quadraplex receptacle for each workstation with a minimum of (1) every 10 LF of wall. Where less than 10 ft. of wall sexists provide a minimum of (2) 125 volt, 20 amp, Duplex receptacles spaced to accommodate for furniture.
Allow only (4) workstations per 20A circuit.
Provide receptacles to serve proposed equipment including government furnished equipment and all ancillary office equipment.
D502001 BRANCH WIRING (1)
Provide 125 volt, 20 amp, duplex receptacle @ ±66” on wall to receive wall-mounted TV/ monitor.
D502002 LIGHTING EQUIPMENT AR 2’ x 4’ Recessed direct / indirect LED luminaires per UFC 3-530-01; Section 3-4.5 “Open Offices” (Alternate Scheme).
D503001 LIGHTING CONTROLS
Controls per UFC 3-530-01; Section 3-4.5 “Open Offices” (Alternate Scheme).
D503001 TELECOMMUNICATIONS SYSTEMS
(2) ea.
At a minimum, provide (2) NIPR + (1) SIPR + (2) GREY phone/ data drops for each workstation with a minimum of (1) drop each network every 10 LF of wall.
Provide phone/ data drops to serve proposed equipment including government furnished equipment and all ancillary office equipment.
D503001 DATA / TELEPHONE (1)
Provide designated data drop(s) and CATV connection @ ±66” on wall to receive wall-mounted TV/ monitor.
D503002 PUBLIC ADDRESS SYSTEMS
Provide Public Address system with flush ceiling
D503004 TELEVISION SYSTEMS (1) Provide wall-mounted TV. See Plans
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
5.0 ROOM REQUIREMENTS
D108 – DIVE SYSTEMS LCPO - PRIVATE OFFICE
Space Characteristics
FUNCTION: Private Office for the Dive Systems LCPO.
ADJACENCIES: Located within the Dive Systems office suite.
SPATIAL REQUIREMENTS:
Ideal Plan Dimensions: See Space Tabulation Data.
Minimum Ceiling Height: 9’-0” Ceiling
ACOUSTICAL REQUIREMENTS: Provide sound attenuation or buffering from other spaces. STC 45 (min).
ACCESS REQUIREMENTS:
NUMBER OF OCCUPANTS: 1 pn
FF&E INFORMATION FOR COORDINATION:
FF&E and AV Equipment will be funded separately as a modification to the construction contract. Infrastructure to support all FF&E and AV must be included in the construction contract. Contractor’s Interior Designer must validate and determine FF&E requirements based on in-depth interviews with Activity at Concept Design workshop(CDW). Space will accommodate, at a minimum, the following:
FF&E: (1) l-shape desk, (1) task chair, (2) guest chairs, trash can, wall clock
UNIFORMA
T
DESCRIPTION QTY SIZE SPECIFIC REQUIREMENTS
A1030 GROUND FLOOR SLABS -- Structurally Reinforced Concrete Slab.
C101001 FIXED PARTITIONS
Impact Resistant gypsum board on cold-formed steel studs continuous to underside of structural deck above. Provide STC 55 (min) lab-tested assembly.
C101001 FIXED PARTITIONS (FURRING) AR
Impact Resistant gypsum board on resilient furring strips secured into CMU @ 16” OC vertically. Gypsum furring to stop 6” above ceiling assembly.
C102001 STANDARD INTERIOR DOORS (1) 3’ x 7’ Solid-Core, flush door panel with natural wood veneer finish hosted in Hollow Metal frame. Factory Primed. Field-Painted.
C102007 INTERIOR DOOR HARDWARE
Electronic Key Pad/ Proximity Card Reader, Mortis power transfer from the hinge side and balanced magnetic door sensor; Hinges, door closure device, Kick Plate and Silencer.
C103003 MARKER BOARDS & TACK BOARDS (1) 36”h x 48”w Glass, magnetic white board. Centerline of boards to be mounted at approx. 5’-6” AFF.
C103004 IDENTIFYING DEVICES
Signage on exterior side of room entry door(s). Indicate permanent room number and changeable room name
P-909 SDVT-2 OPERATIONS SUPPORT FACILITY Work Order Number: 1704761
C301003 WALL FINISHES AR AR
Primed and painted gypsum wallboard. Paint
(1) wall an accent color
C302003 CARPETING SF (CPT1) Carpet Tile
C302007 WALL BASE FINISHES AR 4”H Rubber cove base in 120’ coils
C303001 ACOUSTICAL CEILING TILES & PANELS AR 24 X 24 Acoustical Ceiling Tile
C303005 SUSPENSION SYSTEMS AR AR 15/16” suspended ceiling system
C304001 INTERIOR COATINGS / FINISHES AR AR
Paint suitable in accordance with Master Painter Institute (MPI) standards for the interior architectural surface being finished.
D30 HVAC
Provide air conditioning and heating for temperature control.
D4010 FIRE ALARM / DETECTION SYSTEMS See RFP Part 3; ESR D4010
D4040 SPRINKLER SYSTEMS
Provide wet pipe automatic sprinkler protection providing complete coverage throughout facility. See Part 3; ESR D4040.
D502001 BRANCH WIRING
Provide (2) 125 volt, 20 amp, duplex receptacles on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .