LOG OPS 1512_6_ESR_B30_R1.pdf

PDF 90 KB Posted

Attached to
Hurricane Florence Recovery Training and Storage Facilities at MCB Camp Lejeune. Package 3
Solicitation number
N4008519R9253
Issued by

About this file

This document outlines requirements for a roofing system as part of a design-build request for proposal for hurricane recovery training and storage facilities at Marine Corps Base Camp Lejeune in North Carolina. Key requirements include an aluminum standing seam metal roof with a slope between 12 to 18 inches on center and a PVDF coating. Insulation must meet standards in UFC 1-200-02 and UFC 3-110-03. Compatible gutters, downspouts and flashings are required but concealed gutters and interior downspouts are prohibited. Lightning protection is also required. The related federal contract opportunity is for Package 3 of the hurricane recovery project at Camp Lejeune, consisting of three facilities, with responses due by May 27, 2020 under solicitation number N4008519R9253 issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
M107 1512_6_ESR_B30_R1.pdf PDF
1527_6_ESR_B30_R1.pdf PDF
M107 1512_2_project_objectives_R1.pdf PDF
JRC 1512_6_ESR_D30_R2.pdf PDF
1338_6_ESR_D30_R2.pdf PDF
19R9253 Amendment 0020.pdf PDF
Price Proposal Form Rev 7.10.pdf PDF
LOG OPS 1512_2_project_objectives_R1.pdf PDF
1338_6_ESR_B30_R1.pdf PDF
1527_6_ESR_D30_R2.pdf PDF
LOG OPS 1512_6_ESR_D30_R2.pdf PDF
Attachment H Revised 7.10.2020 v2.pdf PDF
M107 1512_6_ESR_D30_R2.pdf PDF
JRC 1512_6_ESR_B30_R1.pdf PDF
JRC 1512_2_project_objectives_R1.pdf PDF
1338_2_project_objectives_R1.pdf PDF
1527_2_project_objectives_R1.pdf PDF
ATT_RFI177178_TFFPackage3_PriceSchedule_R5.pdf PDF
19R9253 Amendment 0019.pdf PDF
19R9253 Amendment 0018.pdf PDF
19R9253 Amendment 0017.pdf PDF
Att_RFI 292 - TFF Package 3_P1512F Phasing Plan_R1.pdf PDF
Att_RFI 254 - TFF Package 3__5_Room_P1512 LOG OPS_5 Room Req-Mothers Room_R1.pdf PDF
Att_RFI 242 and 248 - TFF Package 3_M107 Exterior Photos.pdf PDF
Att_RFI 291 - TFF Package 3_P1512F LOG OPS_F20_R1.pdf PDF
19R9253 Amendment 0016.pdf PDF
19R9253 Amendment 0015.pdf PDF
19R9253 Amendment 0014.pdf PDF
19R9253 Amendment 0013.pdf PDF
19R9253 Amendment 0012.pdf PDF
ir78.pdf PDF
ir78 pipe.pdf PDF
20200409_Hadnot-1707-PRE-FINAL.pdf PDF
Att_RFI 94 - TFF Package 3_P1527F_E10_R2.pdf PDF
Att_RFI 186 - TFF Package 3_P1512F M107_Additional As-Built.pdf PDF
1527_6_ESR_D30_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1512F LOG OPS_E20_R1.pdf PDF
19R9253 Amendment 0011.pdf PDF
Att_RFI 97 - TFF Package 3_P1527F_E20_R1.pdf PDF
ATT_RFI177178_TFFPackage3_PriceSchedule_R4.pdf PDF
JRC 1512_6_ESR_D30_R1.pdf PDF
1338_6_ESR_D30_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1512F JRC_E20_R1.pdf PDF
LOG OPS 1512_6_ESR_D30_R1.pdf PDF
M107 1512_6_ESR_D30_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1338F_E20_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1512F M107_E20_R1.pdf PDF
TFF MILCON D303001andD304006 REV5.docx DOCX document
19R9253 Amendment 0010.pdf PDF
ATT_RFI 177 - 178_TFF Package 3_Price Schedule_R3.pdf PDF
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build Request for Proposal RTA Hurricane Florence Recovery Training and Storage Facilities 3 March 202027 May 2020 Marine Corps Base Camp Lejeune, North Carolina Rev 01

PART 3 - CHAPTER 6/ESR B30 - P1512F LOG OPS SCHOOL - Page 1

B30 ROOFING – P1512F LOG OPS SCHOOL

B30 GENERAL SYSTEMS DESCRIPTION

Roof systems shall be watertight. Provide complete roof system design and construction services for the entire new facility roof system, including all ancillary and incidental work necessary for a complete, new, watertight roof system installation.

Submittal Requirements: Components of a minimum roof submittal shall include the roof plan, method of drainage, standard details and details unique to the project, wind load calculations and requirements.

Provide a Pre-Design Roofing Conference (if required in RFP Part 4) and Pre-Construction Roofing Conference to assure roof design and construction is properly coordinated before construction begins.

Refer to UFC 3-110-03, Roofing, UFC 3-101-01, Architecture, and UFC 1-200-02 High Performance Sustainable Buildings for additional roofing requirements such as Energy Star qualified products.

MOST RELEVANT CODES AND STANDARDS

Refer to Part 3, Chapter 1.

B3010 ROOF COVERINGS

B301001 STEEP SLOPE ROOFING SYSTEMS

Provide a SSMR (standing seam metal roof system). The slope and configuration of the roofing is suggested in the Base Exterior Architectural Plan (BEAP), 2010, Section 4.13, Camp Johnson. Refer to Part 3, Chapter 2 for prescribed roof slope.

The roof system shall be designed and attached to resist wind uplift pressures calculated in accordance with ASCE 7. Uplift resistance shall be validated by applicable Factory Mutual (FM), Underwriters Laboratories (UL) or ASTM uplift resistance test procedures. The roof material must be 3004 aluminum, ASTM B209M ASTM B209.

Organic Coatings for the metal roof must be a PVDF coating as specified in Part 6, Roof specification section 07 61 15. 00 20 Aluminum Standing Seam Roofing. All other material and construction for metal roofing are per Part 6 specification section.

The spacing of standing seams must be between 12 inches and 18 inches on center as prescribed in the BEAP.

Sub-purlins for the Structural Metal Roof System shall be galvanized and shop painted.

SSSMRS Warranty Certificate – Provide warranty requirements as defined in Part 6, Roof specification section 07 61 15. 00 20 Aluminum Standing Seam Roofing.

Specular Gloss of Finished roof surfaces must have a specular gloss value of 10 or less at an angle of 85 degrees or 30 plus or minus the value specified in project program at 60 degrees when measured in accordance with ASTM D 523.

Design-Build Request for Proposal RTA Hurricane Florence Recovery Training and Storage Facilities 3 March 202027 May 2020 Marine Corps Base Camp Lejeune, North Carolina Rev 01

PART 3 - CHAPTER 6/ESR B30 - P1512F LOG OPS SCHOOL - Page 2

B301002 LOW SLOPE ROOFING SYSTEMS

NOT USED

B301003 ROOF INSULATION AND FILL

Provide roof insulation values no less than in accordance with UFC 1-200-02 High Performance and Sustainable Buildings and UFC 3-110-03 Roofing.

B301004 FLASHINGS AND TRIM

Provide flashing and trim for the Aluminum Standing Seam Metal roof per specification section 07 61 15. 00 20 Aluminum Standing Seam Roofing in Part 6 of this RFP.

B301005 GUTTERS AND DOWNSPOUTS

Provide gutters and downspouts compatible with roofing material and finish. Concealed (interior) gutters and downspouts are prohibited.

B301006 ROOF OPENINGS AND SUPPORTS

NOT USED- this includes any type of horizontally oriented glazed roof opening that includes skylights and solar tubes that are prohibited for this project.

B301090 OTHER ROOFING

Provide lightning protection, without penetrating the roofing or flashing components.

--End of Section--

File details come from the government source that posted it. Updated .