This document is a price schedule for a federal design-build contract opportunity to provide three training and storage facilities at Marine Corps Base Camp Lejeune in North Carolina as recovery efforts from Hurricane Florence. The contract consists of three contract line item numbers (CLINs) for the facilities, with base prices and several options listed separately. CLIN 0001 is for the P1338F Second Marine Expeditionary Force Simulation Training Center, CLIN 0002 is for the P1512F Marine Corps Community Services Logistics School, and CLIN 0003 is for the P1527F Logistics Command Combat Service Support Warehouse. Furniture, fixtures, equipment, audiovisual, and security systems are included as separate CLINs for each facility. Demolition, exterior enclosure methods, flooring, and parking surfaces are among the optional CLINs. The solicitation number is provided as N4008519R9253 and issued by the Naval Facilities Engineering Command for the Department of the Navy.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-1
ATTACHMENT F – PRICE PROPOSAL FORM
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the CLIN lump sum price for the following items:
CLIN 0001 – P1338F 2ND MEF SIMULATION TRAINING CENTER BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0001 for shall provide the full project scope, excluding other Base Bids
(CLIN 0002, 0003), complete and in-place in accordance with the Design Build RFP even if not specifically listed below.
0001: P1338F 2ND MEF Simulation Training Center:
Price for provision of all work for P1338F complete.
Basis of Bid for CLIN 0001 shall be the Total Amount for CLIN 0001, but not including the work indicated or specified to be provided under any other CLIN.
DESCRIPTION ESTIMATED
QUANTITY
UNIT TOTAL PRICE
0001AA All work complete in accordance with the RFP for CLIN 0001 including 0001AB, 0001AC and
0001AD.
1 LS $
0001AB Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20 Exterior Enclosure Enter selected Exterior Enclosure System below:
1 LS $
0001AC Complete work for the facility inside the 5 foot line
1 LS $
0001AD Complete work for the site work outside the 5 foot line
1 LS $
0001AE Design 1 LS $
Total CLIN 0001 (0001AA+0001AE): $
F-2
CLIN 0002 – P1512F MCCSSS LOG OPS SCHOOL: Price includes the following:
Price for the Total Amount for CLIN 002, P1512F MCCSSS LOG OPS SCHOOL shall provide the full project scope, excluding other Base Bids (CLIN 0001, 0003), complete and in place in accordance with the
Design Build RFP even if not specifically listed below.
0002: P1512F MCCSSS LOG OPS SCHOOL Price for provision of all work for P1512F complete.
Basis of Bid for CLIN 0002 shall be the Total Amount for CLIN 0002, but not including the work
UNIT TOTAL PRICE
0002AA All work complete in accordance with the RFP for CLIN 0002 including 0002AB, 0002AC, 0002AD, 0002AE and
0002AF.
1 LS $
0002AB Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20 Exterior Enclosure Enter selected Exterior Enclosure System below:
1 LS $
0002AC Complete work for the facility inside the 5 foot line
1 LS $
0002AD Complete work for P1512F Joint Reception Center inside the 5 foot line
1 LS $
0002AE Complete work for P1512F M107 Renovation to the 5 foot line
1 LS $
0002AF Complete work for the site work outside the 5 foot line
0002AG Design 1 LS $
Total CLIN 0002 (0002AA + 0002AG): $
F-3
CLIN 0003 – P-1527F LOG COM CSP Warehouse BASE PRICE: Price includes the following:
Price for the Total Amount for CLIN 0003 for P-1527F LOG COM CSP Warehouse shall provide the full project scope, excluding other Base Bids (CLIN 0001, 0002), complete and in-place in accordance with the
Design Build RFP even if not specifically listed below
0003: P-1527F LOG COM CSP Warehouse:
Price for provision of all work for P1527F complete.
Basis of Bid for CLIN 0003 shall be the Total Amount for CLIN 0003, but not including the work
UNIT TOTAL PRICE
0003AA All work complete in accordance with the RFP for CLIN 0003 including 0003AB, 0003AC and
0003AD.
1 LS $
0003AB Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20 Exterior Enclosure Enter selected Exterior Enclosure System below:
1 LS $
0003AC Complete work for the facility inside the 5 foot line
1 LS $
0003AD Complete work for the site work outside the 5 foot line
0003AE Design 1 LS $
Total CLIN 0003 (0003AA + 0003AE): $
F-4
Refer to paragraph 1.3 for Planned Modification Bid notes.
CLIN 0004– PLANNED MODIFICATION FOR P1338F – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the RFP and in accordance with the following schedule:
CLIN ITEM GOVERNMENT
FF&E
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
AMOUNT)
0004 FF&E $2,756,804
$137,840 $ 2,894,644
CLIN 0005– PLANNED MODIFICATION FOR P1338F – Price includes the following:
Price to procure and supervise installation of the Audio/Visual System (AV) complete in accordance with the
RFP and in accordance with the following schedule:
AV ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
0005 AV $1,681,440
$84072 $ 1,674,512
CLIN 0006– Not Used.
PLANNED MODIFICATION FOR P1338F – Price includes the following:
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance with the RFP and in accordance with the following schedule:
ESS ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0007 (GOVT ESS
ESTIMATE + HAR
0006 ESS $
F-5
CLIN 0007 – OPTION 1 for P1338F, Demolition and Disposal:
Price for Total Amount to provide the full option scope complete and in place in accordance with the RFP even if not specifically listed below. Refer to paragraph 1.2 for explanation of option.
UNIT TOTAL PRICE
0007 Demolition and disposal of Building Foundations (outside footprint)
CLIN 0008 – OPTION 2 for P1338F, Demolition and Disposal:
UNIT TOTAL PRICE
0008 Demolition and disposal of Buildings, Complete (Outside Footprint)
CLIN 0009 – OPTION 3 for P1338F, Parking areas to be gravel:
UNIT TOTAL PRICE
0009 Gravel parking areas 1 LS $
CLIN 0010 – OPTION 4 for P1338F:
NOT USED
0010 Not Used $
CLIN 0011 – OPTION 5 for P1338F, Tilt-up Construction vs Brick Wall Cavity: NOT USED.
DESCRIPTION
ESTIMATED UNIT TOTAL PRICE
0011 NOT USED 1 LS $
F-6
CLIN 0012 – OPTION 6 for P1338F, Terrazzo Flooring for all corridors and main entry:
0012 Terrazzo Flooring 1 LS $
CLIN 0012A – OPTION 6A for P1338F, Operable Folding Partitions:
UNIT TOTAL PRICE
0012A Operable Folding Partitions with door access
CLIN 0013– PLANNED MODIFICATION FOR P1512F – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
0013 FF&E $14,829,218
$741,461 $ 15,570,678
CLIN 0014– PLANNED MODIFICATION FOR P1512F – Price includes the following:
Price to procure and supervise installation of the Audio/Visual Equipment (AV) complete in accordance with the RFP and in accordance with the following schedule:
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
0014 AV $1,254,723
$62,736 $ 1,317,459
F-7
CLIN 0015 – PLANNED MODIFICATION FOR P1512F – Price includes the following: NOT USED
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0007 (GOVT ESS
ESTIMATE + HAR
0015 ESS $
CLIN 0016 – OPTION 1 for P1512F, Demolition and Disposal:
UNIT TOTAL PRICE
0016 Demolition and disposal of Building Foundations (outside
CLIN 0017 – OPTION 2 for P1512F, Demolition and Disposal:
UNIT TOTAL PRICE
0017 Demolition and disposal of Buildings, Complete (Outside
CLIN 0018 – OPTION 3 for P1512F, Parking areas to be gravel:
0018 Gravel parking areas 1 LS $
F-8
CLIN 0019 – OPTION 4 for P1512F: Tiered Access Floors in Log Ops School Classrooms
NOT USED
RFP even if not specifically listed below.
UNIT TOTAL PRICE
0019 Not Used Tiered Raised Access Floors
CLIN 0020 – OPTION 5 for P1512F, Tilt-up Construction vs Brick Wall Cavity: NOT USED
0020 Tilt-up Construction 1 LS $
CLIN 0021 – OPTION 6 for P1512F, Repair M107 Roof in lieu of Replace:
UNIT TOTAL PRICE
0021 Repair M107 Roof in lieu of Replace
CLIN 0022 – OPTION 7 for P1512F, M107 Sloped Roof: Not used.
0022 M107 Sloped Roof 1 LS $
CLIN 0023 – OPTION 8 for P1512F, Additional pavement for Troop Formations:
UNIT TOTAL PRICE
0023 Additional pavement for Troop Formations (2 ea)
F-9
CLIN 0024 – OPTION 9 for P1512F, Terrazzo flooring at all corridors and Main Entry:
0024 Terrazzo Flooring 1 LS $
CLIN 0025– PLANNED MODIFICATION FOR P1527F – Price includes the following:
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
0025 FF&E $3,114,412
$155,720 $ 3,270,132
CLIN 0026– PLANNED MODIFICATION FOR P1527F – Price includes the following:
Price to procure and supervise installation of the Audio/Visual Equipment (AV) complete in accordance with the RFP and in accordance with the following schedule:
AV ESTIMATE
HAR (NTE 5%) HAR
AMOUNT
(GOVT FF&E
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0006 (GOVT FF&E
ESTIMATE + HAR
0026 AV $10,420
$521 $ 10,941
F-10
CLIN 0027– PLANNED MODIFICATION FOR P1527F – Price includes the following: NOT USED
Price to procure and supervise installation of the Electronic Security System (ESS) complete in accordance
HAR (NTE 5%) HAR
AMOUNT
(GOVT ESS
ESTIMATE X
HAR%)
TOTAL FF&E
ESTIMATED
AMOUNT FOR CLIN
0007 (GOVT ESS
ESTIMATE + HAR
0027 ESS $
CLIN 0028 – OPTION 1 for P1527F, Demolition and Disposal:
UNIT TOTAL PRICE
0028 Demolition and disposal of Building Foundations (outside
CLIN 0029 – OPTION 2 for P1527F, Demolition and Disposal:
UNIT TOTAL PRICE
0029 Demolition and disposal of Buildings, Complete (Outside
CLIN 0030 – OPTION 3 for P1527F, Parking areas to be gravel:
0030 Gravel parking areas 1 LS $
F-11
CLIN 0031 – OPTION 4 for P1527F, Metal Panel Exterior Cladding vs Brick Cavity Wall:
0031 Exterior Metal Cladding 1 LS $
CLIN 0032 – OPTION 5 for P1527F, Tilt-up Construction vs Brick Wall Cavity: NOT USED
0032 Tilt-up Construction 1 LS $
CLIN 0033 – OPTION 6 for P1527F, Membrane Roofing vs Low slope Metal Roofing:
UNIT TOTAL PRICE
0033 Membrane Roofing vs Low slope Metal Roofing
CLIN 0034 – OPTION 7 for P1527F, Reduce Overall Wall Height & Add Pallet Racks:
UNIT TOTAL PRICE
0034 Reduce Overall Wall Height & Add Pallet Racks
F-12
1.2 Explanation of CLIN Items
CLIN 0001
Total amount of Base Amount CLIN 0001 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of specific work items as defined as follows:
CLIN 0001: P1338F 2ND MEF SIMULATION TRAINING CENTER - includes all P1338F Base Bid
Work and includes, but is not limited to, the design and construction of the building and site utilities;
providing construction permitting fees, and all incidental and related work.
0001AA: All work complete in accordance with the RFP for CLIN 0001 including 0001AB, and
0001AC.
0001AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. Enter selected Exterior Enclosure in the space provided.
0001AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, and equipment for construction of the facility and all incidental and related work.
0001AD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and equipment for grading and drainage, paving, utilities, and all incidental and related work.
0001AE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, electrical, and all incidental and related work.
CLIN 0002
Total amount of Base Amount CLIN 0002 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of
CLIN 0002: P1512F MCCSSS LOG OPS SCHOOL - includes all P1512F Base Bid Work and includes, but is not limited to, the design and construction of the building and site utilities; providing construction permitting fees, and all incidental and related work.
0002AA: All work complete in accordance with the RFP for CLIN 0002 and including the work indicated or specified under 0002AB through 0002AE.
0002AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. Enter selected Exterior Enclosure in the space provided.
0002AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0002AD: P1512F Joint Reception Center and work inside the 5 foot line, excluding design costs, F-13 includes labor, materials, and equipment for construction of the facility and all incidental andrelated work.
0002AE: P1512F M107 Renovation and work inside the 5 foot line, excluding design costs, includes labor, materials, and equipment for construction of the facility and all incidental and related work.
0002AF: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0002AG: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0003
Total amount of Base Amount CLIN 0003 shall provide the full project scope, excluding Bid Options defined below, complete in place in accordance with the RFP even if not specifically listed. Explanation of
CLIN 0003: P-1527F LOG COM CSP Warehouse - includes all P1527F Base Bid Work and includes, but is not limited to, the design and construction of the building and site utilities; providing construction permitting fees, and all incidental and related work.
0003AA: All work complete in accordance with the RFP for CLIN 0003 and including the work indicated or specified under 0003AB through 0003AC.
0003AB: Complete work for the facility Exterior Enclosure in accordance with Part 3 ESR B20
Exterior Enclosure. Enter selected Exterior Enclosure in the space provided.
0003AC: Facility and work inside the 5 foot line, excluding design costs, includes labor, materials, 0003AD: Site work outside the 5 foot line, excluding design costs, includes labor, materials, and
0003AE: Design includes provision of all work associated with the site and building design including but not limited to architecture, structural, geotechnical, interior design, civil, mechanical, CLIN 0004 – Planned Modification for P1338F
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in accordance with the RFP.
CLIN 0005 – Planned Modification for P1338F
F-14
Price to procure and supervise installation of the Audio/Visual Equipment (AV) complete in accordance with the RFP.
CLIN 0006 – NOT USED
CLIN 0007 – Planned Option 1 for P1338F
Delete the work for the demolition and disposal of building foundations outside of the P1338F II Simulator
Training Facility footprint complete in accordance with the RFP.
CLIN 0008 – Planned Option 2 for P1338F
Delete the work for the demolition and disposal of building (including foundations) outside of the P1338F II
Simulator Training Facility footprint complete in accordance with the RFP.
CLIN 0009 – Planned Option 3 for P1338F
Delete the work for the asphalt surface course at parking areas for P1338F II Simulator Training Facility.
Price for parking areas to be gravel complete in accordance with the RFP.
CLIN 0010 – Planned Option 4 for P1338F
Not used.
CLIN 0011 – Planned Option 5 for P1338F NOT USED
Delete the work for brick cavity wall assembly over CMU backup. Price for tilt-up wall concrete panel construction complete in accordance with the RFP.
CLIN 0012 – Planned Option 6 for P1338F
Delete the flooring finishes in the corridors and Main Entry (identified in RFP Part 3, Chapter 5 Room
Requirements). Price as terrazzo flooring complete in accordance with the RFP.
CLIN 0012A – Planned Option 6A for P1338F
Delete movable partitions between Simulation Classrooms (identified in RFP Part 3, Chapter 5 Room
Requirements). Price as Operable Partitions (with door access) complete in accordance with the RFP.
F-15
CLIN 0013 – Planned Modification for P1512F
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0014 – Planned Modification for P1512F
Price to procure and supervise installation of the Audio/Visual Equipment (AV) complete in accordance
CLIN 0015 – Planned Modification for P1512F NOT USED
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0002.
CLIN 0016 – Planned Option 1 for P1512F
Delete the work for the demolition and disposal of building foundations outside of the P1512F LOGOPS
School, Joint Reception Facility and M107 Renovation building footprint(s) complete in accordance with the RFP.
CLIN 0017 – Planned Option 2 for P1512F
Delete the work for the demolition and disposal of building (including foundations) outside of the P1512F
LOG OPS School, Joint Reception Facility and M107 Renovation building footprint(s) complete in
CLIN 0018 – Planned Option 3 for P1512F
Delete the work for the asphalt surface course at parking areas for P1512F. Price for parking areas to be gravel complete in accordance with the RFP.
CLIN 0019 – Planned Option 4 for P1512F
Not Used.
Provide “tiered” raised access floor (7” steps per row of desks) in Log Ops School Classrooms (1-9) in lieu of the flat raised access flooring with a slab recess of 6” that is the base bid.
CLIN 0020 – Planned Option 5 for P1512F NOT USED
Delete the work for brick cavity wall assembly over CMU backup. Price for tilt-up wall concrete panel
F-16
CLIN 0021 – Planned Option 6 for P1512F
Delete the work for roof replacement of M107 Renovation included in CLIN 002AD. Price for repairing
M107 roof complete in accordance with the RFP.
CLIN 0022 – Planned Option 7 for P1512F
Delete the work for roof replacement of M107 Renovation included in CLIN 002AD. Price for adding a
High Slope Roof to M107 roof complete in accordance with the RFP.
CLIN 0023 – Planned Option 8 for P1512F
Price for providing the additional pavement for Troop Formations between existing BEQ Buildings M445 and M446 and between M445 and M450 complete in accordance with the RFP.
CLIN 0024 – Planned Option 9 for P1512F
Delete the flooring finishes in the corridors and Main Entry (identified in RFP Part 3, Chapter 5 Room
Requirements. Price as terrazzo flooring complete in accordance with the RFP.
CLIN 0025 – Planned Modification for P1527F
Price to procure and supervise installation of the Furniture, Fixtures, and Equipment (FF&E) complete in
CLIN 0026 – Planned Modification for P1527F
Price to procure and supervise installation of the Audio/Visual Equipment (AV) complete in accordance
CLIN 0027 – Planned Modification for P1527F NOT USED
Price for provision, installation, testing, and associated training for the Electronic Security System (ESS) complete in accordance with the RFP as necessary for the facility. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Closed Circuit Television (CCTV), boundary switches, electronic latches, motion sensors, electronic entry control, and security monitoring and control workstations. ESS design, design submittals, pathways and electrical power are excluded from this item and shall be priced in the base bid CLIN 0003.
CLIN 0028 – Planned Option 1 for P1527F
Delete the work for the demolition and disposal of building foundations outside of the P1527F LOGCOM
Warehouse Facility footprint complete in accordance with the RFP.
F-17
CLIN 0029 – Planned Option 2 for P1527F
Delete the work for the demolition and disposal of building (including foundations) outside of the P1527F
LOGCOM Warehouse Facility footprint complete in accordance with the RFP.
CLIN 0030 – Planned Option 3 for P1527F
Delete the work for the asphalt surface course at parking areas for P1527F LOGCOM Warehouse Facility.
Price for parking areas to be gravel complete in accordance with the RFP.
CLIN 0031 – Planned Option 4 for P1527F
Delete the work for brick cavity wall assembly. Price for metal wall panel exterior cladding complete in
CLIN 0032 – Planned Option 5 for P1527F NOT USED
Delete the work for brick cavity wall assembly over CMU backup. Price for tilt-up wall concrete panel
CLIN 0033 – Planned Option 6 for P1527F
Delete the work for low sloped metal roofing. Price for membrane roofing complete in accordance with the
RFP.
CLIN 0034 – Planned Option 7 for P1527F
Price to reduce the overall wall height by 5’-4” and add additional pallet racks complete in accordance with the RFP.
NOTE: The Government reserves the unilateral right to award the Option(s) to the Contractor at the negotiated price within 180 Calendar Days after the Contract Award Date. If Options are exercised, the
Contract Completion Date remains.