Att_RFI 94 - TFF Package 3_P1527F_E10_R2.pdf

PDF 173 KB Posted

Attached to
Hurricane Florence Recovery Training and Storage Facilities at MCB Camp Lejeune. Package 3
Solicitation number
N4008519R9253
Issued by

About this file

This document outlines requirements for a design-build request for proposal for hurricane recovery training and storage facilities at Marine Corps Base Camp Lejeune in North Carolina. Package 3 consists of replacing three facilities: the MCCSSS Log Ops School, the II MEF Simulation/Training Center, and the LOGCOM CSP Warehouse. The solicitation seeks firms to design and construct the new facilities to include warehouse pallet racks, shelving, dock levelers, kitchen equipment, and the rough-in and connection of government furnished equipment such as mask leak testers and hazardous storage cabinets. Proposals are due by April 27, 2020 and the selected firm will contract with the Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
M107 1512_6_ESR_B30_R1.pdf PDF
1527_6_ESR_B30_R1.pdf PDF
M107 1512_2_project_objectives_R1.pdf PDF
JRC 1512_6_ESR_D30_R2.pdf PDF
1338_6_ESR_D30_R2.pdf PDF
19R9253 Amendment 0020.pdf PDF
Price Proposal Form Rev 7.10.pdf PDF
LOG OPS 1512_2_project_objectives_R1.pdf PDF
1338_6_ESR_B30_R1.pdf PDF
1527_6_ESR_D30_R2.pdf PDF
LOG OPS 1512_6_ESR_D30_R2.pdf PDF
Attachment H Revised 7.10.2020 v2.pdf PDF
M107 1512_6_ESR_D30_R2.pdf PDF
JRC 1512_6_ESR_B30_R1.pdf PDF
JRC 1512_2_project_objectives_R1.pdf PDF
1338_2_project_objectives_R1.pdf PDF
1527_2_project_objectives_R1.pdf PDF
LOG OPS 1512_6_ESR_B30_R1.pdf PDF
ATT_RFI177178_TFFPackage3_PriceSchedule_R5.pdf PDF
19R9253 Amendment 0019.pdf PDF
19R9253 Amendment 0018.pdf PDF
19R9253 Amendment 0017.pdf PDF
Att_RFI 292 - TFF Package 3_P1512F Phasing Plan_R1.pdf PDF
Att_RFI 254 - TFF Package 3__5_Room_P1512 LOG OPS_5 Room Req-Mothers Room_R1.pdf PDF
Att_RFI 242 and 248 - TFF Package 3_M107 Exterior Photos.pdf PDF
Att_RFI 291 - TFF Package 3_P1512F LOG OPS_F20_R1.pdf PDF
19R9253 Amendment 0016.pdf PDF
19R9253 Amendment 0015.pdf PDF
19R9253 Amendment 0014.pdf PDF
19R9253 Amendment 0013.pdf PDF
19R9253 Amendment 0012.pdf PDF
ir78.pdf PDF
ir78 pipe.pdf PDF
20200409_Hadnot-1707-PRE-FINAL.pdf PDF
Att_RFI 186 - TFF Package 3_P1512F M107_Additional As-Built.pdf PDF
1527_6_ESR_D30_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1512F LOG OPS_E20_R1.pdf PDF
19R9253 Amendment 0011.pdf PDF
Att_RFI 97 - TFF Package 3_P1527F_E20_R1.pdf PDF
ATT_RFI177178_TFFPackage3_PriceSchedule_R4.pdf PDF
JRC 1512_6_ESR_D30_R1.pdf PDF
1338_6_ESR_D30_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1512F JRC_E20_R1.pdf PDF
LOG OPS 1512_6_ESR_D30_R1.pdf PDF
M107 1512_6_ESR_D30_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1338F_E20_R1.pdf PDF
Att_RFI 97 - TFF Package 3_P1512F M107_E20_R1.pdf PDF
TFF MILCON D303001andD304006 REV5.docx DOCX document
19R9253 Amendment 0010.pdf PDF
ATT_RFI 177 - 178_TFF Package 3_Price Schedule_R3.pdf PDF
Show 40 more

Latest 50 of 97 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build Request for Proposal RTA Hurricane Florence Recovery Training and Storage Facilities 3 March 2020 27 April 2020 Marine Corps Base Camp Lejeune, North Carolina Rev 02

PART 3 - CHAPTER 6/ESR E10 - P1527F LOGCOM CSP WAREHOUSE REPLACEMENT - Page 1

E10 EQUIPMENT – P1527F LOGCOM CSP WAREHOUSE

REPLACEMENT

GENERAL SYSTEMS REQUIREMENTS

E1010 COMMERCIAL EQUIPMENT

Obtain the services of equipment specialists to specify audiovisual equipment, as indicated in E102009. Equipment specialists shall not have any affiliation with the product specified.

All specialty equipment will be installed by qualified installers regularly engaged in installing the specialty equipment.

Provide energy using equipment per criteria listed in UFGS 01 33 29.05 20 Sustainability Requirements for Design Build.

E101003 VENDING EQUIPMENT

Government to provide and install vending equipment (four units) under separate contract.

Users to provide requirements of electrical and plumbing devices to be provided by Contractor to properly support the complete functional operation of the vending equipment. Design the break rooms to provide space, utilities, and cooling to accommodate the vending equipment.

E101005 SECURITY AND VAULT EQUIPMENT

NOT USED

E1020 INSTITUTIONAL EQUIPMENT

E102003 LABORATORY EQUIPMENT

NOT USED

E102009 AUDIOVISUAL EQUIPMENT

Coordinate design requirements with the end user/Command IT personnel, and provide equipment specifications, and procurement and installation of the Audiovisual (AV) equipment.

Obtain the services of an audiovisual equipment specialist with CTS-D certification to design and specify the audiovisual equipment.

AV Equipment including electronics potentially connected to data/IT, must be coordinated with design and construction but planned for and funded by the user or Budget Submitting Office sponsoring the user. AV equipment must include, but is not limited to, intercom/sound systems, smartboards, flat screens, projectors, video teleconferencing, interactive wall systems and CCTVs.

AV equipment is funded separately. The AV Equipment is identified on the AV Cost Estimate Worksheet. Refer to E20 for the Best Value Determination process for AV systems.

E1030 WAREHOUSE AND VEHICULAR EQUIPMENT

Provide warehouse pallet racks complying with UFC 4-440-01, Change 1 and Rack Manufacturers Institute MH16.1 Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks:

Marine Corps Base Camp Lejeune, North Carolina Rev 01

PART 3 - CHAPTER 6/ESR E10 - P1527F LOGCOM CSP WAREHOUSE REPLACEMENT - Page 2

a. Load beam length: 9 ft. (108 in.)

b. Load beam capacity: 2 loads, 3,000 lb. each per pair of beams

c. 4-levels high with load beam elevations at 1’-0”, 6’-4”, 11’-8”, and 17’-0”’

d. Double deep design with 96” depth for two pallets.

e. 12” minimum back-to-back flue space between rows of double deep rack

f. 6” minimum clearance between racks and building columns

g. 14 ft. wide aisles between racks faces

h. 16 ft. minimum wide cross aisles and end aisles

i. Overall capacity of 1,536 pallet positions minimum.

Provide pallet rack with capacity for 48 pallets minimum in JEFS storage area. This may be either single deep or double deep as fits building arrangement. Beam length, beam capacity, beam elevations, aisle widths, and clearance shall be the same as warehouse pallet racks.

Provide new shelving for Test Equipment Storage similar to existing shelving including 120 volt power strips for some sections.

Loading dock shall be pProvided witha dock levelers and truck-trailer restraining devices at each dock door. Refer to the Architectural Block Diagram.

Minimum performance characteristics for the dock lift shall be based on the following:

a. Service Period:

(1) Number of shift operations of 1.

(2) Maximum number of trucks per shift opening of 8.

(3) Maximum number of days per week of 6.

b. Fork Lift Loads:

(1) Design lift s to accommodate 4-wheel fork trucks with rated capacity of at least 6,000 lbs.

(2) Design lifts to handle 15,000 lb. gross dynamic load.

(3) Base lift design on number of cycles per loading/unloading operation per truck of 18.

c. Dock lift design:

(1) Dock lift must be surface mount type. Pits are not acceptable.

(2) Dock lift must be end design with approach ramp, straight across travel.

E1040 GOVERNMENT FURNISHED EQUIPMENT

Rough-in and provide connections for Government-furnished equipment such that equipment will operate as intended, including providing miscellaneous items such as plugs, receptacles, wire, cable, conduit, flexible conduit and outlet boxes or fittings. Contractor shall pick up equipment at Building 1601 and transfer to site when ready for installation and relocation is approved by Contracting Officer. Equipment shall remain in control of the Government until such time as the Contractor is ready to install. Contractor shall provide 30 days advance notice of expected installation date and pick up equipment and transfer to site for installation. Testing

Marine Corps Base Camp Lejeune, North Carolina Rev 01

PART 3 - CHAPTER 6/ESR E10 - P1527F LOGCOM CSP WAREHOUSE REPLACEMENT - Page 3 requirements of Government Furnished equipment shall be the responsibility of the Contractor and shall follow the same guidelines as though the Contractor had provided the equipment. The following items will be furnished by the Government and shall be relocated, installed and tested by the Contractor:

• JSMLT (Joint Service Mask Leak Tester) equipment in warehouse.

• JSMLT equipment, 4 units, in JEFS.

• Hazardous Storage Cabinets, 3 units in JEFS.

• 50 pallets of JEFS equipment, not to exceed 500 pounds and 48” x 48” x 48” each.

E1090 OTHER EQUIPMENT

E109002 FOOD SERVICE EQUIPMENT

Provide light commercial kitchen equipment design to meet the needs of the end user. All light commercial electric kitchen equipment to be coordinated to provide a functional facility. Project includes the preparation of specific detailed information for each selected item. Each submittal must demonstrate thorough interaction with the end user requirements and complete coordination with the facility design. Equipment must include, but is not limited to, refrigerator, microwave, coffee maker, and ice maker.

--End of Section--