This Request for Proposal outlines requirements for the design and construction of a new Marine Corps Combat Service Support Schools Logistics Operations School facility at Marine Corps Base Camp Lejeune in North Carolina. Key requirements include constructing a new practical application instruction building to provide entry and intermediate level training for Motor Transport MOS Marines, with high bay vehicle training spaces and classrooms. The facility must meet sustainable design and construction standards, incorporate low impact development stormwater management, and achieve energy efficiency goals. Security requirements include antiterrorism force protection measures such as vehicle deterrent landscaping and maintaining a 33-foot unobstructed space around the building. The structural, fire protection, telecommunications, and control systems designs must also meet specified criteria. Offerors must consider challenges around material availability, construction phasing, and providing adequate circulation and mechanical spaces within the programmed square footage. The design must enable flexibility and adaptability to meet evolving training needs.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Build Request for Proposal RTA Hurricane Florence Recovery Training and Storage Facilities 3 March 202027 May 2020 Marine Corps Base Camp Lejeune, North Carolina Rev 01
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 1
2.0 PROJECT OBJECTIVES
2.1. Mission Statement
Construct a new practical application instruction building to address the space needs of the MCCSSS’s LOG OPS Schools and support the mission of this school to provide entry and intermediate level training for MOS Motor Transport. The goal for the design of this facility is to provide the Marine Corps with a building of exceptional cost-effective design that meets key functional, maintenance and security requirements. The programming goal is to provide the building with the optimal mix of instructional space to meet the training mission requirements, as well as, provide spaces that are flexible as teaching methods and technology evolve.
2.2. Facility Function
The LOG OPS School will function as a vehicle repair and operation teaching facility to allow for an increased throughput of marines trained. The function of the new facility is based on providing a simple consistent arrangement of spaces for housing Marine Corp motor transport vehicles used for training along with their associated classrooms and support spaces. The proposed site is in the far northeast quadrant (east of Company Street B and just south of the Physical Fitness Training Trail) of Camp Johnson. The facility location was chosen to improve function by being in close proximity to the Marines it serves; and will be located within a short walking distance to other key Camp Johnson facilities that include dining facilities, the new Joint Reception Center (JRC), and multiple barracks buildings. The building design will be required to meet design guidelines defined in the Camp Lejeune BEAP and this will allow the building to be a part of a continued modern campus aesthetic at Camp Johnson. The building design is required to meet the requirements of current building and codes and UFCs, resulting in a beneficial and improved experience for the Marines that use it. The following chapter will define the priorities and specific technical requirements that the building design for this key MCCSSS instructional facility.
2.3. Project Specific Priorities
2.3.1. Sustainable Design and Construction
All NAVFAC projects are subject to sustainable design criteria and are required to meet the requirements of the Guiding Principles for Sustainable Federal Buildings (HPSB). The Guiding Principles are outlined in a cross disciplinary publication addressing requirements for new building construction and modernization of all federally owned facilities. Sustainable principles will be integrated into the design, development and construction of the project in accordance with Executive Order 13834 and other applicable laws and Executive Orders.
Design and construct the project to comply with sustainability requirements identified in Part 2 Section 01 33 29.05 20, Sustainability Reporting for Design-Build. Additional specific sustainability requirements are found in RFP Part 2, Part 3, and Part 4 sections.
Design and construct the project in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements. The UFC provides design, construction and modernization criteria for projects of all sizes. It outlines performance thresholds in energy and water, addresses criteria of indoor air quality, identifies resiliency concerns, addresses planning and
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 2 design, and establishes a baseline across all of DOD for documenting sustainability. A major component of the policy established in this UFC is the Sustainable Third-Party Certification requirement for projects that reach specific size and cost thresholds.
Additional, agency-specific requirements can be found in NAVFAC Engineering & Construction Bulletins (ECBs) such as Issue No. 2014-02. ECB 2014-02 describes overall NAVFAC policy and guidance on sustainability and energy requirements.
2.3.2. Stormwater Management - Low Impact Development (LID)
Comply with UFC 3-210-10, Low Impact Development and FC 1-300-09N Navy and Marine Corps Design Procedures. Additional specific LID and stormwater management requirements are found in RFP Parts 3 and 4, Section G30. In addition to LID, comply with state and local stormwater regulations.
2.3.3. Energy Efficiency
The level of energy performance the Government seeks may only be achieved through coordinated design of architectural, electrical, and mechanical elements of the design. All energy systems must be designed in compliance with the following unless more stringent requirements are noted otherwise:
UFC 1-200-02, High Performance and Sustainable Building Requirements. Incorporate energy efficiency in accordance with UFC 1-200-02, HPSB requirements
EPAct 2005
EISA 2007
ASHRAE Standard 189.1 - 2014
ASHRAE/IESNA Standard 90.1-2013.
Energy consuming equipment and products must meet or exceed Energy Star or FEMP efficiency levels. This includes built-in equipment (e.g., lights, HVAC, water heating, and industrial equipment) and collateral equipment (e.g., office equipment, IT, and task lighting). For equipment types not rated by Energy Star or FEMP, equipment efficiencies must be in the top 25 percent of similar products. All purchased electronics must be EPEAT registered. In addition, provide an ECA, which will demonstrate compliance with all energy related requirements in UFC 1-200-02. Measure and record existing building utility consumption, provide design calculated estimated energy savings and post construction documentation and reporting of actual realized energy savings.
2.3.4. Building Commissioning
Provide commissioning to meet requirements identified in Section 01 91 00.15 22 Total Building Commissioning, and UFC 1-200-02 High Performance and Sustainable Building Requirements.
2.3.5. Accessibility Requirements
Provide barrier-free design in accordance with UFC 1-200-01, General Building Requirements.
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 3
2.3.6. Anti-Terrorism Force Protection
The primary objective for the Marine Corps Base (MCB) security engineering is to ensure compliance with the Antiterrorism Force Protection (AT/FP) program requirements and applicable Marine Corps physical security measures in MCO 5530.14A, as supplemented by the UFC. The AT/FP program requirements and Marine Corps physical security measures are to safeguard personnel, equipment, and property. A risk analysis and vulnerability assessment (RAVA) has not been performed and a specific Design Basis Threat has not been identified.
The facility is considered Inhabited and will be routinely occupied by 11 or more personnel.
The facility must be designed in accordance with the chapter 3 standards of UFC 4-010-01, except that parking is not permitted in the 33-foot unobstructed space around the building. This includes low occupancy portions of the building, as applicable, due to physical security and operational requirements. The facility must also be designed in accordance with the following requirements:
a) Antiterrorism Architectural Special Requirements – Installation mission-assurance has requested security-conscious layouts and configurations for the interior layout of the building spaces and entrances to the building. The goal is to improve antiterrorism safety without adding cost, without hardening the building, and without adversely affecting the usability of the building.
b) Building Entrance Orientation – Orient the main building entrance such that it does not provide vehicles the capability to drive through the main entry of the building. Where this is impractical, ensure that the entry storefront does not directly face a main hallway or a mass-gathering space. Lay out entrances to be welcoming and accessible, but so that the entrances are visibly protected and inaccessible against a vehicle attempting to force entry. Ensure that building main entrance layouts are also compliant with UFC 4-010-01 Chapter 3-12, Standard 11 “Building Entrance Layout”. Where this section conflicts with Standard 11, Standard 11 must take precedence.
c) Proximity of Densely Populated Areas to Parking – To mitigate risks to densely populated areas, locate uninhabited, low-occupancy, and mechanical yard areas adjacent to parking lots. Locate densely populated areas away from parking lots to the maximum extent possible given available site space and building square footage. The preference is to keep densely populated areas 82 feet away from parking spaces, if sufficient site space is available. Uninhabited and low-occupancy spaces include utility rooms, hallways and corridors without seating, and storage areas. Densely populated areas include classrooms, large break rooms, locker rooms, conference rooms, auditoriums, and other areas with a high personnel density. During the CDW, include the installation Antiterrorism Officer (mission-assurance) on discussions for the preferred layout of mass gathering and densely populated administrative areas relative to the proposed site plan.
d) Antiterrorism Landscape Architecture Special Requirements – Installation mission-assurance has requested security-conscious landscape features that afford improved protection to the building occupants. The goal is to improve antiterrorism safety without adding cost by utilizing UFC-mandated landscape architecture features to protect vulnerable areas and using excess fill from the project site for landscaped berms. A specific design basis threat for an active shooter or attack vehicle does not apply;
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 4 therefore, the intent is to complement architectural layouts and civil site features to improve occupant protection within the project scope of work.
e) Vehicle Deterrent Landscaping – Landscaping features can provide a significant physical and psychological deterrent to the risk of a vehicle ramming attack as a part of a vehicle-deterrent perimeter. Landscaping features do not need to be rated passive vehicle barriers to afford greater security to the building occupants.
f) Unobstructed Space – Trees, plantings, and site furniture may be located within the 33-foot unobstructed space around each building, provided they are compliant with the UFC 4-010-01 and UFC 3-201-02 requirements for landscaping in the unobstructed space. For berms, ensure berms in the unobstructed space do not exceed a height of 4 feet, 6 inches to eliminate concealment opportunities.
g) Large Diameter Trees – Tree species that will grow to a large DBH (greater than 6 inches) provide an aesthetically pleasing and natural barrier to vehicle traffic. It is desirable to position large diameter trees in the space between the building and parking lots or roads where permissible by code and feasible based on available site space.
Provide tree plantings with at least 4 inches DBH where the trees are integrated into the vehicle-deterrent perimeter. Multiple staggered rows of trees serve as highly effective vehicle barriers once the trees have grown. Where providing multiple rows of trees stagger and space the trees to eliminate any corridors exceeding a 5-foot width perpendicular to the adjacent roads or drive aisles. Final tree layout, tree spacing, and species must be approved by the Government Landscape Architect and installation Antiterrorism Officer (or their designated representative).
h) Concrete Site Features – Concrete benches and picnic tables are excellent deterrents to vehicles. Concrete planters are not desirable due to landscaping maintenance issues and concealment concerns in the unobstructed space.
i) Berms and Ditches – Berms and ditches provide protection and can be integrated with the landscaping plan (e.g., trees along tops of berms and creeping juniper on the sides).
j) Elevated Plazas – For buildings that require elevated entryway access with stairs and accessible ramps, consider arranging the stairs, ramps, and any low retaining walls or sloped soil so that they are positioned near the edge of the vehicle parking lot and adjacent roadways. A steeper, landscaped, stabilized slope near the edge of the parking lot with a sidewalk in front of it serves as a visible deterrent to illegal parking and approaching vehicles.
k) Bollards at Building Entrances – Bollards are an option where other features such as stairs, pedestrian ramps, trees, or berms do not deter direct vehicle access to the main building entrance. Bollards are desirable for sidewalks and plazas leading into the main building entrance provided there is no adverse impact to pedestrian accessibility. A bollard spacing of 4 feet on center will meet ABA/ADA requirements. Architectural bollards near the building entry are a desirable way to improve protection while improving site lighting (for lighted bollards) and appeal. Removable bollards are acceptable and beneficial for future building maintenance. Coordinate with vehicle access control requirements as part of civil site design. Provide the option of either permanent or removable bollards, determined based on customer needs at the CDW and subsequent design review meetings.
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 5
l) Visual Screening Landscaping at Queuing & Entry Areas –Visual screening affords protection for building occupants and visitors against the potential for vehicular or active shooter threats. Landscaping that provides visual obscuration of building entrances and outdoor queuing or congregation areas is highly desirable to improve protection of personnel in exposed areas.
m) Anti-Terrorism Civil Site Design Special Requirements – Installation mission-assurance has requested security-conscious site plans that afford improved protection to the building occupants. The goal is to improve anti-terrorism safety without adding cost by laying out necessary vehicle parking and stormwater features to protect vulnerable areas of the building. A specific design basis threat for an attack vehicle does not apply;
therefore, the intent is to complement architectural layouts and landscaping features to improve occupant protection within the project SOW. The unobstructed space and vehicle access control requirements defined below are added scope items to manage nuisance parking and maintain the unobstructed space for base operational considerations.
n) Vehicle Access Control – All projects must include consideration for vehicle access control in the form of lockable swing gates and/or lockable removable bollards along driveways and access roads that lead to service areas around the building within the 33-foot unobstructed space. Other open plaza areas must be secured with permanent bollards in combination with removable bollards. Portions of buildings that must be secured within a restricted area fence (e.g. motor pools) are excluded from this requirement.
o) Service Area Access – Access for service areas around the building includes roads and driveways that lead to utility rooms, loading docks, mechanical yards, other areas in the unobstructed space that are used for building maintenance, and for roads that are only used for fire access.
p) Pedestrian Areas – Open plazas, hardscaping, and other outdoor pedestrian-congregation areas that are adjacent to a roadway must also feature vehicle access control integrated with permanent landscaping and civil site features as part of a vehicle-deterrent perimeter. Removable and fixed architectural bollards (lighted, where beneficial) are preferred for vehicle access control to open plazas, hardscaping, and other outdoor pedestrian-congregation areas with at least four removable bollards in a row for service access to these pedestrian areas. Provide the option of either permanent or removable bollards, determined based on customer needs at the CDW and subsequent design review meetings.
q) Access Control Requirements – Where bollards are provided, space bollards 4 feet on center starting at each edge of the road or driveway. Where gates are provided, provide single or double leaf swing gates with posts that start at the edge of the roadway (or behind the curb) and which include receiving posts to secure the gate in the open position. Gates must not encroach on the roadway or driveway while in the open position. Gates and bollards must be high visibility and meet all other UFC requirements for signage, high-visibility, reflectivity, striping, etc., to meet traffic safety requirements.
Gates and bollards for vehicle access control to service areas and pedestrian congregation areas need not be crash rated. Refer to UFC 4-022-03 Security Fences and Gates for additional requirements for gates.
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 6
r) Vehicle-Deterrent Perimeter – Gates and bollards must be integrated with landscaping and civil site features to deter vehicles from bypassing the access control by driving around the barriers and to maintain a vehicle-deterrent perimeter.
s) Consolidating Access Control – Access roads to service areas around the building can be secured where the access road begins at the adjacent roadway or parking lot, provided this is integrated with the vehicle-deterrent perimeter, in order to reduce the total cost of providing vehicle access control to the unobstructed space.
t) Control Vehicle Speed – Arrange parking lot access roads and drive aisles so that any direct approaches to the building walls or building entrance cannot exceed 25 miles per hour. Speed limit signage alone is not sufficient to constrain vehicle speed. Speed limit control in parking lots and access roads is also desirable to improve pedestrian safety and to reduce the risk of vehicle accidents.
u) Limit Vehicle Approaches to Building – Arrange access roads and drive aisles so that no vehicles have long straight approaches directly at the exterior walls of the building, particularly at the building entrance. Keep the long axis of drive aisles parallel with the walls of the building to control the approach direction of a vehicle. Arrange access roads so that personnel do not drive directly facing the building walls or any entrance. For short drive aisles that run perpendicular to the long axis of the parking lot, coordinate with landscape architecture to provide civil site and landscaping features that visually or physically deter vehicle access. Alternatively, locate these perpendicular drive aisles beyond the ends of the building so traffic does not directly face the building walls or any entrance. Loading docks/heavy truck areas need not consider these requirements due to the impracticability of implementing this where building access is a requirement. Provide curb stops in parking spots that are adjacent to the building to discourage vehicle parking in the unobstructed space.
v) Unobstructed Space & Vehicle-Deterrence – Provide a minimum 33-foot unobstructed space around the building without new parking, existing parking, new roadways, or new drive aisles. Keep existing drive aisles and roadways out of the unobstructed space to the maximum extent practicable. Provide berms, drainage swales/ditches, and other civil site features between the building and any adjacent parking lots or roadways as part of a vehicle-deterrent perimeter. Berms can also reduce off-site fill disposal costs, provided that fill is verified to be non-hazardous, non-contaminated. The CDW must address how to integrate unobstructed space and vehicle-deterrence needs within the available site footprint in consultation with the installation Antiterrorism Officer.
w) Unobstructed Space Preferences – The installation mission-assurance personnel prefer larger unobstructed spaces where feasible based on available site space.
Unobstructed space need not exceed 82 feet for larger, open sites. This unobstructed space preference is to the mass-gathering portions of each facility that excludes open hangar areas, apparatus bays, and other areas that are specifically designed to be low occupancy spaces as defined in UFC 4-010-01. Refer to Paragraph C, Proximity of Densely Populated Areas to Parking, for more information.
2.3.7. Facility-Related Control System Cybersecurity
Design, acquire and execute all facility related control systems in accordance with UFC 4-010- 06 Cybersecurity of Facility-Related Control Systems. Design the project using UFGS 25 05 11, PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 7
Cybersecurity of Facility-Related Control Systems. Government Point of Contact to be utilized in SECTION 25 05 11 is James Mahoney, ICS ISSM for Camp LeJeune, email James.D.Mahoney@usmc.mil. Submit CCIs as attachments to SECTION 25 05 11.
The table below identifies the Facility Related Control Systems which must be included for this facility. Final C-I-A impact levels must be coordinated and approved by the Camp LeJeune ICS ISSM noted above, James Mahoney, James.D.Mahoney@usmc.mil
Authorizing Official
System Owner
System Group
System Existing Authority to Operate?
C-I-A Impact Level
USMC AO
Dr. Ken Bible
DPW UMCS HVAC Existing ATO MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
DPW UMCS Lighting Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
DPW UMCS Advanced Meter Infrastructure
(AMI)
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
DPW BCS Backup Power Generator Annunciator Panels and Controls
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
DPW BCS Elevator Control Systems
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
Fire Dept FLS Fire Alarm Reporting System
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
Physical Security
FLS Mass Notification System
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
Physical Security
ESS Physical Access Control System
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
USMC AO
Dr. Ken Bible
Physical Security
ESS Intrusion Detection System
Existing ATO in MCCAST (USMC) to be validated by ISSM
LOW-LOW-LOW
– ISSM must validate
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 8
Authorizing Official
System Owner
System Group
System Existing Authority to Operate?
C-I-A Impact Level
USMC AO
Dr. Ken Bible
Security Forces
ESS CCTV Existing ATO in eMASS (Navy) or
MCCAST (USMC)??
ISSM to validate.
LOW-LOW-LOW
– ISSM to validate
Incorporate cybersecurity requirements into project facility control systems identified in:
ESR D20, Plumbing
ESR D30, HVAC
ESR D40 Fire Protection including Cooper Notification, Inc. WAVES Emergency Notification System
ESR D50, ELECTRICAL
2.3.8. Secured Areas
Comply with the Marine Corps physical security measures in MCO 5530.14A as supplemented by the Unified Facilities Criteria.
2.3.9. Air Quality Management
When demolition or renovation occurs, ensure that subject buildings are evaluated for asbestos and asbestos-containing materials by a certified professional prior to the demolition/renovation.
Ensure that any fugitive dust emissions generated by construction, renovation, or demolition are appropriately controlled.
If the project includes installation of new activities or equipment which generate air emissions, and the sources have not been evaluated for air permitting by MCB CAMLEJ, contact AQ program at (910)451-9017. Please note that air emission sources are required to be permitted prior to their installation and operation. Examples of such sources include, but are not limited to:
boilers, water heaters, generators, fuel storage tanks, painting and coating operations, woodworking, welding, abrasive blasting, engine testing, refrigerant recovery devices, and parts ovens.
If the project involves any refrigerant handling or manipulation, ensure that appropriate ODS servicing procedures are followed.
If the project includes removal of any currently permitted air emission sources (see Item 3 for examples), contact AQ program at (910)451-9017.
2.4. Appropriate Design
Design the new building and systems in accordance with all Codes, Standards, UFCs, and criteria explicitly and implicitly stated herein. Employ integrated design principles.
2.4.1. Building Design – Architecture
The LOG OPS School building exterior envelope design must follow the architectural design features prescribed in the Camp Lejeune BEAP, 2010 for Camp Johnson (Section 4.13). This
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 9 document establishes key exterior materials, material finishes/colors and building façade and roofing design elements to be incorporated into the building’s exterior design.
Options for the exterior wall design are listed in Part 3, Chapter 6, B20 Exterior Closure ESR.
Any of the listed options is allowed for the design of the exterior wall, as long as the design elements for the exterior wall defined in the BEAP are provided.
In lieu of a 4:12 to 6:12 roof slope that is defined in the BEAP for Camp Johnson, provide a minimum 2:12 roof slope for this building’s roofs. Slopes of roofs that cover longer spans must limit the slope to prevent having an excessive attic area.
The building design floor plan must generally follow the arrangement of spaces indicated in the Architectural Block Diagram in Part 3, Chapter 4 of this RFP. Locations of break rooms and restrooms may vary from what is shown in the diagrams if the functions of the primary teaching and instructor spaces are maintained.
The massing of the building and roofing placement will be influenced by the continuous high bay space of the vehicle training bays and the adjoining classroom, administration, and corridor spaces that will require a lower building height.
Daylighting requirements prescribed in applicable codes and standards must be provided by only vertical fenestration elements that include vertical fenestration (windows) placed in exterior walls, a glazed exterior wall (curtain wall or storefront), vertical fenestration placed in building clerestories, or vertical fenestration elements placed in the steep sloped roofing that include dormers or monitors (raised roof area with clerestory windows above the sloped roof) that are compatible with BEAP prescribed elements and approved by MCBCL during the design process. All fenestration must incorporate shading devices/overhangs or other means to prevent direct sunlight entering occupied spaces and work surfaces per guidelines in applicable UFCs.
Skylights and solar tubes are prohibited for this project.
The high bay vehicle training spaces are a continuation of the training and classroom space and are considered occupied spaces that require daylighting per UFC requirements.
The building design and design documentation must comply with applicable UFCs listed in Chapter 3, Part 1 and applicable building codes.
2.4.2. Civil/Site
The site for the LOG OPS School will provide for military training vehicle access into and out of the classroom bay areas (60-foot minimum out from the bay doors). Due to the infrequent nature of bringing vehicles in and out of the classroom bays, striping for staff parking may be placed within the military vehicle maneuvering area. Provide access for WB-62 vehicle to the special projects point in the building for loading and offloading. The WB-62 design vehicle is a semitrailer vehicle with an effective vehicle wheelbase of 62’ as defined by AASHTO (American Association of State Highway and Transportation Officials). Due to high groundwater and flooding concerns, do not provide a sunken loading dock. Pedestrian circulation must be designed for the high volume of students and personnel that will be traversing to other common destinations adjacent to the facility, such as the mess hall. Most students are not allowed cars on base and as such, large groups of Marines often travel by foot together, often in formation.
These formations will require wider than normal sidewalks.
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 10
Provide parking for staff and advanced students (200 spaces total) adjacent to the facility and provide sidewalks where appropriate from the parking to the facility. Any existing parking removed for construction of this facility must be replaced on a space-for-space basis in an area adjacent to the facility originally being served. These spaces can be co-located with the parking that serves the LOG OPS school if the location will also serve the existing facility.
All-weather access roads to the facility for emergency vehicles and for base maintenance access to mechanical rooms and exterior equipment must be provided.
Being in an already developed portion of Camp Johnson, site utilities (water/sewer) are adjacent to the building site and are readily available for connection.
Provide sufficient area for the dumpster/trash/recycling containers that is convenient for both the building occupants and the solid waste pick-up vehicle.
Stormwater management must comply with UFC 3-210-10 for Low Impact Development, and all State stormwater permit requirements for both treatment quality and discharge quantity and rate.
This project must meet Guiding Principles compliance and must comply with UFC 1-200-02, High Performance and Sustainable Building Requirements.
2.4.3. Environmental/Conservation/Cultural Resources
NEPA work for this project has been completed by NAVFAC.
2.4.4. Structural
The structural design objective is to construct an efficient, safe and durable building constructed from any of the materials and load bearing systems permitted in the Part 3 ESR narratives and meeting the reference codes and standards. As part of this objective, the structural design must be coordinated with all disciplines and must meet functional requirements.
To help meet the objective, NAVFAC has provided a significant amount of historic geotechnical information and ECS has performed a preliminary geotechnical investigation of this site. Refer to Part 6 for the ECS preliminary information that includes previous investigations provided by NAVFAC. The NAVFAC and ECS geotechnical information is reliable for preliminary information but must be verified by the Contractor. The Contractor is solely responsible for interpreting available geotechnical information. The Contractor is responsible for conducting an independent geotechnical investigation for foundation design.
2.4.5. Fire Protection
2.4.5.1. Building Code and Life Safety Analysis
Provide a complete building code and life safety code analyses in accordance with UFC 3-600- 01 and FC 1-300-09N.
2.4.5.2. Fire Alarm and Mass Notification
Design and provide an integrated fire alarm, mass notification system capable of notifying building occupants inside the facility of an emergency event. Design and install all equipment per the criteria of ESR and PTS Sections D40 and the manufacturer’s recommendations. Where
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 11 the words "should" or “shall” are used in the manufacturer’s recommendations and in referenced Codes and Standards, substitute the word "must".
2.4.5.3. Fire Protection Sprinkler System
Design and provide a wet pipe fire sprinkler system for complete fire protection coverage throughout the entire building. Design and install all equipment per the criteria of ESR and PTS Sections D40 and the manufacturer’s recommendations. Where the words "should" or “shall” are used in the manufacturer’s recommendations and in referenced Codes and Standards, substitute the word "must". Base hydraulic design on the water supply data provided in ESR Section D40 and Part 6.
This project includes an electric-motor-driven fire pump with an onsite standby generator and automatic transfer switch to serve as the required alternate power source. Power supply at Camp Lejeune does not qualify as a “reliable power source” as defined in UFC 3-600-01. Refer to ESR Sections D40 and D50 for requirements. A diesel-engine-driven fire pump will not be considered as an acceptable alternative to the specified electric-motor-drive fire pump.
2.4.6. Telecommunications
Provide a complete Telecommunications backbone and horizontal distribution system as specified throughout this RFP. Install all equipment, pathways, and cabling per the criteria per the PTS Sections D50 and G40 and the manufacturer’s recommendations. Where the words “should” or “shall” are used in the manufacturer’s recommendations, substitute with the word “must”.
Provide a MDF to house telecommunications equipment and cabling as well as, service provider equipment and cabling. Additionally, provide floor/area serving IDFs to house telecommunications equipment and cabling.
Provide fiber and copper exterior and interior backbone cabling to each MDF and IDF. Provide copper horizontal cabling from each IDF with cable tray and conduit pathways to each Work Area Outlet (WAO).
Provide exterior underground communications duct bank manhole system from existing duct bank(s) and manhole to the MDF inside each building.
The design and installation must be in accordance with the latest TIA standards, all applicable Unified Facilities Criteria documents and the latest local provider and applicable Using Military Department standards and criteria.
2.5. Workflow Process
This facility’s mission is to provide training for vehicle repair/maintenance that is performed on motor transport vehicles located in high bay training space, with additional instruction provided in a separate set of classrooms that are located adjacent to the high bay spaces. Access to the building for students since they are pedestrians is primarily into the high bay vehicle training spaces; and the students will be given directions for what bay to enter from instructional directions provided in their curriculum processing documents and day to day instruction from instructors. From the high bay space students can access the separate classroom associated with that particular training bay from each bay. Students, if required, are able to go between each high bay space since they must all be interconnected. Several labs and classrooms are
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 12 located outside of the vehicle training bays and will require access from the primary building corridor located along the north side of the building. Students at times will be given access to the primary corridor when needing to access break rooms/lounges, other classrooms/lab or the Special Projects space as allowed by instructional staff. Students can use the primary corridors to exit the building at the end of their workload/classes if they are located in spaces that face the primary corridor. However, the large majority of students will stay in the high bay training space and the associated classrooms most of the time.
Instructors and managing administrative staff will have access to the main entry and use the primary building corridor north of the classrooms to navigate to the building. Or they can use a secondary entry located at the southeast quadrant of the building to access the building.
2.5.1. Hours of Operation
Hours of operation are from 0700 to 2000, Monday through Friday for student instruction.
Instructors and other administrative staff access to the facility is allowed 24 hours per day, 7 days per week.
2.5.2. Staffing/Occupancy
The LOG OPS School is operating as a training facility and will be occupied primarily during daytime hours by students occupying the training spaces (classrooms and high bay training space) and instructional and administrative staff circulating between office areas adjacent to the training spaces and to the training spaces.
The number of occupants specified in the RFP and indicated in the Building Program in Part 3, Chapter 4 are identified for programming purposes. Determine occupancy load to be used to design building features, such as structural, egress, and plumbing fixtures must be as required in applicable building or life safety codes based on the spaces provided in the building design.
2.6. Special Design Challenges
Special design challenges include the following:
The large number of MILCON facilities that are to be built at or around the same time as the LOG OPS School at Camp Lejeune may create challenges with both material and labor availability. The design of the building and systems selected for exterior envelope materials should consider these challenges.
Refer to Part 6 for preliminary construction phasing plan. Develop a detail construction phasing plan as part of the design package for government approval before construction.
Preliminary planning of the building shown in the floor plan diagram in Part 3, Chapter 4 has established space arrangements and the overall building square footage with all of the functions of the building accounted for. However, providing the final building floor plan with adequate circulation and corridor space and adequate indoor mechanical space without reducing the square footage of required programmed occupied spaces could be a challenge moving forward.
Working with the user to further define and establish the correct amount of interconnectivity and occupant flow between the spaces of the building.
Providing daylight per UFC requirements to all occupied spaces.
PART 3 - CHAPTER 2 - P1512F LOG OPS SCHOOL - Page 13
2.7. Adaptability and Flexibility
The LOG OPS School must be adaptable and flexible in its approach to meeting the training mission needs.