This document outlines requirements for a standing seam metal roof system on a warehouse replacement project at Marine Corps Base Camp Lejeune, North Carolina. The roof must have a slope between 1:12 and 2:12, use 3004 aluminum panels with a PVDF coating, and have standing seams spaced 12 to 18 inches. Insulation must meet UFC 1-200-02 requirements. Compatible gutters, downspouts and flashing per specification 07 61 15.00 20 are required. The project is part of Package 3 under solicitation N4008519R9253 for Hurricane Florence recovery facilities at MCB Camp Lejeune, which includes replacement of a Logistics Operations School, Simulation/Training Center, and Logistics Command Consolidated Storage Point warehouse.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design-Build Request for Proposal RTA Hurricane Florence Recovery Training and Storage Facilities 3 March27 May 2020 Marine Corps Base Camp Lejeune, North Carolina Rev 01
PART 3 - CHAPTER 6/ESR B30 - P1527F LOGCOM CSP WAREHOUSE REPLACEMENT - Page 1
B30 ROOFING – P1527F LOGCOM CSP WAREHOUSE
REPLACEMENT
B30 GENERAL SYSTEMS DESCRIPTION
Roof systems shall be watertight. Provide complete roof system design and construction services for the entire new facility roof system, including all ancillary and incidental work necessary for a complete, new, watertight roof system installation.
Submittal Requirements: Components of a minimum roof submittal shall include the roof plan, method of drainage, standard details and details unique to the project, wind load calculations and requirements.
Provide a Pre-Design Roofing Conference (if required in RFP Part 4) and Pre-Construction Roofing Conference to assure roof design and construction is properly coordinated before construction begins.
Refer to UFC 3-110-03, Roofing, UFC 3-101-01, Architecture, and UFC 1-200-02 High Performance Sustainable Buildings for additional roofing requirements such as Energy Star qualified products.
MOST RELEVANT CODES AND STANDARDS
Refer to Part 3, Chapter 1.
B3010 ROOF COVERINGS
B301001 STEEP SLOPE ROOFING SYSTEMS
NOT USED
B301002 LOW SLOPE ROOFING SYSTEMS
Provide a SSMR (standing seam metal roof system). The preferred slope is 1:12. Per UFC 4- 440-01, sloped roofs having a pitch exceeding 1:12 must be avoided unless available roofing materials require a greater pitch. However, a pitch exceeding 2:12 is not permitted. Other requirements are suggested in the Base Exterior Architectural Plan (BEAP), 2010, Section 4.2, Hadnot Point.
The roof system shall be designed and attached to resist wind uplift pressures calculated in accordance with ASCE 7. Uplift resistance shall be validated by applicable Factory Mutual (FM), Underwriters Laboratories (UL) or ASTM uplift resistance test procedures. The roof material must be 3004 aluminum, ASTM B209M ASTM B209.
Organic Coatings for the metal roof must be a PVDF coating as specified in Part 6, Roof specification section 07 61 15. 00 20 Aluminum Standing Seam Roofing. All other material and construction for metal roofing are per Part 6 specification section.
The spacing of standing seams shall between 12 inches and 18 inches on center as prescribed in the BEAP.
Sub-purlins for the Structural Metal Roof System shall be galvanized and shop painted.
SSSMRS Warranty Certificate. – Provide warranty requirements as defined in Part 6, Roof specification section 07 61 15. 00 20 Aluminum Standing Seam Roofing.
Design-Build Request for Proposal RTA Hurricane Florence Recovery Training and Storage Facilities 3 March27 May 2020 Marine Corps Base Camp Lejeune, North Carolina Rev 01
PART 3 - CHAPTER 6/ESR B30 - P1527F LOGCOM CSP WAREHOUSE REPLACEMENT - Page 2
B301003 ROOF INSULATION AND FILL
Provide roof insulation values no less than in accordance with UFC 1-200-02 High Performance and Sustainable Buildings and UFC 3-110-03 Roofing.
B301004 FLASHINGS AND TRIM
Provide flashing and trim for the Aluminum Standing Seam Metal roof per specification section 07 61 15. 00 20 Aluminum Standing Seam Roofing in Part 6 of this RFP.
B301005 GUTTERS AND DOWNSPOUTS
Provide gutters and downspouts compatible with roofing material and finish. Concealed (interior) gutters and downspouts are prohibited.
B301006 ROOF OPENINGS AND SUPPORTS
NOT USED – this includes any type of horizontally oriented glazed roof opening that includes skylights and solar tubes that are prohibited for this project.
B301090 OTHER ROOFING
Provide lightning protection, without penetrating the roofing or flashing components.
--End of Section--