This document is an amendment to a solicitation for Hurricane Florence Recovery Training and Storage Facilities at Marine Corps Base Camp Lejeune in North Carolina. Package 3 consists of renovating and replacing three facilities: the MCCSSS Log Ops School, the II MEF Simulation/Training Center, and the LOGCOM CSP Warehouse. The amendment provides responses to contractor questions, clarifies requirements, and corrects errors in the original solicitation. Key changes include removing a requirement for undercutting and replacing soil, clarifying door sizes and equipment dimensions for a maintenance room, correcting pricing errors in the bid form, and specifying that wetland mitigation will be through off-site mitigation bank credits. Offerors must acknowledge this amendment by the stated deadline. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 97 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PPIs
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9253
X 9B. DATED (SEE ITEM 11)
15-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9253
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0019
This amendment hereby incorporates the following:
1. RFP PDF - pg 819, PART 3 - CHAPTER 3 - P1512F LOG OPS SCHOOL, 3.3.8.1. Criteria for Bidding DELETE Undercut and replacement with imported structural fill to address geotechnical unsuitable soil conditions; 10 percent of the site
2. Revised ATT_RFI177178_TFFPackage3_PriceSchedule_R5 correcting CLIN 0005 total and deleting reference to Paragraph 1.3.
3. PPI responses
Reference Question Government Response Page Sect Para
165 4 Part 3
Chapt er 6
D2030
P1527 -Trench drains are required in diesel engine storage preparation area of the Warehouse
Maintenance Room.
1) What is the requirement for the diesel engine storage size and weight limits?
2) Are there special door size requirements? There are no specific room requirements.
There are two (2) items of equipment in the Maintenance Area Room. The M26
Decontamination Unit - weight 562 pounds and the SHC 60 Heaters, weight 98 pounds. Maintenance is performed on both items of equipment in the facility and all oil and fuel (Diesel) are all drained/captured in drain pans/containers. A trench drainage system is required in the facility with an oil/water separator. All oil and diesel are captured in drain pans and then disposed of in containers. The M26 and the SHC 60 are delivered to the maintenance area by forklift or electrical walkies (Pallets Jacks) – the door size
-minimal of 10 feet – maximum would be 14 feet. The Maintenance room requirement -600 square feet.
215 F-3 Attac hment F –
Price Propo sal Form
Page F-3 of Attachment F – Price Proposal Form from Amendment 0003 states to “Refer to paragraph 1.3 for Planned Modification Bid notes.”
Please provide Paragraph 1.3 as it is not included on the current form.
Delete reference to Paragraph 1.3. see ATT_RFI177178_TFFPackage3_PriceSchedule
_R5
216 Sectio n
E1040 Gover nment Furnis hed Equip
In Section E1040 Government Furnished Equipment, please provide clarification regarding the LOGCOM P1527F facility and the quantity of buildings and approximate amount or description of the amount of furniture that is required to be inventoried (by providing a complete list by room/area - identifying product, manufacturer, and quality/service/model #/ style/size/finish/fabric with
All furniture will be new. Leased items, etc will be the responsibility of the government.
ment photo documentation creating a database). This information is necessary in order to provide an accurate estimate for the packing, moving, storing, unpacking, and relocating/installing of those items.
239 Part 3, P1512
F Renov ate M107
G4020 G4020 reads like entirely new site lighting fixtures are required. Clarify scope of work for exterior site lighting for M107 and confirm if existing lighting can remain.
The D/B RFP intention is to replace all of the site lighting to bring it to current standards.
249 17 01 57
1.11 Part 2 - 01 57 19 - 1.11 Facility Hazardous Waste
Generator Status states that MCAS Cherry Point is designated as a Large Quanity Generator.
Please confirm that MCB Camp Lejeune is a Large
Quantity Generator and will sign all manifests.
Camp Lejeune is a large waste generator and will sign the manifests
259 PDF - pg
PART
3 -
CHA
PTER
3 - P1512
F
LOG
OPS
SCH
OOL
3.3.8.1
Criteri a for
Biddin g
The RFP states, "Undercut and replacement with imported structural fill to address geotechnical unsuitable soil conditions; 10 percent of the site."
Please provide an undercut depth for this 10% area.
Delete this requirement from the criteria for bidding.
260 9 or 539/2366
03.3.1 MEF SIM/Training - Indicates "The existing asphalt
path (trail) running parallel to McHugh Boulevard must be relocated and reconnected. The trail must be asphalt and match the existing width." Does the trail need to be relocated north and conect to the trail on Cross/Birch Street even if it can be retained
No, the trail does not need to be relocated north.
DOR to coordinate with stakeholders during the design phases.
261 Please confirm temporary closures of the fitness trail are acceptable during construction and relocation of these trails at P1512 Log Ops School and P1338.
Temporary closures during construction area is acceptable.
262 3.3.9.
For MEF/SIM and CSP Warehouse: Does the sentence “Provide imported Select Material for the top 2 feet of fill required beneath all pavements, foundations and slabs” only apply to fill areas requiring more than 2 ft of fill or is it intended to only apply to undercut area when encountered? For instance in 10% of the LOG OPS Site
The intent is that all fill within the top 2 feet beneath a pavement, foundation or slab must be imported select material.
263 3.3.8.
For JRC and LOG/OPS School: Does the sentence “Provide imported Select Material for the top 2 feet of fill required beneath all pavements, foundations and slabs” only apply to fill areas requiring more than 2 ft of fill or is it intended to only apply to undercut area when encountered ? For instance in 10% of the LOG OPS Site
The intent is that all fill within the top 2 feet beneath a pavement, foundation or slab must be imported select material.
264 3.3.8.
For JRC does “Existing subgrade soils will require mechanical manipulation or chemical stabilization to reduce moisture content, or 12” minimum over
The intent is that all fill within the top 2 feet beneath a pavement, foundation or slab must be imported select material.
excavation and replacement with imported backfill and fill material” only apply to the cut areas and fondations ? Is this inlieu of the 2 ft of fill in Part
3.3.8.2.
266 3.1.1.
Site Condi tions
Natur al Const raints
PART
3 -
CHAP
TER 3
P1512
F LOG
OPS
SCHO
OL -
Please provide acceptable areas of at least 5 acres where wetlands can be restored or constructed to meet USACE permit requirments in regards to the wetlands being developed for P1512 Log Ops
School construction.
Wetland mitigation shall be provided through purchasing off-site mitigation bank credits.
268 Attac hment
F Price Propo sal Form
If deductive options for demolition of buildings are accepted, is the Contractor still responsible for hazardous survey, permitting, and abatement of structures to be demolished?
No.
273 807 of
Part 3 Chapt er 3 Page
3.1.2.3 The RFP describes 4 light poles and a concrete
vault structure that appears to be remnants of the old steam service for the base. Is the contractor to remove these items?
The light poles and vault are to be removed.
283 Price Propo sal Form R4
There is currently a math error on CLIN 005 of the bid form. Please correct the total value of this line item.
See ATT_RFI177178_TFFPackage3_PriceSchedule
_R5
284 4 G102 1.1
3 Section G102002 1.1 states to remove and dispose of aboveground storage tanks at buildings M119, M121, and M122. (1) Please provide more information on these tanks, such as size, quantity, type of tank, what is being stored. (2) Will tanks be drained by Government prior to removal?
See attached photo "Att_RFI 284 - TFF Package 3_Photo" for a typical tank. Tanks contain #2 fuel oil. Assume tanks to be 1/2 full and will not be drained by the government prior to removal.
285 3 C301
4 Section C301090 Other Wall Finishes states to provide ½” solid surface wall panels at shower walls. The typical industry standard for solid surface it to use ¼” thick wall panels at shower/wet wall enclosures. At shower locations, using ¼” thick material will save a substantial amount of cost both in raw material price and labor to install the product. Would the Government permit the use of
¼” thick solid surface wall panels to be used at shower locations?
Bid per RFP.
286 07 61 15.00
Part 5 has a prescriptive spec for Aluminum Standing Seam Roofing. This material is a 40% premium vs coated steel panels. Consider removing the prescription and putting a Performance requirement for the roof material (i.e., # of years, coating requirements, etc.)
Bid per the RFP. Provide per the spec requirements.
287 6 G204
2 For the LOG OPS School, section G204090 states to provide the standby generator for the fire pump outside the building. Please clarify if this standby generator will be required to be located within a screened wall or enclosure.
The generator must be in an exterior rated enclosure to protect it, but it does not require a screen wall.
(End of Summary of Changes)