ATTACH_13-_(A00001)Pre-Award_Survey-SF-1408.doc

Standard Form DOC document 80 KB Posted

Attached to
Maintenace and Repair service requirement in support of the El Centro and San Diego California Sourthwest Border Patrol Sectors under the Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) program.
Solicitation number
HSBP1013R0017
Issued by

About this file

A00001-Amendment 13 - Pre-Award Survey (SF1408)

View the file

Other versions and copies of SF 1408

File Revision Posted Attached to
B08 - Attachment 0006 - Preaward Survey of Prospective KTR Accounting Sys (SF 1408) - 11SEP2025.pdf Sep 11, 2025 EAGLE Fort Irwin, CA W519TC-25-R-0009
B08 Attachment 0006 Preaward Survey of Prospective KTR Accounting Sys (SF 1408).pdf Revision not stated EAGLE Fort Riley KS W519TC-26-R-A054
Standard Form 1408 - Pre-Award Survey.pdf Revision not stated Next Generation Ammunition & Munitions Equipment (NGAME) for MMHE RFP/Solicitation
Attachment 10-SF1408-14f.pdf Revision not stated Mid-Atlantic Regional Maintenance Center (MARMC) Technical and Professional Services
Attachment 11 - SF1408-14f.pdf Revision not stated Submarine Peculiar Special and Support Equipment (PSSE) Support Services for the Mid-Atlantic Regional Maintenance Center
47QFHA25R0017_T10_08_PRISM MATOC Attachment 4_Modified Preaward Survey (SF 1408).pdf Revision not stated Personnel & Readiness Infrastructure Support Management Services (PRISM) MDoDS Pool Small Business On-Ramp
B08 - Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Picatinny Arsenal, NJ W519TC-25-R-0023
Attachment 7 Pre-Award Survey (SF1408).pdf Revision not stated Joint Safety Health Institutional Facilities Team (JSHIFT) 80LARC25R7001
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Dugway Proving Ground, UT: W519TC-25-R-0008
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Ft. Bliss, TX, W519TC-25-R-0007
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Huachuca, AZ W519TC-24-R-0027
1305M325R0002 - Attachment 6 - SF1408-14f.pdf Revision not stated Phased Array Radar (PAR) Test Article
SF1408-14e.pdf Revision not stated PNW Regional Planning Facilitator
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort McCoy, WI - W519TC-23-R-0119
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Acctng System SF 1408.pdf Revision not stated EAGLE Fort Knox, KY W519TC-23-R-0088
Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System (SF 1408).pdf Revision not stated EAGLE Fort Jackson, SC W519TC-24-R-0026
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Fort Cavazos, TX W519TC-23-R-0102
Attach 4a - SF 1408.pdf Revision not stated USSOCOM Intelligence Support Services -- DRAFT RFP (H92402-24-R-0001)
J.1.b.3 - SF1408-14e.pdf Revision not stated NASA Ames Research Center - Request for Proposal - Aerospace Research Technology and Simulations (ARTS)
B08 Attachment 0006 - Preaward Survey of Prospective Contractor Accounting System SF 1408.pdf Revision not stated EAGLE Presidio of Monterey, CA, W519TC-23-R-0104
Show all 20

Who attaches SF 1408

Other files

File Type Posted
CTIMR_A00005_Questions_and_Answers_(Rev1).pdf.pdf PDF
A00005_HSBP1013R0017_(SF30_-_Final).pdf PDF
Amendment_A00004_-_(Final).pdf PDF
A00003_-HSBP1013R0017_(SF30)_-_Final.pdf PDF
ATTACH_3_-(A00003)_Sample_Work_Plan_Request_CTIMR_WA1_Final_1-17-13).DOC DOC document
ATTACH_5-_(A00002)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
CTIMR_Site_Visit_Attendance_List7-8Jan13.pdf PDF
CTIMR_Technical_Presentation_010413_Final.pdf PDF
ATTACH_8-_(A00002)Client_Authorization_Letter.docx DOCX document
ATTACH_10-(A00002)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_13-_(A00002)Pre-Award_Survey-SF-1408.doc DOC document
A00002_-_HSBP1013R0017__(Final)18Jan13.pdf PDF
Attach_1-_(A00002)BMPs_(rev1-PPW)_5Jan13.doc DOC document
CTIMR_Contractual_Site_Visit_Slides_01-04-2013_Rev1.pdf PDF
ATTACH_3-(A00002)Sample_Work_Plan_Request_Rev._1-18-2013.doc DOC document
CTIMR_Area_1_Questions_and_Answers_Rev1_(Final).PDF.pdf PDF
ATTACH_2_-(A00002)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
ATTACH_7-_(A00002)Consent_Letter_(3).docx DOCX document
ATTACH_9-_(A00002)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_12-_(A00002)Pre-Award_LTR_to_Contractor.doc DOC document
CTIMR_Site_Visit_Agenda_10213.pdf PDF
ATTACH_6_-_(A00002)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
ATTACH_11-_(A00002)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_4_(A00002)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
Web_Notice_Areas_1_Proposal_Site_Visits_12-29-2012.doc DOC document
CTIMR_Work_Area_1_Detailed_Synopsis.doc DOC document
ATTACH_4_(A00001)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
ATTACH_6_-_(A00001)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
TI Design Standards_v1_Sept 2012.pdf PDF
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_8-_(A00001)Client_Authorization_Letter.docx DOCX document
ATTACH_12-_(A00001)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_11-_(A00001)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_3-_(A00001)Sample_Work_Plan_Request_CTIMR_WA1_Final_12-13-12_1.DOC DOC document
ATTACH_9-_(A00001)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_5-_(A00001)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
ATTACH_2_-(A00001)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
A00001-_HSBP1013R0017_Final.pdf PDF
Attach_1-_(A00001)BMPs_(rev1-PPW)_5Jan13.doc DOC document
4-Attach._Cost_Templ_HSBP1013R0017.xls XLS spreadsheet
SF-1442_to_SOL._HSBP1013R0017_22Dec12.pdf PDF
3-Attach-Append_A-_HSBP1013R0017A.doc DOC document
3-Attach-Work_Plan._HSBP1013R0017.doc DOC document
6-Attach-GFM_INstruc-HSBP1013R0017.doc DOC document
5-Attach-__Past_Perf.HSBP1013R0017.doc DOC document
7-Attach-Acronyms-_Def._HSBP1013R0017.doc DOC document
CTIMR_HSBP10R0017_RFP_Doc.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 13

Preaward Survey of Prospective Contractor Accounting System Checklist – SF-1408

Instructions:

1. Mark “X” in the appropriate column.

2. On Page 2 provide a narrative describing how the current accounting system supports your response to each item.

Contractor Name:

Point of Contact:

CAGE Code:

DUNS Code:

Yes
No
N/A
Note

1. Is the accounting system in accord with generally accepted accounting principles?

2. ACCOUNTING SYSTEM PROVIDES FOR:

a. Proper segregation of direct costs from indirect costs.

b. Identification and accumulation of direct costs by contract.

c. A logical and consistent method for the allocation of indirect costs to intermediate and final cost objectives. (A contract is final cost objective.)

d. Accumulation of costs under general ledger control.

e. A timekeeping system that identifies employees' labor by intermediate or final cost objectives.

f. A labor distribution system that charges direct and indirect labor to the appropriate cost objectives.

g. Interim (at least monthly) determination of costs charged to a contract through routine posting of books of account.

h. Exclusion from costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions.

i. Identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract.

j. Segregation of preproduction costs from production costs.

3. Accounting system provides financial information:

a. Required by contract clauses concerning limitation of cost (FAR 52.232-20 and 21) or limitation on payments (FAR 52.216-16).

b. Required to support requests for progress payments.

4. Is the accounting system designed, and are the records maintained in such a manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?

5. Is the accounting system currently in full operation? (If not, describe in Page 2 narrative which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) nonexistent.)

Instruction: Use this section to explain how the current accounting system supports your response to each item. If a response is N/A provide further explanation. Use as much space as needed. Provide references to current policies and procedures if applicable.

Note
Narrative

File details come from the government source that posted it. Updated .