About this file

Site Visit Agenda (7-8 Jan 2013)

View the file

Other files

File Type Posted
CTIMR_A00005_Questions_and_Answers_(Rev1).pdf.pdf PDF
A00005_HSBP1013R0017_(SF30_-_Final).pdf PDF
Amendment_A00004_-_(Final).pdf PDF
A00003_-HSBP1013R0017_(SF30)_-_Final.pdf PDF
ATTACH_3_-(A00003)_Sample_Work_Plan_Request_CTIMR_WA1_Final_1-17-13).DOC DOC document
ATTACH_5-_(A00002)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
CTIMR_Site_Visit_Attendance_List7-8Jan13.pdf PDF
CTIMR_Technical_Presentation_010413_Final.pdf PDF
ATTACH_8-_(A00002)Client_Authorization_Letter.docx DOCX document
ATTACH_10-(A00002)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_13-_(A00002)Pre-Award_Survey-SF-1408.doc DOC document
A00002_-_HSBP1013R0017__(Final)18Jan13.pdf PDF
Attach_1-_(A00002)BMPs_(rev1-PPW)_5Jan13.doc DOC document
CTIMR_Contractual_Site_Visit_Slides_01-04-2013_Rev1.pdf PDF
ATTACH_3-(A00002)Sample_Work_Plan_Request_Rev._1-18-2013.doc DOC document
CTIMR_Area_1_Questions_and_Answers_Rev1_(Final).PDF.pdf PDF
ATTACH_2_-(A00002)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
ATTACH_7-_(A00002)Consent_Letter_(3).docx DOCX document
ATTACH_9-_(A00002)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_12-_(A00002)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_6_-_(A00002)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
ATTACH_11-_(A00002)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_4_(A00002)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
Web_Notice_Areas_1_Proposal_Site_Visits_12-29-2012.doc DOC document
CTIMR_Work_Area_1_Detailed_Synopsis.doc DOC document
ATTACH_4_(A00001)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
ATTACH_6_-_(A00001)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
TI Design Standards_v1_Sept 2012.pdf PDF
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_8-_(A00001)Client_Authorization_Letter.docx DOCX document
ATTACH_12-_(A00001)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_11-_(A00001)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_3-_(A00001)Sample_Work_Plan_Request_CTIMR_WA1_Final_12-13-12_1.DOC DOC document
ATTACH_13-_(A00001)Pre-Award_Survey-SF-1408.doc DOC document
ATTACH_9-_(A00001)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_5-_(A00001)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
ATTACH_2_-(A00001)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
A00001-_HSBP1013R0017_Final.pdf PDF
Attach_1-_(A00001)BMPs_(rev1-PPW)_5Jan13.doc DOC document
4-Attach._Cost_Templ_HSBP1013R0017.xls XLS spreadsheet
SF-1442_to_SOL._HSBP1013R0017_22Dec12.pdf PDF
3-Attach-Append_A-_HSBP1013R0017A.doc DOC document
3-Attach-Work_Plan._HSBP1013R0017.doc DOC document
6-Attach-GFM_INstruc-HSBP1013R0017.doc DOC document
5-Attach-__Past_Perf.HSBP1013R0017.doc DOC document
7-Attach-Acronyms-_Def._HSBP1013R0017.doc DOC document
CTIMR_HSBP10R0017_RFP_Doc.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security Customs and Border Protection

Facilities Management and Engineering Border Patrol Facilities and Tactical Infrastructure

Comprehensive Tactical Infrastructure Maintenance and Repair Pre‐Proposal Site Visit January 7th & 8th, 2013

Purpose: Pre-Proposal Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Site Visit as mentioned in the Request for Proposal (RFP) for Work Area 1 (San Diego and El Centro Sectors).

Bring plenty of water, food, sunscreen, comfortable clothing, hat, walking / hiking shoes, or any other personal items you may need for the visit to the field.

Monday, January 7, 2013 (Day 1 @ 0800) Campo Border Patrol Station Phone: (619) 938‐8700 32355 Old Highway 80 Pine Valley, California 91962

Check‐in / Security / Logistics 0730 – 0800 Mike Urquidi/Heather Santiago o Check in with the sign in table and collect meeting documents o Due to the number of vendors that have requested attendance at the site visit, only one representative from each company will be permitted to attend the RFP review brief that will be held at Campo Border Patrol Station (Room size can only accommodate 100 people). All company representatives will be permitted on the site visit.

o Please hold all questions until the end of the presentation.

Verbal Questions (questions for clarification) will be permitted after the presentation until 1030 (mandatory stop due to Border Patrol operational need at 1100 – all parties must depart the room promptly)

Written Questions are permitted at any time and can be documented on the 3x5 index cards provided in welcome package. Additional 3x5 cards are available from the Government team representatives. Drop off 3x5 cards with one of the Government team representatives.

o Car Signs will be provided to all vendors to display in the car dashboard during the site visit.

Introductions & Attendance 0800 – 0830 Pauline Pickeringwade

CTIMR RFP Review 0830 – 1030 o Technical Team Presentation Mike Urquidi / Heather Santiago o Contracting Specialist Presentation Pauline Pickeringwade o Questions and Answer Session Pauline Pickeringwade

Site Visit Logistics and Guidance 1030 – 1045 Mike Urquidi / Heather Santiago

Depart Border Patrol Campo Station Conference Room @ 1045

Lunch Break / Pick Up Food & Drinks (as needed) 1100 – 1130

Site Visit (See attached Map for route and stopping points) 1130 – 1600 o Fence and Gates o Roads and Bridges o Drainage and Grate System o Lighting and Electrical Systems o Vegetation Control and Debris Removal

Final Questions and Wrap‐up (on site @ the last break) Pauline Pickeringwade

Tuesday, January 8, 2013 (Day 2 @ 0800) Costco Parking Lot 2030 N. Imperial Ave.

El Centro, CA 92243

Check‐in / Security / Logistics 0730– 0800 Heather Santiago

Attendance / Questions from Day 1 0800 – 0830 Pauline Pickeringwade

Site Visit Logistics and Guidance 0830 – 0900 Heather Santiago

Pick Up Food & Drinks (as needed) 0900 – 0930

Site Visit (See attached Map for route and stopping points) 0930 – 1600 o Fence and Gates o Roads and Bridges o Drainage and Grate System o Lighting and Electrical Systems o Vegetation Control and Debris Removal

Final Questions and Wrap‐up (on site @ the last stop) Pauline Pickeringwade

Points of Contact:

Heather Santiago BPFTI Project Manager Phone: (202) 425‐9782

Mike Urquidi BPFTI Project Manager Phone: (949) 254‐2317

Pauline Pickeringwade Contract Specialist Phone: (571) 468‐7035

File details come from the government source that posted it. Updated .