About this file

Attachment 2 - Notice Regarding Contact with Landowners

View the file

Other files

File Type Posted
CTIMR_A00005_Questions_and_Answers_(Rev1).pdf.pdf PDF
A00005_HSBP1013R0017_(SF30_-_Final).pdf PDF
Amendment_A00004_-_(Final).pdf PDF
A00003_-HSBP1013R0017_(SF30)_-_Final.pdf PDF
ATTACH_3_-(A00003)_Sample_Work_Plan_Request_CTIMR_WA1_Final_1-17-13).DOC DOC document
ATTACH_5-_(A00002)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
CTIMR_Site_Visit_Attendance_List7-8Jan13.pdf PDF
CTIMR_Technical_Presentation_010413_Final.pdf PDF
ATTACH_8-_(A00002)Client_Authorization_Letter.docx DOCX document
ATTACH_10-(A00002)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_13-_(A00002)Pre-Award_Survey-SF-1408.doc DOC document
A00002_-_HSBP1013R0017__(Final)18Jan13.pdf PDF
Attach_1-_(A00002)BMPs_(rev1-PPW)_5Jan13.doc DOC document
CTIMR_Contractual_Site_Visit_Slides_01-04-2013_Rev1.pdf PDF
ATTACH_3-(A00002)Sample_Work_Plan_Request_Rev._1-18-2013.doc DOC document
CTIMR_Area_1_Questions_and_Answers_Rev1_(Final).PDF.pdf PDF
ATTACH_7-_(A00002)Consent_Letter_(3).docx DOCX document
ATTACH_9-_(A00002)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_12-_(A00002)Pre-Award_LTR_to_Contractor.doc DOC document
CTIMR_Site_Visit_Agenda_10213.pdf PDF
ATTACH_6_-_(A00002)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
ATTACH_11-_(A00002)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_4_(A00002)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
Web_Notice_Areas_1_Proposal_Site_Visits_12-29-2012.doc DOC document
CTIMR_Work_Area_1_Detailed_Synopsis.doc DOC document
ATTACH_4_(A00001)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
ATTACH_6_-_(A00001)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
TI Design Standards_v1_Sept 2012.pdf PDF
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_8-_(A00001)Client_Authorization_Letter.docx DOCX document
ATTACH_12-_(A00001)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_11-_(A00001)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_3-_(A00001)Sample_Work_Plan_Request_CTIMR_WA1_Final_12-13-12_1.DOC DOC document
ATTACH_13-_(A00001)Pre-Award_Survey-SF-1408.doc DOC document
ATTACH_9-_(A00001)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_5-_(A00001)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
ATTACH_2_-(A00001)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
A00001-_HSBP1013R0017_Final.pdf PDF
Attach_1-_(A00001)BMPs_(rev1-PPW)_5Jan13.doc DOC document
4-Attach._Cost_Templ_HSBP1013R0017.xls XLS spreadsheet
SF-1442_to_SOL._HSBP1013R0017_22Dec12.pdf PDF
3-Attach-Append_A-_HSBP1013R0017A.doc DOC document
3-Attach-Work_Plan._HSBP1013R0017.doc DOC document
6-Attach-GFM_INstruc-HSBP1013R0017.doc DOC document
5-Attach-__Past_Perf.HSBP1013R0017.doc DOC document
7-Attach-Acronyms-_Def._HSBP1013R0017.doc DOC document
CTIMR_HSBP10R0017_RFP_Doc.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

Notice Regarding Contact with Landowners

When any of your employees, contractors, or individuals working to fulfill the above referenced contract have need to contact landowners in the areas surrounding or adjacent to the Tactical Infrastructure specified in the above-referenced contract for any reason, particularly in an effort to acquire other interests in land or to obtain staging/storage areas or temporary access to other land in order to perform work in the contract, the following action must be taken:

· The Contractor must first make contact with the COTR. The COTR will coordinate with the proper Border Patrol representative prior to any contact with any landowner or land manager.

· In the event that the contractor comes into contact with a landowner for any reason,the contractor must immediately ask whether the landowner is in litigation with the Federal Government. If the landowner is in litigation, further discussion with the landowner must cease and the matter shall be referred to the COTR, Border Patrol and Contracting Officer or authorized representative.

Thank you for your cooperation in this matter. For any questions relative to this issue please email the undersigned contracting officer at CTIMR@cbp.dhs.gov

File details come from the government source that posted it. Updated .