About this file

Attachment 4 - Cost Template Guide

View the file

Other files

File Type Posted
CTIMR_A00005_Questions_and_Answers_(Rev1).pdf.pdf PDF
A00005_HSBP1013R0017_(SF30_-_Final).pdf PDF
Amendment_A00004_-_(Final).pdf PDF
A00003_-HSBP1013R0017_(SF30)_-_Final.pdf PDF
ATTACH_3_-(A00003)_Sample_Work_Plan_Request_CTIMR_WA1_Final_1-17-13).DOC DOC document
ATTACH_5-_(A00002)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
CTIMR_Site_Visit_Attendance_List7-8Jan13.pdf PDF
CTIMR_Technical_Presentation_010413_Final.pdf PDF
ATTACH_8-_(A00002)Client_Authorization_Letter.docx DOCX document
ATTACH_10-(A00002)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_13-_(A00002)Pre-Award_Survey-SF-1408.doc DOC document
A00002_-_HSBP1013R0017__(Final)18Jan13.pdf PDF
Attach_1-_(A00002)BMPs_(rev1-PPW)_5Jan13.doc DOC document
CTIMR_Contractual_Site_Visit_Slides_01-04-2013_Rev1.pdf PDF
ATTACH_3-(A00002)Sample_Work_Plan_Request_Rev._1-18-2013.doc DOC document
CTIMR_Area_1_Questions_and_Answers_Rev1_(Final).PDF.pdf PDF
ATTACH_2_-(A00002)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
ATTACH_7-_(A00002)Consent_Letter_(3).docx DOCX document
ATTACH_9-_(A00002)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_12-_(A00002)Pre-Award_LTR_to_Contractor.doc DOC document
CTIMR_Site_Visit_Agenda_10213.pdf PDF
ATTACH_6_-_(A00002)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
ATTACH_11-_(A00002)_Wage_determ._HSBP1013R0017.doc DOC document
Web_Notice_Areas_1_Proposal_Site_Visits_12-29-2012.doc DOC document
CTIMR_Work_Area_1_Detailed_Synopsis.doc DOC document
ATTACH_4_(A00001)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
ATTACH_6_-_(A00001)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
TI Design Standards_v1_Sept 2012.pdf PDF
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_8-_(A00001)Client_Authorization_Letter.docx DOCX document
ATTACH_12-_(A00001)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_11-_(A00001)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_3-_(A00001)Sample_Work_Plan_Request_CTIMR_WA1_Final_12-13-12_1.DOC DOC document
ATTACH_13-_(A00001)Pre-Award_Survey-SF-1408.doc DOC document
ATTACH_9-_(A00001)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_5-_(A00001)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
ATTACH_2_-(A00001)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
A00001-_HSBP1013R0017_Final.pdf PDF
Attach_1-_(A00001)BMPs_(rev1-PPW)_5Jan13.doc DOC document
4-Attach._Cost_Templ_HSBP1013R0017.xls XLS spreadsheet
SF-1442_to_SOL._HSBP1013R0017_22Dec12.pdf PDF
3-Attach-Append_A-_HSBP1013R0017A.doc DOC document
3-Attach-Work_Plan._HSBP1013R0017.doc DOC document
6-Attach-GFM_INstruc-HSBP1013R0017.doc DOC document
5-Attach-__Past_Perf.HSBP1013R0017.doc DOC document
7-Attach-Acronyms-_Def._HSBP1013R0017.doc DOC document
CTIMR_HSBP10R0017_RFP_Doc.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area 1 (Summary)

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED PRIME
SUMMARY
(Fence & Gates, Road & Bridges, Drainage & Grates, Lighting & Electrical, Vegetation & Debris,
Program Management Support, & Improvement Activity)
Fence & Gates=$0
Road & Bridges=$0
Drainage & Grates=$0
Lighting & Electrical=$0
Vegetation Control & Debris Removal=$0
Program Management Support (FFP)=$0
Improvement Activity (NTE)=$0
Total Price=$0
ACQUISITION SENSITIVE

Prime Fence & Gate

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED PRIME (BASE YEAR)
FENCE AND GATES
PRIME CONTRACTOR
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (xx% x Direct Labor)FB Subtotal=
Overhead (xx% x Direct Labor & FB)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Subcontractor Name for F&G

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED SUBCONTRACTOR (BASE YEAR)
FENCE AND GATES
SUBCONTRACTOR NAME: Add this template for each subcontractor.
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (FB) (xx% of Labor $)FB Subtotal=
Overhead (OH) (xx% of Labor $ + FB $)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Prime Road & Bridges

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED PRIME (BASE YEAR)
ROAD AND BRIDGES
PRIME CONTRACTOR
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (xx% x Direct Labor)FB Subtotal=
Overhead (xx% x Direct Labor & FB)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Subcontractor Name for R&B

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED SUBCONTRACTOR (BASE YEAR)
ROAD AND BRIDGES
SUBCONTRACTOR NAME: Add this template for each subcontractor.
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (FB) (xx% of Labor $)FB Subtotal=
Overhead (OH) (xx% of Labor $ + FB $)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Prime Drainage & Grates

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED PRIME (BASE YEAR)
DRAINAGE AND GRATE SYSTEMS
PRIME CONTRACTOR
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (xx% x Direct Labor)FB Subtotal=
Overhead (xx% x Direct Labor & FB)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Subcontractor Name for D&G

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED SUBCONTRACTOR (BASE YEAR)
DRAINAGE AND GRATE SYSTEMS
SUBCONTRACTOR NAME: Add this template for each subcontractor.
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (FB) (xx% of Labor $)FB Subtotal=
Overhead (OH) (xx% of Labor $ + FB $)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Prime Lighting & Electrical

ATTACHMENT 4 - Cost Template Guide
AREA 1 - PROPOSED PRIME (BASE YEAR)
LIGHTING AND ELECTRICAL SYSTEMS
PRIME CONTRACTOR
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (xx% x Direct Labor)FB Subtotal=
Overhead (xx% x Direct Labor & FB)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Subcontractor Name for L&E

AREA 1 - PROPOSED SUBCONTRACTOR (BASE YEAR)
LIGHTING AND ELECTRICAL SYSTEMS
SUBCONTRACTOR NAME: Add this template for each subcontractor.
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (FB) (xx% of Labor $)FB Subtotal=
Overhead (OH) (xx% of Labor $ + FB $)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Prime Veg Control & Debris

AREA 1 - PROPOSED PRIME (BASE YEAR)
VEGETATION CONTROL AND DEBRIS REMOVAL
PRIME CONTRACTOR
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (xx% x Direct Labor)FB Subtotal=
Overhead (xx% x Direct Labor & FB)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Subcontractor Name for Veg&Debr

AREA 1 - PROPOSED SUBCONTRACTOR (BASE YEAR)
VEGETATION CONTROL AND DEBRIS REMOVAL
SUBCONTRACTOR NAME: Add this template for each subcontractor.
Direct Labor CategoryLabor HoursLabor RateTotal Cost
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
x=$0
- 0Labor Subtotal=$0
Fringe Benefits (FB) (xx% of Labor $)FB Subtotal=
Overhead (OH) (xx% of Labor $ + FB $)OH Subtotal=
Total Labor=$0
EquipmentEquipment=
MaterialMaterial=
TravelTravel=
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Subcontractor Name:Labor Hrs____________
Total Subcontractors- 0$0
Burden on Subcontractor CostBurden=
Other Direct Costs (ODCs)
ConsultantsConsultants=
OthersOthers=
Total ODCsODCs Subtotal=$0
General & Administrative Expense (G&A)
(xx% x applicable G&A Base Amount)G&A Subtotal=
Total Estimated Cost (Total Labor $ + Equip $
Material $ + Travel $ + Subcontract + Subcontract Burden
$ + ODCs $ + G&A $)Tot Estimated Cost=$0
(xx% x fee base)Fee=
Total Estimated Cost & Fee (Price)Total Price=$0
ACQUISITION SENSITIVE

Blank.2

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
$1.73$0.00
$0.00
SUBTOTAL$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00$0.00

Blank.3

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00

Blank.4

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00

Blank.5

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00

Blank.6

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
$0.00
SUBTOTAL$0.00
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00

Blank.7

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00

Blank.8

CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.000
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
$0.00
SUBTOTAL$0.00
CLIN:00010 - AREA 3 BASE FENCE & GATES
CATEGORY:FENCE & GATES
OPERATION:BLANK
DESCRIPTION:COST ELEMENT BREAKDOWN
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYBLANK
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST - BLANK$0.00

Blank.9

CLIN:00050 - AREA 3 VEGETATION CONTROL/DEBRIS REMOVAL
CATEGORY:VEG CONTROL/DEBRIS REMOVAL
OPERATION:SPARE
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
CLIN:00050 - AREA 3 VEGETATION CONTROL/DEBRIS REMOVAL
CATEGORY:VEG CONTROL/DEBRIS REMOVAL
OPERATION:SPARE
DESCRIPTION:COST ELEMENT BREAKDOWN
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL$0.00
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYSPARE
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST SPARE$0.00

Blank.10

CLIN:00050 - AREA 3 VEGETATION CONTROL/DEBRIS REMOVAL
CATEGORY:VEG CONTROL/DEBRIS REMOVAL
OPERATION:SPARE
DESCRIPTION:COST ELEMENT BREAKDOWN
OPERATION DETAIL:
LABOR
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
0$0.00$0.00$0.00
SUBTOTALS00$0.00
EQUIPMENT
HoursRateAmount
Classification/DescriptionAbbvStandardOvertimeStandardOvertime
$0.00$0.00$0.00
0$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
31-Dec$0.00$0.00$0.00
0$0.00$0.00$0.00
0SUBTOTAL$0.00
CLIN:00050 - AREA 3 VEGETATION CONTROL/DEBRIS REMOVAL
CATEGORY:VEG CONTROL/DEBRIS REMOVAL
OPERATION:SPARE
DESCRIPTION:COST ELEMENT BREAKDOWN
MATERIALS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL$0.00
SUBCONTRACTORS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
TRAVEL
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
$0.00
$0.00
$0.00
SUBTOTAL$0.00
OTHER DIRECT COSTS
BackupQuantityUnitAmount
Classification/DescriptionReference#UMCost
1LS$ - 0$0.00
$0.00
$0.00
SUBTOTAL$0.00
COST ELEMENT SUMMARY
COST SUMMARYSPARE
LABOR$0.00
EQUIPMENT$0.00
MATERIALS$0.00
SUBCONTRACTORS$0.00
TRAVEL$0.00
ODC$0.00
DIRECT COST SPARE$0.00

worksheet

File details come from the government source that posted it. Updated .