About this file

A00001-Amendment 9 - GFM instruction

View the file

Other files

File Type Posted
CTIMR_A00005_Questions_and_Answers_(Rev1).pdf.pdf PDF
A00005_HSBP1013R0017_(SF30_-_Final).pdf PDF
Amendment_A00004_-_(Final).pdf PDF
A00003_-HSBP1013R0017_(SF30)_-_Final.pdf PDF
ATTACH_3_-(A00003)_Sample_Work_Plan_Request_CTIMR_WA1_Final_1-17-13).DOC DOC document
ATTACH_5-_(A00002)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
CTIMR_Site_Visit_Attendance_List7-8Jan13.pdf PDF
CTIMR_Technical_Presentation_010413_Final.pdf PDF
ATTACH_8-_(A00002)Client_Authorization_Letter.docx DOCX document
ATTACH_10-(A00002)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_13-_(A00002)Pre-Award_Survey-SF-1408.doc DOC document
A00002_-_HSBP1013R0017__(Final)18Jan13.pdf PDF
Attach_1-_(A00002)BMPs_(rev1-PPW)_5Jan13.doc DOC document
CTIMR_Contractual_Site_Visit_Slides_01-04-2013_Rev1.pdf PDF
ATTACH_3-(A00002)Sample_Work_Plan_Request_Rev._1-18-2013.doc DOC document
CTIMR_Area_1_Questions_and_Answers_Rev1_(Final).PDF.pdf PDF
ATTACH_2_-(A00002)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
ATTACH_7-_(A00002)Consent_Letter_(3).docx DOCX document
ATTACH_9-_(A00002)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_12-_(A00002)Pre-Award_LTR_to_Contractor.doc DOC document
CTIMR_Site_Visit_Agenda_10213.pdf PDF
ATTACH_6_-_(A00002)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
ATTACH_11-_(A00002)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_4_(A00002)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
Web_Notice_Areas_1_Proposal_Site_Visits_12-29-2012.doc DOC document
CTIMR_Work_Area_1_Detailed_Synopsis.doc DOC document
ATTACH_4_(A00001)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
ATTACH_6_-_(A00001)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
TI Design Standards_v1_Sept 2012.pdf PDF
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_8-_(A00001)Client_Authorization_Letter.docx DOCX document
ATTACH_12-_(A00001)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_11-_(A00001)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_3-_(A00001)Sample_Work_Plan_Request_CTIMR_WA1_Final_12-13-12_1.DOC DOC document
ATTACH_13-_(A00001)Pre-Award_Survey-SF-1408.doc DOC document
ATTACH_5-_(A00001)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
ATTACH_2_-(A00001)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
A00001-_HSBP1013R0017_Final.pdf PDF
Attach_1-_(A00001)BMPs_(rev1-PPW)_5Jan13.doc DOC document
4-Attach._Cost_Templ_HSBP1013R0017.xls XLS spreadsheet
SF-1442_to_SOL._HSBP1013R0017_22Dec12.pdf PDF
3-Attach-Append_A-_HSBP1013R0017A.doc DOC document
3-Attach-Work_Plan._HSBP1013R0017.doc DOC document
6-Attach-GFM_INstruc-HSBP1013R0017.doc DOC document
5-Attach-__Past_Perf.HSBP1013R0017.doc DOC document
7-Attach-Acronyms-_Def._HSBP1013R0017.doc DOC document
CTIMR_HSBP10R0017_RFP_Doc.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

Instructions for Completing Government Furnished Materials (GFM) Order Form

1. The form is prepared in Excel 2003 for Microsoft Office 2003.

2. There is one workbook with four worksheets. The worksheet labeled data has no fields for CTIMR contractor to input and is for workbook references only.

3. Contractor to provide data in the fields shaded in Yellow. NOTE: Contractor should begin with worksheet labeled “Truck Calculation” as many fields on this worksheet populate fields in worksheet “Truck Schedule Request”.

4. Contractor provides CTIMR Region, Contract #, Task Order #, Contractor’s Name, Address, and Point of Contact’s Name, Phone Number and Email Address. Pickup location is defaulted to El Paso, TX. (TI SCM may direct material from another location; however this will be coordinated with CTIMR contract in advance).

5. Contractor enters Order Date, i.e., the date that the form is submitted.

6. Contractor enters Order Number. Order numbers will be sequential beginning at 1. If an existing order needs revision, the order number should be maintained but revision number should be added, i.e. 1-Rev. 1, 1-Rev.-2. If Order Number will be used as tracking number for submissions.

7. Contractor goes to bill of material area and enters number of bundles requested for each type of material (default is 0). All material will be provided in whole bundles. The spreadsheet will calculate estimated number of trucks required based on trucks capable of 46,000 lb loads.

8. Contractor goes to worksheet labeled “Truck Schedule Request”, enters the date for the first day of requested material pickup (cell B7). The first day requested should be in accordance with the GFM Procedure. Requests are limited to Monday through Friday.

9. Contractor enters the number of bundles of each material requested for pickup on Distribution Day #1 (cells B9 to B28). The request may exceed one truckload and be up to the maximum permitted per the GFM Procedure instructions. The spreadsheet will calculate total weight and estimated trucks based on 46,000 lb truckload capacity. NOTE: If CTIMR contractor intends to use multiple storage locations and wants loads specifically tailored to each location, they should submit separate orders for each location. Contractor enters different requested loads for each day until they have completed entered sufficient trucks to pick up requested material.

10. Contractor goes to worksheet labeled “Mesh Schedule Request”, and follows the same procedures from number 8 and 9 above for MESH.

11. Revisions to the original submittal form can be made by changing the order number by adding “Revision-X” as required. Please highlight all changes with red font.

File details come from the government source that posted it. Updated .