Request for Proposal
HSBP1013R0017
(Area 1) POST A00005 Changes
U.S. Department of Homeland Security
U.S. Customs and Border Protection
Facilities Management & Engineering Tactical Infrastructure Comprehensive Tactical Infrastructure Maintenance and
Repair (CTIMR)
31 January 2013
U.S. Customs and Border Protection Secure Border Initiative Acquisition Office
1901 South Bell Street 8th Floor Arlington, VA 20598
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
PAGE OF PAGES
3. EFF. DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.
7. ADMINISTERED BY (If other than Item 6) CODE
FACILITY CODECODE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR ( No., street, county, State and Zip Code)
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
1. CONTRACT ID CODE
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES ( Such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
E. IMPORTANT: Contractor
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) copies to issuing office.
4. REQUISITION/PURCHASE REQ. NO.
A0005 01/31/2013 0020073270
DHS - Customs & Border Protection Customs and Border Protection 1901 South Bell St.
8th Floor Arlington VA 20598
DHS - Customs & Border Protection Customs and Border Protection
1901 SOUTH BELL ST.
8TH FLOOR
ARLINGTON VA 20598
HSBP1013R0017
01/31/2013
1 1 is required to sign this document and return is not
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA 16C. DATE
SIGNED
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED
BY
(Signature of Contracting Officer)(Signature of person authorized to sign)
15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Clarence Abernathy Contracting Officer
Purpose of Amendment A00005 is to clarify and respond to additional questions hi-lited via separate attachment and listed as questions 73 and 74
Proposal due date remains unchanged and due, 7 February 2013 , at 3pm EST.
TABLE OF CONTENTS
Table Of Contents SECTION A ............................................................................................................ 4 SOLICITATION/CONTRACT FORM SECTION B ..................................................................................... 5 SUPPLIES OR SERVICES & PRICES OR COSTS
B.1 ............................................................................................................... 5 SCHEDULE OF SUPPLIES/SERVICES B.2 ........................................................................................................................................ 6 DELIVERY SCHEDULE B.3 ............................................................................................................................ 6 CONTRACT TYPE (OCT 2008)
SECTION C ............................................................................................................ 7 SPECIFICATIONS/SOW/SOO/ORD C.1 ............................................................... 7 SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D ......................................................................................................................... 26 PACKAGING & MARKING D.1 ...................................................................................... 26 PACKAGING, PACKING AND MARKING (MAR 2003)
SECTION E ................................................................................................................. 27 INSPECTION & ACCEPTANCE E.1 .............................................................. 27 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
SECTION F ........................................................................................................... 28 DELIVERIES OR PERFORMANCE F.1 .............................................................. 28 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) F.2 ............................................................................ 28 52.247-62 SPECIFIC QUANTITIES UNKNOWN (APR 1984) F.3 ....................................................................................................... 28 PERIOD OF PERFORMANCE (MAR 2003) F.4 ..................................................................................... 28 TERM OF CONTRACT WITH OPTION(S) (MAR 2003)
SECTION G ........................................................................................................ 29 CONTRACT ADMINISTATION DATA G.1 .............................. 29 3052.242-72 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (DEC 2003) G.2 .................................................................................... 29 CONTRACTING OFFICER'S AUTHORITY (MAR 2003) G.3 .................................................................................. 29 PAYMENT AND INVOICE INSTRUCTIONS (FEB 2012)
SECTION H .................................................................................................. 32 SPECIAL CONTRACT REQUIREMENTS H.1 .......................................................................... 32 3052.215-70 KEY PERSONNEL OR FACILITIES (DEC 2003) H.2 ............................................... 33 GOVERNMENT CONSENT OF PUBLICATION/ENDORSEMENT (MAR 2003) H.3 ............................................................................................................ 33 SECURITY PROCEDURES (OCT 2009) H.4 ................................................................................................. 35 DISCLOSURE OF INFORMATION (MAR 2003) H.5 ........................................................................................................... 35 NON-PERSONAL SERVICE (MAR 2003) H.6 ................................................................................. 36 HOLIDAYS AND ADMINISTRATIVE LEAVE (MAR 2003) H.7 ................................................... 37 ADDITIONAL CONTRACTOR PERSONNEL REQUIREMENTS (OCT 2007) H.8 ............................... 37 SPECIAL SECURITY REQUIREMENT - CONTRACTOR PRE-SCREENING (SEP 2011)
SECTION I .............................................................................................................................. 38 CONTRACT CLAUSES I.1 ........................................................................................................................ 38 52.202-1 DEFINITIONS (JAN 2012) I.2 .................................................................. 38 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) I.3 .................................... 38 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010) I.4 ......................................... 38 52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT (OCT 1997) I.5 ............................................................................................. 38 52.216-9 FIXED FEE-CONSTRUCTION (JUN 2011) I.6 ...................................................................... 38 52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009) I.7 ............................... 38 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011) I.8
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG
2011) I.9 ................................................................................. 38 52.233-1 DISPUTES (JUL 2002) ALTERNATE I (DEC 1991) I.10 ............................................................................................. 38 52.233-3 PROTEST AFTER AWARD (AUG 1996) I.11 ........................................... 38 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004) I.12 .................................................................................. 38 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) I.13 ......................................................................... 38 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996) I.14 ............................................................. 38 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (DEC 2010) I.15 ..................................................................................... 39 52.232.27 Prompt Payment for Construction Contracts I.16 ....................................... 43 52.232.33 Payment by Electronic Funds Transfer —Central Contractor Registration.
I.17 ....... 44 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 1984) I.18 ................................................................................ 47 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) I.19 ................................................................. 47 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984) I.20 ................. 47 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006) I.21 ................................................................................... 48 52.203-7 ANTI-KICKBACK PROCEDURES (OCT 2010) I.22
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER
ACTIVITY (JAN 1997)
I.23 ................. 49 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997) I.24 ............................................................................. 50 52.203-14 DISPLAY OF HOTLINE POSTER(S) (DEC 2007) I.25 .................................................................. 50 52.204-7 CENTRAL CONTRACTOR REGISTRATION (AUG 2012) I.26 ................................................................. 52 52.216-24 LIMITATION OF GOVERNMENT LIABILITY (APR 1984)
I.27 .................................................................................. 52 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) I.28 ............................................... 53 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) I.29 ..................................................... 53 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) I.30 ....................................................................... 53 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) I.31 .................... 54 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (APR 2012) I.32 ............................................. 55 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997) I.33 ........................................................................ 55 52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990) I.34
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT - OVERTIME COMPENSATION
(JUL 2005)
I.35
52.222-30 DAVIS-BACON ACT--PRICE ADJUSTMENT (NONE OR SEPARATELY SPECIFIED METHOD)
(DEC 2001)
I.36 ................................................. 57 52.225-9 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (SEP 2010) I.37 ................................................................................................................................ 59 52.232-20 Limitation of Cost I.38 .................................................................... 60 52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2010) I.39 ........................................................ 62 52.249-2 Termination for Convenience of the Government (Fixed-Price).
I.40 ...................... 65 52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004) ALTERNATE I (SEP 1996) I.41 .......................................................................................... 67 52.249-8 Default (Fixed-Price Supply and Service).
I.42 ................................. 68 3052.204-71 CONTRACTOR EMPLOYEE ACCESS (JUN 2006) Alternate I (JUN 2006) I.43 .................. 70 3052.209-70 PROHIBITION ON CONTRACTS WITH CORPORATE EXPATRIATES (JUN 2006) I.44
3052.222-70 STRIKES OR PICKETING AFFECTING TIMELY COMPLETION OF THE CONTRACT WORK
(DEC 2003)
I.45 ................. 71 3052.222-71 STRIKES OR PICKETING AFFECTING ACCESS TO A DHS FACILITY (DEC 2003) I.46
52.232-99 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS
(DEVIATION)
SECTION J ........................................................................................................................... 73 LIST OF ATTACHMENTS
J.1 ........................................................................................................................................ 73 LIST OF ATTACHMENTS SECTION K ................................ 74 REPRESENTATIONS, CERTIFICATIONS, OTHER STATEMENTS OF OFFEROR
K.1 .............................................. 74 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2012) K.2 ............................................. 76 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008) K.3
52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN SANCTIONED ACTIVITIES
RELATING TO IRAN--REPRESENTATION AND CERTIFICATION (NOV 2011)
K.4 .................................................................................................................... 78 52.227-17 Rights in Data—General K.5 .................................................. 81 52.236-28 PREPARATION OF PROPOSALS-CONSTRUCTION (OCT 1997)
SECTION L ................................................................ 82 INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS L.1 .................................. 82 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) L.2 ............................................. 82 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991) L.3 ............................................................. 82 52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991) L.4 .............. 82 52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004) - Alternate -1 L.5
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (FEB 2009)
L.6 .......................................................................................................... 82 52.216-1 TYPE OF CONTRACT (APR 1984) L.7
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN
CERTIFIED COST OR PRICING DATA (OCT 2010) ALTERNATE IV (OCT 2010)
L.8 ................................................. 82 52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005) L.9
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
L.10 83 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT-CONSTRUCTION MATERIALS (FEB 2009) L.11 ............................................................... 84 52.250-2 SAFETY ACT COVERAGE NOT APPLICABLE (FEB 2009) L.12 .................................. 84 GENERAL INSTRUCTIONS FOR THE PREPARATION OF PROPOSALS (OCT 2008) L.13 .................................................................................................. 93 52.233-2 SERVICE OF PROTEST (SEP 2006) L.14 ........................................................................................................................ 94 52.237-1 SITE VISIT (APR 1984)
SECTION M .................................................................................................... 95 EVALUATION FACTORS FOR AWARD M.1 .............................. 95 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) M.2 ............................................................................................................................................... 95 Evaluation Criteria
SECTION A SOLICITATION/CONTRACT FORM
SECTION B SUPPLIES OR SERVICES & PRICES OR COSTS
B.1 SCHEDULE OF SUPPLIES/SERVICES
ITEM # DESCRIPTION QTY UNIT UNIT PRICE EXT. PRICE
10 Area 1 Base Fence/Gates 1.000 EA 20 Area 1 Base Roads/Bridges 1.000 EA 30 Area 1 Base Drainage/Grates 1.000 EA 40 Area 1 Base Lighting/Electrical 1.000 EA 50 Area 1 Base Veg Control/Debris Removal 1.000 EA 60 Area 1 Fee 1.000 EA 70 Area 1 OH, G&A Allocation Factor 1.000 EA 80 Area 1 Base Program Management
Support
1.000 EA
90 Improvement Activity 1.000 EA
Total Funded Value of Award:
Option Period 1
ITEM # DESCRIPTION QTY UNIT UNIT PRICE EXT. PRICE
100 Area 1 Base Fence/Gates 1.000 EA 110 Area 1 Base Roads/Bridges 1.000 EA 120 Area 1 Base Drainage/Grates 1.000 EA 130 Area 1 Base Lighting/Electrical 1.000 EA 140 Area 1 Base Veg Control/Debris Removal 1.000 EA 150 Area 1 Fee 1.000 EA 160 Area 1 OH, G&A Allocation Factor 1.000 EA 170 Area 1 Base Program Management
Support
1.000 EA
180 Improvement Activity 1.000 EA
Option Period 2
190 Area 1 Base Fence/Gates 1.000 EA 200 Area 1 Base Roads/Bridges 1.000 EA 210 Area 1 Base Drainage/Grates 1.000 EA 220 Area 1 Base Lighting/Electrical 1.000 EA 230 Area 1 Base Veg Control/Debris Removal 1.000 EA 240 Area 1 Fee 1.000 EA 250 Area 1 OH, G&A Allocation Factor 1.000 EA 260 Area 1 Base Program Management
Support
270 Improvement Activity 1.000 EA
Option Period 3
280 Area 1 Base Fence/Gates 1.000 EA 290 Area 1 Base Roads/Bridges 1.000 EA 300 Area 1 Base Drainage/Grates 1.000 EA 310 Area 1 Base Lighting/Electrical 1.000 EA 320 Area 1 Base Veg Control/Debris Removal 1.000 EA
330 Area 1 Fee 1.000 EA 340 Area 1 OH, G&A Allocation Factor 1.000 EA 350 Area 1 Base Program Management
Support
360 Improvement Activity 1.000 EA
Option Period 4
370 Area 1 Base Fence/Gates 1.000 EA 380 Area 1 Base Roads/Bridges 1.000 EA 390 Area 1 Base Drainage/Grates 1.000 EA 400 Area 1 Base Lighting/Electrical 1.000 EA 410 Area 1 Base Veg Control/Debris Removal 1.000 EA 420 Area 1 Fee 1.000 EA 430 Area 1 OH, G&A Allocation Factor 1.000 EA 440 Area 1 Base Program Management
Support
450 Improvement Activity 1.000 EA
OPTION PERIODS
The contract consists of four (4) one year option periods, that, if exercised annually, will follow the base Clin structure listed above and commences at the end of the base year period after funding is identified. The government reserves the right to not exercise all or part of the option periods.
Improvement Activity Option Clin The Improvement Activity Option CLIN shall be exercised as required and will be independent of all other option CLINS during the option periods. The Government anticipates a total of three (3) separate improvement activities each year, including the base period and each exercised option period over the life of the contract.
The estimated not-to-exceed (NTE) amount of each improvement activity is $750,000. Exercising of the Improvement Activity Option CLIN shall be at the sole discretion of the government and may be exercised at any time during the contract’s period of performance, unless the time remaining on the contract is inadequate to complete the required improvement. Applicable Overhead (OH) and G&A for the improvement activities shall be included in the Improvement Activity Option CLIN. However, the Fee for improvement activities shall be included in the Fee CLIN under Section B.
B.2 DELIVERY SCHEDULE
DELIVER TO: ITEM # QTY DELIVERY DATE
Customs and Border Protection 1301 Constitution Av, NW Washington, DC 20004 10 1.000 06/30/2014 20 1.000 06/30/2014 30 1.000 06/30/2014 40 1.000 06/30/2014 50 1.000 06/30/2014 60 1.000 06/30/2014 70 1.000 06/30/2014 80 1.000 06/30/2014 90 1.000 06/30/2014
B.3 CONTRACT TYPE (OCT 2008)
This is a Hybrid of CPFF and FFP contract, order, or BPA.
[End of Clause]
SECTION C SPECIFICATIONS/SOW/SOO/ORD
C.1 SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
COMPREHENSIVE TACTICAL INFRASTRUCTURE MAINTENANCE AND REPAIR (CTIMR) STATEMENT
OF WORK (SOW)
1.0 Introduction
The purpose of this Statement of Work (SOW) is to acquire contractor Maintenance and Repair (M&R) support along the Southwest Border and surrounding areas. The support shall consist of: fence and gates; roads and bridges; drainage and grate systems; lighting and electrical systems and; vegetation control and debris removal.
1.1 Background
Section 102 of the Secure Fence Act requires the Department of Homeland Security (DHS) to construct – in the most expeditious manner possible – the infrastructure necessary to deter and prevent illegal entry on our Southwest Border, including pedestrian and vehicle fencing, roads, and technology. Gaining effective control of our Nation’s borders is a critical element of national security, and U.S. Customs and Border Protection (CBP) is constructing tactical infrastructure (TI) to better execute this vital mission.
Under the Facilities Management and Engineering (FM&E) Division of CBP, the Border Patrol Facilities and Tactical Infrastructure (BPFTI) Program Management Office (PMO) – originally part of the Secure Border Initiative (SBI) – was established to acquire, maintain, and sustain all TI. The program develops and installs physical components (consisting mainly of roads, bridges, pedestrian and vehicle fences, and lights) designed to consistently slow, delay, and act as persistent impedance to illicit cross-border activity. TI, in turn, helps increase the level of operational control by the Border Patrol between the Land Ports of Entry (LPOEs).
Fencing is but one element of this layered defense-in-depth plan. Each Border Patrol Sector identifies specific TI requirements that if fulfilled will enable agents to perform their mission more efficiently and increase the Sectors’ level of effective control based upon the current-day threat.
The TI program addresses the goals and objectives established by both the DHS 2008 Strategic Plan and U.S.
Customs and Border Protection (CBP) Fiscal Year 2009-2014 Strategic Plan (draft). The TI program directly aligns with the achievement of the DHS Strategic Plan’s Goal 1 – “Protect our Nation from dangerous people,” and corresponding Objective 1.1 – “Achieve effective control of our borders.” The TI program also directly aligns with the achievement of the CBP Strategic Plan’s Goal 1 – “Secure our Nation’s borders to protect America from the entry of dangerous people and goods and prevent unlawful trade and travel,” and corresponding Objective 1.1 – “Establish and maintain effective control of air, land, and maritime borders through the use of the appropriate mix of infrastructure, technology, and personnel.”
1.2 Scope
This work effort addresses the M&R of TI along Work Area 1 of the Southwest Border as defined inTable 1.2-1
– Work Areas below. It also addresses, at the discretion of the Government, improvements incidental to the M&R of existing TI. Architectural and Engineering (AE) design is not part of this contract.
Maintenance includes work activities that preserve or sustain the ability of an asset to continue to carry out its intended function or preserve its established level of performance.
Repairs include work to restore an existing asset to pre-existing condition and level of performance so that it may be effectively utilized for its designated purpose.
Improvements include work that enhances the mission and functional capabilities of an asset through an addition, expansion, or adaptation. For example, a replacement of fence sections with more permanent fence structures, improving the condition of a roadway by adding improved base or surfacing material on a large section of road, and replacing a drainage culvert with a larger diameter culvert. Any improvements included in this work effort will be confined to the existing TI footprint and will not exceed a dollar level threshold of $750,000 per activity. All improvements shall be assessed for environmental and real estate compliance requirements.
While the Border Patrol divides the Southwest Border into nine (9) unique Sectors, for internal contract management purposes, CBP has aggregated the Sectors into four (4) work area-oriented groupings, of which the focus of this acquisition is Work Area 1 (as shown in Table 1.2-1 below). This was done to align Sectors with similar characteristics to promote efficiency and ensure consistency with other CBP programs. While the TI within each Sector is similar, the specific TI types and quantities vary, driving the different M&R requirements for each Sector.
Work Area Sectors Length of border
(miles) El Centro, CA 83 San Diego, CA 70
Total 153
Table 1.2-1. Work Area 1
As shown in Table 1.2-1 above, Work Area 1 is divided into two Sectors, El Centro, CA and San Diego, CA.
The El Centro Sector (ELC) is situated within the Imperial Valley of Southern California. ELC consists of four Border Patrol stations, which have some of the most rugged, remote, and diverse terrain along the southwest border, posing many dangers for agents and potential border crossers. Border Patrol Stations are located at El Centro, Calexico, Indio, and Riverside. The El Centro Sector area of responsibility spans 70 linear miles along the international boundary with Mexico from the Jacumba Mountains in the west to the Imperial Sand Dunes in the east. The Imperial Valley has three main cities, Calexico, El Centro and Brawley. These incorporated areas and other small communities comprise less than one percent of the land. Half of the land is currently undeveloped, with one-fifth of nearly 3 million acres being irrigated for agricultural purposes. The Imperial Valley is almost entirely below sea level, which contributes to the hot and dry climate.
In the San Diego Sector there is currently about 56,831 square miles of inland area, including 114 linear miles of coastline and 60 linear miles of international boundary with Mexico, within the 7,000 square miles roughly corresponding to the boundaries of San Diego County and the southern portions of Orange and Riverside Counties.
1.3 Objectives
The Government seeks a Contractor that has the proven management and technical capability and sufficient, directly-related experience and resources to perform a wide variety of urgent and routine M&R activities for different types of assets dispersed along Work Area 1 (see Table 1.2-1) of the Southwest Border of the United States. The Contractor must have demonstrated management and technical capability to efficiently and effectively manage its personnel, equipment, and other resources to satisfy all Government requirements.
2.0 References
The Contractor shall comply with all applicable Federal, State, International Boundary and Water Commission (IBWC) regulations, local, and Native American Nation laws, regulations, policies and other requirements while executing the SOW requirements. Relevant documents include:
Occupational Safety and Health Administration (OSHA) Manual Regulations Code of Federal Regulations, Title 29, Part 1926 – Safety and Health Regulations for Construction and Engineering Manual, US Army Corps of Engineers (USACE) Engineering Manual (EM) 385-1-1 (September 2008) Code of Federal Regulations, Title 49, Part 105 Hazardous Materials Program Definitions and General Procedures
Roads/Bridges:
American Association of State Highway and Transportation Officials (AASHTO) Standard specification for Highway Bridges, 17th Edition, dated 2002
Federal Highway Administration (FHWA) Manual of Uniform Traffic Control Devices (MUTCD)
American Welding Society Standards and Specifications (AWS) AASHTO/AWS D1.5M/D1.5:2008; Bridge Welding Code, dated 2008
Concrete/Steel:
American Concrete Institute (ACI) Manual of Concrete Practice, dated 2012
American Institute of Steel Construction (AISC), Steel Construction Manual, 14th Edition
American Welding Society Standards and Specifications (AWS)
American Society for Testing and Materials (ASTM) Standards
Electrical:
National Fire Protection Association (NFPA) 101, Line Safety Code, dated 2012
National Electrical Code (NEC), NFPA 70, dated 2011
Environmental:
Code of Federal Regulations, Title 40, Part 122.26, Storm Water Discharges (for Storm Water Pollution Prevention Plans)
National Environmental Policy Act (NEPA)
DHS MD 023.1 Environmental Planning Program
DHS MD 023.2 Environmental Compliance
DHS MD 025.01 Sustainable Practices for Environmental, Energy and Transportation Management
Code of Federal Regulations, Title 40: Protection of the Environment, Chapter I -- Environmental Protection Agency
Subchapter A -- General (Parts 1 - 29) Subchapter C -- Air Programs (Parts 50 - 99) Subchapter D -- Water Programs (Parts 100 - 149) Subchapter E -- Pesticide Programs (Parts 150 - 189) Subchapter G -- Noise Abatement Programs (Parts 201 - 211) Subchapter I -- Solid Wastes (Parts 239 - 282) Subchapter J -- Superfund, Emergency Planning, and Community Right-to-Know Programs (Parts 300 - 399) Subchapter Q -- Energy Policy (Parts 600 - 699) Subchapter R -- Toxic Substances Control Act (Parts 700 - 799) Subchapter U -- Air Pollution Controls (Parts 1027 - 1074) Approved State Hazardous Waste Management Programs:
California environmental regulations: Title 14, Natural Resources -- Division 7, California Integrated Waste Management Board (CIWMB) and Title 27, Environmental Protection -- Division 2, Solid Waste
Code of Federal Regulations Title 40: Council on Environmental Quality (Parts 1500-1508)
Building/Construction Codes:
California
California Building Code 2010 (IBC 2009) California Electrical Code 2010 (NEC 2008)
Applicable City, Local, Native American Nation, and County Codes
3.0 Work Requirements
The Government requires maintenance, repair (M&R), and improvement support in five work categories:
1) Fence and Gates
2) Roads and Bridges
3) Drainage and Grate Systems
4) Lighting and Electrical Systems
5) Vegetation Control and Debris Removal
A Program Management contract line item (CLIN) is included to capture appropriate, allowable and allocable program management support for the work plan development and other program management tasks (e.g., report development/submission), and is described in Section 3.1.7.
An optional Improvement Activity CLIN is also included for the performance of specific improvement activities relative to the program, and is described in Section 3.1.8.
The work required to support the TI varies based on the inventory quantities for each work category, the number and type of incidents, type and recurrence of road washouts/deterioration, time of year (variances in illegal border traffic fluctuate with the time of year), economic conditions, weather events, and location. There is typically a higher frequency of damage in and around the more urbanized areas.
As the basis for routine M&R work requirements, the Contractor will be required to develop the appropriate work plan (typically in sequential, 90 day performance periods, but at the discretion of the Government, may be extended to 180, 270 or 365 days).
The Contractor must also collect, store, and report certain data in contract deliverables (e.g., recurring reports) and/or into an automated system for use by the Government.
As part of this contract, the Government will divide and classify the M&R work to be performed as either urgent or routine. The classifications are defined as:
Urgent – Urgent work consists of M&R work requirements resulting from willful or other destruction, a natural event such as severe weather, or premature failure of the TI asset and poses an immediate risk to operations, systems, equipment or components. Urgent work requirements are typically completed to promote Agent safety and alleviate the situation before injury occurs, equipment or property is damaged, or the condition worsens. Urgent work requirements (such as breaches for fences, gates, and grates, certain road washouts, etc.) may be performed five (5) days a week, as required. The contractor must respond immediately to urgent work requirements (as defined in Table 3-1 below) to support mission requirements.
Routine – Routine work consists of all non-urgent M&R work requirements that can be planned or scheduled at a designated frequency. The work requirements do not pose an immediate risk to systems, equipment or components and can be performed on a routine planned and scheduled basis. Routine work requirements will be performed five (5) days a week from Monday to Friday. The contractor’s response to routine work requirements is typically greater than five (5) business days in duration or as scheduled in the approved contractor work plan.
During urgent work requirements, the Contractor shall provide services to restore TI asset conditions to its pre-existing condition. It is anticipated that the majority of all urgent work requirements will result from breaches of fences, gates, grates, and roads for which repair work will be completed during normal business hours.
However, based on mission requirements, the Contracting Officer’s Representative (COR) may direct the Contractor to perform a limited amount of urgent work requirements beyond or after normal business hours.
Table 3-1 provides typical urgent services response and support times. The COR will set the time to start and completion of the M&R work will be based on the severity and location of the urgent service required.
Contractor Acknowledgement
Government Prescribed Time to Start and Finish
Notification of Completion Time
Thirty minutes from notification by the COR, the Contractor shall provide a mobilization response 2
As defined by the COR, work shall typically start within twenty-four hours after the Contractor is notified by the
COR.
Within two hours of arriving at the repair site the Contractor shall notify the COR of the estimated completion time 3
1 Both mobilization response and completion times are established from the time of notification (or identification).
2 Mobilization Response is when the Contractor verbalizes to the COR the plan of action to complete the urgent repair, including justification for any time needed outside of the Government prescribed times. Exceptions are made only by the COR.
3 Completion is defined as when TI assets are restored back to pre-existing conditions. If estimated completion time is greater than 24 hours, Contractor shall provide COR verbal or email explanation as to why and the plan to complete said work.
Table 3-1. Typical Urgent Services Support Times 1
The Government shall have the primary TI inspection responsibility to identify M&R work requirements. The Contractor shall report to the Government any work requirements that it observes while performing maintenance, repair or improvement activities. Also, the Government may require the Contractor to formally survey and inspect select TI on a periodic basis.
3.1 Description of Work
3.1.1 Fence and Gates
There are two general types of fencing: pedestrian fencing and vehicle fencing. Each fence type has several different designs (e.g., for pedestrian fence, there is chain link, wire mesh, landing mat, steel bollards, and other designs).
Many fence segments and roads have gates that will also require periodic M&R. The gates are manually, mechanically, and/or electromechanically-operated. All electrical work is covered in section 3.1.4.
The Contractor shall perform maintenance and repair on approximately 120.14 miles of fence and 290 gate/panels (depicted by Sector in Table 3.1.1-1) consisting of multiple types of fence (shown in Table 3.1.1-2). All fence and gate maintenance and repairs shall be performed in accordance with the CBP Tactical Infrastructure (TI) Standard Designs as noted in Section J, Attachment (10).
San Diego Sector Total
Fence (miles ) 61.74 Gate/Panels (count) 280 El Centro Sector Total
Fence (miles ) 58.40 Gate/Panels (count) 10
Table 3.1.1-1. Work Area 1 Fence Quantities
San Diego Sector El Centro Sector Fence Type Miles Fence Type Miles
PF255 Primary Bollard 0.10 PF255 Primary Bollard 18.2 PF255 Primary Bollard w/ Ext 14.2 PF255 Primary Bollard w/ Ext 9.70 PF Legacy Primary Landing Mat 28.1 PF255 Primary Triangle w/
Bollard 2.80
PF Legacy Landing Mat w/ Ext 1.70 VF300 Normandy 8.90 PF Legacy Primary Wire Mesh 0.10 PF Legacy Primary Landing Mat 4.20 PF Primary Bollard 0.14 PF Legacy Primary Aesthetic 1.80 PF Legacy Secondary Sandia 9.90 PF 70 Primary Bollard 7.40 PF Legacy Secondary Landing Mat 1.60 VF Legacy Normandy 5.40 PF Legacy Secondary Landing Mat w/ Ext
0.20
PF Legacy Secondary Bollard 0.10 PF Legacy Secondary Bollard w/ Ext 1.60 PF Legacy Secondary Aesthetic 0.20 PF Legacy Tertiary Chain Link 2.00 PF 70 Primary Landing Mat 1.40 VF Legacy Normandy 0.33 VF Legacy Post & Rail 0.06 VF Legacy Rail 0.01
Table 3.1.1-2. Work Area 1 Miles of Fence by Type
3.1.1.1 Fence and Gates - Type of Damage
Based on historical data, CBP experiences on average over 280 Fence breaches per year within this Work Area.
Damage to fencing can be caused by two primary elements: Natural and Manmade.
Natural elements refer to the forces of nature that will act upon the fencing and include corrosion, erosion, water pooling, sand drifting, debris build-up, wind loading, temperature change (i.e., thermal expansion and contraction cycles that may create cracks) and ground shift.
Manmade elements refers to damage made by vandalism and includes, but may not be limited to, the following attack/defeat vectors: cutting, burrowing below, climbing, prying/twisting, disassembly, ramming, ramping/bridging, pulling down, graffiti, cryogenic and fire/heating/burning. Fence segments have varying levels of susceptibility to the aforementioned damage elements depending on design and location.
3.1.1.2 Fence - Type of Work
The Contractor, at a minimum, shall perform the following types of work as directed by the COR:
Making repairs that restore the structural integrity to pre-existing state, are tamper proof, and do not significantly change the design
Fixing damage caused by burrowing, water, and wind erosion
Fixing damage to fence foundations and all erosion control elements
Relocating fence sections that are specially designed to work on shifting sands
Repositioning movable fence segments that have concrete bases and set on top of the ground
Preparing the fence for potential floods by taking preventative actions such as removing and storing fence panels, and then reinstalling them after flood events subside
Moving and storing fence panels so levee and other work can be performed and then reinstalling them
Abate graffiti by methods approved by the Government
3.1.1.3 Gates - Type of Work
The Contractor, at a minimum, shall perform the following types of M&R work as directed by the COR:
Making repairs that restore the structural integrity to pre-existing state, are tamper proof, and do not significantly change the design
Fixing damage caused by ramming, burrowing, water, and wind erosion
In addition to these repairs, the Contractor shall also perform monthly preventative maintenance to ensure that the gates are maintained in good working order. This systemic maintenance will be performed and documented on a completed check sheet and submitted to the COR each month. This maintenance includes, but is not limited to:
Electrically operate gate, check for binding, and adjust/grease/repair as necessary (minor repairs for preventative maintenance only)
Remove all accumulated debris, dirt and corrosion build up from inside each unit
Check for any broken welds on the vehicle gate frame structure or fence panels
Reinforce the operator stands (minor repairs)
Clean and remove all of the accumulated debris from the V track rails, Apply a coating of cold galvanizing compound on the V track rails as needed
Remove the accumulated grease and dirt build up on the aluminum guide tracks on the Hy-Security Hydraulic gate operator units
Remove any accumulated corrosion from the drive chains
Remove any dirt or corrosion damage from the controller boards or any electronic components
Lubricate all grease fittings, drive chains, gate wheels, guide rollers if applicable
Check gear box oil or hydraulic oil if applicable, refill if necessary
Check for oil leaks, repair as necessary (minor repairs)
Check alignment of motor and condition of belt- adjust or replace as needed
Check hardware for tightness (Important: Contractor to conduct load test and check shear pins)
Check travel stop limit switches for proper opening and closing, and adjust if necessary
Check all safety/reverse devices for proper operation
Check amperage readings, compare with the unit data and adjust settings on control panels as needed
Observe standard safety procedures
Use lock-out/tag out
Check all electrical wires for damage (e.g., fraying) - repair as necessary (minor repairs)
Check all access covers and enclosure covers for rain tight, replace any missing screws
Test the entire gate system
Gate maintenance will not include replacement of parts. Any repair requirements identified by the Contractor during the gate maintenance inspection will be recommended to the COR for subsequent repair approval.
3.1.2 Roads and Bridges
Approximately 210.93 miles of roads in San Diego and El Centro Sectors are used for patrolling and access to TI. The roads can be sand, dirt, gravel, or paved, and require different types of maintenance and varying levels of repair. Culverts, low water crossings, cattle guards, guardrails, and bridges are also part of the road system. Many of the roads belong to public agencies other than CBP, or to private individuals, creating some challenges to road M&R, such as acquiring Rights of Entry and maintaining accurate mileage information and location data. The Government will coordinate the Rights of Entry and mapping for all roads.
CBP classifies its roads as follows:
FC-1: any type of surface paved road. These roads may include surfaces consisting of bituminous asphalt and aggregate, hot-mix asphaltic concrete, portland cement concrete or some combination of these types of improved surface courses; generally overlaying an aggregate base course of varying depths.
FC-2: an all-weather road. These roads generally consist of 6” minimum depth well-graded aggregate (may be native or imported) roadbeds, shaped with a defined crown section and including adequate parallel ditches and cross-culverts to ensure proper drainage both parallel and transverse to the road alignment. These roads should allow travel even during inclement weather, with service disruption only in the case of severe localized flooding of the road.
FC-3: a graded earth road. These roads should generally consist of a defined crown section and parallel ditches, similar to the FC-2 roads. However, the graded earth roadbed will consist of shaped and compacted in-situ materials of varying depth. These roads will be more susceptible to service disruption during storms of only moderate severity. Wet weather traction may also be compromised in areas with clay or silt soils.
FC-4: a two-track road. These roads may also be described as un-improved roads, wagon trails, or 4-wheel drive roads. The two track name implies that the road consists of two parallel tracks created by the loss of vegetation where the tires contact and compact the earth; between which may lay a strip of low-growth vegetation. These roads generally receive very little maintenance consisting primarily of occasional brush and boulder clearing, and possibly, but much less frequently, box-blading. Two-track roads have no crown, and generally do not have any improved drainage features or ditches.
The Contractor shall perform maintenance and repair on approximately 210.93 miles of road and 5 bridges/crossovers (depicted by Sector in Table 3.1.2-1) consisting 4 types of classifications (shown in Table 3.1.2-2). All road maintenance and repairs shall be performed in accordance with the CBP Tactical Infrastructure (TI) Standard Designs as noted in Section J, Attachment (10).
San Diego Sector Total Roads - Access Only (miles) 16.31 Roads (miles ) 115.41 Bridges/Crossovers (count) 5 El Centro Sector Total Roads - Access Only (miles) 2.23 Roads (miles ) 76.98 Bridges/Crossovers (count) 0
Table 3.1.2-1. Work Area 1 Roads and Bridges Quantities
San Diego Sector El Centro Sector FC-1 FC-2 FC-3 UNK FC-3 FC-2 Miles
12.24 13.47 76.53 13.16 76.98 4,100 LF
Table 3.1.2-2. Work Area 1 Roads and Bridges Classifications
3.1.2.1 Roads and Bridges – Frequency of Repairs
Each Sector’s M&R work requirements vary across the different road classifications. Road maintenance is relatively predictable and can usually be scheduled in advance as routine work. Access roads to fence and technology facilities need to be inspected after major natural events (such as rainstorms) as directed by the
COR.
3.1.2.2 Roads and Bridges – Type of Work
The Contractor, at a minimum, shall perform the following types of work (as directed by the COR):
Blading FC-2, FC-3, and sand-based roads to facilitate traffic and provide proper drainage.
Performing spot surfacing, patching potholes, deep patching of asphalt surface, skin patching of asphalt surfaces, and patching asphalt berms. The work includes preparing the area, furnishing, hauling, and placing all necessary materials.
Removing and/or clearing vegetation so that roads are drivable
Furnishing, hauling, and placing erosion resistant materials and protective materials for use on designated locations such as embankments and culvert inlets.
Returning road sections damaged by weather events or excessive use to a serviceable condition.
Adding binding and/or stabilizing agents to roads for dust suppression and road stabilization efforts.
Repair or replace damaged safety barriers, guardrails, signs, etc.
Inspecting bridges (to include cross-overs), as required by applicable codes, to evaluate the structural integrity and determine M&R requirements. Bridge inspections and evaluations are to be performed by personnel properly trained or certified to perform bridge inspections.
Perform periodic maintenance to bridges and repair damage related to weather-related events and willful/accidental destruction.
3.1.3 Drainage and Grate Systems
Drainage systems comprise items such as catch basins, storm drainage grates, and conveyance structures used for peak water flow mitigation and runoff control/containment, water quality improvement, and flood plain compensation. They can range in size from two-foot diameter pipes to tunnels large enough to accommodate trucks.
The Contractor shall perform maintenance and repair on approximately 463 culverts and 14 low water crossings (depicted by Sector in Table 3.1.3-1):
San Diego Sector Total Culvert (count) 19 Low Water Crossings (count) 14 El Centro Sector Total Culvert (count) 444 Low Water Crossings (count) 0
Table 3.1.3-1. Work Area 1 Drainage and Grates Quantities
3.1.3.1 Drainage and Grate Systems – Type of Damage
Repairs are required to keep drainage systems operating efficiently. The periodic removal of debris, silt and trash is required to reduce the risk of flooding and to ensure proper functioning. Water flowing at or near the border may be contaminated, at times requiring special hazardous material (HAZMAT) equipment and procedures to perform the work.
The drainage system gates and grates are subject to frequent vandalism. The most common form of vandalism is cutting the gate or grate with a saw or torch to allow for illicit traffic/activities to pass. Other forms of vandalism occur such as using hydraulic jacks to pry openings in the structure.
3.1.3.2 Drainage and Grate Systems – Type of Work
Making repairs that restore the structural integrity, are tamper proof, and do not change the design without prior COR approval
Fixing damage caused by water and wind erosion
Removing and replacing existing culverts and appurtenances with new ones
Cleaning and reconditioning culverts, appurtenances, other drainage structures, and ditches
Restoring drainage system function by removing debris, silt and other obstacles
3.1.4 Lighting and Electrical Systems
Lighting systems and electrical equipment range from power supply and distribution (both above and below ground), utility pole-style lights and stadium-type lights and are used to illuminate the border at night. Also included are electrical components of gates and grates.
The Contractor shall perform maintenance and repair on approximately 586 lights (depicted by Sector in Table 3.1.4-1):
San Diego Sector Total Lights (count) 326 El Centro Sector Total Lights (count) 260
Table 3.1.4-1. Work Area 1 Lighting and Electrical Systems Quantities
3.1.4.1 Lighting and Electrical Systems – Type of Damage
Damage to lighting and electrical systems may be caused by a variety of events such as shooting out lights, theft of lighting system copper wire, or poles downed by storms or vehicles.
3.1.4.2 Lighting and Electrical Systems – Type of Work
Performing preventive, routine maintenance, repairs, and replacements (e.g., bulbs, ballasts, lens covers, etc)
Repositioning lights to properly illuminate border areas as dictated by operational needs
NOTE: inspection of lighting systems will at times require work before/after normal business hours.
3.1.5…