Site Visit Technical Presentation (7Jan 2013)

View the file

Other files

File Type Posted
CTIMR_A00005_Questions_and_Answers_(Rev1).pdf.pdf PDF
A00005_HSBP1013R0017_(SF30_-_Final).pdf PDF
Amendment_A00004_-_(Final).pdf PDF
A00003_-HSBP1013R0017_(SF30)_-_Final.pdf PDF
ATTACH_3_-(A00003)_Sample_Work_Plan_Request_CTIMR_WA1_Final_1-17-13).DOC DOC document
ATTACH_5-_(A00002)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
CTIMR_Site_Visit_Attendance_List7-8Jan13.pdf PDF
ATTACH_8-_(A00002)Client_Authorization_Letter.docx DOCX document
ATTACH_10-(A00002)TI_Design_Standards_v1_Sept_2012.zip ZIP file
ATTACH_13-_(A00002)Pre-Award_Survey-SF-1408.doc DOC document
A00002_-_HSBP1013R0017__(Final)18Jan13.pdf PDF
Attach_1-_(A00002)BMPs_(rev1-PPW)_5Jan13.doc DOC document
CTIMR_Contractual_Site_Visit_Slides_01-04-2013_Rev1.pdf PDF
ATTACH_3-(A00002)Sample_Work_Plan_Request_Rev._1-18-2013.doc DOC document
CTIMR_Area_1_Questions_and_Answers_Rev1_(Final).PDF.pdf PDF
ATTACH_2_-(A00002)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
ATTACH_7-_(A00002)Consent_Letter_(3).docx DOCX document
ATTACH_9-_(A00002)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_12-_(A00002)Pre-Award_LTR_to_Contractor.doc DOC document
CTIMR_Site_Visit_Agenda_10213.pdf PDF
ATTACH_6_-_(A00002)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
ATTACH_11-_(A00002)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_4_(A00002)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
Web_Notice_Areas_1_Proposal_Site_Visits_12-29-2012.doc DOC document
CTIMR_Work_Area_1_Detailed_Synopsis.doc DOC document
ATTACH_4_(A00001)Cost_Template_Guide_HSBP1013R0017.xls XLS spreadsheet
ATTACH_6_-_(A00001)_Past_Perf.Questionaire__HSBP1013R0017.doc DOC document
TI Design Standards_v1_Sept 2012.pdf PDF
ATTACH_7-_(A00001)Consent_Letter_(3).docx DOCX document
ATTACH_8-_(A00001)Client_Authorization_Letter.docx DOCX document
ATTACH_12-_(A00001)Pre-Award_LTR_to_Contractor.doc DOC document
ATTACH_11-_(A00001)_Wage_determ._HSBP1013R0017.doc DOC document
ATTACH_3-_(A00001)Sample_Work_Plan_Request_CTIMR_WA1_Final_12-13-12_1.DOC DOC document
ATTACH_13-_(A00001)Pre-Award_Survey-SF-1408.doc DOC document
ATTACH_9-_(A00001)GFM_Instruc-HSBP1013R0017.doc DOC document
ATTACH_5-_(A00001)Past__Perf.Questionaire_Cover_LTR_(3).docx DOCX document
ATTACH_2_-(A00001)Notice_Regarding_Landlord-HSBP1013R0017.doc DOC document
A00001-_HSBP1013R0017_Final.pdf PDF
Attach_1-_(A00001)BMPs_(rev1-PPW)_5Jan13.doc DOC document
4-Attach._Cost_Templ_HSBP1013R0017.xls XLS spreadsheet
SF-1442_to_SOL._HSBP1013R0017_22Dec12.pdf PDF
3-Attach-Append_A-_HSBP1013R0017A.doc DOC document
3-Attach-Work_Plan._HSBP1013R0017.doc DOC document
6-Attach-GFM_INstruc-HSBP1013R0017.doc DOC document
5-Attach-__Past_Perf.HSBP1013R0017.doc DOC document
7-Attach-Acronyms-_Def._HSBP1013R0017.doc DOC document
CTIMR_HSBP10R0017_RFP_Doc.doc DOC document
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBP Office of Administration Facilities Management and Engineering

Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Work Area 1 (San Diego & El Centro Sector)

January 2013

For Official Use Only

For Official Use Only 2

CTIMR Work Area 1 Introduction/Agenda

Overview of Tactical Infrastructure (TI) and Mission Support

TI Under Attack

Work Requirements

TI supports U.S. Border Patrol mission to guard U.S. Southwest Border against illegal entry

Includes an inventory of:

– Fences and Gates

– Roads and Bridges

– Grates and Drainage structures

– Lighting and Electrical systems

– Lands

TI spans lands owned by:

– U.S. Government, often under other agency control

– Tribal nations

– Private landowners (under agreements, easements, and leases)

Lands encumbered by significant environment constraints such as endangered species, cultural and historic requirements

– Requires very special steps to avoid violations

Overview: Tactical Infrastructure (TI)

For Official Use Only 4

Overview: Tactical Infrastructure (TI)

For Official Use Only 5

For Official Use Only 6

Inventory: Fence and Gates

For Official Use Only 7

Bridges require preventive maintenance inspections

Inventory: Roads and Bridges

For Official Use Only 8

Drainage structures require repairs and routine inspection and maintenance

Inventory: Drainage Structures and Grates

For Official Use Only 9

Inventory: Lighting and Electrical Systems

Maintenance and Repair requirements stem from willful destruction, weather, normal aging

Typical causes for M&R in each work category include:

- Fence and Gates

• Fence fabric cut, bollards removed, or sections pushed away

• Burrowing or tunneling below the fence

- Roads and Bridges

• Roads and bridges washed out/damaged by storms

- Drainage and Grates

• Grates removed or cut, debris builds up

- Lighting and Electrical

• Lighting often vandalized, also requires routine maintenance

- Vegetation Control and Debris Removal

• Vegetation growth must be controlled

TI Under Attack

Maintenance, repair and improvement support is required in 5 work categories:

1. Fence and Gates

2. Roads and Bridges

3. Drainage and Grate Systems

4. Lighting and Electrical Systems

5. Vegetation Control and Debris Removal

Program Management CLIN will capture labor, equipment, and material costs for:

- Mobilization

- Work plan development

- Program oversight activities of key personnel described in Section H

- Government information management/reporting requirements and meeting requirements

- Transportation and storage of Government furnished materials

Improvement Activity CLIN (Optional) is included for:

- Performance of specific improvement activities relative to the program

- Each improvement shall not exceed a dollar level threshold of $750,000 per activity

Work Requirements

Work requirements will vary based on:

- Inventory quantities for each work category

- Number and type of incidents

- Type and recurrence of road washouts/deterioration

- Time of year (variances in illegal border traffic fluctuate with the time of year)

- Economic conditions

- Weather events

- Location

- There is typically a higher frequency of damage in and around more urbanized areas

Contractor will be required to develop an appropriate work plan

- The performance period for the work plan:

• Will typically be in sequential 90 day performance periods

• May be extended to 180, 270 or 365 days

- Work plan will serve as the basis for routine M&R work requirements

Work Requirements (Continued)

M&R work is classified as either urgent or routine for Work Categories 1-5 Urgent work

- Resulting from:

• Willful or other destruction

• Natural event such as severe weather

• Premature failure of the TI asset

- Poses immediate risk to operations, systems, equipment or components

- May be performed five (5) days a week, as required

• Majority of urgent work will be completed during normal business hours.

• Based on mission requirements, limited amount of urgent work may be required after normal business hours

Routine work

- Non-urgent M&R work that can be planned or scheduled at a designated frequency.

- Does not pose an immediate risk to systems, equipment or components

- Will be performed five (5) days a week from Monday to Friday.

Work Requirements (Continued)

Slide Number 1
CTIMR Work Area 1 �Introduction/Agenda
CTIMR Work Area 1 �Overview: Tactical Infrastructure (TI)
Slide Number 4
Slide Number 5
Slide Number 6