DID for CDRL A005 (DI-FNCL-80331) Revision A

View the file

Other versions and copies of DI-FNCL-80331

Who attaches DI-FNCL-80331

Other files

File Type Posted
09Feb Industry Day Small Business Brief_09-MDA-4341.pdf PDF
MS Industry Day - DA Brief -- Road Ahead_09-MDA-4367 —
MiDAESS-OCI Feb Industry Day_09-MDA-4316.pdf PDF
MiDAESS Keynote_09-MDA-4331.pdf PDF
MS Industry Days 3 Overview_09-MDA-4366.pdf PDF
PSC and MiDAESS.pdf PDF
Contracting DRFP Overview_09-MDA-4321.pdf PDF
MiDAESS Historical Data.pdf PDF
MiDAESS Industry Day Registration List_Dec 08.doc DOC document
IDR09 Feb Form.xls XLS spreadsheet
08Dec Industry Day Bus Ops Brief_08MDA4070.pdf PDF
08Dec Industry Day Contracting Brief_09MDA4148.pdf PDF
08Dec Industry Day MDA Update Brief_08MDA4021.pdf PDF
08Dec Industry Day Systems Eng Brief_08MDA4073.pdf PDF
08Dec Industry Day UMDF Brief_08MDA4119.pdf PDF
08Dec Industry Day Small Business Brief_09MDA4146.pdf PDF
08Dec Industry Day OCI Brief_09MDA4147.pdf PDF
08Dec Industry Day Keynote Brief_09MDA4111.pdf PDF
08Dec Industry Day Acq Mgt Brief_09MDA4150.pdf PDF
08Dec Industry Day Test Brief_09MDA4149.pdf PDF
08Dec Industry Day MiDAESS Reqs Overview_09MDA4145.pdf PDF
IndustryDayRegistrationForm DEC 18-19 08.xls XLS spreadsheet
MiDAESS OCI Policy Statement 24 Nov 08.doc DOC document
MiDAESS Sources Sought.doc DOC document
IndustryDaylist-Rev1.xls XLS spreadsheet
IndustryDaylist.xls XLS spreadsheet
MiDAESSIndustryDay-PAOrelease.ppt PPT presentation
Attachment11-AdvancedTechnologyAppendix.doc DOC document
ExhibitA-2CDRLA002PresentationMaterial.doc DOC document
Attachment17-OCIDocument-Revised4.xls XLS spreadsheet
Attachment2-Business FinancialManagementAppendix.doc DOC document
Attachment5-AcquisitionManagementAppendix.doc DOC document
ExhibitC-PastPerformanceQuestionaire.rtf RTF text file
Attachment16-DD254SecurityGuidelines.doc DOC document
DIDforCDRLA002(DI-ADMN-81373).pdf PDF
Attachment12-SecurityandIntelligenceAppendix.doc DOC document
MiDAESSDraftRFPCoverLetter.pdf PDF
SourcesSoughtForm.xls XLS spreadsheet
Attachment7-HumanResourcesAppendix.doc DOC document
DIDforCDRLA001(DI-MGMT-80227).pdf PDF
DIDforCDRLA006(DI-MGMT-80790).pdf PDF
DIDforCDRLA004(DI-ADMN-81505).pdf PDF
ExhibitA-6CDRLA006TransitionPlan.doc DOC document
Attachment6-Infrastructure EnvironmentAppendix.doc DOC document
Attachment9-WarfighterSupportCenterAppendix.doc DOC document
Attachment3-Administrative OtherProfessionalSupportAppendix.doc DOC document
Attachment10-WorldwideDeploymentAppendix.doc DOC document
ExhibitA-5CDRLA005FundsandMan-HoursExpenditureReport.doc DOC document
Attachment14-InformationManagementandTechnologyOperationsAppendix.doc DOC document
ExhibitA-4CDRLA004Report RecordofMeeting-Minutes.doc DOC document
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Funds and Man-Hours Expenditure Report

Number: DI-FNCL-80331A Approval Date: 30 OCT 2006 AMSC Number: 7618 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship:

This report provides Government visibility into contractor expenditures for labor, materials, travel and other contract charges. It tracks these expenditures against baseline values, and provides to-completion estimates.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to time and material, research and development and other contracts where use of Cost Performance Reporting (CPR) or Cost/Schedule Status Reporting (C/SSR) are not appropriate. It is not applicable on fixed-price contracts. It is acquired on a periodic basis.

It is not intended that all the requirements contained herein should be applied to every contract or program phase. Portions of this DID are subject to deletion tailoring depending on the management requirements of the solicitation/contract in which it is applied.

This DID is related to DI-A-5016, Project Planning/Actual Progress Chart (Other than fixed price contracts), and DI-FNCL-80003, Man-Hour Expenditure Chart.

This DID supersede DI-FNCL-80331.

Requirements:

1. Reference documents. None.

engineer shop, etc), burden/overhead, material/parts, travel, subsistence, fringe, DI-FNCL-80331A

2. General. The Funds and Man-Hours Expenditure Report shall contain the following data:

a. A tabular listing of funding and man-hour expenditures inclusive of the reporting period compared to original baseline values, including to-completion estimates.

b. A graphical plot of planned versus actual funding expenditures.

c. A graphical plot of planned and actual percentage of work completed.

3. Scope. Each task, job-order, sub-task, or unit of work will be separately addressed. If schedule or milestone reporting is also a reporting requirement under the contract; the breakdown of work task elements should be consistent with the reporting.

4. Format and Content. The report shall contain the following:

4.1 Funds and man-hour expenditure summary. This chart shall contain the following data elements (See Figure 1).

4.1.1 Original negotiated contract. A summary of all cost elements associated with the original negotiated contracts. This is defined as the contractor’s original cost proposal, as negotiated and accepted by the Government. It is that cost as it appears on the original contract document. Its elements shall contain the cost estimate breakdown by category (i.e., direct labor (Sr. Engineer, Jr Engineer, draftsman, General and Administration (G&A) fee, outstanding commitments, etc), as provided in the accepted proposal. Items and amounts specified in this entry shall remain constant on successive reports during the term of the contract.

4.1.2 Latest negotiated contract changes. A summary of the latest negotiated contract changes. It shall be a recapitulation of the 4.1.1 data elements reflecting all subsequent changes resulting for contract modifications. Breakdown by category shall be as provided in 4.1.1 unless altered by a contract modification. Indicated “none” if revised proposal has no effect.

4.1.3 Reporting period expenditures. Expenditure data for the current reporting period for the work task categories used in 4.1.1 or 4.1.2 (as applicable), and covering man hours, funds, and the change (new orders minus fulfilled orders) in outstanding commitments.

4.1.4 Cumulative expenditure to date. Cumulative man hour, funds and outstanding commitments expenditure data through the current reporting period for the work task categories used in 4.1.1 and 4.1.2 (as applicable). Additionally, show the cumulative costs as a percentage of the 4.1.1 of 4.1.2 costs.

4.1.5 Estimated cost-to-complete. The estimated costs required to complete the work task from the reporting date to the date of completion. This estimate shall be defined by categories as they appear in 4.1.1 of 4.1.2. All estimates shall be justified.

4.1.6 Latest cost estimate. An estimate of the final total cost at completion of the work effort. This is derived from 4.1.4 and 4.1.5. Deviations between the original contract and/or latest negotiated contract change shall be justified/explained in footnote remarks.

4.2 Funds expenditure graph. A funds expenditure graph shall be included. The graph shall be reproducible to enable periodic changes reflecting current contract funding status to be entered. The graph shall portray, on a periodic basis, the planned versus actual total dollar expenditures and the percentage of the total contract dollars that the expenditure represent (See Figure 2).

4.3 Work completed graph. A work completed graph shall be included that reflects the percentage of work completed by the contractor through the current reporting period.

The graph shall plot actual completion versus planned completion, and shall be maintained current and be fully legible and reproducible (See Figure 3).

5. END OF DI-FNCL-80331A

DATA ITEM DESCRIPTION
Requirements: