08Dec Industry Day Test Brief_09MDA4149.pdf
PDF 85 KB Posted
- Attached to
- MiDAESS Industry Day Briefings - 18-19 Feb 09
- Solicitation number
- HQ0006-07-R-0012
- Issued by
-
DOD Missile Defense Agency
About this file
Test - Mr. Chet DeCesaris
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1FOR OFFICIAL USE ONLY 1
Ref: 013106
Approved for Public Release
09-MDA-4149 (08 JAN 09)
MiDAESS Industry Day Improving Test
December 19, 2008
Mr. Chet DeCesaris Test Functional Manager Missile Defense Agency
Draft v3 22 Sep 08
Distribution Statement A:
Approved for public release;
distribution is unlimited
Approved for Public Release
09-MDA-4149 (08 JAN 09)
2FOR OFFICIAL USE ONLY 2
Approved for Public Release
09-MDA-4149 (08 JAN 09)
Test Policy Changes
• Test Policy, MDA Directive 3002.03, 21 Nov 08
- Revitalized BMDS testing with emphasis on increased, non-delegable, direct responsibility and accountability to MDA/D at each of the five phases of the BMDS test process:
Phase Office of Primary Responsibility (As assigned by D) Requirements Deputy for Engineering (DE) Planning & Design Deputy for Test (DT) Readiness Designated Mission Director (MD) Execution MD Analysis & Evaluation DE
- Team Members: BMDS Operational Test Agency (OTA), Warfighter Support Center (WSC), DE, DT, Deputy for Operations (DO), Element Engineering & Test Functional Leads, Program Directors/Program Managers (PDs/PMs), Targets (TC), Safety, Quality and Mission Assurance (QS), etc.
- Team is responsible to the MD for the Readiness and Execution Phases
- Increased emphasis on the flexibility, efficiency, and cost effectiveness of the BMDS test program
- Space launch and contingency operations will be included in a future revision of the policy
3FOR OFFICIAL USE ONLY 3
Approved for Public Release
09-MDA-4149 (08 JAN 09)
Working as one team is key to the success of the Agency’s test effortsWorking as one team is key to the success of the Agency’s test efforts
EMDR
Integrated Test Team
Appointment Memo
(DT prepares, D signs)
Roles
Test Directive (Execution Order) (OPR prepares, D signs)
MD, as Phase OPR
• DE
• DT
• Element Engineering & Test Functional Leads
• Supporting Element orgs
• BMDS OTA
• Warfighter Support Center
DE, as Phase OPR
• DT
• MD
• Element Engineering & Test Functional Leads
• Supporting Element orgs
• BMDS OTA
• Warfighter Support Center
EQLB
Test Event
EMR
MD, as Phase OPR
• DE
• DT
• Element Engineering & Test Functional Leads
• Supporting Element orgs
• BMDS OTA
• Warfighter Support Center
Test Event Activity Start
Test Event Requirements Phase
DE^
Phase 1 OPR
DE, as Phase OPR
• DT
• MD
• DO
• Element Engineering & Test Functional Leads
•Supporting Element orgs
• BMDS OTA
• Warfighter Support Center
DT, as Phase OPR
• DE
• MD
• DO
• Element Engineering & Test Functional Leads
•Supporting Element orgs
• BMDS OTA
• Warfighter Support Center
Test Directive (Operations Order)
(OPR prepares, D signs)
ETR
Test Directive (Planning Order) (OPR prepares, D signs)
Phase Review
ETPR
Test Objs & MS-O Memos
(OPR prepares, D signs)
Phase Review
ETRR°
++^ Responsible to the MDA Director during specified Test Event Phase.
++ Mission Director (MD designated by MDA/D.
Phase Lead is direct report to MDA Director.
Executive Test Milestone Review chaired by MDA Director Phase review chaired by Phase Leader
KEYKEY
* BMDS Test CONOPS will address specific constructs for:
1) Flight Tests
2) Ground Tests
3) Capability Development Tests
4) International Tests
5) Contingency Operations
6) Space Launch
Phase Review
Initial Review
Phase Review
Phase Review
• TC
• QS
• TC
• QS
• TC
• QS
• TC
• QS
• QS
• TC
° ETRR will be included in a future revision to the policy
Test Event Planning & Design Phase
DT^
Phase 2 OPR
Test Event Readiness Phase
MD^++
Phase 3 OPR
Test Event Execution Phase
MD^++
Phase 4 OPR
Test Event Analysis & Evaluation Phase
DE^
Phase 5 OPR
Time T-15 Months T-12 Months T-9 Months T-3 Months T-10 Days T+5 Days T+60 Days
MDA
Director Test Event
Activity Complete
| Test Policy Changes |
| Roles |