MiDAESS Contracting Strategy Overview - Ms. Robbie Phifer
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MiDAESS Contracting Strategy Overview
Ms. Robbie Phifer MiDAESS Contracting Officer
Missile Defense Agency
December 18, 2008Distribution Statement A:
Approved for public release;
distribution is unlimited
Approved for Public Release
09-MDA-4148 (08 JAN 09)
09-MDA-4148 (08 JAN 09)
MiDAESS Contracting Strategy
One Source Selection, Two RFPs
- Full and Open Competition
- Small Business Set-Aside Competition
- Evaluation of different capability groups will be conducted in parallel in order to maximize efficiency and minimize resourcing impacts across the Agency
- Multiple awards at the Functional Capability Group level
09-MDA-4148 (08 JAN 09)
Contract Awards
RFP CONTRACTS
QSMA Acq Support
Capability Group Capability Group0001 QSMA 0002 Acq Mgt 0003 Business FM 0004 Leg. Affairs 0015 Travel
0016 ODC
0017 CDRL
0001 QSMA
0002 Acq Mgt 0003 Business FM 0004 Leg. Affairs 0015 Travel
0016 ODC
0017 CDRL
CLINS
CLINS
CLINS
CLINS
Capability Groups
09-MDA-4148 (08 JAN 09)
Contract Transition
• All Existing Contracts Will be Allowed to Reach Natural End Point
- End of Contract
- End of Option
• Requirements From Multiple Contracts Will be Consolidated Into MiDAESS Capability Group Task Orders
MDA Existing Contract #1
MDA Existing Contract #1
MDA Existing Contract #1
Eng Cap Grp Task Order
Acq Cap Grp Task Order
Engineering Requirements
Acquisition Requirements
09-MDA-4148 (08 JAN 09)
Task Ordering
• Task Order evaluation criteria will include:
- Small Business utilization on prior MiDAESS Task Orders
- Past Performance on prior MiDAESS Task Orders
- Technical solution to accomplish the effort
• Task Orders will include :
- Resolution of potential organizational conflicts of interest
(OCI)
- Pricing based on fixed rates for labor as contained in the contract and fixed burden factor for any associated travel and incidental other direct costs (ODCs)
- Performance objectives and standards/thresholds (stated at the contract level or amended, as necessary, at the task order level)
09-MDA-4148 (08 JAN 09)
Cross Teaming
• Cross Teaming is prohibited at the prime and subcontract level for the basic contract and subsequent task orders.
- Enhance Competition
• Neither a prime contractor nor a subcontractor can propose on more than one team in one functional capability group.
• Exception is if the supply chain for one function is exclusive to one subcontractor then more than one prime contractor may include this critical supplier in their proposed list of subcontractors. Market research must be submitted to support this assertion.
• Prime contractors can add subcontractors to their team at any time during contract performance upon notification to
PCO.
09-MDA-4148 (08 JAN 09)
Source Selection Methodology
• Evaluation factors
- Past performance is more important than price
Past Performance evaluation will be based on a subjective integrated assessment of current and past performance record based on
— Recency
— Relevancy
— Quality
- Technical capability will be evaluated as acceptable or not acceptable.
- Price evaluation will be based on fair and reasonable fully burdened labor rates and total evaluated price
09-MDA-4148 (08 JAN 09)
| MiDAESS Contracting Strategy |
| Contract Awards |
| Contract Transition |
| Task Ordering |
| Cross Teaming |
| Source Selection Methodology |