FA520517R00040005_Atch1.pdf

PDF 121 KB Posted

Attached to
Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
Solicitation number
FA5205-17-R-0004
Issued by

About this file

FA520517R00040005_Atch1

View the file

Other files

File Type Posted
FA520517R00040005_Amendment.pdf PDF
FA520517R00040005_Atch3.pdf PDF
FA520517R00040005_Atch4.pdf PDF
FA520517R00040005_Atch7.pdf PDF
FA520517R00040005_Atch6.pdf PDF
FA520517R00040005_Atch2.pdf PDF
FA520517R00040005_Atch5.pdf PDF
FA520517R00040004_Atch4.pdf PDF
FA520517R00040004_Amendment.pdf PDF
FA520517R00040004_Atch3-4.pdf PDF
FA520517R00040004_Atch3-3.pdf PDF
FA520517R00040004_Atch5.pdf PDF
FA520517R00040004_Atch1.pdf PDF
FA520517R00040004_Atch2.pdf PDF
FA520517R00040004_Atch3-5.pdf PDF
FA520517R00040004_Atch3-2.pdf PDF
FA520517R00040004_Atch3-1.pdf PDF
FA520517R00040003_Atch1.pdf PDF
FA520517R00040003_Atch2.pdf PDF
FA520517R00040003_Amendment.pdf PDF
FA520517R00040002_Amendment.pdf PDF
FA520517R00040002_Atch.pdf PDF
FA520517R00040001_Atch2_Revised_Specification_Section.pdf PDF
FA520517R00040001_Amendment.pdf PDF
FA520517R00040001_Atch4_Revised_Solicitation_Page.pdf PDF
FA520517R00040001_Atch1_Addendum_No._1.pdf PDF
FA520517R00040001_Atch3_Revised_Drawings.pdf PDF
FA520517R0004_PreProposal_Conference_Minutes_&_Record_of_Site_Visit.pdf PDF
FA520517R0004_Atch2_Drawings_8_Electrical.pdf PDF
FA520517R0004_Atch2_Drawings_6_Plumbing.pdf PDF
FA520517R0004_Atch10_Asbestos_Sampling_and_Analysis.pdf PDF
FA520517R0004_Atch2_Drawings_3_Structural.pdf PDF
FA520517R0004_Atch2_Drawings_2_Hazmat.pdf PDF
FA520517R0004_Atch2_Drawings_5_Mechanical.pdf PDF
FA520517R0004_Atch4_PPQ_Cvr_Ltr.pdf PDF
FA520517R0004_Solicitation.pdf PDF
FA520517R0004_Atch8_Acceptable_JPN_Product_Substitutes.pdf PDF
FA520517R0004_Atch2_Drawings_7_Controls.pdf PDF
FA520517R0004_Atch2_Drawings_4_Architectural.pdf PDF
FA520517R0004_Atch9_Mfr's_Cut_Sheet_Catalog_Info.pdf PDF
FA520517R0004_Atch2_Drawings_1_General.pdf PDF
FA520517R0004_Atch3_Other_Contract_Requirements.pdf PDF
FA520517R0004_Atch1_Specifications.pdf PDF
FA520517R0004_Atch6_Construction_Timeline.pdf PDF
FA520517R0004_Atch5_PPQ.pdf PDF
FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 3

FOR

PROJECT NO. QKKA 15-4008

IMFH Phase 3, A/C & Weatherization

MISAWA AB, JAPAN

14 Jun 2017

1. The following specifications have been revised for the change of information as provided:

SPECIFICATION

Section Number Paragraph Description

1 Table of Contents Deleted section 31 41 16 and 31 63 29

2 01 11 00 1.28 Revised title to say “MANAGING RADIOACTIVE MATERIALS Not Applicable”

3 01 11 00 1.40 Revised (1) Work Days: Monday through Sunday

(2) Working hours: 08:00 to 19:00

4 01 57 20.00 10 3.15.3.b (2) Revised title to say “Transformers: Not Applicable”

5 01 57 20.00 10 3.15.3.b (3) Revised title to say “PILC: Not Applicable”

6 23 82 02.00 10 2.2.1.2 Revised title to say “Wall-mounted indoor unit:

Not Applicable”

7 31 41 16 All Removed section 31 41 16

8 31 63 29 All Removed section 31 63 29

2. The following drawings have been revised for the change of information as provided:

DRAWING

Sheet

Identification

Number

Description

4P3-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

7P2-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

16N-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

6N-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

4P1-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

Atch. 1 to

FA520517R00040005

DRAWING

Sheet

Identification

Number

Description

6P1-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

6A-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

7A-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

8N-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

10N-ED102 Revised sheet note 1 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

15N-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

12N-ED101 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

16ND-ED102 Revised sheet note 5 to delete “Demolish all ceiling mounted disconnect switches and accessible unused conduit”

3. The following documents have been revised for the change of information as provided:

Attachment

Number: Action Description

6 Revision Revised construction timeline to 1095 days of construction