ADDENDUM 2
FOR
PROJECT NO. QKKA 15-4008
IMFH Phase 3, A/C & Weatherization
MISAWA AB, JAPAN
31 May 2017
1. The following specifications have been revised for the change of information as provided:
SPECIFICATION
Section Number Paragraph Description
1 00 01 15 1.2 Revised list of drawings to incorporate added and deleted drawings and changed sheet titles by this addendum.
2 01 11 00 1.1.1 Removed portion titled “INSTALL WATER METERS”. Removed column 12 “WATER METER” in table.
3 01 11 00 1.1.1 Updated Table to clarify existing ACM conditions.
4 01 33 00 Submittal Register Deleted Product Data Submittals associated with Section 25 10 10
5 08 11 16 2.1 Delete the text “and frames” in the first sentence. Replace the text “complete with frames, framing members, and accessories” with “complete with accessories. Doors should be sized and configured to hang in existing frames.”
6 23 09 23.13 20 1.3-b Removed text “Water meter pulse aggregator and’’
7 23 09 23.13 20 1.3-c Removed text “water and”
8 23 09 23.13 20 1.3-d Changed paragraphs labels so they are numbered in sequence (1,2,2,3,4) to (1,2,3,4,5).
9 23 09 23.13 20 1.3-d.4 Removed text ”and Water Metering”
10 25 10 10 1.1 Replaced “natural gas distribution, steam, chilled water, heating water, domestic water, recovered water and makeup water systems” with “power systems”
11 25 10 10 1.1-3 Replaced “Volumetric flowmeters, temperature sensors and pressure transducers” with “Electric Meters”
12 25 10 10 1.1-4 Deleted “4. Mass flowmeters”
13 25 10 10 1.6-B Deleted item B regarding Reporting Accuracy of water meters.
Atch. 1 to
FA520517R00040004
SPECIFICATION
Section Number Paragraph Description
14 25 10 10 1.8 Deleted SD-03 Product Data Submittal requirements.
15 25 10 10 2.1.4 Deleted subpart “2.1.4 Water Meter Criteria”
16 25 10 10 2.5 Deleted subpart “2.5 WATER, GAS METER
DEVICES”
17 25 10 10 3.1.1 Deleted subpart “3.1.1 Water and Gas Meters”
2. The following drawings have been revised for the change of information as provided:
DRAWING
Sheet Identification Number
Description
G-011 Revised list to incorporate added and deleted drawings by this addendum. See revised sheet.
G-011 Corrected Sheet Title for Sheet AE502 from “Window Details” to “Door Types, Window Types and Details”. See revised sheet.
G-011 Corrected Sheet Title for Sheet EI106 from “Cabe Cod Drive and Yoseeite Drive” to “Cape Cod Drive and Yosemite Drive”. See revised sheet.
G-021 Corrected the Sheet Title in the Titleblock from “Scope of Work” to “General Project Information”. See revised sheet.
G-021 Add Note 18 – Contractor shall close the Outside Air Vents by temporary seals to prevent damage to water lines when temperatures are below freezing during construction. See revised sheet.
G-024 Updated Disposition of Housing Units Table to clarify existing ACM conditions.
See revised sheet.
AE502 Updated Details 4 and 7 to remove requirement for replacement of termination bar. Updated Detail 14 to clarify glazing type. See revised sheet.
12N-MH102 Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. See Building legend in revised sheet
12N-MH103 Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. See Building legend in revised sheet.
12N-MH104 Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. See Building Legend in revised sheet.
12N-MH105 Slim-duct routing was revised to accommodate addition of rear patio awnings.
Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. This sheet was added.
12N-MH106 Slim-duct routing was revised to accommodate addition of rear patio awnings.
Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. This sheet was added.
Identification Number
Description
15N-MH102 Slim-duct routing was revised to accommodate addition of rear patio awnings.
See revised sheet.
16ND-MH102 Slim-duct routing was revised to accommodate addition of rear patio awnings.
See revised sheet.
16N-MH102 Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. See revised sheet.
16N-MH103 Slim-duct routing was revised to accommodate addition of rear patio awnings.
Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. See revised sheet.
16N-MH104 Slim-duct routing was revised to accommodate addition of rear patio awnings.
Buildings applicable to this elevation has changed as a result of addition of rear patio awnings. This sheet was added.
M-501 Detail 5 - Condensate drain routing was modified at wing walls to accommodate splash block at end of patio. See revised sheet.
M-501 Detail 5 - Condensate pipe stainless steel cover was added for falling icicle protection. See revised sheet.
M-501 Detail 1 - Dimension of heat pump bracket was modified to accommodate the potential of a slightly longer vertical bracket member. See revised sheet.
M-503 Detail 5 - Condensate drain piping ant barrier mesh was added to drawings. See revised sheet.
M-503 Detail 6 - A detail was added to drawing showing refrigerant line-set, electrical and control wiring routed underground where it is not feasible to mount slim-duct on existing wall. See revised sheet.
EM002 Remove water meters from the project. See revised sheet.
EM004 Remove water meters from the project. See revised sheet.
4P1-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
4P3-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
6N-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
6P1-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
6A-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
7P2-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
7A-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
8N-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
10N-EM102 Reroute M-Net cable for Multi-Purpose room. See revised sheet.
15N-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
Identification Number
Description
12N-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
16N-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
16ND-EM101 Delete Note 3 (Detail 1), Detail 4, and Line types and symbols referencing water meters. See revised sheet.
EM103 Change Details 1 thru 9 to indicate correct conduit size at 28mm. See revised sheet.
EM104 Change Details 1, 2, and 3 to indicate correct conduit size at 28mm. See revised sheet.
EM104 Change Detail 4 to indicate correct conduit sizes at 100mm in lieu of 400mm. See revised sheet.
EM104 Change Detail 5 to indicate correct ground rod size at 3.05m or 10 Feet. See revised sheet.
EM501 Change Sheet Note 9 to indicate correct source panelboard First Floor Lighting Panel M-1A. See revised sheet.
EM501 Change Sheet Note 12 to indicate correct conduit size at 42mm. See revised sheet.
EM503 Change Sheet Note 9 to indicate correct source panelboard Floor Panel M. See revised sheet.
EM504 Remove water meters from the project. See revised sheet.
EM505 Remove water meters from the project. See revised sheet.
EM506 Change Sheet Note 22 to “Not Applicable”, and change Detail 1 to remove references to water meters. See revised sheet.
EM506 Change Sheet Note 11 to indicate correct conduit size at 28mm. See revised sheet.
EM507 Delete Detail 2. See revised sheet.
EM508 Change Sheet Note 2 to indicate correct handhole dimension to 600mm x 600mm x 690mm. Change Detail 1 to remove water meters. See revised sheet.
EM509 Change Detail 1 to remove water meters from the project. See revised sheet.
E-001 Change General Plan Note 5. See revised sheet.
4P1-EP101 Change Sheet Note 2 to indicate correct conduit at FEP 65mm. See revised sheet.
4P1-EP101 Add Sheet Note 13 and water service entrance locations. Changed Detail 2. See revised sheet.
4P1-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
4P1-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet 4P1-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet 4P3-ED101 Change Sheet Note 1 to indicate building panel to be removed. See revised sheet.
4P3-EP101 Change Sheet Note 4 to indicate building panel to be new. See revised sheet 4P3-EP101 Change Sheet Note 2 to indicate correct conduit at FEP 65mm. See revised
Identification Number
Description sheet.
4P3-EP101 Add Sheet Note 11 and water service entrance locations. Changed Detail 2. See
4P3-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
4P3-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
4P3-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
6N-EP101 Change Sheet Note 2 to indicate correct conduit size at 65mm. See revised sheet.
6N-EP101 Add Sheet Note 11 and water service entrance locations. Changed Detail 2. See revised sheet.
6N-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
6N-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
6N-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
6P1-EP101 Change Sheet Note 2 to indicate correct conduit at FEP 65mm. See revised sheet.
6P1-EP101 Add Sheet Note 13 and water service entrance locations. Changed Detail 2. See revised sheet.
6P1-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
6P1-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
6P1-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
6A-EP101 Change Sheet Note 2 to indicate correct conduit size at FEP 65mm. See revised sheet.
6A-EP101 Add Sheet Note 13 and water service entrance locations. Changed Detail 2. See revised sheet.
6A-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
6A-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
6A-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
7P2-ED101 Change Sheet Note 1 to indicate building panel to be demolished See revised sheet.
7P2-EP101 Change Sheet Note 4 to indicate building panel to be new. See revised sheet.
7P2-EP101 Change Sheet Note 2 to indicate correct conduit size at FEP 65mm. See revised sheet.
7P2-EP101 Add Sheet Note 11 and water service entrance locations. Changed Detail 2. See revised sheet.
7P2-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
7P2-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
7P2-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
Identification Number
Description
7A-EP101 Change Sheet Note 2 to indicate correct conduit size at FEP 65mm. See revised sheet.
7A-EP101 Add Sheet Note 12 and water service entrance locations. Changed Detail 2. See revised sheet.
7A-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
7A-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
7A-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
8N-EP101 Change Sheet Note 2 to indicate correct conduit size at FEP 65mm. See revised sheet.
8N-EP101 Add Sheet Note 11 and water service entrance locations. Changed Detail 2. See revised sheet.
8N-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
8N-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
8N-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
10N-EP101 Change Detail 1 to show location of existing electrical panels and new panel M-
1A. See revised sheet.
10N-EP101 Change Detail 2, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
10N-EP101 Change Sheet Note 7 to add GFCI receptacle. See revised sheet.
10N-EP102 Add Detail 3 to indicate work associated with Main Lighting Panel M-1 and new panel M-1A. See revised sheet.
10N-EP103 Change Detail 1 to indicate corrected demand load for 10N-MDP and updated circuit breaker sizes. See revised sheet.
10N-EP103 Change Detail 2 to indicate corrected circuit breaker sizes. See revised sheet.
10N-EP103 Change Detail 3 to indicate Unit Panel and modify heat pump circuit breaker from a 3-pole to a 2-pole. See revised sheet.
10N-EP103 Change Detail 4 to indicate correct panel calculations and circuit compliments.
See revised sheet.
10N-EP103 Change Detail 5 to indicate modified demand calculations. See revised sheet.
10N-EP104 Add panel schedule for new panel M-1A See revised sheet.
15N-EP101 Change Sheet Note 2 to indicate correct conduit size at FEP 65mm. See revised sheet.
15N-EP101 Add Sheet Note 13 and water service entrance locations. Changed Detail 2. See revised sheet.
15N-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
15N-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
15N-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
12N-EP101 Change Sheet Note 2 to indicate correct conduit size at FEP 65mm. See revised sheet.
12N-EP101 Add Sheet Note 13 and water service entrance locations. Changed Detail 2. See
Identification Number
Description
12N-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
12N-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
12N-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
16N-ED101 Change Sheet Note 4 to indicate telecommunication cabinet to remain as is See revised sheet.
16N-EP101 Change Details 2 & 4 to indicate new location of heat pump and disconnect switch. Change Sheet Notes 6, 9, & 10 as shown. Telecommunication cabinet to remain in original location. See revised sheet.
16N-EP101 Add Sheet Note 16 and water service entrance locations. Changed Detail 2. See
16N-EP101 Add Detail 4/16N-EP101 General Note. See revised sheet. .
16N-EP102 Change Detail 1, panel schedule as shown on drawings. See revised sheet. sheet 16N-EP102 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
16N-EP102 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
16ND-EP103 Add Sheet Note 10 and water service entrance locations. Changed Detail 2. See revised sheet.
16ND-EP104 Change Detail 1, panel schedule as shown on drawings. See revised sheet.
16ND-EP104 Change Detail 2, one line diagram as shown on drawings. See revised sheet.
16ND-EP104 Change Detail 4, heat pump disconnect switch to indicate IP44 rating in lieu of
NEMA-4X and a 2-pole circuit breaker in lieu of a 3-pole. See revised sheet.
E-601 E-602 E-603 E-604
Updated Equipment Connection Schedule. See revised sheets.
P-001 Remove this sheet from project 15N-P-101 Remove this sheet from project 16N-P-101 Remove this sheet from project 16ND-P-101 Remove this sheet from project 4P1-P-101 Remove this sheet from project 4P3-P-101 Remove this sheet from project 6A-P-101 Remove this sheet from project 6N-P-101 Remove this sheet from project 6P1-P-101 Remove this sheet from project 7A-P-101 Remove this sheet from project 7P2-P-101 Remove this sheet from project 8N-P-101 Remove this sheet from project 12N-P-101 Remove this sheet from project