FA520517R0004_Atch2_Drawings_3_Structural.pdf
PDF 885 KB Posted
- Attached to
- Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
- Solicitation number
- FA5205-17-R-0004
About this file
FA520517R0004_Atch2_Drawings_3_Structural
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
A C wp
STEAM
METER
CONTROL
PANEL
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
D. H. W SUPPLY PUMP
D. H. W RETURN HEADER
D. H. W SUPPLY HEADER
H. W SUPPLY HEADER
NO. 1
D. H. W STORAGE TANK
NO. 2
D. H. W STORAGE TANK
EXPANSION TANK
STEAM HEADER
HEAT EXCHANGER for H. W
H. W RETURN HEADER
H. W SUPPLY PUMP
NO. 1
NO. 2
NO. 1
NO. 2
1 3 1 3
1 21 2
1 3
1 3
B
A C
EXIST POWER
PANEL BOARD EXIST PLC
CABINET
RP - 1
STEAM
METER
CONTROL
PANEL
D. H. W SUPPLY PUMP
D
H
W
R
E T
U R
N
H
E A
D E
R D
H
S
U P
P L
Y
H
E A
D E
R
NO. 2
D.H.W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
EXPANSION TANK
STEAM HEADER
HEAT EXCHANGER for H. W
H
T
U R
N
H
E A
D E
R
H. W SUPPLY PUMP
NO. 2
NO. 1
NO. 2
NO. 1
H. W SUPPLY HEADER
1 3
1 3
1 2
1 3
1 3
SHEET OF
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
A L
I N
T E
G R
A T
D
T
E R
P R
I S
E S
M
A Y
F A
O A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
C T
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
OF
U S
A
F
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
T I M
O T
H Y
W
E N
D T
T T
W
KEY PLAN
MAIN BASE
GENERAL PLAN NOTES:
KEYED NOTES:
REMOVE EXISTING 200 MM TALL HOUSE KEEPING PAD. POLISH SMOOTH TO MATCH ADJACENT SLAB. CUT
ANY AND ALL EXISTING ANCHOR BOLTS AND GRIND SMOOTH.
REMOVE EXISTING STEEL SUPPORT FRAME ALONG WITH ASSOCIATED ANCHOR BOLTS.
REMOVE EXISTING STEEL TUBE COLUMN SUPPORTS ALONG WITH ASSOCIATED ANCHOR BOLTS.
1. PATCHING OF EXISTING CONCRETE WALLS SHALL OCCUR AT (2) LOCATIONS PER PUMPHOUSE, 25MM
PIPE VENT FOR EXPANSION TANK AND 25MM PIPE VENT FOR EXISTING SHELL AND TUBE HEAT
EXCHANGER TO BE REMOVED.
2. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER
TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.
3. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND
FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE
REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS
AND CONDITIONS. THIS INCLUDES (BUT NOT LIMITED TO) HOT WATER PIPING, STEAM PIPING, DRAIN
PIPING, AND VENT PIPING ASSOCIATED WITH SYSTEMS TO BE DEMOLISHED.
C T
S T
T W
A N
D R
J
B
A C
K E
S
P U
M P
H O
U S
E
S
T R
U C
T U
R A
L
D
E M
O L I T
I O
N
P
L A
N
SCALE: 1:50
0 1000 2000PUMPHOUSE 141 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD101 PH-SD101 SCALE: 1:50
SCALE: 1:50
0 1000 2000PUMPHOUSE 172 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD101 PH-SD101 SCALE: 1:50
A C D
TEL BOX
LIGHTING PANEL
wp
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
STEAM
METER
CONTROL
PANEL
NO. 1
D. H. W STORAGE TANK
NO. 2
D. H. W STORAGE TANK
HEAT EXCHANGER for H. W
E X
P A
N S
I O
N
T
A N
K f o r
H
W
H. W SUPPLY PUMP
SPARE LINE
H. W SUPPLY PUMP
A LINE
H. W SUPPLY PUMP
B LINE
H. W SUPPLY PUMP
C LINE
H
T
U R
N
H
E A
D E
R
STEAM HEADER
D. H. W RETURN HEADER D. H. W SUPPLY HEADER
H
P
P L
Y
H
E A
D E
R
D.H.W RETURN PUMP
SPARE LINE
D. H. W RETURN PUMP
A LINE
D. H. W RETURN PUMP
B LINE
D. H. W RETURN PUMP
C LINE
1 3
1 3
STEAM
METER
B
A C D
P - EB / 706
PANEL BOARD
wp
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
CONTROL
PANEL
NO. 2
D. H. W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
H
P
P
A
D E
R
STEAM HEADER
D
H
T
U R
N
H
E A
D E
R
E X
P A
N S
I O
N
T
A N
K f o r
H
W
HEAT EXCHANGER for H. W
H
T
U R
N
H
E A
D E
R
D. H. W SUPPLY HEADER
D. H. W RETURN PUMP
B LINE
A LINE
SPARE LINE
H. W RETURN PUMP
B LINE
A LINE
SPARE LINE
1 3 1 3
SHEET OF
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
OF
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
T I M
O T
W
E N
D T
T T
W
KEY PLAN
MAIN BASE
GENERAL PLAN NOTES:
KEYED NOTES:
REMOVE EXISTING 200 MM TALL HOUSE KEEPING PAD. POLISH SMOOTH TO MATCH ADJACENT SLAB. CUT
ANY AND ALL EXISTING ANCHOR BOLTS AND GRIND SMOOTH.
REMOVE EXISTING STEEL SUPPORT FRAME ALONG WITH ASSOCIATED ANCHOR BOLTS.
REMOVE EXISTING STEEL TUBE COLUMN SUPPORTS ALONG WITH ASSOCIATED ANCHOR BOLTS.
1. PATCHING OF EXISTING CONCRETE WALLS SHALL OCCUR AT (2) LOCATIONS PER PUMPHOUSE, 25MM
PIPE VENT FOR EXPANSION TANK AND 25MM PIPE VENT FOR EXISTING SHELL AND TUBE HEAT
EXCHANGER TO BE REMOVED.
2. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER
TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.
3. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND
FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE
REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS
AND CONDITIONS. THIS INCLUDES (BUT NOT LIMITED TO) HOT WATER PIPING, STEAM PIPING, DRAIN
PIPING, AND VENT PIPING ASSOCIATED WITH SYSTEMS TO BE DEMOLISHED.
C T
S T
T W
A N
D R
B
A C
K E
S
P U
M P
H O
U S
E
S
T R
U C
T U
R A
L
D
E M
O L I T
I O
N
P
L A
N
SCALE: 1:50
0 1000 2000PUMPHOUSE 185 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD102 PH-SD102 SCALE: 1:50
SCALE: 1:50
0 1000 2000PUMPHOUSE 706 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD102 PH-SD102 SCALE: 1:50
A C wp
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
STEAM
METER
CONTROL
PANEL
D
H
P
P
A
D E
R
H. W SUPPLY HEADER
HEAT EXCHANGER for H. W
D. H. W SUPPLY PUMP
D
H
T
U R
N
H
E A
D E
R
NO. 2
D. H. W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
EXPANSION TANK
STEAM HEADER
H
T
U R
N
H
E A
D E
R
H. W SUPPLY PUMP
NO. 2
NO. 1
NO. 2
NO. 1
1 3
1 3
1 3
1 3
1 3
B
A C wp
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
STEAM
METER
CONTROL
PANEL
NO. 2
D. H. W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
HEAT EXCHANGER for H. W
EXPANSION TANK
S T
E A
M
H
E A
D E
R
NO. 1
NO. 2
NO. 1
NO. 2
D. H. W CIRCULATING
PUMP
H. W CIRCULATING PUMP
1 2
SHEET OF
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
OF
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
T I M
O T
W
E N
D T
T T
W
KEY PLAN
MAIN BASE
GENERAL PLAN NOTES:
KEYED NOTES:
REMOVE EXISTING 200 MM TALL HOUSE KEEPING PAD. POLISH SMOOTH TO MATCH ADJACENT SLAB. CUT
ANY AND ALL EXISTING ANCHOR BOLTS AND GRIND SMOOTH.
REMOVE EXISTING STEEL SUPPORT FRAME ALONG WITH ASSOCIATED ANCHOR BOLTS.
REMOVE EXISTING STEEL TUBE COLUMN SUPPORTS ALONG WITH ASSOCIATED ANCHOR BOLTS.
1. PATCHING OF EXISTING CONCRETE WALLS SHALL OCCUR AT (2) LOCATIONS PER PUMPHOUSE, 25MM
PIPE VENT FOR EXPANSION TANK AND 25MM PIPE VENT FOR EXISTING SHELL AND TUBE HEAT
EXCHANGER TO BE REMOVED.
2. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER
TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.
3. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND
FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE
REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS
AND CONDITIONS. THIS INCLUDES (BUT NOT LIMITED TO) HOT WATER PIPING, STEAM PIPING, DRAIN
PIPING, AND VENT PIPING ASSOCIATED WITH SYSTEMS TO BE DEMOLISHED.
C T
S T
T W
A N
D R
B
A C
K E
S
P U
M P
H O
U S
E
S
T R
U C
T U
R A
L
D
E M
O L I T
I O
N
P
L A
N
SCALE: 1:50
0 1000 2000PUMPHOUSE 897 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD103 PH-SD103 SCALE: 1:50
SCALE: 1:50
0 1000 2000PUMPHOUSE 61 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD103 PH-SD103 SCALE: 1:50
A C
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
STEAM
METER
CONTROL
PANEL
NO. 2
D. H. W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
EXPANSION TANK
S T
E A
M
H
E A
D E
R
HEAT EXCHANGER for H. W
NO. 1
D. H. W SUPPLY PUMP
H. W SUPPLY PUMP
NO. 2
NO. 1
NO. 2
1 2
B
A C wp
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
CONTROL
PANEL
STEAM
METER
NO. 1
D. H. W STORAGE TANK
NO. 2
D. H. W STORAGE TANK
HEAT EXCHANGER for H. W
EXPANSION TANK for H. W
No. 2
No. 1
No. 2
No. 1
STEAM HEADER
D. H. W CIRCURATING PUMP
H. W CIRCURATING PUMP
1 3 1 3
SHEET OF
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
OF
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
T I M
O T
W
E N
D T
T T
W
KEY PLAN
MAIN BASE
GENERAL PLAN NOTES:
KEYED NOTES:
REMOVE EXISTING 200 MM TALL HOUSE KEEPING PAD. POLISH SMOOTH TO MATCH ADJACENT SLAB. CUT
ANY AND ALL EXISTING ANCHOR BOLTS AND GRIND SMOOTH.
REMOVE EXISTING STEEL SUPPORT FRAME ALONG WITH ASSOCIATED ANCHOR BOLTS.
REMOVE EXISTING STEEL TUBE COLUMN SUPPORTS ALONG WITH ASSOCIATED ANCHOR BOLTS.
1. PATCHING OF EXISTING CONCRETE WALLS SHALL OCCUR AT (2) LOCATIONS PER PUMPHOUSE, 25MM
PIPE VENT FOR EXPANSION TANK AND 25MM PIPE VENT FOR EXISTING SHELL AND TUBE HEAT
EXCHANGER TO BE REMOVED.
2. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER
TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.
3. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND
FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE
REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS
AND CONDITIONS. THIS INCLUDES (BUT NOT LIMITED TO) HOT WATER PIPING, STEAM PIPING, DRAIN
PIPING, AND VENT PIPING ASSOCIATED WITH SYSTEMS TO BE DEMOLISHED.
C T
S T
T W
A N
D R
B
A C
K E
S
P U
M P
H O
U S
E
S
T R
U C
T U
R A
L
D
E M
O L I T
I O
N
P
L A
N
SCALE: 1:50
0 1000 2000PUMPHOUSE 227 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD104 PH-SD104 SCALE: 1:50
SCALE: 1:50
0 1000 2000PUMPHOUSE 265 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD104 PH-SD104 SCALE: 1:50
A C D
EXIST
MANUAL XFR SWITCH
EXIST
LIGHTING PANEL
EXIST P - EB / 328
PANEL BOARD
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
CONTROL
PANEL
STEAM
METER
H. W RETURN HEADER
NO. 2
D. H. W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
HEAT EXCHANGER for H. W
EXPANSION TANK for H. W
D. H. W SUPPLY HEADER
H. W SUPPLY HEADER
STEAM HEADER
D. H. W RETURN HEADER
D. H. W RETURN PUMP
A LINE
D. H. W RETURN PUMP
B LINE
D. H. W RETURN PUMP
C LINE
H. W SUPPLY PUMP
SPARE LINE
H. W SUPPLY PUMP
A LINE
H. W SUPPLY PUMP
B LINE
H. W SUPPLY PUMP
C LINE
D. H. W RETURN PUMP
SPARE LINE
1 2
1 3
1 3
1 2
1 2
1 1
B
A C wp
EXIST POWER
PANEL BOARD
EXIST PLC
CABINET
RP -
STEAM
METER
CONTROL
PANEL
D. H. W SUPPLY PUMP
D
H
T
U R
N
H
E A
D E
R D
H
P
P
A
D E
R
H. W SUPPLY HEADER
NO. 2
D. H. W STORAGE TANK
NO. 1
D. H. W STORAGE TANK
EXPANSION TANK
STEAM HEADER
HEAT EXCHANGER for H. W
H
T
U R
N
H
E A
D E
R
H. W SUPPLY PUMP
NO. 1
NO. 2
NO. 3
NO. 1
NO. 2
NO. 3
1 3 1 3
1 2
1 3
1 3
SHEET OF
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
OF
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
T I M
O T
W
E N
D T
T T
W
KEY PLAN
MAIN BASE
GENERAL PLAN NOTES:
KEYED NOTES:
REMOVE EXISTING 200 MM TALL HOUSE KEEPING PAD. POLISH SMOOTH TO MATCH ADJACENT SLAB. CUT
ANY AND ALL EXISTING ANCHOR BOLTS AND GRIND SMOOTH.
REMOVE EXISTING STEEL SUPPORT FRAME ALONG WITH ASSOCIATED ANCHOR BOLTS.
REMOVE EXISTING STEEL TUBE COLUMN SUPPORTS ALONG WITH ASSOCIATED ANCHOR BOLTS.
1. PATCHING OF EXISTING CONCRETE WALLS SHALL OCCUR AT (2) LOCATIONS PER PUMPHOUSE, 25MM
PIPE VENT FOR EXPANSION TANK AND 25MM PIPE VENT FOR EXISTING SHELL AND TUBE HEAT
EXCHANGER TO BE REMOVED.
2. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER
TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.
3. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND
FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE
REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS
AND CONDITIONS. THIS INCLUDES (BUT NOT LIMITED TO) HOT WATER PIPING, STEAM PIPING, DRAIN
PIPING, AND VENT PIPING ASSOCIATED WITH SYSTEMS TO BE DEMOLISHED.
C T
S T
T W
A N
D R
B
A C
K E
S
P U
M P
H O
U S
E
S
T R
U C
T U
R A
L
D
E M
O L I T
I O
N
P
L A
N
SCALE: 1:50
0 1000 2000PUMPHOUSE 328 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD105 PH-SD105 SCALE: 1:50
SCALE: 1:50
0 1000 2000PUMPHOUSE 334 -FIRST FLOOR AND LOWER LEVEL - STRUCTURAL DEMO PLAN
PH-SD105 PH-SD105 SCALE: 1:50
| 020_PH-SD101 |
| 021_PH-SD102 |
| 022_PH-SD103 |
| 023_PH-SD104 |
| 024_PH-SD105 |
File details come from the government source that posted it. Updated .