FA520517R0004_Atch2_Drawings_5_Mechanical.pdf

PDF 13 MB Posted

Attached to
Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
Solicitation number
FA5205-17-R-0004
Issued by

About this file

FA520517R0004_Atch2_Drawings_5_Mechanical

View the file

Other files

File Type Posted
FA520517R00040005_Amendment.pdf PDF
FA520517R00040005_Atch3.pdf PDF
FA520517R00040005_Atch1.pdf PDF
FA520517R00040005_Atch4.pdf PDF
FA520517R00040005_Atch7.pdf PDF
FA520517R00040005_Atch6.pdf PDF
FA520517R00040005_Atch2.pdf PDF
FA520517R00040005_Atch5.pdf PDF
FA520517R00040004_Atch4.pdf PDF
FA520517R00040004_Amendment.pdf PDF
FA520517R00040004_Atch3-4.pdf PDF
FA520517R00040004_Atch3-3.pdf PDF
FA520517R00040004_Atch5.pdf PDF
FA520517R00040004_Atch1.pdf PDF
FA520517R00040004_Atch2.pdf PDF
FA520517R00040004_Atch3-5.pdf PDF
FA520517R00040004_Atch3-2.pdf PDF
FA520517R00040004_Atch3-1.pdf PDF
FA520517R00040003_Atch1.pdf PDF
FA520517R00040003_Atch2.pdf PDF
FA520517R00040003_Amendment.pdf PDF
FA520517R00040002_Amendment.pdf PDF
FA520517R00040002_Atch.pdf PDF
FA520517R00040001_Atch2_Revised_Specification_Section.pdf PDF
FA520517R00040001_Amendment.pdf PDF
FA520517R00040001_Atch4_Revised_Solicitation_Page.pdf PDF
FA520517R00040001_Atch1_Addendum_No._1.pdf PDF
FA520517R00040001_Atch3_Revised_Drawings.pdf PDF
FA520517R0004_PreProposal_Conference_Minutes_&_Record_of_Site_Visit.pdf PDF
FA520517R0004_Atch2_Drawings_8_Electrical.pdf PDF
FA520517R0004_Atch2_Drawings_6_Plumbing.pdf PDF
FA520517R0004_Atch10_Asbestos_Sampling_and_Analysis.pdf PDF
FA520517R0004_Atch2_Drawings_3_Structural.pdf PDF
FA520517R0004_Atch2_Drawings_2_Hazmat.pdf PDF
FA520517R0004_Atch4_PPQ_Cvr_Ltr.pdf PDF
FA520517R0004_Solicitation.pdf PDF
FA520517R0004_Atch8_Acceptable_JPN_Product_Substitutes.pdf PDF
FA520517R0004_Atch2_Drawings_7_Controls.pdf PDF
FA520517R0004_Atch2_Drawings_4_Architectural.pdf PDF
FA520517R0004_Atch9_Mfr's_Cut_Sheet_Catalog_Info.pdf PDF
FA520517R0004_Atch2_Drawings_1_General.pdf PDF
FA520517R0004_Atch3_Other_Contract_Requirements.pdf PDF
FA520517R0004_Atch1_Specifications.pdf PDF
FA520517R0004_Atch6_Construction_Timeline.pdf PDF
FA520517R0004_Atch5_PPQ.pdf PDF
FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

CEILING DIFFUSERS - CONNECT TO AUX SUPPLY

RETURN/EXHAUST DUCT (UP & DOWN)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

MANUAL VOLUME DAMPER

FLEXIBLE DUCTWORK (INSULATED)

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

B BOILER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BDD GRAVITY OPERATED DAMPER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CONVECTOR

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CI CAST IRON

COP COEFFICIENT OF PERFORMANCE

COMP COMPRESSOR

CP CONDENSATE PUMP

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EH EXHAUST HOOD

ENT ENTERING

EOD ELECTRICALLY OPERATED DAMPER

ERU ENERGY RECOVERY UNIT

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EIH ELECTRIC INFRARED HEATER

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

CONTROLS SYMBOLS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

THERMOSTAT

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FSD COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FD FLOOR DRAIN

F FIRE DAMPER

FF FINAL FILTER

FG FILTER GRILLE

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

G NATURAL GAS

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

HC HEATING COIL

HD HEAD

HGBP REFRIGERANT HOT GAS BYBASS

HP HEAT PUMP

HP HORSEPOWER

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HSTAT HUMIDISTAT

HW HOT WATER

HWC HOT WATER COIL

HWWF HOT WATER WALLFIN

HWSX EXISTING HOT WATER SUPPLY PIPING

HWRX EXISTING HOT WATER RETURN PIPING

HX HEAT EXCHANGER

HZ HERTZ

D DAMPER - AUTOMATIC

DB DECIBELS

Db DRY-BULB TEMPERATURE

DC DUST COLLECTOR

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DG DOOR GRILLE

DIA DIAMETER

DN DOWN

DP DEW POINT TEMPERATURE

DUC DOOR UNDERCUT

DWH DOMESTIC WATER HEATER

DX DIRECT EXPANSION

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MD MOTORIZED DAMPER

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOP MAX OVERCURRENT PROTECTION

M.C. MECHANICAL CONTRACTOR

L LOUVER

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

kW KILOWATT kWh KILOWATT HOUR

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IH INTAKE HOOD

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

T TRANSFER GRILLE

TAB TESTING, ADJUSTING, BALANCE

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DIFFERENCE

TG TRANSFER GRILLE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SD SMOKE DETECTOR

SD SLOT DIFFUSER

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

ST STEAM TRAP

SUH STEAM UNIT HEATER

SWHX STEAM TO WATER HEAT EXCHANGER

(X)R STEAM RADIATOR

R RETURN

RA RETURN AIR

RF RETURN FAN

RG RETURN GRILLE

RH ROOF HOOD

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PG PRESSURE GAGE

PG PROPYLENE GLYCOL-WATER (SOLUTION)

P.O.C. POINT OF CONNECTION

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

ABBREVIATIONS

UH UNIT HEATER

UV UNIT VENTILATOR

WWHP WATER TO WATER HEAT PUMP

WWHX WATER TO WATER HEAT EXCHANGER

WF WATER FILTER

(X) EXISTING EQUIPMENT (WHEN FOLLOWED BY

EQUIPMENT ABBREVIATION)

GENERAL PIPING SYMBOLS

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

RISE OR DROP IN PIPE

CAPPED OUTLET

PIPE UP

PIPE DOWN

STARTER/DISCONNECT

PIPING FLEXIBLE CONNECTION

EXISTING HOT WATER SUPPLY PIPING

EXISTING HOT WATER RETURN PIPING

POINT OF CONNECTION TO EXISTING

FAN SPEED CONTROLLER

DUCTWORK TO BE DEMOLISHED

PIPING TO BE DEMOLISHED

VENT PIPING

COOLING COIL CONDENSATE PIPING

REFRIGERANT PIPING

EXISTING EQUIPMENT TO BE DEMOLISHED

GENERAL SYMBOLS

AC

X

HEAT PUMP (OUTDOOR UNIT)

CEILING CASSETTE AC UNIT

HP

X

CEILING ACCESS PANEL

KNOCKOUT AT CASSETTE UNIT WHERE SHOWN ON PLANS

SINGLE DIRECTIONAL CEILING AC

UNIT

AC

X

NOTES

1. REFER TO MECHANICAL SITE PLANS AND FLOOR PLANS FOR MECHANICAL EQUIPMENT LOCATIONS.

2. REFER TO DRAWING M-502 FOR 4-PLEX EXTERIOR MECHANICAL EQUIPMENT AND POWER SERVICE CONFIGURATIONS AND ELEVATIONS.

3. REFER TO ELECTRICAL FLOOR PLANS FOR ELECTRICAL SERVICES LOCATIONS. FIELD VERIFY ALL EXISTING ELECTRICAL EQUIPMENT LOCATIONS.

4. POWER SERVICE LATERAL ENTERS BUILDING FROM UNDERGROUND WITH NO EXTERIOR DISCONNECTING MEANS.

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

A L

I N

T E

G R

A T

E D

T

E R

P R

I S

E S

M

A Y

F A

R

O A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

C T

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

S

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

W

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

B

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

F

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

H Y

W

E N

D T

T T

W

M E

C H

A N

I C

A L

C

O V

E

E T

T T

W C

T S

A N

D R

J

C

K E

S

M-001

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text 10/8

AutoCAD SHX Text 45%%d

AutoCAD SHX Text T

AutoCAD SHX Text

UNION

AutoCAD SHX Text

HWS

AutoCAD SHX Text

HWR

AutoCAD SHX Text

AutoCAD SHX Text P.O.C.

AutoCAD SHX Text V

AutoCAD SHX Text

CD

AutoCAD SHX Text

RP

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L O

S T

O

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L O

S T

O

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

T

T

NO

WORK

THIS

AREA

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

T

T

NO

WORK

THIS

AREA

6 6

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

T

T

NO

WORK

THIS

AREA

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

T

T

NO

WORK

THIS

AREA

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

H W

S

H W

R

H W

R

H W

S

T

T

T

H W

S

H W

R

H W

R

H W

S

T

T

T

H W

S

H W

R

H W

S

T

T

T

H W

S

H W

R

H W

S

T

T

T

5 5 5 5

NO WORK

THIS AREA

NO WORK

THIS AREA

NO

WORK

THIS

AREA

NO WORK

THIS AREA

NO

WORK

THIS

AREA

H W

R

H W

R

7 777

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

GENERAL PLAN NOTES:

KEYED NOTES:

EXISTING CEILING ACCESS PANEL TO REMAIN.

EXISTING CEILING ACCESS PANEL TO BE REMOVED. PATCHING OF EXISTING OPENING BY GENERAL

CONTRACTOR.

EXISTING FILTER GRILLE TO REMAIN.

EXISTING THERMOSTAT TO BE REMOVED. NEW THERMOSTAT WILL BE INSTALLED AT THIS LOCATION -

EXISTING WIRE CONDUIT TO BE REUSED.

EXISTING CEILING MOUNTED FAN-COIL UNIT TO BE DEMOLISHED. REMOVE 20 MM PIPING UP TO

ISOLATION VALVE AND CAP PIPING WATER TIGHT. PATCHING OF EXISTING OPENING BY GENERAL

CONTRACTOR.

PARTIAL REMOVAL OF EXISTING CEILING AT THIS LOCATION (BY GENERAL CONTRACTOR) IN ORDER TO

FACILITATE INSTALLATION ABOVE CEILING AT THIS LOCATION.

REMOVE EXISTING HW PIPING GOING THRU EXISTING SLEEVE SUCH THAT IT CAN BE RE-USED FOR NEW

REFRIGERANT LINESET PIPING AND COOLING COIL CONDENSATE PIPING. DRAIN EXISTING HW PIPING

COMPLETELY BEFORE CAPPING WATER-TIGHT.

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER HEATING SYSTEM, ALONG WITH POWER

TO DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS. ALL OUTAGES TO UNITS (WHICH WILL BE OCCUPIED

DURING CONSTRUCTION) SHALL BE RESTORED WITHIN 8 HRS.

2. REMOVE EXISTING PIPING SERVING EXISTING HOT WATER FAN-COIL UNITS UP TO ISOLATION VALVE AND

FAR ENOUGH TO FACILITATE REMOVAL OF EXISTING UNIT, INSTALLATION OF NEW A/C UNIT ALONG WITH

ASSOCIATED PIPING, CONTROLS AND ELECTRICAL CONNECTION.

3. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL

PIPING AND EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT WITH BASE HOUSING.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER

TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND

FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE

REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS

AND CONDITIONS. REFER TO GENERAL NOTES ON SHEET G-021 FOR MORE INFORMATION.

7. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS OTHERWISE NOTED.

LEGEND

PIPE CAP

DIGITAL THERMOSTAT

CEILING ACCESS PANEL

T

AC

X

PIPE DOWN

PIPE UP

COOLING COIL CONDENSATE PIPINGCD

REFRIGERANT PIPINGRP

HEAT PUMP (OUTDOOR UNIT)

SINGLE DIRECTIONAL CEILING

AC UNIT

CEILING CASSETTE AC UNIT

AC-X

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

EXISTING AIR DEVICE

EXISTING EQUIPMENT TO BE

DEMOLISHED

HP

X

AC

X

4P1-MD101

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

P

B

E D

R O

M

I R

C

O N

D

SCALE: 1:100

0 2000 4000

F L O

V A

C

D

E M

O

P

L A

N

TYPE 4P1 - 3 BEDROOM - FIRST FLOOR - HVAC DEMO PLAN

4P1-MD101 4P1-MD101 SCALE: 1:100

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - SECOND FLOOR - HVAC DEMO PLAN

4P1-MD101 4P1-MD101 SCALE: 1:100

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L O

S T

O

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L O

S T

O

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

NO

WORK

THIS

AREA

AC-4

T

AC-3

T

CD

RP

RP

AC

AC

RP AND

25 CD UP

RP AND

25 CD UP

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

NO

WORK

THIS

AREA

T

AC-4

AC-3

T

AC

AC

25 CD

RP AND

25 CD UP

R P

25 CD

RP

AC-4

25 CD

R P

HP

R P

HP

HP

HP

AC-4

R P

R P

MH102

MH102

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

NO

WORK

THIS

AREA

AC-4

T

AC-3

T

CD

RP

12 2

RP

AC

AC

RP AND

25 CD UP

RP AND

25 CD UP

H W

R

H W

S

HWR

HWR

H W

R

H W

S

H W

R

HWS

NO

WORK

THIS

AREA

T

AC-4

AC-3

T

AC

AC

25 CD

RP AND

25 CD UP

25 CD

RP

AC-4

25 CD

R P

R P

AC-4

R P

R P

MH102

MH102

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

H W

S

H W

R

H W

R

H W

S

AC-1

T

AC-1

T

AC-1

T

AC

POC

150Ø

H W

S

H W

R

H W

R

H W

S

AC-1

T

AC-1

T

AC-1

T

AC

POC

150Ø

H W

S

H W

R

H W

S

AC-1

T

AC-1

T

AC-1

T

AC

POC

150Ø

H W

S

H W

R

H W

S

AC-1

T

AC-1

T

AC-1

T

AC

POC

150Ø

NO WORK

THIS AREA

NO WORK

THIS AREA

NO

WORK

THIS

AREA

NO WORK

THIS AREA

NO

WORK

THIS

AREA

H W

R

H W

R

AC

AC

25 CD

RP

25 CD

RP

7 8

AC

AC

25 CD

RP

25 CD

RP

7 8

AC

AC

25 CD

RP

25 CD

RP

AC

AC

25 CD

RP

25 CD

RP

OA (ETR)

OA (ETR)

OA (ETR)

OA (ETR)

TOILET AIR (ETR) TOILET AIR (ETR)

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

GENERAL PLAN NOTES:

KEYED NOTES:

RUN REFRIGERANT PIPING ON UNDERSIDE OF EXISTING BUILDING OVERHANG IN PRE-MANUFACTURED

PIPING ENCLOSURE.

RUN REFRIGERANT PIPING ON SIDE OF EXISTING BUILDING IN PRE-MANUFACTURED PIPING ENCLOSURE.

RUN CONDENSATE PIPING LOW AT 200 MM ABOVE PATIO FLOOR - DISCHARGE TO GRADE.

RUN REFRIGERANT PIPING ABOVE ROOF OF EBS UNIT IN PRE-MANUFACTURED PIPING ENCLOSURE.

RUN CONDENSATE PIPING EXPOSED ALONG SIDE OF BUILDING - RUN PIPING AROUND AND ALONG SIDE

OF EBS UNIT WHERE THESE ARE PRESENT.

RUN NEW REFRIGERANT AND CONDENSATE PIPING THRU OPENINGS CREATED AS A RESULT OF

REMOVAL OF EXISTING HOT WATER FAN-COIL UNITS, THRU EXISTING CEILING ACCESS PANELS, AND

NEW ACCESS PANELS. REFRIGERANT COUPLINGS TUBE COUPLINGS ARE ONLY ALLOWED AT ACCESS

PANELS IN ORDER TO MINIMIZE RISK OF LEAKS IN CONCEALED IN EXISTING DRYWALL CEILINGS.

REFRIGERANT PIPE RUNS SHALL BE CONTINUOUS BETWEEN TERMINATIONS AT AIR CONDITIONING

UNITS.

RUN REFRIGERANT AND CONDENSATE PIPING IN NEW VERTICAL CHASE TO BE PROVIDED BY G.C..

ALL PIPING BELOW CEILING SHALL BE CONCEALED IN PRE-MANUFACTURED PIPE ENCLOSURE UP TO

NEW VERTICAL PIPE CHASE.

1. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND

UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER. REFRIGERANT PIPING TO BE SIZED PER

MANUFACTURER RECOMMENDATION.

3. NEW THERMOSTATS SHALL BE INSTALLED WHERE AT LOCATION OF PREVIOUS THERMOSTAT AND WIRED

THRU EXISTING CONDUIT.

4. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR. PROVIDE MITSUBISHI ELECTRIC "LINE-HIDE LINESET COVER SYSTEM" SIZE 140

OR EQUIVALENT EQUAL. REFER TO ELEVATION DRAWINGS FOR EXACT LOCATION. ENSURE THAT

LINE-HIDE ENCLOSURE EXTENDS BEHIND UNIT AT CONNECTION TO HEAT PUMP.

5. PROVIDE ALL INDOOR CEILING AC UNITS INTEGRAL CONDENSATE PUMP. PITCH ALL CONDENSATE

PIPING TOWARDS TERMINATION POINT AT BUILDING EXTERIOR. DO NOT DISCHARGE CONDENSATE ON

PATIOS OR WALKWAYS. PROVIDE SPLASH BLOCKS WHERE CONDENSATE PIPING TERMINATES ON

GRADE.

6. NO REFRIGERANT TUBE SEAMS OR COUPLINGS SHALL BE ALLOWED TO BE CONCEALED ABOVE EXISTING

DRYEALL CEILINGS, OR IN NEW VERTICAL CHASES. ALL BREAKS IN REFRIGERANT PIPING SHALL BE

ACCESSIBLE AT DX EQUIPMENT, OR AT NEW OR EXISTING ACCESS PANELS.

7. ALL CONDENSATE PIPING TO BE 25 MM SEKISU PLASTIC PIPING UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL HAVE HAVE AN ALLOWANCE FOR X1.5 NUMBER OF CLEANOUTS PER INDOOR UNIT.

LEGEND

PIPE CAP

DIGITAL THERMOSTAT

CEILING ACCESS PANEL

T

AC

X

PIPE DOWN

PIPE UP

COOLING COIL CONDENSATE PIPINGCD

REFRIGERANT PIPINGRP

HEAT PUMP (OUTDOOR UNIT)

SINGLE DIRECTIONAL CEILING

AC UNIT

CEILING CASSETTE AC UNIT

AC-X

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

EXISTING AIR DEVICE

EXISTING EQUIPMENT TO BE

DEMOLISHED

HP

X

AC

X

4P1-MH101

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

I R

C

O N

D

SCALE: 1:100

0 2000 4000

F L O

V A

C

P

L A

N

TYPE 4P1 - 3 BEDROOM - FIRST FLOOR - NEW HVAC PLAN

4P1-MH101 4P1-MH101 SCALE: 1:100

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - SECOND FLOOR - NEW HVAC PLAN

4P1-MH101 4P1-MH101 SCALE: 1:100

D

C D

C D

C D

X0X1X2X3X4

C D

C D

Y4 Y3 Y2 Y1 Y0

C

D

C D

Y4Y3Y2Y1Y0

C D

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P1-MH102

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH102 4P1-MH102 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH102 4P1-MH102 SCALE: 1:100

BUILDING LEGEND

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 184, 186, AND

261.

D

C D

C D

C D

X0X1X2X3X4

C D

C D

ADD OFFSET TO

EXISTING 100

ROOF CONDUCTOR

ADD OFFSET TO

EXISTING 100

ROOF CONDUCTOR

Y4 Y3 Y2 Y1 Y0

C

D

C D

ADD OFFSET TO

EXISTING 100

ROOF CONDUCTOR

Y4Y3Y2Y1Y0

C D

ADD OFFSET TO

EXISTING 100

ROOF CONDUCTOR

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P1-MH103

C T

S T

T W

T I M

O T

W

E N

D T

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH103 4P1-MH103 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH103 4P1-MH103 SCALE: 1:100

BUILDING LEGEND

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 176, 177, AND

178.

D

C D

C D

C D

X0X1X2X3X4

C D

C D

ADD OFFSET TO

EXISTING 100

ROOF CONDUCTOR

ADD OFFSET TO

EXISTING 100

ROOF CONDUCTOR

Y4 Y3 Y2 Y1 Y0

C

D

C D

ADD OFFSET TO

EXISTING 100 ROOF

CONDUCTOR

Y4Y3Y2Y1Y0

C D

ADD OFFSET TO

EXISTING 100 ROOF

CONDUCTOR

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P1-MH104

C T

S T

T W

T I M

O T

W

E N

D T

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH104 4P1-MH104 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH104 4P1-MH104 SCALE: 1:100

BUILDING LEGEND

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 179.

D

C D

C D

C D

X0X1X2X3X4

C D

C D

REFER TO

DETAILS

SHEETS

Y4 Y3 Y2 Y1 Y0

C

D

C D

Y4Y3Y2Y1Y0

CD

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P1-MH105

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH105 4P1-MH105 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS

4P1-MH105 4P1-MH105 SCALE: 1:100

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 259.

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L O

S T

O

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L O

S T

O

T

T

NO

WORK

THIS

AREA

H W

S

H W

R

H W

R

HWS

HWR

T

T

NO

WORK

THIS

AREA

HWS

HWR

H W

S

H W

R

H W

R

T

T

NO

WORK

THIS

AREA

H W

S

H W

R

H W

R

HWS

HWR

T

T

NO

WORK

THIS

AREA

HWS

HWR

H W

S

H W

R

H W

R

6 66

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

H W

R

H W

S

T

T

H W

R

T

NO WORK

THIS AREA

NO WORK

THIS AREA

NO WORK

THIS AREA

H W

R

H W

S

H W

R

T

T

T

H W

R

H W

S

H W

R

T

NO WORK

THIS AREA

NO WORK

THIS AREA

H W

R

H W

S

H W

R

T

T

T

2 52

T

T

777 7

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

GENERAL PLAN NOTES:

KEYED NOTES:

EXISTING CEILING ACCESS PANEL TO REMAIN.

EXISTING CEILING ACCESS PANEL TO BE REMOVED. PATCHING OF EXISTING OPENING BY GENERAL

CONTRACTOR.

EXISTING FILTER GRILLE TO REMAIN.

EXISTING THERMOSTAT TO BE REMOVED. NEW THERMOSTAT WILL BE INSTALLED AT THIS LOCATION -

EXISTING WIRE CONDUIT TO BE REUSED.

EXISTING CEILING MOUNTED FAN-COIL UNIT TO BE DEMOLISHED. REMOVE 20 MM PIPING UP TO

ISOLATION VALVE AND CAP PIPING WATER TIGHT. PATCHING OF EXISTING OPENING BY GENERAL

CONTRACTOR.

PARTIAL REMOVAL OF EXISTING CEILING AT THIS LOCATION (BY GENERAL CONTRACTOR) IN ORDER TO

FACILITATE INSTALLATION ABOVE CEILING AT THIS LOCATION.

REMOVE EXISTING INSIDE PORTION OF NATURAL VENTILATION VENT. REMOVE EXISTING MANUAL

DAMPER AND GRILLE. PROVIDE SHEET METAL BLANKOFF PLATE IN ORDER TO ACCOMMODATE

INSULATION OF CAVITY.

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER HEATING SYSTEM, ALONG WITH POWER

TO DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. REMOVE EXISTING PIPING SERVING EXISTING HOT WATER FAN-COIL UNITS UP TO ISOLATION VALVE AND

FAR ENOUGH TO FACILITATE REMOVAL OF EXISTING UNIT, INSTALLATION OF NEW A/C UNIT ALONG WITH

ASSOCIATED PIPING, CONTROLS AND ELECTRICAL CONNECTION.

3. LOCATION OF EQUIPMENT OF EQUIPMENT TO BE REMOVED SHOWN ON DRAWINGS IS APPROXIMATE -

FIELD VERIFY ALL PIPING AND EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT WITH BASE HOUSING.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER

TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND

FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE

REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS

AND CONDITIONS. REFER TO GENERAL NOTES ON SHEET G-021 FOR MORE INFORMATION.

7. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS OTHERWISE NOTED.

8. SAVE ALL TRANE INDOOR UNITS AND RETURN TO BASE FOR SALVAGE.

LEGEND

PIPE CAP

DIGITAL THERMOSTAT

CEILING ACCESS PANEL

T

AC

X

PIPE DOWN

PIPE UP

COOLING COIL CONDENSATE PIPINGCD

REFRIGERANT PIPINGRP

HEAT PUMP (OUTDOOR UNIT)

SINGLE DIRECTIONAL CEILING

AC UNIT

CEILING CASSETTE AC UNIT

AC-X

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

EXISTING AIR DEVICE

EXISTING EQUIPMENT TO BE

DEMOLISHED

HP

X

AC

X

4P3-MD101

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

I R

C

O N

D

SCALE: 1:100

0 2000 4000

F L O

V A

C

D

E M

O

P

L A

N

TYPE 4P3 - 3 BEDROOM - FIRST FLOOR - HVAC DEMO PLAN

4P3-MD101 4P3-MD101 SCALE: 1:100

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - SECOND FLOOR - HVAC DEMO PLAN

4P3-MD101 4P3-MD101 SCALE: 1:100

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L

O

S T

O

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KIT.

LAUND.

PATIO

PORCH

PATIO

H A

L L

C L

O

S T

O

NO

WORK

THIS

AREA

H W

S

H W

R

H W

R

HWS

HWR

AC-4

T

AC-3

T

AC

AC

RP AND

25 CD UP

RP

RP

R P

RP

25 CD 25 CD

RP AND

25 CD UP

RP AND

25 CD UP

R P

HP

HP

NO

WORK

THIS

AREA

HWS

HWR

AC-4

T

AC-3

T

AC

R P

HP

HP

R P

RP

CD

AC

RP

CD

H W

S

H W

R

H W

R

NO

WORK

THIS

AREA

H W

S

H W

R

H W

R

HWS

HWR

AC-4

T

AC-3

T

AC

AC

RP AND

25 CD UP

RP

RP

RP

25 CD25 CD

RP AND

25 CD UP

RP AND

25 CD UP

R P

NO

WORK

THIS

AREA

HWS

HWR

AC-4

T

AC-3

T

AC

R P

RP

CD

AC

RP

CD

H W

S

H W

R

H W

R

MH102

MH102

MH102

MH102

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

BATH

S T

A I R

BEDROOM 1

HALL

CLO.

LAV

CLO.

CLO.CLO.

BEDROOM 2

BEDROOM 3

BATH

H W

R

H W

S

H W

R

NO WORK

THIS AREA

AC

AC-1

T

AC-1

T

T

NO WORK

THIS AREA

NO WORK

THIS AREA

H W

R

H W

S

H W

R

AC-1

T

AC-1

T

T

AC

AC

25 CD

RP

25 CD

RP

AC

AC-1

25 CD

RP

25 CD

RP

78 7 8

7 8

AC

AC

25 CD

RP

25 CD

RP

AC-1

H W

R

H W

S

H W

R

NO WORK

THIS AREA

NO WORK

THIS AREA

H W

R

H W

S

H W

R

AC

AC

25 CD

RP

25 CD

RP

7 8

AC

AC

25 CD

RP

25 CD

RP

AC

25 CD

RP

7 8

AC

25 CD

RP

TT

AC-1AC-1

AC-1

T

AC-1

T

AC-1

T

AC-1

T

OA (ETR)

OA (ETR)

OA (ETR) OA (ETR)

OA (ETR) OA (ETR)

OA (ETR)

OA (ETR)

OA (ETR)OA (ETR)

OA (ETR)OA (ETR)

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

GENERAL PLAN NOTES:

KEYED NOTES:

RUN REFRIGERANT PIPING ON UNDERSIDE OF EXISTING BUILDING OVERHANG IN PRE-MANUFACTURED

PIPING ENCLOSURE.

RUN REFRIGERANT PIPING ON SIDE OF EXISTING BUILDING IN PRE-MANUFACTURED PIPING ENCLOSURE.

RUN CONDENSATE PIPING LOW AT 200 MM ABOVE PATIO FLOOR - DISCHARGE TO GRADE.

RUN REFRIGERANT PIPING ABOVE ROOF OF EBS UNIT IN PRE-MANUFACTURED PIPING ENCLOSURE.

RUN CONDENSATE PIPING EXPOSED ALONG SIDE OF BUILDING - RUN PIPING AROUND AND ALONG SIDE

OF EBS UNIT WHERE THESE ARE PRESENT.

RUN NEW REFRIGERANT AND CONDENSATE PIPING THRU OPENINGS CREATED AS A RESULT OF

REMOVAL OF EXISTING HOT WATER FAN-COIL UNITS, THRU EXISTING CEILING ACCESS PANELS, AND

NEW ACCESS PANELS. REFRIGERANT COUPLINGS TUBE COUPLINGS ARE ONLY ALLOWED AT ACCESS

PANELS IN ORDER TO MINIMIZE RISK OF LEAKS IN CONCEALED IN EXISTING DRYWALL CEILINGS.

REFRIGERANT PIPE RUNS SHALL BE CONTINUOUS BETWEEN TERMINATIONS AT AIR CONDITIONING

UNITS.

RUN REFRIGERANT AND CONDENSATE PIPING IN NEW VERTICAL CHASE TO BE PROVIDED BY G.C..

ALL PIPING BELOW CEILING SHALL BE CONCEALED IN PRE-MANUFACTURED PIPE ENCLOSURE UP TO

NEW VERTICAL PIPE CHASE.

1. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND

UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS SYSTEM.

2. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER. REFRIGERANT PIPING TO BE SIZED PER

MANUFACTURER RECOMMENDATION.

3. NEW THERMOSTATS SHALL BE INSTALLED WHERE AT LOCATION OF PREVIOUS THERMOSTAT AND WIRED

THRU EXISTING CONDUIT.

4. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR. PROVIDE MITSUBISHI ELECTRIC "LINE-HIDE LINESET COVER SYSTEM" SIZE 140

OR EQUIVALENT EQUAL. REFER TO ELEVATION DRAWINGS FOR EXACT LOCATION. ENSURE THAT

LINE-HIDE ENCLOSURE EXTENDS BEHIND UNIT AT CONNECTION TO HEAT PUMP.

5. PROVIDE ALL INDOOR CEILING AC UNITS INTEGRAL CONDENSATE PUMP. PITCH ALL CONDENSATE

PIPING TOWARDS TERMINATION POINT AT BUILDING EXTERIOR. DO NOT DISCHARGE CONDENSATE ON

PATIOS OR WALKWAYS. PROVIDE SPLASH BLOCKS WHERE CONDENSATE PIPING TERMINATES ON

GRADE.

6. NO REFRIGERANT TUBE SEAMS OR COUPLINGS SHALL BE ALLOWED TO BE CONCEALED ABOVE EXISTING

DRYEALL CEILINGS, OR IN NEW VERTICAL CHASES. ALL BREAKS IN REFRIGERANT PIPING SHALL BE

ACCESSIBLE AT DX EQUIPMENT, OR AT NEW OR EXISTING ACCESS PANELS.

7. ALL CONDENSATE PIPING TO BE 25 MM SEKISU PLASTIC PIPING UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL HAVE HAVE AN ALLOWANCE FOR X1.5 NUMBER OF CLEANOUTS PER INDOOR UNIT.

LEGEND

PIPE CAP

DIGITAL THERMOSTAT

CEILING ACCESS PANEL

T

AC

X

PIPE DOWN

PIPE UP

COOLING COIL CONDENSATE PIPINGCD

REFRIGERANT PIPINGRP

HEAT PUMP (OUTDOOR UNIT)

SINGLE DIRECTIONAL CEILING

AC UNIT

CEILING CASSETTE AC UNIT

AC-X

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

EXISTING AIR DEVICE

EXISTING EQUIPMENT TO BE

DEMOLISHED

HP

X

AC

X

4P3-MH101

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

I R

C

O N

D

SCALE: 1:100

0 2000 4000

F L O

A

C

P

L A

N

TYPE 4P3 - 3 BEDROOM - FIRST FLOOR - NEW HVAC PLAN

4P3-MH101 4P3-MH101 SCALE: 1:100

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - SECOND FLOOR - NEW HVAC PLAN

4P3-MH101 4P3-MH101 SCALE: 1:100

D

C D

C D

C D

X0X1X2X3X4

C D

C D

Y4 Y3 Y2 Y1 Y0

C

D

Y4Y3Y2Y1Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P3-MH102

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH102 4P3-MH102 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH102 4P3-MH102 SCALE: 1:100

BUILDING LEGEND

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 707, 708, AND

720.

D

C D

C D

C D

X0X1X2X3X4

C D

C D

Y4 Y3 Y2 Y1 Y0

C

D

Y4Y3Y2Y1Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P3-MH103

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH103 4P3-MH103 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH103 4P3-MH103 SCALE: 1:100

BUILDING LEGEND

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 709, 710, 713,

AND 714.

C D

C D

C D

X0 X1 X2 X3 X4

C D

C D

X0X1X2X3X4

C

D

Y4 Y3 Y2 Y1 Y0

Y4Y3Y2Y1Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P3-MH104

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH104 4P3-MH104 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH104 4P3-MH104 SCALE: 1:100

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 711.

C D

C D

C D

X0 X1 X2 X3 X4

C D

C D

X0X1X2X3X4

REFER TO

DETAILS

SHEETS

C

D

Y4 Y3 Y2 Y1 Y0

Y4Y3Y2Y1Y0

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

4P3-MH105

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

V A

C

E

L E

V A

T I O

N S

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH105 4P3-MH105 SCALE: 1:100

GENERAL ELEVATION NOTES:

1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO

G-022 TO LOCATE INDIVIDUAL BUILDINGS.

2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO

ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED

WITH AWNING.

3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION

SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT

AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW

EMCS SYSTEM.

4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS

AS RECOMMENDED BY EQUIPMENT MANUFACTURER.

5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS

PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING

OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN

ON BUILDING EXTERIOR.

7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT

DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR

GOVERNMENT APPROVAL.

8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND

EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.

SCALE: 1:100

0 2000 4000

TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS

4P3-MH105 4P3-MH105 SCALE: 1:100

1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 721.

li

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KITCHEN

L A

U N

D

PATIO

PORCH

PATIO

H A

L L

CLO.

S T

O li

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KITCHEN

L A

U N

D

PATIO

PORCH

PATIO

H A

L L

CLO.

S T

O

TT

T

5 5

T T

T

H W

S

H W

R

H W

S

H W

R

T T

T

TT

T

5 5

H W

S

H W

R

H W

S

H W

R

66 6

777 7

BEDROOM 1

BEDROOM 2

BEDROOM 3

CLO.

CLO.

CLO.

C L O

C L O

C L O

BATH

BATH

IBS

S T

A I R

HALL

BEDROOM 4

BEDROOM 1

BEDROOM 2

BEDROOM 3

CLO.

CLO.

CLO.

C L O

C L O

C L O

BATH

BATH

IBS

S T

A I R

HALL

BEDROOM 4

H W

R

H W

S

T

T

T

H W

R

H W

S

T

T

T

H W

R

H W

S

T

T

T

T

H W

R

H W

S

T

T

T

T

T

T

NO WORK

THIS AREA

NO WORK

THIS AREA

6 6 6 6

4 4 44

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N

D A

T E

A P

P R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

GENERAL PLAN NOTES:

KEYED NOTES:

EXISTING CEILING ACCESS PANEL TO REMAIN.

EXISTING CEILING ACCESS PANEL TO BE REMOVED. PATCHING OF EXISTING OPENING BY GENERAL

CONTRACTOR.

EXISTING FILTER GRILLE TO REMAIN.

EXISTING THERMOSTAT TO BE REMOVED. NEW THERMOSTAT WILL BE INSTALLED AT THIS LOCATION -

EXISTING WIRE CONDUIT TO BE REUSED.

EXISTING CEILING MOUNTED FAN-COIL UNIT TO BE DEMOLISHED. REMOVE 20 MM PIPING UP TO

ISOLATION VALVE AND CAP PIPING WATER TIGHT. PATCHING OF EXISTING OPENING BY GENERAL

CONTRACTOR.

PARTIAL REMOVAL OF EXISTING CEILING AT THIS LOCATION (BY GENERAL CONTRACTOR) IN ORDER TO

FACILITATE INSTALLATION ABOVE CEILING AT THIS LOCATION.

REMOVE EXISTING HW PIPING GOING THRU EXISTING SLEEVE SUCH THAT IT CAN BE RE-USED FOR NEW

REFRIGERANT LINESET PIPING AND COOLING COIL CONDENSATE PIPING. DRAIN EXISTING HW PIPING

COMPLETELY BEFORE CAPPING WATER-TIGHT.

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER HEATING SYSTEM, ALONG WITH POWER

TO DWELLING UNITS WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS. ALL OUTAGES TO UNITS (WHICH WILL BE OCCUPIED

DURING CONSTRUCTION) SHALL BE RESTORED WITHIN 8 HRS.

2. REMOVE EXISTING PIPING SERVING EXISTING HOT WATER FAN-COIL UNITS UP TO ISOLATION VALVE AND

FAR ENOUGH TO FACILITATE REMOVAL OF EXISTING UNIT, INSTALLATION OF NEW A/C UNIT ALONG WITH

ASSOCIATED PIPING, CONTROLS AND ELECTRICAL CONNECTION.

3. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL

PIPING AND EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT WITH BASE HOUSING.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS CONTAINING MATERIALS FOR ALL UNITS. REFER

TO HAZMAT PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL OPENINGS IN CEILINGS, WALLS AND

FLOORS THAT RESULT FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS TO BE

REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS

AND CONDITIONS. REFER TO GENERAL NOTES ON SHEET G-021 FOR MORE INFORMATION.

7. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS OTHERWISE NOTED.

LEGEND

PIPE CAP

DIGITAL THERMOSTAT

CEILING ACCESS PANEL

T

AC

X

PIPE DOWN

PIPE UP

COOLING COIL CONDENSATE PIPINGCD

REFRIGERANT PIPINGRP

HEAT PUMP (OUTDOOR UNIT)

SINGLE DIRECTIONAL CEILING

AC UNIT

CEILING CASSETTE AC UNIT

AC-X

PIPING TO BE DEMOLISHED

EXISTING HOT WATER SUPPLY

PIPING

HWS

EXISTING HOT WATER RETURN

PIPING

HWR

EXISTING AIR DEVICE

EXISTING EQUIPMENT TO BE

DEMOLISHED

HP

X

AC

X

6N-MD101

C T

S T

T W

A N

D R

B

A C

K E

S

T Y

B

E D

R O

I R

C

O N

D

SCALE: 1:100

0 2000 4000

F L O

V A

C

D

E M

O

P

L A

N

TYPE 6N- 4 BEDROOM - FIRST FLOOR - HVAC DEMO PLAN

6N-MD101 6N-MD101 SCALE: 1:100

SCALE: 1:100

0 2000 4000

TYPE 6N - 4 BEDROOM - SECOND FLOOR - HVAC DEMO PLAN

6N-MD101 6N-MD101 SCALE: 1:100

li

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KITCHEN

L A

U N

D

PATIO

PORCH

PATIO

H A

L L

CLO.

S T

O li

X0 X1 X2 X3 X4

Y4

Y3

Y2

Y1

Y0

LIVING / DINING

EBS

BATH

FAMILY

RM

S T

A I R

EBS

EBS

EBS

EBS

EBS

KITCHEN

L A

U N

D

PATIO

PORCH

PATIO

H A

L L

CLO.

S T

O

H W

S

H W

R

H W

S

H W

R

RP

AC

AC-4

RP AND

25 CD UP

T

CD

RP

HP

HP

AC

R P

RP AND

25 CD UP

25 CD

R P

R P

RP AND

25 CD UP

25 CD

R P

CD

AC-4

T

HP

RP

AC

AC-4

RP AND

25 CD UP

T

CD

RP

R P

R P

CD

AC-4

T

HP

POC

H W

S

H W

R

H W

S

H W

R

POC

R P

RP AND

25 CD UP

25 CD

R P

RP AND

25 CD UP

25 CD

POCPOC

MH102

MH102

AC-5

T

AC

AC-5

T

AC

AC-5

T

AC

AC-5

T

MH102

MH102

RP

BEDROOM 1

BEDROOM 2

BEDROOM 3

CLO.

CLO.

CLO.

C L O

C L O

C L O

BATH

BATH

IBS

S T

A I R

HALL

BEDROOM 4

BEDROOM 1

BEDROOM 2

BEDROOM 3

CLO.

CLO.

CLO.

C L O

C L O

C L O

BATH

BATH

IBS

S T

A I R

HALL

BEDROOM 4

H W

R

H W

S

AC-1

T

AC-1

TAC-1

T

H W

R

H W

S

AC-1

T

AC-1

T AC-1

T

H W

R

H W

S

AC-1

T

AC-1

T AC-1

T

T

AC-1

H W

R

H W

S

AC-1

T

AC-1

TAC-1

T

T

AC-1

T

AC-1

T

AC-1

NO WORK

THIS AREA

NO WORK

THIS AREA

AC

AC

25 CD

RP

AC

AC

25 CD

RP

AC

25 CD

RP

AC

25 CD

RP

7 8

25 CD

RP

25 CD

RP

7 8

AC

AC

25 CD

RP

25 CD

RP

AC

AC

25 CD

RP

25 CD

RP

AC

25 CD

RP

AC

25 CD

RP

7 8

AC

AC

25 CD

RP

25 CD

RP

7 8

AC

AC

25 CD

RP RP

25 CD

SHEET OF

SHEET

IDENTIFICATION

O N

E I D

A

T

O T

T E

G R

A T

T

E R

P R

I S

E S

M

A Y

F A

A

D

S

U I T

E

M I L

W A

U K

E E

W

I

F A

D

S O

L

B

N

U M

B

I S

O

A

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

D R

A W

I N

G

C

O D

E

I S

S U

E

D

A T

E

P L

A

L E

S U

B M

I T

T E

D

B

Y

F I L

E

N

A M

E

S I Z

E

A

A

T H

E R

I Z

A T

I O

N

P D

C

Q

K K

A

M I S

A W

A

A

S

E

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E A

P P

R

THIS WORK WAS

PREPARED BY ME OR

UNDER MY SUPERVISION

FINAL DOCUMENTS

OF

U S

A

R

C E

C I V

G

I N

E E

R

S

Q U

A D

R O

N

A F

Oneida Total Integrated Enterprises

I M

P R

O V

E

M

I L

I T

A R

Y

F

A M

I L

Y

H

O U

S I N

G

P

H A

T I M

O T

W

E N

D T

T T

W

KEY PLAN

MAIN BASE

GENERAL PLAN NOTES:

KEYED NOTES:

RUN REFRIGERANT PIPING ON UNDERSIDE OF EXISTING BUILDING OVERHANG IN PRE-MANUFACTURED

PIPING ENCLOSURE.

RUN REFRIGERANT PIPING ON SIDE OF EXISTING BUILDING IN PRE-MANUFACTURED PIPING ENCLOSURE.

RUN CONDENSATE PIPING LOW AT 200 MM ABOVE PATIO FLOOR - DISCHARGE TO GRADE.

RUN REFRIGERANT PIPING ABOVE ROOF OF EBS UNIT IN PRE-MANUFACTURED PIPING ENCLOSURE.

RUN CONDENSATE PIPING EXPOSED ALONG SIDE OF BUILDING - RUN PIPING AROUND AND ALONG SIDE

OF EBS UNIT WHERE THESE ARE PRESENT.

RUN NEW REFRIGERANT AND CONDENSATE PIPING THRU OPENINGS CREATED AS A RESULT OF

REMOVAL OF EXISTING HOT WATER FAN-COIL UNITS, THRU EXISTING CEILING ACCESS PANELS, AND

NEW ACCESS PANELS. REFRIGERANT COUPLINGS TUBE COUPLINGS ARE ONLY ALLOWED AT ACCESS

PANELS IN ORDER TO MINIMIZE RISK OF LEAKS IN CONCEALED IN EXISTING DRYWALL CEILINGS.

REFRIGERANT PIPE RUNS SHALL BE CONTINUOUS BETWEEN TERMINATIONS AT AIR CONDITIONING

UNITS.

RUN REFRIGERANT AND CONDENSATE PIPING IN NEW VERTICAL CHASE TO BE PROVIDED BY G.C..

ALL PIPING BELOW CEILING SHALL BE CONCEALED IN PRE-MANUFACTURED PIPE ENCLOSURE UP TO

NEW VERTICAL PIPE CHASE.

1. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND

UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW EMCS SYSTEM.

2. PROVIDE ALL NECESSARY PIPING,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .