Design Improve Military Family Housing Phase 3 A/C and Weatherization Misawa AB, Japan Contract No. FA8903-08-D-8782 - TO 40 Project #QKKA154008
07 December 2016
Final Design
Specifi cations
Prepared by
Atch. 1 to RFP No. FA520517R0004
IMFH Phase 3 A/C & Weatherization QKKA154008 Misawa AB, Japan
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 10 LIST OF ACRONYMS
00 01 15 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 00.00 33 JIS ACCEPTABLE ALTERNATIVES
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 03 - CONCRETE
03 33 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 41 13 METAL ROOF PANELS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 16 ALUMINUM DOORS
08 53 00 PLASTIC WINDOWS
08 81 00 GLAZING
08 87 13 SUN-CONTROL FILM FOR GLASS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 90 00 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 1
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 10 10 ADVANCED UTILITY METERING SYSTEM
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.00 10 INSULATED WIRE AND CABLE
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 16.00 40 PANELBOARDS
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
DIVISION 31 - EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
31 41 16 METAL SHEET PILING
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE
PAVING
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
32 12 10 BITUMINOUS TACK AND PRIME COATS
PROJECT TABLE OF CONTENTS Page 2
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 92 23 SODDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
Document 00 00 10 Page 1
SECTION 00 00 10
LIST OF ACRONYMS
PART 1 GENERAL
1.1 SUMMARY
This document provides a listing of acronyms used in this specifications document
A2LA American Association for Laboratory Accreditation
AASHTO American Association of State Highway and Transportation
Officials
AB Air Base
ABC Aggregate Base Course
ABS Acrylonitrile-Butadiene-Styrene
ACI American Concrete Institute
ACM(s) Asbestos-containing Material(s)
AEIC Association of Edison Illuminating Companies
AF Air Force / Actual Finish
AFOHA Air Force Occupational Safety and Health Standard(s)
AHA(s) Activity Hazard Analysis(es) / American Hardboard Association
AHAP Asbestos Hazard Abatement Plan
AI Asphalt Institute
AIHA American Industrial Hygiene Association
AMRL AASHTO Materials Reference Laboratory
ANSI American National Standards Institute
APP(s) Accident Prevention Plan(s)
AS Actual Start
Asbestos f/cc Asbestos Fiber Concentrations
ASME American Society of Mechanical Engineers
ASSE American Society of Sanitary Engineering
ASTM American Society for Testing Materials
AWG American Wire Gauge
AWS American Welding Society
AWWA American Water Works Association (AWWA)
Base Misawa AB, Misawa, Japan bhp Brake Horsepower
BICSI Building Industry Consulting Services International
BIDI Bid Item
BMEP Brake Mean Effective Pressure
BMP(s) Best Management Practices
BPE Base Project Engineer
CATV Community Antenna Television
CATW Category of Work
CCE Calcium Carbonate Equivalent
CD Compact Disk
CES 35th Civil Engineering Squadron
CGPM General Conference on Weights and Measures
CIH Certified Industrial Hygienist
CIPP Cured In Place Pipe
CLIN Contract Line Item Number
Document 00 00 10 Page 2 cm centimeter(s)
CMU Concrete Masonry Unit(s)
CO Contracting Officer
COC Chain-of-Custody
CONS 35th Contracting Squadron
COR Contracting Officers Representative
COTR Contracting Officer's Technical Representative
CP Competent Person
CPG(s) Comprehensive Procurement Guideline(s)
CPM Critical Path Method
CPP Containment Prevention Plan
CQC Contractor Quality Control
CRR Corrosion Resistance Ratio
CS 35th Communications Squadron
CSEP Confined Space Entry Plan
CSP Certified Safety Professional
CWA Constant Wattage Autotransformer
DALT Duct Air Leak Test dBmV decibel millivolts
DGA Dissolved Gas Analysis
DLA Defense Logistics Agency
DOD Department of Defense
DOR Designer of Record
DOT U.S. Department of Transportation
ELEC Electrical
ELLAP Environmental Lead Laboratory Accreditation Program
ELPAT Environmental Lead Proficiency Analytical Testing
EMCS Energy Management Control System
EPA U.S. Environmental Protection Agency
EPP Environmental Protection Plan
EPR Ethylene-Propylene-Rubber
ES Early Start
EXTR Exterior
FAR Federal Acquisition Regulations f'c Compressive Strength
FEMP Federal Energy Management Program
FIFRA Federal Insecticide, Fungicide, and Rodenticide Act
FM Factory Mutual f'm Strength
FOW Feature of Work
FP&P Fall Protection and Prevention g gram(s)
G Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for
Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
g/L gram(s) per Liter(s)
GCA Graded-crushed Aggregate
GFCI Ground-fault Circuit Interrupter
GFE Government furnished equipment
Document 00 00 10 Page 3
GOJ Government of Japan
GOVT Government
GSA U.S. General Services Administration
HEPA High-Efficiency Particulate Air
HIC Head Injury Criteria
HID High-intensity Discharge
HM Hazardous Material
HPS High-pressure Sodium
HSCOR Heavy Snow Conditions of Readiness
HVAC Heating, Ventilating, Air Conditioning
ICC International Code Council
ICRI International Concrete Repair Institute
IDC Initiating Device Circuits
IDC Insulation Displacement Connection
IEEE Institute of Electrical and Electronics Engineers
IH Industrial Hygienist
IHT(a) Industrial Hygiene Technician(s)
IMPC Installation Pest Management Coordinator
I-P Inch-Pounds
JEGS Japan Environmental Governing Standards
JIS Japanese Industrial Standard(s)
JMF Job Mix Formula
JMOE Japanese Ministry of the Environment kg kilogram(s) kg/m^3 kilogram(s) per cubic meter km kilometer(s) km/h kilometer(s)/hour kPa kilopascal(s)
L Liter(s)
L/s Liter(s) per second
LBP Lead-based Paint
LBP/R/CP Lead-based Paint/Removal/Control Plan
LED/LCD Light Emitting Diode/Liquid Crystal Diode
LEED Leadership in Energy and Environmental Design
LF Late Finish
LL Load Losses
LM Linear Meter m meter(s) m/s meter(s) per second
MAP Model Accreditation Plan
MCL/PWL Material Containing Lead/Paint with Lead
MCOV Maximum Continuous Operating Voltage
MDI Methylene Diphenel Isocyanate
MECH Mechanical
MEP Master Entry Plan
MFH Military Family Housing mm millimeter(s) mm/s millimeter(s) per second
MODF Modification
MPa Megapascal
Document 00 00 10 Page 4
MSDS Material Safety Data Sheet(s)
NAC Notification Appliance Circuits
NARA National Archives and Records Administration
NAS Network Analysis Schedule
NBR Nitrile Butadeine Rubber
NEMA National Electrical Manufacturers Association
NESHAP "National Emission Standards for Hazardous Air Pollutants"
NEXT Near End Cross Talk
NICET "National Institute for Certification in Engineering
Technologies"
NLL No-load Losses
NLLAP National Lead Laboratory Accreditation Program
Nm Newton meter(s)
NPE Negative Pressure Enclosure
NTP Notice To Proceed
NTT Nippon Telephone Telegraph
O&M Operation(ing) and Maintenance o.c. on center
OD Outside Diameter / Original Duration
ODS Ozone Depleting Substances
OSHA Occupational Safety and Health Administration
OS&Y Outside Screw and Yoke
P&T Pressure and Temperature
PAT Proficiency Analytical Testing
PCB(s) Polychlorinated Biphenyl(s)
PCM Phase Contrast Microscopy
PDM Precedence Diagram Method
PE Professional Engineer
PELs Permissible Exposure Limit(s)
PHAS Phase of Work
PILC Paper Insulated Lead Covered
PLM Polarized Light Microscopy
PMG Permanent Magnet Generator
PPC Project Pesticide Coordinator
PPE Personal Protective Equipment ppm parts per million
PRV Pressure Reducing Valve
PVC Polyvinyl Chloride
PVDC Polyvinylidene Chloride
QA Quality Assurance
QAP Quality Assurance Plan
QC Quality Control
QCS Quality Control System
R Thermal Resistance
RAP Recycled Asphalt Pavement
RD Remaining Duration
REA Request for Equitable adjustment
REFL Reflected
REP Rescue and Evacuation Plan
RESP Responsible Party
RF Radio Frequency
RFI Request for Information
Document 00 00 10 Page 5
RLC(s) Residential Load Center(s)
RMS Root Mean Square / Resident Management System
RSO Radiation Safety Officer
S/mm Structures per square millimeters
SBR Styrene Butadeine Rubber
SD Submittal Description
SF Start to Finish
SHP Safety and Health Program
SI International System of Units
SLC Signal Line Circuits
SOFA Status of Forces Agreement
SPDT Single-pole Double-throw
SSHO Site Safety and Health Officer
TDI Toluene Diphenel Isocyanate
TEM Transmission Electron Microscopy
THD Total Harmonic Distortion
TNR Tensile Strength Ratio
TPH Total Petroleum Hydrocarbons
TSI Thermal System Insulation
TSR Tensile Strength Ratio
TV Television
TWA Time Weighted Average
UL Underwriter's Laboratories
USACE U.S. Army Corps of Engineers
USG United States Government
USGBC U.S. Green Building Council
UV Ultraviolet
V Volt(s)
Vac Volts a.c.
VECP Value Engineering Change Proposal
VMA Voids in Mineral Aggregate
VOC(s) Volatile Organic Compound(s)
W Watt(s)
WBS Work Breakdown Structure
WHE Weight Handling Equipment
WIFI Wireless Internet
WMP Waste Management Plan
WPS Welding Procedure Specifications
XLP Cross-linked-thermosetting
XRF X-ray Fluorescence
-- End of Document --
SECTION 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
List of contract drawings follow from the next page:
GENERAL
01 G-001 COVER SHEET
02 G-011 DRAWING INDEX
03 G-021 GENERAL PROJECT INFORMATION
04 G-022 SCOPE OF WORK
05 G-023 OVERALL PROJECT MFH MAP
06 G-024 DISPOSITION OF DRAWING UNITS
HAZMAT
07 4P1-H-101 TYPE 4P1 - 3 BEDROOMPLANS - EXISTING HAZARDOUS MATERIALs
08 4P3-H-101 TYPE 4P3 - 3 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
09 6N-H-101 TYPE 6N - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
10 6P1-H-101 TYPE 6P1 - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
11 6A-H-101 TYPE 6A - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
12 7P2-H-101 TYPE 7P2 - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
13 7A-H-101 TYPE 7A - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
14 8N-H-101 TYPE 8N - 3 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
15 10N-H-101 TYPE 10N - 3 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
16 15N-H-101 TYPE 15N - 2 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
DOCUMENT 00 01 15 Page 1
17 12N-H-101 TYPE 12N - 3 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
18 16N-H-101 TYPE 16N - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
19 16ND-H-101 TYPE 16ND - 4 BEDROOM PLANS - EXISTING HAZARDOUS MATERIALS
STRUCTURAL
20 PH-SD101 PUMPHOUSE STRUCTURAL DEMOLITION PLAN
21 PH-SD102 PUMPHOUSE STRUCTURAL DEMOLITION PLAN
22 PH-SD103 PUMPHOUSE STRUCTURAL DEMOLITION PLAN
23 PH-SD104 PUMPHOUSE STRUCTURAL DEMOLITION PLAN
24 PH-SD105 PUMPHOUSE STRUCTURAL DEMOLITION PLAN
ARCHITECTURAL
25 AE001 ARCHITECTURAL SYMBOLS, MATERIAL LEGEND, AND ABBREVIATIONS
26 4P1-AE101 TYPE 4P1 - 3 BEDROOM - PLANS - NEW HVAC EQUIPMENT
27 4P1-AE201 TYPE 4P1 - 3 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
28 4P3-AE101 TYPE 4P3 - 3 BEDROOM - PLANS - NEW HVAC EQUIPMENT
29 4P3-AE201 TYPE 4P3 - 3 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
30 6N-AE101 TYPE 6N - 4 BEDROOM - PLANS - NEW HVAC EQUIPMENT
31 6N-AE201 TYPE 6N - 4 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
32 6P1-AE101 TYPE 6P1 - 4 BEDROOM - PLANS - NEW HVAC EQUIPMENT
33 6P1-AE201 TYPE 6P1 - 4 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
34 6A-AE101 TYPE 6A - 4 BEDROOM ACCESSIBLE / ADAPTABLE - PLANS - NEW HVAC
EQUIPMENT
35 6A-AE201 TYPE 6A - 4 BEDROOM ACCESSIBLE / ADAPTABLE - ELEVATIONS - NEW
HVAC EQUIPMENT
36 7P2-AE101 TYPE 7P2 - 4 BEDROOM - PLANS - NEW HVAC EQUIPMENT
37 7P2-AE201 TYPE 7P2 - 4 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
38 7A-AE101 TYPE 7A - 4 BEDROOM - PLANS - NEW HVAC EQUIPMENT
39 7A-AE201 TYPE 7A - 4 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
40 8N-AE101 TYPE 8N - 3 BEDROOM - PLANS - NEW HVAC EQUIPMENT
41 8N-AE201 TYPE 8N - 3 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
DOCUMENT 00 01 15 Page 2
42 10N-AE101 TOWER 10N FIRST FLOOR - REC ROOM AND LOBBY PLANS & ELEVATIONS
- NEW HVAC & EMCS
43 10N-AE102 TOWER 10N - FIRST AND TYPICAL FLOOR REFLECTED CEILING PLANS -
NEW EMCS CONDUIT
44 10N-AE103 TOWER 10N UNIT TYPE A - 3 BEDROOM - PLANS & ELEVATIONS - NEW
HVAC EQUIPMENT
45 10N-AE104 TOWER 10N UNIT TYPE B - 3 BEDROOM - PLANS & ELEVATIONS - NEW
HVAC EQUIPMENT
46 10N-AE105 TOWER 10N UNIT TYPE C - 3 BEDROOM - PLANS & ELEVATIONS - NEW
HVAC EQUIPMENT
47 10N-AE201 TOWER 10N - 3 BEDROOM - BUILDING ELEVATIONS - NEW HVAC
EQUIPMENT
48 15N-AE101 TYPE 15N - 2 BEDROOM - PLANS - NEW HVAC EQUIPMENT
49 15N-AE201 TYPE 15N - 2 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
50 12N-AE101 TYPE 12N - 3 BEDROOM - PLANS - NEW HVAC EQUIPMENT
51 12N-AE201 TYPE 12N - 3 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
52 16N-AE101 TYPE 16N - 4 BEDROOM - PLANS - NEW HVAC EQUIPMENT
53 16N-AE201 TYPE 16N - 4 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
54 16ND-AE101 TYPE 16ND - 4 BEDROOM - PLANS - NEW HVAC EQUIPMENT
55 16ND-AE201 TYPE 16ND - 4 BEDROOM - ELEVATIONS - NEW HVAC EQUIPMENT
56 AE501 DETAILS
57 AE502 WINDOW DETAILS
MECHANICAL
58 M-001 MECHANICAL COVER SHEET
59 4P1-MD101 TYPE 4P1 - 3 BEDROOM - HVAC DEMO PLANS
60 4P1-MH101 TYPE 4P1 - 3 BEDROOM - NEW HVAC PLANS
61 4P1-MH102 TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS
62 4P1-MH103 TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS
63 4P1-MH104 TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS
64 4P1-MH105 TYPE 4P1 - 3 BEDROOM - HVAC ELEVATIONS
65 4P3-MD101 TYPE 4P3 - 3 BEDROOM - HVAC DEMO PLANS
66 4P3-MH101 TYPE 4P3 - 3 BEDROOM - NEW HVAC PLANS
67 4P3-MH102 TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS
DOCUMENT 00 01 15 Page 3
68 4P3-MH103 TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS
69 4P3-MH104 TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS
70 4P3-MH105 TYPE 4P3 - 3 BEDROOM - HVAC ELEVATIONS
71 6N-MD101 TYPE 6N - 4 BEDROOM - HVAC DEMO PLANS
72 6N-MH101 TYPE 6N - 4 BEDROOM - NEW HVAC PLANS
73 6N-MH102 TYPE 6N - 4 BEDROOM - HVAC ELEVATIONS
74 6P1-MD101 TYPE 6P1 - 4 BEDROOM - HVAC DEMO PLANS
75 6P1-MH101 TYPE 6P1 - 4 BEDROOM - NEW HVAC PLANS
76 6P1-MH102 TYPE 6P1 - 4 BEDROOM - HVAC ELEVATIONS
77 6P1-MH103 TYPE 6P1 - 4 BEDROOM - HVAC ELEVATIONS
78 6P1-MH104 TYPE 6P1 - 4 BEDROOM - HVAC ELEVATIONS
79 6P1-MH105 TYPE 6P1 - 4 BEDROOM - HVAC ELEVATIONS
80 6A-MD101 TYPE 6A - 4 BEDROOM - HVAC DEMO PLANS
81 6A-MH101 TYPE 6A - 4 BEDROOM - NEW HVAC PLANS
82 6A-MH102 TYPE 6A - 4 BEDROOM - HVAC ELEVATIONS
83 7P2-MD101 TYPE 7P2 - 4 BEDROOM - HVAC DEMO PLANS
84 7P2-MH101 TYPE 7P2 - 4 BEDROOM - NEW HVAC PLANS
85 7P2-MH102 TYPE 7P2 - 4 BEDROOM - HVAC ELEVATIONS
86 7P2-MH103 TYPE 7P2 - 4 BEDROOM - HVAC ELEVATIONS
87 7P2-MH104 TYPE 7P2 - 4 BEDROOM - HVAC ELEVATIONS
88 7A-MD101 TYPE 7A - 4 BEDROOM - HVAC DEMO PLANS
89 7A-MH101 TYPE 7A - 4 BEDROOM - NEW HVAC PLANS
90 7A-MH102 TYPE 7A - 4 BEDROOM - HVAC ELEVATIONS
91 8N-MD101 TYPE 8N - 3 BEDROOM - HVAC DEMO PLANS
92 8N-MH101 TYPE 8N - 3 BEDROOM - NEW HVAC PLANS
93 8N-MH102 TYPE 8N - 3 BEDROOM - HVAC ELEVATIONS
94 8N-MH103 TYPE 8N - 3 BEDROOM - HVAC ELEVATIONS
DOCUMENT 00 01 15 Page 4
95 10N-MD101 TOWER 10N REC ROOM - HVAC DEMO PLAN
96 10N-MD102 TOWER 10N UNIT TYPE A & B - 3 BEDROOM - 1ST THRU 9TH FLOOR -
HVAC DEMO PLAN
97 10N-MD103 TOWER 10N UNIT TYPE C - 3 BEDROOM - 2ND THRU 9TH FLOOR - HVAC
DEMO PLAN
98 10N-MH101 TOWER 10N REC ROOM - NEW HVAC PLAN
99 10N-MH102 TOWER 10N UNIT TYPE A & B - 3 BEDROOM - 1ST THRU 9TH FLOOR -
NEW HVAC PLAN
100 10N-MH103 TOWER 10N UNIT TYPE C - 3 BEDROOM - 2ND THRU 9TH FLOOR - NEW
HVAC PLAN
101 15N-MD101 TYPE 15N - 2 BEDROOM - HVAC DEMO PLANS
102 15N-MH101 TYPE 15N - 2 BEDROOM - NEW HVAC PLANS
103 15N-MH102 TYPE 15N - 2 BEDROOM - HVAC ELEVATIONS
104 12N-MD101 TYPE 12N - 3 BEDROOM - HVAC DEMO PLANS
105 12N-MH101 TYPE 12N - 3 BEDROOM - NEW HVAC PLANS
106 12N-MH102 TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
107 12N-MH103 TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
108 12N-MH104 TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
109 16N-MD101 TYPE 16N - 4 BEDROOM - HVAC DEMO PLANS
110 16N-MH101 TYPE 16N - 4 BEDROOM - NEW HVAC PLANS
111 16N-MH102 TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
112 16N-MH103 TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
113 16ND-MD101 TYPE 16ND - 4 BEDROOM - HVAC DEMO PLANS
114 16ND-MH101 TYPE 16ND - 4 BEDROOM - NEW HVAC PLANS
115 16ND-MH102 TYPE 16ND - 4 BEDROOM - HVAC ELEVATIONS
116 PH-MD101 PUMPHOUSE DEMOLITION PLAN
117 PH-MD102 PUMPHOUSE DEMOLITION PLAN
118 PH-MD103 PUMPHOUSE DEMOLITION PLAN
119 PH-MD104 PUMPHOUSE DEMOLITION PLAN
120 PH-MD105 PUMPHOUSE DEMOLITION PLAN
121 M-501 MECHANICAL DETAILS
DOCUMENT 00 01 15 Page 5
122 M-502 MECHANICAL DETAILS
123 M-503 MECHANICAL DETAILS
124 M-504 MECHANICAL DETAILS
125 M-505 MECHANICAL DETAILS
126 M-601 MECHANICAL SCHEDULES
127 M-602 MECHANICAL SCHEDULES
PLUMBING
128 P-001 PLUMBING COVER SHEET
129 4P1-P-101 TYPE 4P1 - 3 BEDROOM - PLUMBING PLANS
130 4P3-P-101 TYPE 4P3 - 3 BEDROOM - PLUMBING PLANS
131 6N-P-101 TYPE 6N - 4 BEDROOM - PLUMBING PLANS
132 6P1-P-101 TYPE 6P1 - 4 BEDROOM - PLUMBING PLANS
133 6A-P-101 TYPE 6A - 4 BEDROOM - PLUMBING PLANS
134 7P2-P-101 TYPE 7P2 - 4 BEDROOM - PLUMBING PLANS
135 7A-P-101 TYPE 7A - 4 BEDROOM - PLUMBING PLANS
136 8N-P-101 TYPE 8N - 3 BEDROOM - PLUMBING PLANS
137 15N-P-101 TYPE 15N - 2 BEDROOM - PLUMBING PLANS
138 12N-P-101 TYPE 12N - 3 BEDROOM - PLUMBING PLANS
139 16N-P-101 TYPE 16N - 4 BEDROOM - PLUMBING PLANS
140 16ND-P-101 TYPE 16ND - 4 BEDROOM - PLUMBING PLANS
CONTROLS
141 EM001 EMCS COVER SHEET
142 EM002 TOWN HOUSE EMCS BLOCK DIAGRAM
143 EM003 TYPE 10N BLOCK DIAGRAM
144 EM004 EMCS BLOCK DIAGRAM
145 4P1-EM101 TYPE 4P1: 3 BEDROOM - NEW EMCS PLANS
146 4P3-EM101 TYPE 4P3: 3 BEDROOM - NEW EMCS PLANS
DOCUMENT 00 01 15 Page 6
147 6N-EM101 TYPE 6N: 4 BEDROOM - NEW EMCS PLANS
148 6P1-EM101 TYPE 6P1: 4 BEDROOM - NEW EMCS PLANS
149 6A-EM101 TYPE 6A: 4 BEDROOM - NEW EMCS PLANS
150 7P2-EM101 TYPE 7P2: 4 BEDROOM - NEW EMCS PLANS
151 7A-EM101 TYPE 7A: 4 BEDROOM - NEW EMCS PLANS
152 8N-EM101 TYPE 8N: 3 BEDROOM - NEW EMCS PLANS
153 10N-EM101 TYPE 10N: FLOOR 2-9 - NEW EMCS PLANS
154 10N-EM102 TYPE 10N: FIRST FLOOR - NEW EMCS PLAN
155 10N-EM103 TYPE 10N: EQUIPMENT EMCS PLAN
156 15N-EM101 TYPE 15N: 2 BEDROOM - NEW EMCS PLANS
157 12N-EM101 TYPE 12N: 3 BEDROOM - NEW EMCS PLANS
158 16N-EM101 TYPE 16N: 2 BEDROOM - NEW EMCS PLANS
159 16ND-EM101 TYPE 16ND: 2 BEDROOM - NEW EMCS PLANS
160 EM103 PUMP HOUSE PLANS
161 EM104 PUMP HOUSE PLANS
162 EM501 EMCS DETAILS
163 EM502 EMCS DETAILS
164 EM503 EMCS DETAILS
165 EM504 EMCS DETAILS
166 EM505 EMCS DETAILS
167 EM506 EMCS DETAILS
168 EM507 EMCS DETAILS
169 EM508 EXTERIOR CONDUIT DETAIL AND SYSTEM INTERCONNECT DETAIL
170 EM509 POINTS LIST
171 EI101 SITE PLAN - MAIN BASE HOUSING PLAN - EMCS
172 EI102 EMCS UTILITY PLAN - ELM LOOP
173 EI103 EMCS UTILITY PLAN - ELM LOOP & ZELKOVA LANE
DOCUMENT 00 01 15 Page 7
174 EI104 EMCS UTILITY PLAN - ZELKOVA LANE
175 EI105 EMCS - UTILITY PLAN - CAPE COD DRIVE
176 EI106 EMCS UTILITY PLAN - CABE COD DRIVE AND YOSEEITE DRIVE
177 EI107 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
178 EI108 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
179 EI109 EMCS UTILITY PLAN - CAPE CANAVERAL COURT
180 EI110 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
181 EI111 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
182 EI112 EMCS UTILITY PLAN - DENALI DRIVE
183 EI113 EMCS UTILITY PLAN - CASCADE DRIVE
184 EI114 EMCS UTILITY PLAN - DEMOCRACY DRIVE
185 EI115 EMCS UTILITY PLAN - CUMBERLAND COURT
186 EI116 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
187 EI117 EMCS UTILITY PLAN - BLUERIDGE DRIVE
188 EI118 EMCS UTILITY PLAN - BLUERIDGE DRIVE
189 EI119 EMCS UTILITY PLAN - FREEDOM COURT
190 EI120 EMCS UTILITY PLAN - RUSHMORE COURT
191 EI121 EMCS UTILITY PLAN - SEQUOIA DRIVE
192 EI122 EMCS UTILITY PLAN - ACADIA COURT
193 EI123 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
194 EI124 EMCS UTILITY PLAN - YELLOWSTONE DRIVE
195 EI125 EMCS UTILITY PLAN - SEQUOIA DRIVE
196 EI126 EMCS UTILITY PLAN - SEQUOIA DRIVE
197 EI127 CIVIL DETAILS
ELECTRICAL
198 E-001 ELECTRICAL COVER SHEET
199 4P1-ED101 TYPE 4P1: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
DOCUMENT 00 01 15 Page 8
200 4P1-EP101 TYPE 4P1: 3 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
201 4P1-EP102 TYPE 4P1: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
202 4P3-ED101 TYPE 4P3: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
203 4P3-EP101 TYPE 4P3: 3 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
204 4P3-EP102 TYPE 4P3: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
205 6N-ED101 TYPE 6N: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
206 6N-EP101 TYPE 6N: 4 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
207 6N-EP102 TYPE 6N: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
208 6P1-ED101 TYPE 6P1: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
209 6P1-EP101 TYPE 6P1: 4 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
210 6P1-EP102 TYPE 6P1: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
211 6A-ED101 TYPE 6A: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
212 6A-EP101 TYPE 6A: 4 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
213 6A-EP102 TYPE 6A: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
214 7P2-ED101 TYPE 7P2: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
215 7P2-EP101 TYPE 7P2: 4 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
216 7P2-EP102 TYPE 7P2: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
217 7A-ED101 TYPE 7A: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
218 7A-EP101 TYPE 7A: 4 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
219 7A-EP102 TYPE 7A: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
220 8N-ED101 TYPE 8N: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
221 8N-EP101 TYPE 8N: 3 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
222 8N-EP102 TYPE 8N: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
223 10N-ED101 TYPE 10N - ELECTRICAL DEMOLITION PLAN
224 10N-ED102 TYPE 10N - ELECTRICAL DEMOLITION PLAN
DOCUMENT 00 01 15 Page 9
225 10N-EP101 TYPE 10N - ELECTRICAL DEMOLITION PLAN
226 10N-EP102 TYPE 10N - NEW ELECTRICAL PLAN
227 10N-EP103 TYPE 10N - ELECTRICAL DETAILS
228 10N-EP104 TYPE 10N - ELECTRICAL DETAILS
229 15N-ED101 TYPE 15N: 2 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
230 15N-EP101 TYPE 15N: 2 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
231 15N-EP102 TYPE 15N: 2 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
232 12N-ED101 TYPE 12N: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
233 12N-EP101 TYPE 12N: 3 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
234 12N-EP102 TYPE 12N: 3 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
235 16N-ED101 TYPE 16N: 2 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL DEMO
PLAN
236 16N-EP101 TYPE 16N: 2 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
237 16N-EP102 TYPE 16N: 2 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
238 16ND-ED102 TYPE 16ND: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DEMO PLAN
239 16ND-EP103 TYPE 16ND: 4 BEDROOM - FIRST AND SECOND FLOOR - NEW ELECTRICAL
PLAN
240 16ND-EP104 TYPE 16ND: 4 BEDROOM - FIRST AND SECOND FLOOR - ELECTRICAL
DETAILS
241 E-501 PUMP HOUSE PLANS
242 E-502 PUMP HOUSE PLANS
243 E-503 ELECTRICAL DETAILS
244 E-601 ELECTRICAL SCHEDULES
245 E-602 ELECTRICAL SCHEDULES
246 E-603 ELECTRICAL SCHEDULES
247 E-604 ELECTRICAL SCHEDULES
-- End of Section --
DOCUMENT 00 01 15 Page 10
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 STATEMENT OF WORK
1.1.1 Project Description
ITEM NO. 001 (68 Units in 1 Tower, 526 Units in 132 Townhouse Buildings)
The Contractor shall provide all supervision, management, quality control, labor, tools, equipment, materials, and performance of all work necessary to construct improvements for the renovation of the Military Family Housing units as depicted in the construction documents to include interior demolition of existing heating equipment and piping; the addition of heat pump style heating and cooling units and all necessary piping, electrical, standalone controls, structural and site improvements to support new building HVAC systems; site improvements to integrate with existing sidewalks, amenities and utilities; new architectural finishes; new windows and exterior wall infill as required; new insulation assemblies; renovate mechanical, electrical and plumbing systems.
labor, tools, equipment, materials, and performance of all work necessary to:
a. Address interruption of asbestos containing materials as a result of construction activities. This includes all control methods, material removal and disposal, air sampling and reporting.
b. Check any removed gypsum board material to verify if it is marked as lots containing arsenic or cadmium and then properly transporting and disposing of the material in accordance with GOJ requirements.
extend the base Energy Management Control System (EMCS) to each MFH unit in this project to allow central monitoring and management of the heat pump systems. The base fiber optic telecommunications system currently is terminated at pump (mechanical) buildings located through the housing areas.
The following will be installed in this project:
a. EMCS network hardware located at the fiber optic system termination in pump buildings.
b. Control panels at each building.
c. Conduit and communication wiring from the EMCS network hardware to the building control panels.
Section 01 11 00 Page 2
d. Communication wiring from the building control panel to each heat pump system thermostat.
e. Installation of EMCS network "head-end" hardware and operator workstation at building 794 and associated software and programming required to provide completely operational functionality.
f. System commissioning.
INSTALL WATER METERS (Quantity = 526 Units in 132 Townhouse Buildings) install water meters in the cold water and hot water piping serving each MFH unit (2 or 4 units) at each MFH townhouse building in this project, extend
EMCS communication wiring from the building control panel to the water meters controllers, programming and commissioning to enable reporting of meter data. Tower 116 is not included.
INSTALL ELECTRIC METERS (Quantity = 1 meter at each of 132 Townhouse
Buildings) include integral electric metering into the new main electrical panels (per
Detail 5 on Sheet E-502) being provided at each MFH townhouse building (not individual units), extend EMCS communication wiring from the building control panel to the electric meters controllers, programming and commissioning to enable reporting of meter data. Tower 116 is not included.
DEMOLISH SPACE HEATING EQUIPMENT (Quantity = 10 Pumphouses) for demolition of MFH unit space heating equipment in Buildings 61, 141, 172, 185, 227, 265, 328, 334, 706 and 897. Demolition work includes removal of equipment, piping, valves, controls, supports and concrete bases.
REPLACE FRONT DOORS (Quantity = 458 Units in 114 Townhouse Buildings) replace front doors on unit types 4P1, 6A, 6N, 6P1, 8N, 12N, 15N, 16N, and
16ND.
HAZARDOUS ABATEMENT (Quantity = 68 Units in 1 Tower, 526 Units in 132
Townhouse Buildings) for Asbestos Hazard Control Activities as indicated on contract documents.
Address disruption of asbestos containing materials as a result of construction activities. This includes all control methods, material removal and disposal, air sampling and reporting. Check any removed gypsum board material to verify if it is marked as lots containing arsenic or cadmium.
Properly transport and dispose of material in accordance with GOJ
Requirements.
Section 01 11 00 Page 3
BLDG
NUMB
STREET BLDG
TYPE
BR# STRUCTURE PAIP HVAC ROOF WDW
IMPROVE
FRONT DR
REPLACE
ELECTRIC
METERING
WATER
METERING
CAPPING
OF VENT
OPENING
ACM VCT
MASTIC
ACM
COVE
BASE
MASTIC
ACM GYP
BD
JOINT
CPD
ACM
EXTR
WALL
COATING
41 FREEDOM 16N 4 STL NR X - X,F X X X pos neg pos neg
43 FREEDOM 16N 4 STL NR X - X,F X X X pos neg pos neg
44 FREEDOM 16N 4 STL NR X - X,F X X X pos neg pos neg
45 FREEDOM 16N 4 STL NR X - X,F X X X pos neg pos neg
47 FREEDOM 16N 4 STL NR X - X,F X X X pos neg pos neg
51 FREEDOM 16ND 4 STL NR X - X,F X X X pos neg pos neg
53 FREEDOM 16N 4 STL NR X - X,F X X X pos neg pos neg
109 CUMBERLAND 12N 3 STL NR X - - X X X pos pos neg pos
111 CUMBERLAND 12N 3 STL NR X - - X X X pos pos neg pos
113 CUMBERLAND 12N 3 STL NR X - - X X X pos pos neg pos
114 CASCADE 12N 3 STL NR X - - X X X pos pos neg pos
116 SHENANDOAH 10N 3 RC NR X - F - - - pos pos pos pos
120 CASCADE 12N 3 STL NR X - - X X X pos pos neg pos
121 CASCADE 12N 3 STL NR X - - X X X pos pos neg pos
122 CASCADE 12N 3 STL NR X - - X X X pos pos neg pos
131 DEMOCRACY 12N 3 STL NR X - - X X X pos pos neg pos
133 DEMOCRACY 12N 3 STL NR X - - X X X pos pos neg pos
135 DEMOCRACY 12N 3 STL NR X - - X X X pos pos neg pos
137 DEMOCRACY 12N 3 STL NR X - - X X X pos pos neg pos
139 DEMOCRACY 12N 3 STL NR X - - X X X pos pos neg pos
150 DENALI 12N 3 STL NR X - - X X X pos pos neg pos
153 DENALI 12N 3 STL NR X - - X X X pos pos neg pos
155 DENALI 12N 3 STL NR X - - X X X pos pos neg pos
156 DENALI 12N 3 STL NR X - - X X X pos pos neg pos
157 DENALI 12N 3 STL NR X - - X X X pos pos pos pos
162 YOSEMITE 16N 4 STL NR X - - X X X pos neg pos neg
166 YOSEMITE 12N 3 STL NR X - - X X X pos pos neg pos
168 YOSEMITE 12N 3 STL NR X - - X X X pos pos neg pos
169 YOSEMITE 12N 3 STL NR X - - X X X pos pos neg pos
Section 01 11 00 Page 4
170 CAPE
CANAVERAL
15N 2 STL NR X - - X X X pos neg pos neg
171 CAPE
CANAVERAL
15N 2 STL NR X - - X X X pos pos pos pos
174 CAPE
CANAVERAL
15N 2 STL NR X - - X X X pos neg pos neg
175 CAPE
CANAVERAL
15N 2 STL NR X - - X X X pos neg pos neg
176 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
177 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
178 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
179 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
184 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
186 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos pos pos pos
187 CAPE
CANAVERAL
6P1 4 RC PAIP1 X - - X X X pos neg pos neg
188 CAPE
CANAVERAL
6P1 4 RC PAIP1 X - - X X X pos neg pos neg
189 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos pos pos pos
190 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
191 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
192 CAPE
CANAVERAL
6P1 4 RC PAIP1 X - - X X X pos neg pos neg
193 YELLOWSTONE 7P2 4 RC PAIP2 X - - - X X X pos neg pos neg
194 YELLOWSTONE 7P2 4 RC PAIP2 X - - - X X X pos neg pos neg
195 YELLOWSTONE 7P2 4 RC PAIP2 X - - - X X X pos neg pos neg
196 YELLOWSTONE 7P2 4 RC PAIP2 X - - - X X X pos neg pos neg
197 YELLOWSTONE 7A 4 RC PAIP2 X - - - X X pos neg pos neg
198 YOSEMITE 7P2 4 RC PAIP2 X - - - X X X pos neg pos neg
201 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
203 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
205 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
223 SEQUOIA 12N 3 STL NR X - - X X X pos pos neg pos
225 SEQUOIA 12N 3 STL NR X - - X X X pos pos neg pos
226 SEQUOIA 12N 3 STL NR X - - X X X pos pos neg pos
235 ACADIA 12N 3 STL NR X - - X X X pos pos neg pos
237 ACADIA 12N 3 STL NR X - - X X X pos pos neg pos
Section 01 11 00 Page 5
239 ACADIA 12N 3 STL NR X - - X X X pos pos neg pos
241 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
243 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
245 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
247 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
249 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
251 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
252 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
253 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
255 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
257 BLUERIDGE 12N 3 STL NR X - - X X X pos pos neg pos
259 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
261 YELLOWSTONE 4P1 3 RC PAIP1 X - - X X X pos neg pos pos
329 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
331 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
332 SEQUOIA 6N 4 RC NR X X X X X X X pos pos pos pos
333 SEQUOIA 6N 4 RC NR X X X X X X X pos pos pos pos
335 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
336 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
338 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
339 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
340 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
341 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
345 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
346 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
347 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
348 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
349 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
350 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
351 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
352 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
353 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
354 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
Section 01 11 00 Page 6
355 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
356 YELLOWSTONE 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
357 YELLOWSTONE 6A 4 RC PAIP1 X - - X X X X pos neg pos neg
360 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
361 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
365 SEQUOIA 8N 3 RC NR X X - X X X pos pos pos pos
371 RUSHMORE 8N 3 RC NR X X - X X X pos pos pos pos
374 RUSHMORE 8N 3 RC NR X X - X X X pos pos pos pos
376 RUSHMORE 8N 3 RC NR X X - X X X pos pos pos pos
400 SEQUOIA 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
403 SEQUOIA 6P1 4 RC PAIP1 X - - X X X pos neg pos neg
701 YOSEMITE 16N 4 STL NR X - - X X X pos pos pos pos
707 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos pos pos pos
708 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
709 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
710 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
711 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
713 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
714 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
717 CAPE COD 7P2 4 RC PAIP3 X - - - X X X pos neg pos neg
719 YELLOWSTONE 7P2 4 RC PAIP3 X - - - X X X pos neg pos neg
720 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
721 CAPE COD 4P3 3 RC PAIP3 X - - - X X X pos neg pos pos
863 ZELKOVA 12N 3 STL NR X - - X X X pos pos neg pos
864 ZELKOVA 12N 3 STL NR X - - X X X pos pos neg pos
865 ZELKOVA 12N 3 STL NR X - - X X X pos pos neg pos
866 ZELKOVA 12N 3 STL NR X - - X X X pos pos neg pos
870 ZELKOVA 12N 3 STL NR X - - X X X pos pos neg pos
871 ELM 12N 3 STL NR X - - X X X pos pos neg pos
872 ELM 12N 3 STL NR X - - X X X pos pos neg pos
873 ELM 12N 3 STL NR X - - X X X pos pos neg pos
876 ELM 12N 3 STL NR X - - X X X pos pos neg pos
877 ELM 12N 3 STL NR X - - X X X pos pos neg pos
Section 01 11 00 Page 7
878 ELM 12N 3 STL NR X - - X X X pos pos neg pos
879 ELM 12N 3 STL NR X - - X X X pos pos neg pos
880 ELM 12N 3 STL NR X - - X X X pos pos neg pos
881 ELM 12N 3 STL NR X - - X X X pos pos neg pos
882 ELM 12N 3 STL NR X - - X X X pos pos neg pos
884 ELM 12N 3 STL NR X - - X X X pos pos neg pos
886 ELM 12N 3 STL NR X - - X X X pos pos neg pos
893 ZELKOVA 12N 3 STL NR X - - X X X pos pos neg pos
Section 01 11 00 Page 8
1.1.1.1 Project Engineer Qualifications
The Contractor shall appoint a skilled Licensed Construction Engineer or
Architectural Engineer in accordance with paragraphs 1 and 2 of Article 4, Contract Handling Regulations of the Prime Minister's Office of the
Government of Japan, as the Project Engineer for this contract. A First
Grade Construction Engineer or Architectural Engineer is required.
1.1.2 Location
The work shall be located at Misawa Air Base, Japan (Base).
1.1.3 Definitions
The term "United States" is assumed to appear before the word "Government" whenever the latter word appears in this contract, except where the word
"Government" refers to a different named Government.
1.2 AUTHORITY
Except as noted below, the term "Contracting Officer" (CO) as used in this specification includes the authorized representative of the CO acting within the limits of his/her authority. With respect to all paragraphs of the specifications citing "approval by the CO" and all paragraphs cited in
Material Approval Submittals, of the solicitation, the term "Contracting
Officer" means only those individuals properly appointed as a Contracting
Officer within the Contracting Squadron; no other Government personnel has the authority to grant such approval. This includes the Contracting
Officer's Representative (COR). The COR has authority to review Material
Submittal packages and recommend approval by the CO. At the Final
Acceptance Inspection, the COR will perform the inspection and recommend acceptance or conditional acceptance to the CO.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:"
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work as approved by the CO. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 WORK AREA
The Contractor's personnel are restricted to the area of construction only.
Transiting of areas not in the contract is not permitted except as required in the performance of this contract. Contractor shall secure work site(s) during non-working hours.
Adequate outside security lighting shall be provided at the Contractor's temporary facilities. The Contractor shall be responsible for the security of its own equipment; in addition, the Contractor shall notify the
Section 01 11 00 Page 9 appropriate law enforcement agency requesting periodic security checks of the temporary project field office. Provide warning signs, hazardous communications, and other safety information in both Japanese and English, when non-English speaking personnel are in the area.
1.5 LOCATION OF UNDERGROUND FACILITIES
The Contractor shall obtain an Air Force (AF) Form 103 from Base Civil
Engineering. This form will be approved/signed and utilities will be marked one time by the Government. The Contractor shall be responsible for maintaining these markings.
1.5.1 Notification Prior to Excavation
Notify the CO at least 48 hours prior to starting excavation work.
1.5.2 Excavation
a. Permits: The Contractor shall obtain an excavation permit before any excavation is started. The form(s) and the offices to be contacted will be provided by 35 CES/CENM project inspector and the
Contractor is responsible for obtaining the required coordination.
Those areas which are known to contain underground utility lines will be designated as caution areas. The Contractor must exercise extreme caution when accomplishing the required excavation work.
Hand excavation is required within 914.4 millimeters (mm) of existing utility lines. The Government reserves the right to repair all utility lines damaged by the Contractor at the expense of the Contractor.
b. Open Trenches: The Contractor shall rope off/barricade all open trenches in accordance with standard construction procedures, to include hazardous/warning signs.
c. Restoration: The Contractor shall restore all excavated areas to their original condition, to include backfill, original compaction, sodding, and scrubbings. New/replacement sod shall be placed edge-to-edge and staggered, unless otherwise shown or indicated.
1.6 WORKMANSHIP
a. Materials shall be installed in accordance with the approved recommendations of the manufacturer. The installation shall be accomplished by workmen skilled in this type of work.
b. Sufficient precautions shall be taken during the construction to protect all personnel from injury and to prevent damage of the
Government-owned materials and equipment. The Contractor shall replace damaged Government properties caused by this project with new materials or equipment without additional cost to the
Government. The work shall proceed in such a manner as to minimize the spread of dust and flying particles.
c. Demolition and Salvage: Materials to be removed shall be removed carefully so as not to damage material which is to remain or material which is deemed salvageable material. Sufficient safety precautions shall be taken to protect all personnel from injury.
Section 01 11 00 Page 10
All items to be removed shall be disposed of off base by the
Contractor in an approved dumping area in accordance with local laws and regulations. Contractor shall restore all damaged surfaces and openings as a result of work under this contract to match new and/or existing adjacent surfaces unless otherwise specified or shown.
1.7 DELIVERY AND STORAGE
Equipment and materials shall be properly stored, adequately protected, and carefully handled to prevent damage before and during installation.
Equipment and materials shall be handled, stored, and protected in accordance with the manufacturer's recommendations and as approved by the
CO. Damaged or defective materials and equipment shall be replaced with new materials and equipment at no cost to the Government.
1.8 STANDARD PRODUCTS
Materials and equipment shall be essentially the standard cataloged products of manufacturers regularly engaged in production design that complies with the specification requirements. Materials and equipment shall essentially duplicate items that have been in satisfactory commercial or industrial use at least two years prior to the date for receipt of proposals. Where two or more units of the same type and class are required, these units shall be products of a single manufacturer.
1.9 MANUFACTURER'S RECOMMENDATIONS
Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the CO prior to installation. Installation of the item(s) will not be allowed to proceed until the recommendations are received and approved by the CO. Failure to furnish these recommendations can be cause for rejection of the material.
1.10 WELDING
Welding shall be in accordance with qualified procedures using performance-qualified welders and welding operators. Welders shall be qualified using procedures in accordance with AWS D1.1 - 1998, JIS Z 3801 (1997), STANDARD
QUALIFICATIONS PROCEDURE FOR MANUAL WELDING TECHNIQUE.
1.11 COMMUNICATIONS
The Contractor shall work through the Base project manager and must notify
CS/SCSP through the Contracting Officer's Representative at least 72 hours in advance to have communication lines staked. Any properly identified communication lines damaged by the Contractor's work shall be repaired by
Japanese Government licensed communication lineman at the Contractor's expense. The repair action must meet USG or local Nippon Telephone
Telegraph (NTT) standards. The Government reserves the right to repair all
Contractor-damaged communications lines and deduct the repair cost from the contract.
Existing cables shall be uncovered by hand digging. Extreme care shall be used during digging to avoid penetrating or otherwise damaging the cable
Section 01 11 00 Page 11 insulation. Power digging equipment shall be used for extensions only in the direction away from buried cables. Communication utilities will be identified electrically by the 35th Communications Squadron, Cable
Maintenance Work Center. Utilities will be identified in accordance with acquisition of the building permit. In the event that changed conditions result, it is incumbent upon the Contractor to seek changed conditions through the Contract Office, 35 CONS/LGCC (Base Contracting Officer).
If a communications cable must be moved, it shall be coordinated through the
COR and a government cable technician will advise on the best way to relocate it. The Contractor shall relocate the cable as directed. If the required relocation is not indicated in the contract drawings and specifications, relocation is subject to approval via changed conditions to the basic contract.
Refer to drawings for required action for Cable TV Equipment attached to exterior.
1.12 INTERPRETER
The Contractor shall have an English-speaking representative at all job sites at all times during the performance of work under this contract.
Failure to provide such representative could result in the Contractor's work being stopped at his/her expense until such time as one is provided.
1.13 FINAL INSPECTION
Final inspection will be conducted during the period of Monday through
Friday between 0800 hours and 1615 hours. The Government will perform the inspection after (a) written notification by the Contractor to the CO; or
(b) the contract completion dates, whichever comes first. Final inspections falling on weekends or U.S. legal holidays will be postponed to the following workday. The Contractor shall notify the Using Agency (35
CES/CENM) through the COR 14 days prior to the final inspection.
1.14 NOTIFICATION BEFORE STARTING ON-SITE WORK
The Contractor shall notify the CO a minimum of seven calendar days prior to starting on-site work.
1.15 PREPARATION OF MATERIAL APPROVAL SUBMITTALS
See Submittal Register after Section 01 33 00 SUBMITTAL PROCEDURES for listing of submittals. Copies of manufacturer data sheets and catalog cuts shall accompany each submittal.
1.16 JAPANESE INDUSTRIAL STANDARDS
Where materials or equipment are specified to conform to U.S. Standards from organizations such as the American National Standards Institute (ANSI), American Society for Testing Materials (ASTM), National Electrical
Manufacturers Association (NEMA), Underwriters laboratory Inc. (UL) or other
U.S. Standards and organizations, material or equipment that meets an equivalent Japanese Industrial Standard (JIS) may be substituted. It is the responsibility of the Contractor to provide all documentation required to prove the Japanese Industrial Standard is equivalent or more stringent than the U.S. Standard. All substituted material or equipment meeting an
../Word/01%2033%2000.doc
Section 01 11 00 Page 12 equivalent Japanese Industrial Standard (JIS) shall be submitted by the
Contractor to the Contracting Officer for review and approval for compliance to the U.S. Standards prior to its use on the Project. If the Government requires, the Contractor shall provide an English language copy of the referenced standard to the Government for its consideration.
1.17 DRAWINGS AND SPECIFICATIONS AT THE SITE
The Contractor shall maintain in good condition one copy of all drawings, specifications, addenda, modifications, approved shop drawings, Material
Safety Data Sheets (MSDS), and other related documents affecting the work at this site. Drawings and specifications shall be marked daily to record all changes during construction. These documents shall be made available to the
COR during construction and shall be made available on request and be delivered to the CO upon completion of the work.
1.18 USE OF EXPLOSIVES
The use of explosives is not permitted on Government installations.
1.19 BARRICADES
The Contractor shall provide barriers/signs to keep unauthorized persons from entering working area(s). Such barricades shall be required whenever safe public access to paved areas, such as roads, parking areas, or sidewalks, is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic.
Necessary bilingual warning signs shall be provided by the Contractor and shall be used in the area where construction is undertaken. The Contractor shall protect open excavations with barricades and battery-powered lights at night as warning lights and shall assure that these lights are continuously operated. Warning signs and battery-powered lights shall be removed only after the affected area(s) has been inspected and accepted as directed by the CO.
1.20 CLEANUP OF AREA
All Contractor-generated debris and rubbish shall be collected daily in a container that can be covered at the end of the day once the container is filled with trash.
1.21 DEBRIS AND RUBBISH CONTROL
For removal and transport of debris and rubbish, use only roadway(s) and/or street(s) designated by the COR. Remove and transport debris and rubbish in a manner so as to prevent spillage on streets or adjacent area(s).
Contractor shall be responsible for cleanup for any spills on roadways,…