FA520517R00040001_Atch1_Addendum_No._1.pdf

PDF 589 KB Posted

Attached to
Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
Solicitation number
FA5205-17-R-0004
Issued by

About this file

FA520517R00040001_Atch1_Addendum No. 1

View the file

Other files

File Type Posted
FA520517R00040005_Amendment.pdf PDF
FA520517R00040005_Atch3.pdf PDF
FA520517R00040005_Atch1.pdf PDF
FA520517R00040005_Atch4.pdf PDF
FA520517R00040005_Atch7.pdf PDF
FA520517R00040005_Atch6.pdf PDF
FA520517R00040005_Atch2.pdf PDF
FA520517R00040005_Atch5.pdf PDF
FA520517R00040004_Atch4.pdf PDF
FA520517R00040004_Amendment.pdf PDF
FA520517R00040004_Atch3-4.pdf PDF
FA520517R00040004_Atch3-3.pdf PDF
FA520517R00040004_Atch5.pdf PDF
FA520517R00040004_Atch1.pdf PDF
FA520517R00040004_Atch2.pdf PDF
FA520517R00040004_Atch3-5.pdf PDF
FA520517R00040004_Atch3-2.pdf PDF
FA520517R00040004_Atch3-1.pdf PDF
FA520517R00040003_Atch1.pdf PDF
FA520517R00040003_Atch2.pdf PDF
FA520517R00040003_Amendment.pdf PDF
FA520517R00040002_Amendment.pdf PDF
FA520517R00040002_Atch.pdf PDF
FA520517R00040001_Atch2_Revised_Specification_Section.pdf PDF
FA520517R00040001_Amendment.pdf PDF
FA520517R00040001_Atch4_Revised_Solicitation_Page.pdf PDF
FA520517R00040001_Atch3_Revised_Drawings.pdf PDF
FA520517R0004_PreProposal_Conference_Minutes_&_Record_of_Site_Visit.pdf PDF
FA520517R0004_Atch2_Drawings_8_Electrical.pdf PDF
FA520517R0004_Atch2_Drawings_6_Plumbing.pdf PDF
FA520517R0004_Atch10_Asbestos_Sampling_and_Analysis.pdf PDF
FA520517R0004_Atch2_Drawings_3_Structural.pdf PDF
FA520517R0004_Atch2_Drawings_2_Hazmat.pdf PDF
FA520517R0004_Atch2_Drawings_5_Mechanical.pdf PDF
FA520517R0004_Atch4_PPQ_Cvr_Ltr.pdf PDF
FA520517R0004_Solicitation.pdf PDF
FA520517R0004_Atch8_Acceptable_JPN_Product_Substitutes.pdf PDF
FA520517R0004_Atch2_Drawings_7_Controls.pdf PDF
FA520517R0004_Atch2_Drawings_4_Architectural.pdf PDF
FA520517R0004_Atch9_Mfr's_Cut_Sheet_Catalog_Info.pdf PDF
FA520517R0004_Atch2_Drawings_1_General.pdf PDF
FA520517R0004_Atch3_Other_Contract_Requirements.pdf PDF
FA520517R0004_Atch1_Specifications.pdf PDF
FA520517R0004_Atch6_Construction_Timeline.pdf PDF
FA520517R0004_Atch5_PPQ.pdf PDF
FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM No. 1

FOR

PROJECT QKKA 15-4008

IMPROVE MILITARY FAMILY HOUSING PHASE 3

A/C & WEATHERIZATION

MISAWA AB, JAPAN

2 May 17

The project scope of work is amended to provide the following changes:

1. Specification: Section 02 82 14.00 10

a. Paragraph 1.1

Insert

Roudou-Anzen-Eisei-Hou

Ishiwata-Shougai-Yobou Kisoku 3 Preliminary Survey

Ishiwata-Shougai-Yobou Kisoku 4 Work Plan

Roudou-Anzen-Eisei-Hou 88 Construction Plan Notification

Ishiwata-Shougai-Yobou Kisoku 6 Asbestos Leakage Prevention Control

Taikiosen-Bousi-Hou

Haikibutsushori-Hou

b. Paragraph 1.2.5

Add the below to the end of the paragraph.

“or comply with Roudo-Anzen Eisei Hou.”

c. Paragraph 1.2.6

“or comply with Roudo-Anzen Eisei Hou.”

d. Paragraph 1.2.12

Atch. 1 to FA520517R00040001

“or Taiki-Osen Boushi Hou.”

e. Paragraph 1.2.19

“or Ishiwata-sagyou-shuninn sha must train to all of Asbestos workers.”

f. Paragraph 1.5.1

“or comply with Roudou-Anzen Eisei Hou, Taiki-Osen-Boushi-Hou, Haikibutsu-Shori-Hou, Kensetsu-Re-cycle-Hou and Aomori Prefecture Jourei.”

g. Paragraph 1.5.2.d

“or Kankyou keiryou-shi.”

h. Paragraph 1.5.2.e

“or comply with Roudo-Anzen-Eisei Hou.”

2. Drawings

a. Drawing 4P1-H-101 (to be renamed to 4P1-H-101a): TYPE 4P1-3 bedroom

i) 1 a: MINI-COMTAINMENT OPERATION:

Delete all.

ii) 1 b: GLOVE BAG OPERATION:

a. Delete “AND CRITICAL BARRIERS MUST BE INSTALLED” from 2nd-3rd row in

2nd block.

b. Add the following to the end of this description

(A) HEPA VACCUM

(B) HALF-MASK PURIFYING W/HEPA FILTERS RESPIRATOR

(C) PROTECTING CLOSING

iii) 1 c: GENERAL HAZMAT NOTES:

a. Paragraph 1: Delete “EITHER MINI CONTAINMENTS” and “OR BOTH”.

b. Paragraph 2: Delete “REFER TO MINI-CONTAINMENT AND”.

b. Drawing 4P3-H-101 (to be renamed to 4P3-H-101a): TYPE 4P3-3 bedroom

i) 1 a: GENERAL HAMAT NOTES:

c. Drawing 6P1-H-101 (to be renamed to 6P1-H-101a): TYPE 6P1-4 bedroom

i) 1 a: GENERAL HAZMAT NOTES:

d. Drawing 7P2-H-101 (to be renamed to 7P2-H-101a): TYPE 7P2-4 bedroom

e. Drawing 8N-H-101 (to be renamed to 8N-H-101a): TYPE 8N-3 bedroom

f. Drawing 10N-H-101 (to be renamed to 10N-H-101a): TYPE 10N-3 bedroom

i) 1 a: Details of 1, 2 and 3/10N-H-101:

Delete the symbols of “A” and “C” with diamond.

ii) 1 b: KETNOTES A:

Keynote “A” is not applied to tower 116.

iii) 1 c: KETNOTES B:

Keynote “B” is revised inserting “WALL” before BOARD, and “(NOT CEILING) after

BOARD in 1st line.

iv) 1 d: KETNOTES C:

Keynote “C” is not applied to tower 116.

v) 1 e: GENERAL HAZMAT NOTES:

g. Drawing 15N-H-101 (to be renamed to 15N-H-101a): TYPE 15N-2 bedroom

h. Drawing 12N-H-101 (to be renamed to 12N-H-101a): TYPE 12N-3 bedroom

i. Drawing 16N-H-101 (to be renamed to 16N-H-101a): TYPE 16N-4 bedroom

j. Drawing 16ND-H-101 (to be renamed to 16ND-H-101a): TYPE 16ND-4 bedroom

Attachments:

1. Revised Spec Section 02 82 14.00 10

2. Revised 4P1-H-101a

3. Revised 4P3-H-101a

4. Revised 6P1-H-101a

5. Revised 7P2-H-101a

6. Revised 8N-H-101a

7. Revised 10N-H-101a

8. Revised 15N-H-101a

9. Revised 12N-H-101a

10. Revised 16N-H-101a

11. Revised 16ND-H-101a

File details come from the government source that posted it. Updated .