FA520517R00040004_Atch3-3.pdf
PDF 3 MB Posted
- Attached to
- Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
- Solicitation number
- FA5205-17-R-0004
About this file
FA520517R00040004_Atch3-3
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X0 X1 X2 X3 X4
X0X1X2X3X4 C
D
C D
2 2
Y3 Y2 Y1 Y0
C D
Y3Y2Y1Y0
C D
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
TT
W
KEY PLAN
MAIN BASE
15N-MH102
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
5N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 15N - 2 BEDROOM - HVAC ELEVATIONS
15N-MH102 15N-MH102 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 15N - 2 BEDROOM - HVAC ELEVATIONS
15N-MH102 15N-MH102 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 170, 171, 174,
AND 175.
TT
W
5-
-1
A D
D E
N D
U M
Atch. 3 to FA520517R00040004 devnic Polygon devnic Polygon devnic Polygon devnic Polygon
C
D
C D
Y3 Y2 Y1 Y0
C D
Y3Y2Y1Y0
C D
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
TT
W
KEY PLAN
MAIN BASE
12N-MH102
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
2N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH102 12N-MH102 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH102 12N-MH102 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 166, 168, 169,
863, 864, 865, 866, 871, 882, 884, AND 886.
TT
W
5-
-1
A D
D E
N D
U M
SHEET 106 of 247
C D
C D
Y3 Y2 Y1 Y0
C D
Y3Y2Y1Y0
C D
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
TT
W
KEY PLAN
MAIN BASE
12N-MH103
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
2N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH103 12N-MH103 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH103 12N-MH103 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 870, 872, 873,
876, 877, 879, 880, 881, AND 893
TT
W
5-
-1
A D
D E
N D
U M
C D
C D
Y3 Y2 Y1 Y0
C D
Y3Y2Y1Y0
C D
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
TT
W
KEY PLAN
MAIN BASE
12N-MH104
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
2N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH104 12N-MH104 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH104 12N-MH104 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 878.
TT
W
5-
-1
A D
D E
N D
U M
C D
C D
2 2
Y3 Y2 Y1 Y0
C D
Y3Y2Y1Y0
C D
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
TT
W
KEY PLAN
MAIN BASE
ADD 2-1
12N-MH105
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
2N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH105 12N-MH105 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH105 12N-MH105 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 109, 111, 113,
114, 120, 121, 122, 131, 133, 135, 137, 139, 150, 153, 155, 156, 157, 223, 225, 226, 235, 237, 239, 241, 243, 251, 253, & 255
TT
W
5-
-1
A D
D E
N D
U M devnic Polygon devnic Polygon devnic Polygon devnic Polygon devnic Polygon nelkar
C D
C D
2 2
Y3 Y2 Y1 Y0
C D
Y3Y2Y1Y0
C D
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
TT
W
KEY PLAN
MAIN BASE
12N-MH106
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
2N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH106 12N-MH106 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 12N - 3 BEDROOM - HVAC ELEVATIONS
12N-MH106 12N-MH106 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 245, 247, 249,
252, & 257
TT
W
5-
-1
A D
D E
N D
U M
ADD 2-2
devnic Polygon devnic Polygon devnic Polygon devnic Polygon devnic Polygon
C D
C D
C D
C D
X0X1X2X3X4
CDCD
Y2 Y1 Y0
C D
Y2Y1Y0
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
KEY PLAN
MAIN BASE
16N-MH102
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
TY
P
E
6N
B
E D
R O
O M
H
V A
C E
LE
V
A
TI
O N
S
SCALE: 1:100
0 2000 4000
TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
16N-MH102 16N-MH102 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
16N-MH102 16N-MH102 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDINGS 162, AND 701.
5-
-1
TT
W
A D
D E
N D
U M
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
D
C D
C D
C D
X0X1X2X3X4
CDCD
Y2 Y1 Y0
C D
Y2Y1Y0
SHEET
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
A L
I N
T E
G R
A T
E D
T
E R
P R
I S
E S
M
A Y
F A
R
O A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
T
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
S
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
A
W
A
T H
E R
I Z
A T
I O
N
P D
C
Q
K K
A
M I S
A W
A
A
B
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U S
A
F
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
I M
P R
O V
E
M
I L
I T
A R
Y
F
A M
I L
Y
H
O U
S I N
G
P
H A
T I M
O T
H Y
W
E N
D T
KEY PLAN
MAIN BASE
16N-MH103
C T
S T
T W
A N
D R
J
B
A C
K E
S
T Y
P
B
E D
R O
M
V A
C
E
L E
V A
T I O
N S
SCALE: 1:100
0 2000 4000
TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
16N-MH103 16N-MH103 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION
SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT
AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS
PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
16N-MH103 16N-MH103 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 53.
W A
D D
E N
D U
M
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0 devnic Polygon devnic Polygon devnic Polygon devnic Polygon
D
C D
C D
C D
X0X1X2X3X4
CDCD
Y2 Y1 Y0
C D
Y2Y1Y0
SHEET
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
A
A
T H
E R
I Z
A T
I O
N
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
I M
P R
O V
E
M
I L
I T
A R
Y
F
A M
I L
Y
H
O U
S I N
G
P
H A
T I M
O T
W
E N
D T
KEY PLAN
MAIN BASE
ADD 2-03
16N-MH104
C T
S T
T W
A N
D R
B
A C
K E
S
T Y
B
E D
R O
V A
C
E
L E
V A
T I O
N S
SCALE: 1:100
0 2000 4000
TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
16N-MH104 16N-MH104 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION
SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT
AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS
PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 16N - 4 BEDROOM - HVAC ELEVATIONS
16N-MH104 16N-MH104 SCALE: 1:100
BUILDING LEGEND
ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 41, 43, 44, 45, AND 47
W A
D D
E N
D U
M
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0 devnic Polygon devnic Polygon devnic Polygon devnic Polygon devnic Polygon devnic Polygon
X0 X1 X2
X0X1X2
CD
Y2 Y1 Y0
C D
Y2Y1Y0
SHEET
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
A
A
T H
E R
I Z
A T
I O
N
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
I M
P R
O V
E
M
I L
I T
A R
Y
F
A M
I L
Y
H
O U
S I N
G
P
H A
T I M
O T
W
E N
D T
A D
D E
N D
U
W
KEY PLAN
MAIN BASE
16ND-MH102
C T
S T
T W
A N
D R
B
A C
K E
S
T Y
N
D
B
E D
R O
V A
C
E
L E
V A
T I O
N S
SCALE: 1:100
0 2000 4000
TYPE 16ND - 4 BEDROOM - HVAC ELEVATIONS
16ND-MH102 16ND-MH102 SCALE: 1:100
GENERAL ELEVATION NOTES:
1. KEY PLAN IS INTENDED TO SHOW ALL BUILDINGS WHICH CORRESPOND WITH UNIT TYPE. REFER TO
G-022 TO LOCATE INDIVIDUAL BUILDINGS.
2. REFER TO ARCHITECTURAL DETAILS FOR HEAT PUMP AWNING CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR APPLICABLE AWNING TYPE. ALL HEAT PUMPS SHALL BE PROVIDED
WITH AWNING.
3. ELEVATION VIEW ON MH102 IS TYPICAL, UNLESS OTHERWISE NOTED ON SUBSEQUENT ELEVATION
SHEETS FOR CORRESPONDING UNIT TYPE. PROVIDE NEW HEAT PUMP AIR COOLED CONDENSING UNIT
AS SHOWN. PROVIDE CLEAR SPACE AROUND UNIT PER MANUFACTURER'S INSTRUCTIONS. WIRE TO NEW
EMCS SYSTEM.
4. PROVIDE ALL NECESSARY PIPING, WIRING, DDC CONTROLS AND SUPPORTS FOR INDOOR HEAT PUMPS
AS RECOMMENDED BY EQUIPMENT MANUFACTURER.
5. ELEVATIONS ARE FOR REFERENCE ONLY. CONTRACTOR SHALL COMPLETE A SURVEY FOR ALL UNITS
PRIOR TO GENERATING SHOP DRAWINGS. CONTRACTOR SHALL COORDINATE WITH BASE CONTRACTING
OFFICER SUCH THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.
6. ROUTE RP AND CD IN EXTERIOR PRE-MANUFACTURED PLASTIC ENCLOSURE WHERE PIPING IS SHOWN
ON BUILDING EXTERIOR.
7. CONTRACTOR SHALL IDENTIFY INSTANCES WHERE PIPE ROUTING DIFFERS FROM CONSULTANT
DRAWINGS DURING SHOP DRAWING/INSTALLATION DRAWING CONTRACTOR SUBMITTAL FOR
GOVERNMENT APPROVAL.
8. ELECTRICAL AND CONTROL DEVICES ARE SHOWN FOR REFERENCE ONLY - REFER TO ELECTRICAL AND
EMCS DRAWINGS FOR EXACT LOCATION AND INSTALLATION REQUIREMENTS.
SCALE: 1:100
0 2000 4000
TYPE 16ND - 4 BEDROOM - HVAC ELEVATIONS
16ND-MH102 16ND-MH102 SCALE: 1:100
BUILDING LEGEND
1. ELEVATION VIEWS SHOWN HEREIN APPLY TO BUILDING 51.
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0
AutoCAD SHX Text
GRADE
AutoCAD SHX Text 0.0
AutoCAD SHX Text
FLOOR 1
AutoCAD SHX Text 500.0
AutoCAD SHX Text
FLOOR 2
AutoCAD SHX Text 3750.0
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 6900.0 devnic Polygon devnic Polygon devnic Polygon
FILL W/FIRE
RATED FOAM
INSULATION
21mm FLEXIBLE
POWER CONDUIT
75mm RP BUNDLE W/
FOAM INSULATION
SECTION A-A
CONCRETE WALL
CONDENSATE DRAIN
LINE, INSULATE PER
SPECIFICATIONS
INTERIOR SIDE OF
BUILDING WALL
SECTION 1
SHEETROCK
FURRING STRIP
150mmø CORE DRILLED
WALL PENETRATION
25mm MIN CD W/
FOAM INSULATION
REFRIGERANT LINES,
INSULATE PER
SPECIFICATIONS
OFFSET FLEX
CONDUIT IN FURRED
SPACE
FILL SPACE W/
FIRE RATED
FOAM INSULATION
25mm Ø CONDENSATE DRAIN, ROUTE TO ABOVE GRADE
FLEXIBLE POWER AND
CONTROL CONDUIT
RP BUNDLE
A
A
21mm FLEXIBLE
CONTROL CONDUIT
CAULK WEATHERTIGHT
ESCUTHEAN PLATE AT
INTERIOR PENETRATION
ALL PIPING ON EXTERIOR OF
BUILDING SHALL BE COVERED
WITH PRE-FABRICATED LINE-HIDE
PIPING COVER SYSTEM
GRADE
EXTERIOR 4-PLEX
WALL
150mm MIN
FROM WALL
600mm MIN
ABOVE GRADE
25mm MIN
CLEARANCE
BOTH SIDES OF
UNIT
HEAT PUMP
UNIT
ANGLE
SUPPORT
75mm REFRIGERANT PIPING
(RP) BUNDLE TO FAN COIL
UNITS, INSULATE PER
SPECIFICATIONS
NOTES:
MAINTAIN 1 METER CLEARANCE IN FRONT OF UNIT.
SEE PLANS AND CONFIGURATIONS SHEET, M-502, FOR PIPING TO FAN COIL UNITS.
SEE PLANS AND OUTDOOR EQUIPMENT MATRIX SHEET, M-602, FOR LOCATION
ON BUILDING.
PROVIDE METAL AIR OULET GUIDE ON HP.
1.
2.
3.
4.
SIDE AIR INTAKE
SERVICE PANEL
ATTACH ANGLE SUPPORTS
TO WALL W/ SSTL ANCHOR
BOLTS & WASHERS
USE 13mm THICK x 50mm WIDE x 460mm LONG NEOPRENE
VIBRATION ISOLATION PADS
W/ SSTL BOLTS, NUTS, &
WASHERS TO ATTACH HP UNIT
TO ANGLE SUPPORTS
CANOPY ROOF
SEE ARCHITECTURAL
DETAILS
EXTERIOR
WALL
PRIVACY
WING WALL "CORE-DRILL" CONCRETE SPLASH
BLOCK BY MECHANICAL CONTRACTOR.
RE-USE WALL "CORE-DRILL" REMAINS
AS SPLASH BLOCK
GRADE
25mm Ø CONDENSATE DRAIN
LINE, PLACE SSTL CLAMP
SUPPORTS 600mm ON CENTER.
PAINT TO MATCH EXTERIOR
SURFACE
300mm MAX
FURNISH AND INSTALL SST METAL
MESH AND PVC SLEEVE AT END OF
CONDENSATE DRAIN PIPING AS ANT
BARRIER (SEE DETAIL)
STAINLESS STEEL PIPE
COVER 1.59mm THICK
1000mm
SPLASH BLOCKCONCRETE
PATIO SLAB
250mm
ATTACH TO WING
WALL WITH STAINLESS
STEEL ANCHORS.
EXTERIOR
WALL
25mm Ø CONDENSATE DRAIN
LINE, PLACE SSTL CLAMP
SUPPORTS 1000mm ON CENTER.
PAINT TO MATCH EXTERIOR
SURFACE
GRADE
150mm MAX
"CORE-DRILL" CONCRETE SPLASH
BLOCK BY MECHANICAL CONTRACTOR.
RE-USE 6"Ø WALL "CORE-DRILL"
REMAINS AS SPLASH BLOCK
FURNISH AND INSTALL SST METAL
MESH AND PVC SLEEVE AT END OF
CONDENSATE DRAIN PIPING AS ANT
BARRIER
CD PIPE WILL NOT DELIVER WATER DIRECTLY
TO THE PATIO SURFACE. EXTEND HORIZONTAL
CD PIPE AS REQUIRED
OUTDOOR UNIT
4.
9.
.7
.8
9.
.7
.8
55060140 60 140
403059.5
30 59.5
OUTDOOR UNIT
55060140 60 140
950 5015
SUS Ø38x1.5
SUS M8x20
SUS L-30x30x4
SUS M8x20
SUS M8x75
SUS Ø38x1.5
33050 78.7 52.3 20
130 250
181.1 118.9
50 28.7
280 100 101
60 40
28.7 72.3
.8
.7
9.
M
IN
(4
M A
X
330 5078.752.320
130250
181.1118.9
5028.7
280100101
28.772.3
.8
.7
9.
M
IN
(4
M A
X
N.T.S.M-501
WALL PENETRATION DETAIL2
N.T.S.M-501
4-PLEX HEAT PUMP UNIT DETAIL3
N.T.S.M-501
CONDENSATE DRAIN AT WING WALL DETAIL5N.T.S.M-501
SPLASH BLOCK DETAIL4
SHEET
SHEET
IDENTIFICATION
O N
E
ID
A T
O
TA
L
IN
TE
G
R A
TE
D
E N
TE
R
P R
IS
E
S
N
. M A
Y
FA
IR
R
O A
D S
U
IT
E
M
IL
W
A U
K E
E , W
I 5
FA
-0
8- D
-8
S O
L-
-B -N
U M
B
IS
O
A
/7
/1
D E
S
IG
N E
D B
Y
D W
N B
Y
C K
D B
Y
S O
LI
C
IT
A
TI
O
N N
O
D A
TE
C O
N
TR
A C
T N
O
D R
A W
IN
G
C O
D E
IS
S U
E D
A
TE
P
LO
T
S C
A
LE
S U
B M
IT
TE
D B
Y
FI
LE
N A
M E
S
IZ
E
A/ C
W
EA
TH
ER
IZ
AT
IO
N
P D
C
Q K
K A
-1
M
IS
A W
A A
IR
B
A S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R
IP
TI
O
N D
A
TE
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U .S
. A
IR
F O
R C
E C
IV
IL
E N
G
IN
E E
R S
Q U
A D
R O
N
A F-
2-
5-
/7
/1
Oneida Total Integrated Enterprises
IM
PR
OV
E
M
IL
IT
AR
Y
FA
M
IL
Y
HO
US
IN
G
PH
AS
E
3, TI
M
O
TH
Y T
. W E
N D
T
1:
C
TS
TT
W
A N
D R
E W
J . B
A C
K E
S
M E
C H
A N
IC
A
L D
E
TA
IL
S
N.T.S.M-501
DRAIN PAN DETAIL1
M-501
5-
-1
TT
W
A D
D E
N D
U M devnic Polygon devnic Polygon
N.T.S.M-503
DETAIL UNDER BALCONY
N.T.S.M-503
DETAIL UNDER BALCONY
REFRIGERANT PIPE MOUNTING
REFRIGERANT PIPE MOUNTING
STANDARD 1-5/8"
UNISTRUT CHANNEL
MITSUBISHI ELECTRIC
LINE-HIDE SPLIT LINE
TUBE CD-140
STANDARD 1-5/8"
UNISTRUT CHANNEL
MITSUBISHI ELECTRIC
LINE-HIDE SPLIT LINE
TUBE CD-140
N.T.S.M-503
HVAC PIPE COVER - ELEVATION
N.T.S.M-503
STL HVAC PIPE COVER
FIN FLR
PROVIDE CLEANOUT FOR COOLING
COIL CONDENSATE AT 150MM AFF
FIN CLG
REMOVABLE COVER WITH
CAM LOCKS
RP & CD PIPING AND
CONTROL WIRING
REFER TO
ARCHITECTURAL DETAILS
80 OR AS REQ'D
FOR NEW PIPIG
O
R
A
S
R
E Q
D
F O
R
N
P
I N
G
CD
RP
C D
R P
N.T.S.M-503
ANT PROTECTION AT CONDENSATE
DRAIN PIPINNG
INTERIOR PVC SLEEVE
50mm IN LENGTH
INTERIOR Ø: 25mm
EXTERIOR Ø: 38mm
EXTERIOR PVC SLEEVE
40mm IN LENGTH
INTERIOR Ø: 40mm
CONDENSATE
DRAIN PIPING
2 LAYERS STAINLESS STEEL
MESH 1 LAYER #20 1 LAYER #24.
ATTACH MESH TO INTERIOR
PVC SLEEVE. FIT EXTERIOR PVC
SLEEVE OVER INTERIOR PVC
SLEEVE AND MESH.
N.T.S.M-503
UNDERGROUND PIPING DETAIL
FREESTANDING HEAT PUMP
NOTES:
THIS DETAIL APPLIES ONLY WHERE ELECTRICAL AND CONTROL
WIRING IS SHOWN TRANSITIONING TO GROUND ON ELEVATIONS
(MH102 THRU MH106), WHERE EXISTING OBSTRUCTIONS PREVENT
MOUNTING OF LINE-HISE ENCLOSURE ON EXISTING WALLS.
1.
ELECTRICAL/CONTROL
REACEWAY
HEAT PUMP
DISCONNECT
ENCLOSURE
LINE-HIDE
PLASTIC
ENCLOSURE
EXISTING
OBSTRUCTION
SHEET
SHEET
IDENTIFICATION
O N
E I D
A
T
O T
T E
G R
A T
T
E R
P R
I S
E S
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
F A
D
S O
L
B
N
U M
B
I S
O
A
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
D R
A W
I N
G
C
O D
E
I S
S U
E
D
A T
E
P L
A
L E
S U
B M
I T
T E
D
B
Y
F I L
E
N
A M
E
S I Z
E
A
A
T H
E R
I Z
A T
I O
N
P D
C
Q
K K
A
M I S
A W
A
A
S
E
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N
D A
T E
A P
P R
THIS WORK WAS
PREPARED BY ME OR
UNDER MY SUPERVISION
FINAL DOCUMENTS
U S
A
R
C E
C I V
G
I N
E E
R
S
Q U
A D
R O
N
A F
Oneida Total Integrated Enterprises
I M
P R
O V
E
M
I L
I T
A R
Y
F
A M
I L
Y
H
O U
S I N
G
P
H A
T I M
O T
W
E N
D T
M-503
C T
S T
T W
A N
D R
B
A C
K E
S
M E
C H
A N
I C
A L
D
E T
A I L S
W A
D D
E N
D U
M
AutoCAD SHX Text 38 mm mm
AutoCAD SHX Text 20 mmmmm
AutoCAD SHX Text
AutoCAD SHX Text 25 mmmmm
AutoCAD SHX Text 15 mmmmm
AutoCAD SHX Text 40 mmmmm nelkar Polygon
| 103_15N-MH102 |
| 106_12N-MH102 |
| 107_12N-MH103 |
| 108_12N-MH104 |
| ADD2-1_12N-MH105 |
| ADD2-2_12N-MH106 |
| 111_16N-MH102 |
| 112_16N-MH103 |
| ADD2-3_16N-MH104 |
| 115_16ND-MH102 |
| 121_M-501 |
| 123_M-503 |
File details come from the government source that posted it. Updated .