FA520517R0004_Atch7_Schedule_of_Material_Submittals.pdf
PDF 323 KB Posted
- Attached to
- Improve Military Family Housing (IMFH) Phase III, A/C and Weatherization, Misawa Air Base, Japan
- Solicitation number
- FA5205-17-R-0004
About this file
FA520517R0004_Atch7_Schedule of Material Submittals
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 31 PAGES
QKKA154008
IMFH Phase 3 A/C & Weatherization
01 32 01.00 10 SD-01 Preconstruction Submittals
3.4 GProject Schedule
01 33 00 SD-01 Preconstruction Submittals
1.4Submittal Register
01 35 29 SD-01 Preconstruction Submittals
1.6 G AAccident Prevention Plan (APP)
1.7 G AActivity Hazard Analysis (AHA)
SD-06 Test Reports
1.11Reports
1.11.1Accident Reports
1.11.3Monthly Exposure Reports
SD-07 Certificates
1.8Hot work permit
3.5.3Machinery & Mechanized
Equipment Certification Form
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Atch. 7 to RFP No. FA520517R0004 Dated 7 Dec 16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
01 78 00 SD-10 Operation and Maintenance
Data
1.4.1 GEquipment/Product Warranty List
SD-11 Closeout Submittals
1.3.1 GAs-Built Drawings
1.3.3 GRecord Of Materials
1.3.2 GUtility As-Built Drawings
1.4.2 GEquipment/Product Warranty Tag
GHazardous Material Reporting
1.2 GCertification of EPA Designated
Items
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.11 GExisting Conditions
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.2 GReceipts
02 82 14.00 10 SD-01 Preconstruction Submittals
1.3.2Asbestos Sampling Plan
SD-02 Shop Drawings
1.3 GDetailed Drawings
SD-03 Product Data
3.6.3.1 GAsbestos Waste Shipment
Records
3.6.3.1 GWeight Bills and Delivery Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
02 82 14.00 10 2.1 GEncapsulants
1.8.1 GRespiratory Protection Program
3.6 GCleanup and Disposal
1.5.1 GQualifications
1.10 GTraining Program
1.7.1 GLicenses, Permits and
Notifications
3.6.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.4 GExposure Assessment and Air
Monitoring
1.8 GMedical Surveillance
Requirements
03 33 00 SD-02 Shop Drawings
1.4.1 GDetail Drawings
SD-03 Product Data
1.2.1 GReport Of Mix Proportion
Ready-Mixed Concrete
SD-04 Samples
2.1 GMaterials
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 GErection Drawings
SD-02 Shop Drawings
1.4.2 GFabrication drawings
SD-03 Product Data
2.1 GGalvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
05 12 00 2.5 GGalvanizing
2.4.1 GWelding electrodes and rods
2.4.2 GNon-Shrink Grout
2.3.3 GTension control bolts
SD-06 Test Reports
2.3 GBolts, nuts, and washers
3.6.1.2 GWeld Inspection Reports
SD-07 Certificates
2.2 GSteel
2.3 GBolts, nuts, and washers
1.4.3.1 GWelding Procedures and
Qualifications
07 14 00 SD-03 Product Data
2.1 GFluid-applied membrane
2.2 GMembrane primer
2.7 GElastomeric sheet
2.9 GFlexible foam-backed elastomeric
sheet
3.3 GSolvent
3.4.1 GMoisture meter
2.10 GProtection board
2.6 GBond breaker
SD-11 Closeout Submittals
1.6 GWarranty
3.6 GInformation Card
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
07 14 00 3.5 GInstructions To Government
Personnel
07 21 13 SD-02 Shop Drawings
2.1 GTaper Cants And Crickets
SD-03 Product Data
2.1 GBlock or board insulation
2.3 GPressure sensitive tape
2.5 GAccessories
2.5.2 GFasteners
2.4 GProtection Board
SD-08 Manufacturer’s Instructions
2.1 GBlock or Board Insulation
2.5.1 GAdhesive
07 41 13 SD-02 Shop Drawings
1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
SD-03 Product Data
2.1 GRoof panels
1.4.5 GFactory-Applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
2.6 GUnderlayments
2.7 GGaskets and Sealing/Insulating
Compounds
1.4.5 GAluminized Steel Repair Paint
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
07 41 13 2.1 GRoof Panels
1.4.5 GFactory-applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GGaskets and Sealant/Insulating
Compounds
SD-05 Design Data
1.2.1.2 GWind Uplift Resistance
SD-07 Certificates
2.1 GRoof Panels
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
1.4.5 GInstallation Manual
SD-09 Manufacturer’s Field
Reports
3.9.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 GWarranties
3.10 GInformation Card
07 60 00 SD-02 Shop Drawings
3.1.8 GEave flashing
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
07 84 00 2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2 GInspector Qualifications
2.2 GFirestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond breakers
2.4Backstops
08 11 16 SD-02 Shop Drawings
1.5.1 GDoors
2.1 GDoors
SD-04 Samples
1.5.2.1Finish sample
SD-05 Design Data
1.5.1 Gcalculations
SD-08 Manufacturer’s Instructions
1.5.1Doors
2.1Doors
08 53 00 SD-02 Shop Drawings
2.2.1 GWindows
2.2.1 GWindows
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
08 53 00 2.2.1 GWindows
2.4.5Fasteners
2.4.3Hardware
2.4.6Accessories
SD-04 Samples
2.2.1 GWindows
SD-06 Test Reports
2.2.1 GWindows
SD-10 Operation and Maintenance
Data
2.2.1 GWindows
08 81 00 SD-02 Shop Drawings
3.2Installation
SD-04 Samples
1.5.1Insulating Glass
2.3.3Tape
2.3.1.1Sealant
SD-07 Certificates
1.5.1Insulating Glass
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.3Glass Setting
08 87 13 SD-03 Product Data
2.2Sun-control and Heat Retention
Film
3.3Cleaning
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
08 87 13 SD-04 Samples
2.2 GSun-control and Heat Retention
Film
SD-06 Test Reports
2.2Sun-control and Heat Retention
Film
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data
2.1.1Gypsum Board
2.1.2Glass Mat Covered or Reinforced
Gypsum Sheathing
2.1.5Accessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-10 Operation and Maintenance
Data
3.6Waste Management
09 90 00 SD-02 Shop Drawings
3.7Piping identification
3.7stencil
SD-03 Product Data
2.1 GCoating
2.1.1Epoxy Coatings
2.1Manufacturer's Technical Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
09 90 00 3.2.4Sealant
SD-04 Samples
2.1 GColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions
3.3.1Application instructions
3.5.2Mixing
1.7.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
22 00 00 SD-02 Shop Drawings
3.6.1 GPlumbing System
SD-03 Product Data
3.6.1Plumbing System
22 07 19.00 40 SD-02 Shop Drawings
3.1Installation Drawings
SD-03 Product Data
Part 2Adhesives
Part 2Coatings
Part 2Insulation Materials
Part 2Jacketing
Part 2Tape
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
22 07 19.00 40 SD-08 Manufacturer’s Instructions
3.1Installation Manual
23 00 00 SD-02 Shop Drawings
1.4.5Detail Drawings
SD-03 Product Data
2.9.1.1Duct Connectors
2.9.2Manual Balancing Dampers
2.9.4.1Diffusers
2.9.4.2Registers and Grilles
SD-06 Test Reports
3.9Performance Tests
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.11.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
2.9.2Manual Balancing Dampers
23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2Record Drawings
1.2Connection Diagrams
1.2Coordination Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 05 15 3.1Installation Drawings
SD-03 Product Data
2.1Pipe and Fittings
2.2Piping Specialties
2.3Valves
2.4Miscellaneous Materials
2.5Supporting Elements
1.2Equipment Foundation Data
SD-05 Design Data
2.1Pipe and Fittings
SD-06 Test Reports
3.1Hydrostatic Tests
3.1Air Tests
3.1Valve-Operating Tests
3.1Drainage Tests
SD-10 Operation and Maintenance
Data
3.8Operation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2Installation Drawings
SD-03 Product Data
1.2Equipment and Performance
Data
2.3Isolators
23 05 93 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 05 93 1.3 GRecords of Existing Conditions
1.5.3.1 GTAB Firm
1.2 GTAB team assistants
1.2TAB team engineer
1.5.3.2 GTAB Specialist
1.2 GTAB team field leader
SD-02 Shop Drawings
1.2 GTAB Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.5.4 GTAB Execution
SD-06 Test Reports
3.5TAB Work Execution Schedule
3.5TAB Procedures Summary
1.7.3.1 GDesign review report
3.5 GDesign review report
1.5.5.1TAB Report for Season 1
3.5TAB Report for Season 1
1.5.5.1 GTAB Report for Season 2
3.5 GTAB Report for Season 2
SD-07 Certificates
1.5.1 GIndependent TAB agency and
personnel qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 05 93 3.5 GAdvance Notice of TAB Field
Work
3.5Completed Season 1 Pre-TAB
Work Checklist
3.5Completed Season 1 Pre-TAB
Work Checklist
1.7.1 GTAB Submittal and Work
Schedule
1.7.3 GTAB Submittal and Work
Schedule
1.7.3.1 GDesign review report
3.5 GDesign review report
1.7.3.2 GPre-field TAB engineering report
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
SD-08 Manufacturer’s Instructions
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning Plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 08 00.00 10 3.2.1 GPre-Functional Performance Test
Checklists
3.2.2 GFunctional Performance Tests
SD-06 Test Reports
3.3 GCommissioning Report
SD-07 Certificates
1.5.1 GCommissioning Firm
1.5.2 GCommissioning Specialist
23 09 23.13 20 SD-02 Shop Drawings
1.3.1.1 GControl System Drawings Title
Sheet
1.3.1.2 GList of I/O Points
1.3.1.3 GControl System Components List
1.3.1.4 GControl System Schematics
1.3.1.5 GHVAC Equipment Electrical
Ladder Diagrams
1.3.1.6 GComponent Wiring Diagrams
1.3.1.7 GTerminal Strip Diagrams
1.3.1.8 GBACnet Communication
Architecture Schematic
2.1.3.4 GEMCS Front-End Interface
Graphic Screens
2.1.3.4 GEnergy Dashboard Interface
Graphic Screen And Reporting
SD-03 Product Data
2.1.1 GDirect Digital Controllers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 09 23.13 20 2.1.2 GDDC Software
2.1.3 GBACnet Operator Workstation
2.1.4 GNotebook Computer
2.2 GSensors and Input Hardware
SD-05 Design Data
3.4.2 GPerformance Verification Testing
Plan
3.4.4 GPre-Performance Verification
Testing Checklist
SD-06 Test Reports
3.4.10 GPerformance Verification Testing
Report
SD-07 Certificates
1.5.6 GContractor's Qualifications
SD-09 Manufacturer’s Field
Reports
3.4.1 GPre-PVT Checklist
SD-10 Operation and Maintenance
Data
1.3 GBACnet Direct Digital Control
Systems
3.3 GControls System Operators
Manuals
SD-11 Closeout Submittals
3.5.1 GTraining Documentation
23 09 33.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 09 33.00 40 1.2.1Material, Equipment, and Fixture
Lists
1.2.1Records of Existing Conditions
SD-02 Shop Drawings
1.2.2Fabrication Drawings
3.1Installation Drawings
SD-03 Product Data
2.1Control Components
2.1.3Thermostats
2.2Stand-Alone Controller
2.3 GSensors
2.4Dampers
2.5Operators
SD-08 Manufacturer’s Instructions
1.2.2Operating Instructions
SD-10 Operation and Maintenance
Data
2.4Dampers
2.5Operators
2.1.3Thermostats
2.2Stand-Alone Controller
2.3Outside Air Sensors
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 23 00 1.5.2Spare Parts
1.3.1 GQualifications
3.5 GRefrigerant Piping Tests
3.4 GDemonstrations
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance
Data
1.5Maintenance
3.4Operation and Maintenance
Manuals
23 31 13.00 40 SD-01 Preconstruction Submittals
1.5Material, Equipment, and Fixture
Lists
1.5Records of Existing Conditions
SD-02 Shop Drawings
1.6Connection Diagrams
1.6Record Drawings
SD-03 Product Data
2.1.1Galvanized Steel Ductwork
Materials
2.1.2Mill-Rolled Reinforcing and
Supporting Materials
2.2.1Round Sheet Metal Duct Fittings
2.2.4Flexible Connectors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
23 31 13.00 40 2.2.8Gravity Backdraft and Relief
Dampers
2.2.7Manual Volume Dampers
23 82 02.00 10 SD-02 Shop Drawings
1.4 GDrawings
SD-03 Product Data
2.1.1Materials and Equipment
1.6Spare Parts
3.4Posted Instructions
3.1Verification of Dimensions
3.6System Performance Tests
3.4 GDemonstrations
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
3.6 GSystem Performance Tests
SD-10 Operation and Maintenance
Data
3.4Operation and Maintenance
Manuals
25 10 10 SD-02 Shop Drawings
1.10.2 GWiring Diagrams
1.10.1 GDetail Drawings
3.5 GAs-Built Drawings
SD-03 Product Data
2.5.3 GTurbine Flowmeters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
25 10 10 2.5.2 GTemperature Sensors
2.5.2 GPressure Transmitters
2.5.4 GVortex-Shedding Flowmeters
2.5.5 GUltrasonic Flowmeters
2.5.6 GMagnetic Flowmeters
SD-07 Certificates
1.11.2 GManufacturer Qualifications
1.11.2 GInstaller Qualifications
3.2 GBicsi Certification
SD-10 Operation and Maintenance
Data
1.11.1 GSoftware
1.11.1.2 GOperation And Maintenance Data
SD-11 Closeout Submittals
1.9.2 GPreventive Maintenance Work
Plan
26 05 19.00 10 SD-03 Product Data
3.1Installation Instructions
3.2.1Cable data
SD-06 Test Reports
3.2Tests, Inspections, and
Verifications
26 05 48.00 10 SD-02 Shop Drawings
1.3Equipment Requirements
SD-03 Product Data
1.3 GEquipment Requirements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
26 05 48.00 10 1.2.2 GContractor Designed Bracing
26 05 71.00 40 SD-01 Preconstruction Submittals
2.1 GConnection Diagrams
2.1 GFabrication Drawings
2.4 GFuses
SD-02 Shop Drawings
3.1 GControl Devices
3.1 GProtective Devices
SD-03 Product Data
2.2 GEnclosures
2.3 GCircuit Breakers
3.1 GControl Devices
SD-06 Test Reports
3.2 GFinal Test Reports
SD-07 Certificates
2.5 GCircuit Tests
SD-08 Manufacturer’s Instructions
3.1 GControl Devices
3.1 GProtective Devices
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
26 20 00 2.12 GPanelboards
3.1.6.1 GMarking strips
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.14 GCircuit breakers
2.9 GSwitches
2.15 GEnclosed circuit breakers
2.6.4.1 GGrounding Busbar
2.2Conduit And Fittings
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4 GGrounding system test
3.5.3 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 24 16.00 40 SD-02 Shop Drawings
2.1.1Detail Drawings
2.1.1Outline Drawings
SD-03 Product Data
1.3Panelboards
2.1.1Panelboards
2.1.3Directory Card and Holder
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
26 24 16.00 40 SD-06 Test Reports
3.2Continuity Tests
3.2Insulation Tests
SD-07 Certificates
1.4Statements
SD-08 Manufacturer’s Instructions
1.3Panelboards
2.1.1Panelboards
SD-11 Closeout Submittals
2.1.1Keys
27 10 00 SD-02 Shop Drawings
1.5.1.1 GTelecommunications drawings
1.5.1.2 GTelecommunications Space
Drawings
SD-03 Product Data
2.3 GTelecommunications cabling
2.4.3 GPatch panels
2.4.1 GEquipment support frame
3.1.5.1 GConnector blocks
1.9.3 GSpare Parts
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.5.2.1 GTelecommunications Contractor
1.5.2.2 GKey Personnel
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
27 10 00 1.5.2.3 GManufacturer Qualifications
1.5.3 GTest plan
SD-09 Manufacturer’s Field
Reports
2.9.1 GFactory reel tests
SD-10 Operation and Maintenance
Data
1.9.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.9.2 GRecord Documentation
27 21 10.00 40 SD-02 Shop Drawings
1.4.2.4 GFiber Optic System
3.1 GInstallation
SD-03 Product Data
1.4.2.4 GFiber Optic System
1.3.5 GSpare Parts
SD-07 Certificates
1.4.2.4 GFiber Optic System
SD-08 Manufacturer’s Instructions
3.1 GManufacturer's Instructions
SD-10 Operation and Maintenance
Data
3.3.2 GSystem Maintenance Training
Course
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
27 21 10.00 40 2.5.3.1Keys
28 05 26.00 40 SD-03 Product Data
1.3 GGrounding Systems
2.1.1 GGround Rods
2.1.2 GGround Wires
2.1.3 GConnectors and Fasteners
3.2.5 GBonding Materials
SD-06 Test Reports
3.3.1 GBond Resistance Test
3.3.2 GGround Resistance Tests
3.3.3 GGround Isolation Test
3.3.4 GContinuity Isolation Test
SD-08 Manufacturer’s Instructions
1.3 GGrounding Systems
SD-11 Closeout Submittals
3.4 GRecord Drawings
31 11 00 SD-03 Product Data
3.6.1 GNon-saleable Materials
SD-04 Samples
2.1 GTree Wound Paint
2.2 GHerbicide
31 23 00.00 20 SD-01 Preconstruction Submittals
1.7.1 GShoring and Sheeting Plan
1.7.2 GDewatering work plan
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
31 23 00.00 20 3.6 GBuried Warning And Identification
Tape
2.9 GDetection Wire For Non-Metallic
Piping
SD-04 Samples
2.6 GFilter Fabric
2.7 GGeogrid Reinforcement
SD-05 Design Data
2.3 GFlowable Fill
SD-06 Test Reports
1.6 GBorrow Site Testing
3.12.2.1 GFill and backfill
3.12.2.2 GSelect material
3.12.2.2 GSelect material
3.12.2.3 GDensity tests
2.2 GUtility Bedding Material
2.3 GFlowable Fill
2.5 GStructural Fill
2.6 GFilter Fabric
2.7 GGeogrid Reinforcement
SD-07 Certificates
2.7 GGeogrid Certificates Of
Compliance
31 41 16 SD-02 Shop Drawings
2.1 GMetal Sheet Piling
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
31 41 16 3.2.2.2Driving
3.2.1 GPile Driving Equipment
3.2.5 GPulling and Redriving
SD-06 Test Reports
2.3.1 GMaterials Tests
SD-11 Closeout Submittals
3.4 GPile Driving Record
31 63 29 SD-02 Shop Drawings
2.1.1 GDrilled Shaft Diameters
2.1.1 GDepth of Test Holes
2.1.1 GTop and Bottom of Shaft
Elevations
2.1.1 GSteel Reinforcement
2.1.1 GAccessories
SD-05 Design Data
2.1 GDrilled Shaft Foundation Design
Analysis
2.1 GMix Design Data
SD-06 Test Reports
3.3.1 GSoils Report
3.3.1 GGround Water Conditions
3.3.1 GLoad Test
3.3.1 GPenetration Test
3.3.1 GSlump
3.3.1 GConcrete
3.3.1 GCompressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
31 63 29 SD-07 Certificates
2.1 GBill of Lading for Ready-Mix
Concrete Deliveries
2.1.1 GSteel Reinforcement
1.4.6 GWelding Certificates
2.2.1 GExcavation and Drilling
Equipment
1.4.4 GQualifications of Excavator
1.4.5 GQualifications of Engineer
32 05 33 SD-01 Preconstruction Submittals
2.4 GIntegrated Pest Management
Plan
SD-03 Product Data
2.1 GFertilizer
2.2.1 GHose
2.3 GMulches Topdressing
2.3.2 GOrganic Mulch Materials
SD-05 Design Data
3.1 GTree Plan
SD-07 Certificates
3.4.1 GMaintenance inspection report
3.4.2 GPlant quantities
SD-10 Operation and Maintenance
Data
3.4.1 GMaintenance
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
32 05 33 3.4.3 GTree, staking and guying removal
32 11 16.16 SD-03 Product Data
2.1 GMaterials
SD-06 Test Reports
2.1 GBearing ratio
2.1 GLiquid limit
2.1 GPlasticity index
2.1 GDry weight
2.1 GPercentage of wear
3.4.2.1 GGradation tests
3.4.2.3 GDensity tests
SD-07 Certificates
2.2 GSource
32 11 24 SD-06 Test Reports
3.5.2.1 GGradation
3.5.2.1 GGradation
2.1.1 GBearing ratio
2.1.1 GLiquid limit
2.1.1 GPlasticity index
2.1.1 GPercentage of wear
2.1.1 GDry weight
3.5.2.3 GDensity
3.5.2.3 GDensity
3.5.2.2 GSmoothness
3.5.2.5 GThickness
32 12 10 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
32 12 10 3.7 GSampling and Testing
32 12 17 SD-05 Design Data
1.3.2 GJob-mix formula
2.2 GASPHALT CEMENT BINDER
2.3 GMIX DESIGN
SD-06 Test Reports
2.4.1 GSpecific gravity test of asphalt
2.4.1 GCoarse aggregate tests
2.4.1 GWeight of slag test
2.4.1 GPercent of crushed pieces in
gravel
2.4.1 GFine aggregate tests
2.4.1 GSpecific gravity of mineral filler
2.4.1 GBituminous mixture tests
3.5.2.1 GAggregates tests
3.5.2.2 GBituminous mix tests
3.5.2.3 GPavement courses
32 16 13 SD-03 Product Data
2.1 GConcrete
SD-06 Test Reports
3.8 GField Quality Control
32 92 23 SD-03 Product Data
2.4 GFertilizer
SD-06 Test Reports
2.2.3 GTopsoil composition tests
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 31 PAGES
IMFH Phase 3 A/C & Weatherization
32 92 23 2.1 Gsods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD